메뉴 건너뛰기




Volumn 17, Issue 7, 2011, Pages 1486-1494

Multi-bottleneck scheduling algorithm for large-scale Job Shop

Author keywords

Critical path; Job Shop; Multi bottleneck; Rolling horizon; Scheduling algorithm

Indexed keywords

BOTTLENECK MACHINES; BOTTLENECK OPERATIONS; CONSTRUCTION PROCESS; CRITICAL PATH METHOD; CRITICAL PATHS; DISPATCHING RULES; GLOBAL SOLUTIONS; JOB SHOP; JOB SHOP SCHEDULING PROBLEMS; LOAD-BALANCED; MULTI-BOTTLENECK; OVERLAPPING OPERATIONS; ROLLING HORIZON; SIMULATION RESULT; SOLUTION PROCESS; SOLUTION QUALITY; SUB-PROBLEMS; THEORY OF CONSTRAINT;

EID: 80051553873     PISSN: 10065911     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (8)

References (17)
  • 2
    • 33646378933 scopus 로고    scopus 로고
    • Research status and prospects for massive production scheduling
    • Chinese source
    • JIN Feng, WU Cheng. Research status and prospects for massive production scheduling[J]. Computer Integrated Manufacturing Systems, 2006, 12(2): 161-168(in Chinese).
    • (2006) Computer Integrated Manufacturing Systems , vol.12 , Issue.2 , pp. 161-168
    • Jin, F.1    Wu, C.2
  • 3
    • 56549095060 scopus 로고    scopus 로고
    • New coding method for massive production scheduling problem
    • Chinese source
    • LIANG Xu, WANG Jia, HUANG Ming. New coding method for massive production scheduling problem[J]. Computer Integrated Manufacturing Systems, 2008, 10(14): 1974-1982(in Chinese).
    • (2008) Computer Integrated Manufacturing Systems , vol.10 , Issue.14 , pp. 1974-1982
    • Liang, X.1    Wang, J.2    Huang, M.3
  • 4
    • 0038238721 scopus 로고    scopus 로고
    • An alternative framework to lagrangian relaxation approach for Job Shop scheduling
    • CHEN H, LUH P B. An alternative framework to lagrangian relaxation approach for Job Shop scheduling[J]. European Journal of Operational Research, 2003, 149(3): 499-512.
    • (2003) European Journal of Operational Research , vol.149 , Issue.3 , pp. 499-512
    • Chen, H.1    Luh, P.B.2
  • 5
    • 0032186585 scopus 로고    scopus 로고
    • An improvement of the lagrangean relaxation approach for Job Shop scheduling: A dynamic programming method
    • HAOXUN C, CHENGBIN C, PROTH J M. An improvement of the lagrangean relaxation approach for Job Shop scheduling: a dynamic programming method[J]. IEEE Transactions on Robotics and Automation, 1998, 14(5): 786-795.
    • (1998) IEEE Transactions on Robotics and Automation , vol.14 , Issue.5 , pp. 786-795
    • Haoxun, C.1    Chengbin, C.2    Proth, J.M.3
  • 6
    • 33750718514 scopus 로고    scopus 로고
    • Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex Job Shops
    • MNCH L, SCHABACKER R, PABST D, et al. Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex Job Shops[J]. European Journal of Operational Research, 2007, 177(3): 2100-2118.
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 2100-2118
    • Mnch, L.1    Schabacker, R.2    Pabst, D.3
  • 7
    • 48249133668 scopus 로고    scopus 로고
    • Study on constraint scheduling algorithm for job shop problems with multiple constraint machines
    • ZUO Y, GU H, XI Y. Study on constraint scheduling algorithm for job shop problems with multiple constraint machines[J]. International Journal of Production Research, 2008, 46(17): 4785-4801.
    • (2008) International Journal of Production Research , vol.46 , Issue.17 , pp. 4785-4801
    • Zuo, Y.1    Gu, H.2    Xi, Y.3
  • 8
    • 0030417871 scopus 로고    scopus 로고
    • Decomposition techniques for the solution of large-scale scheduling problems
    • BASSETT M H, PEKNY J F, REKLAITIS G V. Decomposition techniques for the solution of large-scale scheduling problems[J]. AIChE Journal, 1996, 42(12): 3373-3387.
    • (1996) AIChE Journal , vol.42 , Issue.12 , pp. 3373-3387
    • Bassett, M.H.1    Pekny, J.F.2    Reklaitis, G.V.3
  • 9
    • 33845487579 scopus 로고    scopus 로고
    • Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication
    • SOURIRAJAN K, UZSOY R. Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication[J]. Journal of Scheduling, 2007, 10(1): 41-65.
    • (2007) Journal of Scheduling , vol.10 , Issue.1 , pp. 41-65
    • Sourirajan, K.1    Uzsoy, R.2
  • 10
    • 34250219585 scopus 로고    scopus 로고
    • A very fast TS/SA algorithm for the Job Shop scheduling problem
    • ZHANG C Y, LI P, RAO Y, et al. A very fast TS/SA algorithm for the Job Shop scheduling problem[J]. Computers & Operations Research, 2008, 35(1): 282-294.
    • (2008) Computers & Operations Research , vol.35 , Issue.1 , pp. 282-294
    • Zhang, C.Y.1    Li, P.2    Rao, Y.3
  • 11
    • 0000927907 scopus 로고    scopus 로고
    • A graph-theoretic decomposition of the Job Shop scheduling problem to achieve scheduling robustness
    • WU S D, BYEON E S, STORER R H. A graph-theoretic decomposition of the Job Shop scheduling problem to achieve scheduling robustness[J]. Operations Research, 1999, 47(1): 113-124.
    • (1999) Operations Research , vol.47 , Issue.1 , pp. 113-124
    • Wu, S.D.1    Byeon, E.S.2    Storer, R.H.3
  • 13
    • 78149397827 scopus 로고    scopus 로고
    • Study on bottleneck detection method based on orthogonal experiment for Job Shop
    • Chinese source
    • ZHAI Yingni, SUN Shudong, WANG Junqiang, et al. Study on bottleneck detection method based on orthogonal experiment for Job Shop[J]. Computer Integrated Manufacturing Systems, 2010, 16(9): 1945-1952(in Chinese).
    • (2010) Computer Integrated Manufacturing Systems , vol.16 , Issue.9 , pp. 1945-1952
    • Zhai, Y.1    Sun, S.2    Wang, J.3
  • 14
    • 34249973653 scopus 로고
    • A survey of priority rule-based scheduling
    • HAUPT R. A survey of priority rule-based scheduling[J]. OR Spektrum, 1989, 11(1): 3-16.
    • (1989) OR Spektrum , vol.11 , Issue.1 , pp. 3-16
    • Haupt, R.1
  • 15
    • 52249097242 scopus 로고    scopus 로고
    • Decomposition-based optimization algorithm for large-scale Job Shop scheduling problems
    • Chinese source
    • ZHANG Rui, WU Cheng. Decomposition-based optimization algorithm for large-scale Job Shop scheduling problems[J]. Computer Integrated Manufacturing Systems, 2008, 18(8): 1559-1565(in Chinese).
    • (2008) Computer Integrated Manufacturing Systems , vol.18 , Issue.8 , pp. 1559-1565
    • Zhang, R.1    Wu, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.