-
1
-
-
33748692510
-
Management and control of manufacturing cells based on theory of constrains
-
in Chinese
-
WANG Junqiang, SUN Shudong, WANG Dongcheng, et al. Management and control of manufacturing cells based on theory of constrains[J]. Computer Integrated Manufacturing Systems, 2006, 12(7): 1108-1116(in Chinese).
-
(2006)
Computer Integrated Manufacturing Systems
, vol.12
, Issue.7
, pp. 1108-1116
-
-
Wang, J.1
Sun, S.2
Wang, D.3
-
2
-
-
33646364087
-
Integrated production planning & control system based on drum-buffer-rope theory
-
in Chinese
-
GUO Yonghui, QIAN Xingsan. Integrated production planning & control system based on drum-buffer-rope theory[J]. Computer Integrated Manufacturing Systems, 2006, 12(2): 252-256(in Chinese).
-
(2006)
Computer Integrated Manufacturing Systems
, vol.12
, Issue.2
, pp. 252-256
-
-
Guo, Y.1
Qian, X.2
-
3
-
-
1342330563
-
A study of the utilization of capacity constrained resources in drum-buffer-rope systems
-
ATWATER J B, CHAKRAVORTY S S. A study of the utilization of capacity constrained resources in drum-buffer-rope systems[J]. Production and Operations Management, 2002, 11(2): 259-273.
-
(2002)
Production and Operations Management
, vol.11
, Issue.2
, pp. 259-273
-
-
Atwater, J.B.1
Chakravorty, S.S.2
-
5
-
-
67650532372
-
A survey of data-based production scheduling methods
-
in Chinese
-
LIU Min. A survey of data-based production scheduling methods[J]. Acta Automatica Sinica, 2009, 35(6): 785-806(in Chinese).
-
(2009)
Acta Automatica Sinica
, vol.35
, Issue.6
, pp. 785-806
-
-
Liu, M.1
-
6
-
-
34848819135
-
Modified bottleneck-based heuristic for large-scale job-shop scheduling problems with a single bottleneck
-
ZUO Yan, GU Hanyu, XI Yugeng. Modified bottleneck-based heuristic for large-scale job-shop scheduling problems with a single bottleneck[J]. Journal of Systems Engineering and Electronics, 2007, 18(3): 556-565.
-
(2007)
Journal of Systems Engineering and Electronics
, vol.18
, Issue.3
, pp. 556-565
-
-
Zuo, Y.1
Gu, H.2
Xi, Y.3
-
7
-
-
0032044994
-
On the role of a queueing network model in the design of a complex assembly system
-
ZHUANG L, WONG Y S, FUH J Y H, et al. On the role of a queueing network model in the design of a complex assembly system[J]. Robotics and Computer-Integrated Manufacturing, 1998, 14(2): 153-161.
-
(1998)
Robotics and Computer-Integrated Manufacturing
, vol.14
, Issue.2
, pp. 153-161
-
-
Zhuang, L.1
Wong, Y.S.2
Fuh, J.Y.H.3
-
8
-
-
34347265552
-
New TOC operational logic for product mix optimization decision
-
in Chinese
-
WANG Junqiang, SUN Shudong, YU Xiaoyi, et al. New TOC operational logic for product mix optimization decision[J]. Computer Integrated Manufacturing Systems, 2007, 13(5): 931-939(in Chinese).
-
(2007)
Computer Integrated Manufacturing Systems
, vol.13
, Issue.5
, pp. 931-939
-
-
Wang, J.1
Sun, S.2
Yu, X.3
-
9
-
-
0035708230
-
A pratical bottleneck detection method
-
Washington, D. C., USA: IEEE Computer Society
-
ROSER C, NAKANO M, TANAKA M. A pratical bottleneck detection method[C]//Proceedings of the 2001 Winter Simulation Conference. Washington, D. C., USA: IEEE Computer Society, 2001: 949-953.
-
(2001)
Proceedings of the 2001 Winter Simulation Conference
, pp. 949-953
-
-
Roser, C.1
Nakano, M.2
Tanaka, M.3
-
10
-
-
0036929040
-
Shifting bottleneck detection
-
San Diego, Cal., USA: Winter Simulation Conference
-
ROSER C, NAKANO M, TANAKA M. Shifting bottleneck detection[C]//Proceedings of the 2002 Winter Simulation Conference. San Diego, Cal., USA: Winter Simulation Conference, 2002: 1079-1086.
-
(2002)
Proceedings of the 2002 Winter Simulation Conference
, pp. 1079-1086
-
-
Roser, C.1
Nakano, M.2
Tanaka, M.3
-
11
-
-
79551628560
-
Machine bottleneck identification for Job Shop operation management
-
in Chinese
-
WANG Gang, WANG Junqiang, SUN Shudong, et al. Machine bottleneck identification for Job Shop operation management[J]. Mechanical Science and Technology for Aerospace Engineering, 2010, 29(12): 1697-1702(in Chinese).
-
(2010)
Mechanical Science and Technology for Aerospace Engineering
, vol.29
, Issue.12
, pp. 1697-1702
-
-
Wang, G.1
Wang, J.2
Sun, S.3
|