-
1
-
-
84892234592
-
-
Upper Saddle River, N.J., USA: Prentice Hall
-
PINEDO M L. Scheduling: theory, algorithms, and systems[M]. Upper Saddle River, N.J., USA: Prentice Hall, 2008.
-
(2008)
Scheduling: Theory, Algorithms, and Systems
-
-
Pinedo, M.L.1
-
2
-
-
33646378933
-
Research status and prospects for massive production scheduling
-
Chinese source
-
JIN Feng, WU Cheng. Research status and prospects for massive production scheduling[J]. Computer Integrated Manufacturing Systems, 2006, 12(2): 161-168(in Chinese).
-
(2006)
Computer Integrated Manufacturing Systems
, vol.12
, Issue.2
, pp. 161-168
-
-
Jin, F.1
Wu, C.2
-
3
-
-
56549095060
-
New coding method for massive production scheduling problem
-
Chinese source
-
LIANG Xu, WANG Jia, HUANG Ming. New coding method for massive production scheduling problem[J]. Computer Integrated Manufacturing Systems, 2008, 10(14): 1974-1982(in Chinese).
-
(2008)
Computer Integrated Manufacturing Systems
, vol.10
, Issue.14
, pp. 1974-1982
-
-
Liang, X.1
Wang, J.2
Huang, M.3
-
4
-
-
0038238721
-
An alternative framework to lagrangian relaxation approach for Job Shop scheduling
-
CHEN H, LUH P B. An alternative framework to lagrangian relaxation approach for Job Shop scheduling[J]. European Journal of Operational Research, 2003, 149(3): 499-512.
-
(2003)
European Journal of Operational Research
, vol.149
, Issue.3
, pp. 499-512
-
-
Chen, H.1
Luh, P.B.2
-
5
-
-
0032186585
-
An improvement of the lagrangean relaxation approach for Job Shop scheduling: A dynamic programming method
-
HAOXUN C, CHENGBIN C, PROTH J M. An improvement of the lagrangean relaxation approach for Job Shop scheduling: a dynamic programming method[J]. IEEE Transactions on Robotics and Automation, 1998, 14(5): 786-795.
-
(1998)
IEEE Transactions on Robotics and Automation
, vol.14
, Issue.5
, pp. 786-795
-
-
Haoxun, C.1
Chengbin, C.2
Proth, J.M.3
-
6
-
-
33750718514
-
Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex Job Shops
-
MNCH L, SCHABACKER R, PABST D, et al. Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex Job Shops[J]. European Journal of Operational Research, 2007, 177(3): 2100-2118.
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 2100-2118
-
-
Mnch, L.1
Schabacker, R.2
Pabst, D.3
-
7
-
-
48249133668
-
Study on constraint scheduling algorithm for job shop problems with multiple constraint machines
-
ZUO Y, GU H, XI Y. Study on constraint scheduling algorithm for job shop problems with multiple constraint machines[J]. International Journal of Production Research, 2008, 46(17): 4785-4801.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.17
, pp. 4785-4801
-
-
Zuo, Y.1
Gu, H.2
Xi, Y.3
-
8
-
-
0030417871
-
Decomposition techniques for the solution of large-scale scheduling problems
-
BASSETT M H, PEKNY J F, REKLAITIS G V. Decomposition techniques for the solution of large-scale scheduling problems[J]. AIChE Journal, 1996, 42(12): 3373-3387.
-
(1996)
AIChE Journal
, vol.42
, Issue.12
, pp. 3373-3387
-
-
Bassett, M.H.1
Pekny, J.F.2
Reklaitis, G.V.3
-
9
-
-
33845487579
-
Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication
-
SOURIRAJAN K, UZSOY R. Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication[J]. Journal of Scheduling, 2007, 10(1): 41-65.
-
(2007)
Journal of Scheduling
, vol.10
, Issue.1
, pp. 41-65
-
-
Sourirajan, K.1
Uzsoy, R.2
-
10
-
-
34250219585
-
A very fast TS/SA algorithm for the Job Shop scheduling problem
-
ZHANG C Y, LI P, RAO Y, et al. A very fast TS/SA algorithm for the Job Shop scheduling problem[J]. Computers & Operations Research, 2008, 35(1): 282-294.
-
(2008)
Computers & Operations Research
, vol.35
, Issue.1
, pp. 282-294
-
-
Zhang, C.Y.1
Li, P.2
Rao, Y.3
-
11
-
-
0000927907
-
A graph-theoretic decomposition of the Job Shop scheduling problem to achieve scheduling robustness
-
WU S D, BYEON E S, STORER R H. A graph-theoretic decomposition of the Job Shop scheduling problem to achieve scheduling robustness[J]. Operations Research, 1999, 47(1): 113-124.
-
(1999)
Operations Research
, vol.47
, Issue.1
, pp. 113-124
-
-
Wu, S.D.1
Byeon, E.S.2
Storer, R.H.3
-
12
-
-
33847418712
-
The evolution of a management philosophy: The theory of constraints
-
WATSON K J, BLACKSTONE J H, GARDINER S C. The evolution of a management philosophy: the theory of constraints[J]. Journal of Operations Management, 2007, 25(2): 387-402.
-
(2007)
Journal of Operations Management
, vol.25
, Issue.2
, pp. 387-402
-
-
Watson, K.J.1
Blackstone, J.H.2
Gardiner, S.C.3
-
13
-
-
78149397827
-
Study on bottleneck detection method based on orthogonal experiment for Job Shop
-
Chinese source
-
ZHAI Yingni, SUN Shudong, WANG Junqiang, et al. Study on bottleneck detection method based on orthogonal experiment for Job Shop[J]. Computer Integrated Manufacturing Systems, 2010, 16(9): 1945-1952(in Chinese).
-
(2010)
Computer Integrated Manufacturing Systems
, vol.16
, Issue.9
, pp. 1945-1952
-
-
Zhai, Y.1
Sun, S.2
Wang, J.3
-
14
-
-
34249973653
-
A survey of priority rule-based scheduling
-
HAUPT R. A survey of priority rule-based scheduling[J]. OR Spektrum, 1989, 11(1): 3-16.
-
(1989)
OR Spektrum
, vol.11
, Issue.1
, pp. 3-16
-
-
Haupt, R.1
-
15
-
-
52249097242
-
Decomposition-based optimization algorithm for large-scale Job Shop scheduling problems
-
Chinese source
-
ZHANG Rui, WU Cheng. Decomposition-based optimization algorithm for large-scale Job Shop scheduling problems[J]. Computer Integrated Manufacturing Systems, 2008, 18(8): 1559-1565(in Chinese).
-
(2008)
Computer Integrated Manufacturing Systems
, vol.18
, Issue.8
, pp. 1559-1565
-
-
Zhang, R.1
Wu, C.2
|