-
3
-
-
34249973653
-
A survey of priority rule-based scheduling
-
HAUPT R. A survey of priority rule-based scheduling[J]. OR Spectrum, 1989, 11(1): 3-16.
-
(1989)
OR Spectrum
, vol.11
, Issue.1
, pp. 3-16
-
-
Haupt, R.1
-
5
-
-
33646378933
-
Research status and prospects for massive production scheduling
-
(in Chinese)
-
JIN Feng, WU Cheng. Research status and prospects for massive production scheduling[J]. Computer Integrated Manufacturing Systems, 2006, 12(2): 161-168(in Chinese).
-
(2006)
Computer Integrated Manufacturing Systems
, vol.12
, Issue.2
, pp. 161-168
-
-
Jin, F.1
Wu, C.2
-
6
-
-
0030417871
-
Decomposition techniques for the solution of large-scale scheduling problems
-
BASSETT M H, PEKNY J F, REKLAITIS G V. Decomposition techniques for the solution of large-scale scheduling problems[J]. AIChE Journal, 1996, 42(12): 3373-3387.
-
(1996)
AIChE Journal
, vol.42
, Issue.12
, pp. 3373-3387
-
-
Bassett, M.H.1
Pekny, J.F.2
Reklaitis, G.V.3
-
7
-
-
38149118014
-
A prediction based iterative decomposition algorithm for scheduling large-scale Job Shops
-
LIU M, HAO J H, WU C. A prediction based iterative decomposition algorithm for scheduling large-scale Job Shops[J]. Mathematical and Computer Modelling, 2008, 47(3/4): 411-421.
-
(2008)
Mathematical and Computer Modelling
, vol.47
, Issue.3-4
, pp. 411-421
-
-
Liu, M.1
Hao, J.H.2
Wu, C.3
-
9
-
-
0038238721
-
An alternative framework to Lagrangian relaxation approach for Job Shop scheduling
-
CHEN H, LUH P B. An alternative framework to Lagrangian relaxation approach for Job Shop scheduling[J]. European Journal of Operational Research, 2003, 149(3): 499-512.
-
(2003)
European Journal of Operational Research
, vol.149
, Issue.3
, pp. 499-512
-
-
Chen, H.1
Luh, P.B.2
-
10
-
-
33750718514
-
Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex Job Shops
-
MÖNCH L, SCHABACKER R, PABST D, et al. Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex Job Shops[J]. European Journal of Operational Research, 2007, 177(3): 2100-2118.
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 2100-2118
-
-
Mönch, L.1
Schabacker, R.2
Pabst, D.3
-
11
-
-
34848819135
-
Modified bottleneck-based heuristic for large-scale Job-Shop scheduling problems with a single bottleneck
-
ZUO Y, GU H, XI Y. Modified bottleneck-based heuristic for large-scale Job-Shop scheduling problems with a single bottleneck[J]. Journal of Systems Engineering and Electronics, 2007, 18(3): 556-565.
-
(2007)
Journal of Systems Engineering and Electronics
, vol.18
, Issue.3
, pp. 556-565
-
-
Zuo, Y.1
Gu, H.2
Xi, Y.3
-
12
-
-
67650248955
-
Bottleneck identification procedures for the Job Shop scheduling problem with applications to genetic algorithms
-
ZHANG R, WU C. Bottleneck identification procedures for the Job Shop scheduling problem with applications to genetic algorithms[J]. The International Journal of Advanced Manufacturing Technology, 2009, 42(11): 1153-1164.
-
(2009)
The International Journal of Advanced Manufacturing Technology
, vol.42
, Issue.11
, pp. 1153-1164
-
-
Zhang, R.1
Wu, C.2
-
14
-
-
78149397827
-
Study on bottleneck detection method based on orthogonal experiment for Job Shop
-
(in Chinese)
-
ZHAI Yingni, SUN Shudong, WANG Junqiang, et al. Study on bottleneck detection method based on orthogonal experiment for Job Shop[J]. Computer Integrated Manufacturing Systems, 2010, 16(9): 1945-1952(in Chinese).
-
(2010)
Computer Integrated Manufacturing Systems
, vol.16
, Issue.9
, pp. 1945-1952
-
-
Zhai, Y.1
Sun, S.2
Wang, J.3
|