-
1
-
-
0036929040
-
Shifting bottleneck detection
-
San Diego, Chile, December 7-10
-
Roser C, Nakano M, Tanaka M. Shifting bottleneck detection [C]//Proceedings of the 2002 Winter Simulation Conference, San Diego, Chile, December 7-10, 2002: 1079-1086.
-
(2002)
Proceedings of the 2002 Winter Simulation Conference
, pp. 1079-1086
-
-
Roser, C.1
Nakano, M.2
Tanaka, M.3
-
2
-
-
33846650637
-
Appling discrete event simulation and an automated bottleneck analysis as an aid to detect running production constraints
-
Orlando, USA, December 4-7
-
Faget P, Eriksson U, Herrmana F. Appling discrete event simulation and an automated bottleneck analysis as an aid to detect running production constraints[C]//Proceeding of the 2005 Winter Simulation Conference, Orlando, USA, December 4-7, 2005: 1401-1407.
-
(2005)
Proceeding of the 2005 Winter Simulation Conference
, pp. 1401-1407
-
-
Faget, P.1
Eriksson, U.2
Herrmana, F.3
-
3
-
-
34547296610
-
A heuristic method for a flexible flow line with unrelated parallel machines problem
-
Chicago, USA, December 1-4
-
Chen Chun-Lung, Chen Chuen-Lung. A heuristic method for a flexible flow line with unrelated parallel machines problem[C]// 2006 IEEE Conference on Robotics, Automation and Mechatronics, Chicago, USA, December 1-4, 2006: 1-4.
-
(2006)
2006 IEEE Conference on Robotics, Automation and Mechatronics
, pp. 1-4
-
-
Chen, C.-L.1
Chen, C.-L.2
-
4
-
-
16644381187
-
Research on priority scheduling algorithm based on bottleneck analysis
-
(in Chinese)
-
Li Li, Cheng Ye, Yuan Shouhua. Research on priority scheduling algorithm based on bottleneck analysis[J]. Computer Integrated Manufacturing Systems, 2005, 12(11): 247-250. (in Chinese)
-
(2005)
Computer Integrated Manufacturing Systems
, vol.12
, Issue.11
, pp. 247-250
-
-
Li, L.1
Cheng, Y.2
Yuan, S.3
-
5
-
-
47849124586
-
Bottleneck detection of manufacturing systems using data driven method
-
Michigan, USA, July 22-25
-
Li Lin, Chang Qing, Ni Jun, et al. Bottleneck detection of manufacturing systems using data driven method [C]//Proceedings of the 2007 IEEE International Symposium on Assembly and Manufacturing, Michigan, USA, July 22-25, 2007: 22-25.
-
(2007)
Proceedings of the 2007 IEEE International Symposium on Assembly and Manufacturing
, pp. 22-25
-
-
Li, L.1
Chang, Q.2
Ni, J.3
-
6
-
-
33646357251
-
Method of shifting bottleneck analysis in knowledge-oriented manufacturing system
-
(in Chinese)
-
Shi Wenwu, Yan Honsen. Method of shifting bottleneck analysis in knowledge-oriented manufacturing system[J]. Computer Integrated Manufacturing Systems, 2006, 12(2): 271-279. (in Chinese)
-
(2006)
Computer Integrated Manufacturing Systems
, vol.12
, Issue.2
, pp. 271-279
-
-
Shi, W.1
Yan, H.2
-
8
-
-
18844410306
-
Application of the theory of constraints to a bottleneck operation in a manufacturing plant
-
Pegels C Carl, Watrous Craig. Application of the theory of constraints to a bottleneck operation in a manufacturing plant[J]. Journal of Manufacturing Technology Management, 2005, 16(3): 302-311.
-
(2005)
Journal of Manufacturing Technology Management
, vol.16
, Issue.3
, pp. 302-311
-
-
Carl, P.C.1
Craig, W.2
-
10
-
-
33748688420
-
A method on determining bottleneck in make-to-order production
-
(in Chinese)
-
Ye Taofeng, Han Wenmin. A method on determining bottleneck in make-to-order production[J]. Industrial Engineering and Management, 2003, 6: 51-54. (in Chinese)
-
(2003)
Industrial Engineering and Management
, vol.6
, pp. 51-54
-
-
Ye, T.1
Han, W.2
-
11
-
-
3543150189
-
Scheduling jobs on a K-stage flexible flow shop using a TOC-based (bottleneck) procedure
-
Charlottesville, VA, Canada, April 16-16
-
Acero-Dominquez M J, Paternina-Arboleda C D. Scheduling jobs on a K-stage flexible flow shop using a TOC-based (bottleneck) procedure[C]//Proceeding of the 2004 Systems and Information Engineering Design Symposium, Charlottesville, VA, Canada, April 16-16, 2004: 295-298.
-
(2004)
Proceeding of the 2004 Systems and Information Engineering Design Symposium
, pp. 295-298
-
-
Acero-Dominquez, M.J.1
Paternina-Arboleda, C.D.2
-
12
-
-
0002087205
-
Toward the estimation of bottleneck shiftiness in a manufacturing operation
-
Moss H K, Yu W B. Toward the estimation of bottleneck shiftiness in a manufacturing operation[J]. Production and Inventory Management Journal, 1999, 40(2): 53-58.
-
(1999)
Production and Inventory Management Journal
, vol.40
, Issue.2
, pp. 53-58
-
-
Moss, H.K.1
Yu, W.B.2
-
13
-
-
36048984408
-
Study of the shifting production bottleneck: possible causes and solutions
-
Shanghai, China, June 21-23
-
Lu Jiansha, Shen Miaomiao, Lan Xiuju. Study of the shifting production bottleneck: possible causes and solutions[C]//Service Operations and Logistics, and Informatics, 2006. SOLI '06. IEEE International Conference on, Shanghai, China, June 21-23, 2006: 684-688.
-
(2006)
Service Operations and Logistics, and Informatics, 2006. SOLI '06. IEEE International Conference on
, pp. 684-688
-
-
Lu, J.1
Shen, M.2
Lan, X.3
-
14
-
-
34047149103
-
A job-shop scheduling algorithm based on constraint satisfaction problem
-
(in Chinese)
-
Yang Hong'an, Sun Shudong, Wang Sunxin, et al. A job-shop scheduling algorithm based on constraint satisfaction problem[J]. System Engineering, 2004, 22(11): 15-18. (in Chinese)
-
(2004)
System Engineering
, vol.22
, Issue.11
, pp. 15-18
-
-
Yang, H.1
Sun, S.2
Wang, S.3
-
15
-
-
70749126944
-
An assessment method for multivariate process capability
-
(in Chinese)
-
Ma Yizhong, Li Yanjun. An assessment method for multivariate process capability[J]. System Engineering, 2002, 20 (1): 77-81. (in Chinese)
-
(2002)
System Engineering
, vol.20
, Issue.1
, pp. 77-81
-
-
Ma, Y.1
Li, Y.2
|