Multi-reentrant manufacturing system scheduling based on layered bottleneck analysis

Author keywords

Drum buffer rope theory; Layered bottleneck; Multi reentrant manufacturing; Scheduling algorithm; Semiconductor

Indexed keywords

BOTTLENECK ANALYSIS; CALCULATION METHODS; COMPLEX MANUFACTURING SYSTEMS; DRUM-BUFFER-ROPE; EQUIPMENT CONTROL; MANUFACTURING SCHEDULING; RE-ENTRANT MANUFACTURING SYSTEM; SCHEDULING STRATEGIES; SEMICONDUCTOR PRODUCTION;

EID: 77953730287     PISSN: 10065911     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (8)

References (15)
  • 2
    • 33746921229 scopus 로고    scopus 로고
    • A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor
    • MATHIRAJAN M, SIVAKUMAR A I. A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor[J]. International Journal of Advanced Manufacturing Technology, 2006, 29(9/10): 990-1001.
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , Issue.9-10 , pp. 990-1001
    • Mathirajan, M.1    Sivakumar, A.I.2
  • 3
    • 35348867629 scopus 로고    scopus 로고
    • Bottleneck station scheduling in semiconductor assembly and test manufacturing using ant colony optimization
    • SONG Y, TAO Z M, YI J G, et al. Bottleneck station scheduling in semiconductor assembly and test manufacturing using ant colony optimization[J]. IEEE Transactions on Automation Science and Engineering, 2007, 4(4): 569-578.
    • (2007) IEEE Transactions on Automation Science and Engineering , vol.4 , Issue.4 , pp. 569-578
    • Song, Y.1    Tao, Z.M.2    Yi, J.G.3
  • 4
    • 54949140449 scopus 로고    scopus 로고
    • ACO-based scheduling for a single batch processing machine in semiconductor manufacturing
    • Washington, D. C., USA: IEEE
    • LI Li, QIAO Fei. ACO-based scheduling for a single batch processing machine in semiconductor manufacturing[C]//Proceedings of 2008 IEEE Conference on Automation Science and Engineering. Washington, D. C., USA: IEEE, 2008: 85-90.
    • (2008) Proceedings of IEEE Conference on Automation Science and Engineering , pp. 85-90
    • Li, L.1    Qiao, F.2
  • 5
    • 10444260511 scopus 로고    scopus 로고
    • Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
    • ALLAOUI H, ARTIBA A. Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints[J]. Computers & Industrial Engineering, 2004, 47(4): 431-450.
    • (2004) Computers & Industrial Engineering , vol.47 , Issue.4 , pp. 431-450
    • Allaoui, H.1    Artiba, A.2
  • 7
    • 35348861539 scopus 로고    scopus 로고
    • Alot dispatching strategy integrating WIP management and wafer start control
    • WANG Zuntong, WU Qidi, QIAO Fei. Alot dispatching strategy integrating WIP management and wafer start control[J]. IEEE Transactions on Automation Science and Engineering, 2007, 4(4): 579-583.
    • (2007) IEEE Transactions on Automation Science and Engineering , vol.4 , Issue.4 , pp. 579-583
    • Wang, Z.1    Wu, Q.2    Qiao, F.3
  • 8
    • 0032376210 scopus 로고    scopus 로고
    • Theory of constraints - A review of the philosophy and its applications
    • RAHMAN S. Theory of constraints-a review of the philosophy and its applications[J]. International Journal of Operations & Production Management, 1998, 18(4): 336-355.
    • (1998) International Journal of Operations & Production Management , vol.18 , Issue.4 , pp. 336-355
    • Rahman, S.1
  • 9
    • 32644479705 scopus 로고    scopus 로고
    • A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows
    • WU H H, YEH M L. A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows[J]. International Journal of Production Research, 2006, 44(5): 883-902.
    • (2006) International Journal of Production Research , vol.44 , Issue.5 , pp. 883-902
    • Wu, H.H.1    Yeh, M.L.2
  • 10
    • 33645771768 scopus 로고    scopus 로고
    • Shop floor control in wafer fabrication based on drum-buffer-rope theory
    • Chinese source
    • GUO Yonghui, QIAN Xingsan. Shop floor control in wafer fabrication based on drum-buffer-rope theory[J]. Computer Integrated Manufacturing Systems, 2006, 12(1): 111-115(in Chinese).
    • (2006) Computer Integrated Manufacturing Systems , vol.12 , Issue.1 , pp. 111-115
    • Guo, Y.1    Qian, X.2
  • 11
    • 0031556588 scopus 로고    scopus 로고
    • Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system
    • DANIEL V, GUIDE R. Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system[J]. International Journal of Production Economics, 1997, 53(1): 101-116.
    • (1997) International Journal of Production Economics , vol.53 , Issue.1 , pp. 101-116
    • Daniel, V.1    Guide, R.2
  • 12
    • 0032114482 scopus 로고    scopus 로고
    • FMS simulation: Some experience and recommendations
    • KOSTURIAK J, GREGOR M. FMS simulation: some experience and recommendations[J]. Simulation Practice and Theory, 1998, 6(5): 423-442.
    • (1998) Simulation Practice and Theory , vol.6 , Issue.5 , pp. 423-442
    • Kosturiak, J.1    Gregor, M.2
  • 15
    • 34250021037 scopus 로고    scopus 로고
    • Performance evaluation system for scheduling semiconductor wafer product line
    • Chinese source
    • QIAO Fei, XU Xiaohong, FANG Ming, et al. Performance evaluation system for scheduling semiconductor wafer product line[J]. Journal of Tongji University, 2006, 34(11): 537-542(in Chinese).
    • (2006) Journal of Tongji University , vol.34 , Issue.11 , pp. 537-542
    • Qiao, F.1    Xu, X.2    Fang, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.