메뉴 건너뛰기




Volumn 69, Issue 3, 2008, Pages 911-917

Assembly systems with non-exponential machines: Throughput and bottlenecks

Author keywords

Assembly systems; Bottlenecks; Finite buffers; Simulations; Throughput; Unreliable machines

Indexed keywords

APPROXIMATION THEORY; ASSEMBLY; COMPUTER SIMULATION; MARKOV PROCESSES; PRODUCTION ENGINEERING;

EID: 44649165595     PISSN: 0362546X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.na.2008.02.068     Document Type: Article
Times cited : (51)

References (9)
  • 1
    • 0000440767 scopus 로고
    • Assembly/disassembly systems: An efficient decomposition algorithm for tree-structured networks
    • Gershwin S.B. Assembly/disassembly systems: An efficient decomposition algorithm for tree-structured networks. IIE Transactions 23 (1991) 302-314
    • (1991) IIE Transactions , vol.23 , pp. 302-314
    • Gershwin, S.B.1
  • 2
    • 84873013614 scopus 로고
    • Modeling and analysis of assembly systems with unreliable machines and finite buffers
    • Mascolo M.D., David R., and Dallery Y. Modeling and analysis of assembly systems with unreliable machines and finite buffers. IIE Transactions 23 (1991) 315-330
    • (1991) IIE Transactions , vol.23 , pp. 315-330
    • Mascolo, M.D.1    David, R.2    Dallery, Y.3
  • 3
    • 0034397418 scopus 로고    scopus 로고
    • A decomposition method for analyzing inhomogeneous assembly/disassembly systems
    • Gershwin S.B., and Burman M.H. A decomposition method for analyzing inhomogeneous assembly/disassembly systems. Annals of Operations Research 93 (2000) 91-115
    • (2000) Annals of Operations Research , vol.93 , pp. 91-115
    • Gershwin, S.B.1    Burman, M.H.2
  • 4
    • 0000285320 scopus 로고    scopus 로고
    • Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems
    • Inman R.R. Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems. Production and Operations Management 8 (1999) 409-432
    • (1999) Production and Operations Management , vol.8 , pp. 409-432
    • Inman, R.R.1
  • 5
    • 17444380674 scopus 로고    scopus 로고
    • On the coefficients of variation of up- and downtime in manufacturing equipment
    • Li J., and Meerkov S.M. On the coefficients of variation of up- and downtime in manufacturing equipment. Mathematical Problems in Engineering 2003 (2003) 1-6
    • (2003) Mathematical Problems in Engineering , vol.2003 , pp. 1-6
    • Li, J.1    Meerkov, S.M.2
  • 7
    • 44649156605 scopus 로고    scopus 로고
    • S.-Y. Chiang, Bottlenecks in production systems with Markovian machines: Theory and applications, Ph.D. Thesis, University of Michigan, 1999
    • S.-Y. Chiang, Bottlenecks in production systems with Markovian machines: Theory and applications, Ph.D. Thesis, University of Michigan, 1999
  • 8
    • 84885784965 scopus 로고    scopus 로고
    • Evaluation of throughput in serial production lines with non-exponential machines
    • Boukas E.K., and Malhame R. (Eds), Kluwer Academic Publisher (Chapter 4)
    • Li J., and Meerkov S.M. Evaluation of throughput in serial production lines with non-exponential machines. In: Boukas E.K., and Malhame R. (Eds). Analysis Control and Optimization of Complex Dynamic Systems (2005), Kluwer Academic Publisher 55-82 (Chapter 4)
    • (2005) Analysis Control and Optimization of Complex Dynamic Systems , pp. 55-82
    • Li, J.1    Meerkov, S.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.