메뉴 건너뛰기




Volumn 22, Issue 5, 2009, Pages 710-716

Dynamic prediction method of production logistics bottleneck based on bottleneck index

Author keywords

Bottleneck index; Bottleneck shifting; Prediction model; Production logistics; Quality assurance capability

Indexed keywords

BOTTLENECK SHIFTING; DYNAMIC CHANGES; DYNAMIC PREDICTION; DYNAMIC PROPERTY; MANUFACTURING PATTERN; MANUFACTURING PROCESS; MANUFACTURING RESOURCE; PRACTICAL PRODUCTION; PREDICTION METHODS; PREDICTION MODEL; PRODUCT ATTRIBUTES; PRODUCTION CAPABILITIES; PRODUCTION LOAD; PRODUCTION LOGISTICS; PRODUCTION PLANNING AND CONTROL; PRODUCTION PROCESS; PRODUCTION UNITS; QUANTITATIVE RESEARCH; UNCERTAIN FACTORS;

EID: 70749099497     PISSN: 10009345     EISSN: None     Source Type: Journal    
DOI: 10.3901/CJME.2009.05.710     Document Type: Article
Times cited : (23)

References (15)
  • 2
    • 33846650637 scopus 로고    scopus 로고
    • Appling discrete event simulation and an automated bottleneck analysis as an aid to detect running production constraints
    • Orlando, USA, December 4-7
    • Faget P, Eriksson U, Herrmana F. Appling discrete event simulation and an automated bottleneck analysis as an aid to detect running production constraints[C]//Proceeding of the 2005 Winter Simulation Conference, Orlando, USA, December 4-7, 2005: 1401-1407.
    • (2005) Proceeding of the 2005 Winter Simulation Conference , pp. 1401-1407
    • Faget, P.1    Eriksson, U.2    Herrmana, F.3
  • 3
    • 34547296610 scopus 로고    scopus 로고
    • A heuristic method for a flexible flow line with unrelated parallel machines problem
    • Chicago, USA, December 1-4
    • Chen Chun-Lung, Chen Chuen-Lung. A heuristic method for a flexible flow line with unrelated parallel machines problem[C]// 2006 IEEE Conference on Robotics, Automation and Mechatronics, Chicago, USA, December 1-4, 2006: 1-4.
    • (2006) 2006 IEEE Conference on Robotics, Automation and Mechatronics , pp. 1-4
    • Chen, C.-L.1    Chen, C.-L.2
  • 4
    • 16644381187 scopus 로고    scopus 로고
    • Research on priority scheduling algorithm based on bottleneck analysis
    • (in Chinese)
    • Li Li, Cheng Ye, Yuan Shouhua. Research on priority scheduling algorithm based on bottleneck analysis[J]. Computer Integrated Manufacturing Systems, 2005, 12(11): 247-250. (in Chinese)
    • (2005) Computer Integrated Manufacturing Systems , vol.12 , Issue.11 , pp. 247-250
    • Li, L.1    Cheng, Y.2    Yuan, S.3
  • 6
    • 33646357251 scopus 로고    scopus 로고
    • Method of shifting bottleneck analysis in knowledge-oriented manufacturing system
    • (in Chinese)
    • Shi Wenwu, Yan Honsen. Method of shifting bottleneck analysis in knowledge-oriented manufacturing system[J]. Computer Integrated Manufacturing Systems, 2006, 12(2): 271-279. (in Chinese)
    • (2006) Computer Integrated Manufacturing Systems , vol.12 , Issue.2 , pp. 271-279
    • Shi, W.1    Yan, H.2
  • 8
    • 18844410306 scopus 로고    scopus 로고
    • Application of the theory of constraints to a bottleneck operation in a manufacturing plant
    • Pegels C Carl, Watrous Craig. Application of the theory of constraints to a bottleneck operation in a manufacturing plant[J]. Journal of Manufacturing Technology Management, 2005, 16(3): 302-311.
    • (2005) Journal of Manufacturing Technology Management , vol.16 , Issue.3 , pp. 302-311
    • Carl, P.C.1    Craig, W.2
  • 10
    • 33748688420 scopus 로고    scopus 로고
    • A method on determining bottleneck in make-to-order production
    • (in Chinese)
    • Ye Taofeng, Han Wenmin. A method on determining bottleneck in make-to-order production[J]. Industrial Engineering and Management, 2003, 6: 51-54. (in Chinese)
    • (2003) Industrial Engineering and Management , vol.6 , pp. 51-54
    • Ye, T.1    Han, W.2
  • 12
    • 0002087205 scopus 로고    scopus 로고
    • Toward the estimation of bottleneck shiftiness in a manufacturing operation
    • Moss H K, Yu W B. Toward the estimation of bottleneck shiftiness in a manufacturing operation[J]. Production and Inventory Management Journal, 1999, 40(2): 53-58.
    • (1999) Production and Inventory Management Journal , vol.40 , Issue.2 , pp. 53-58
    • Moss, H.K.1    Yu, W.B.2
  • 14
    • 34047149103 scopus 로고    scopus 로고
    • A job-shop scheduling algorithm based on constraint satisfaction problem
    • (in Chinese)
    • Yang Hong'an, Sun Shudong, Wang Sunxin, et al. A job-shop scheduling algorithm based on constraint satisfaction problem[J]. System Engineering, 2004, 22(11): 15-18. (in Chinese)
    • (2004) System Engineering , vol.22 , Issue.11 , pp. 15-18
    • Yang, H.1    Sun, S.2    Wang, S.3
  • 15
    • 70749126944 scopus 로고    scopus 로고
    • An assessment method for multivariate process capability
    • (in Chinese)
    • Ma Yizhong, Li Yanjun. An assessment method for multivariate process capability[J]. System Engineering, 2002, 20 (1): 77-81. (in Chinese)
    • (2002) System Engineering , vol.20 , Issue.1 , pp. 77-81
    • Ma, Y.1    Li, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.