메뉴 건너뛰기




Volumn 47, Issue 18, 2009, Pages 5019-5036

Data driven bottleneck detection of manufacturing systems

Author keywords

Bottleneck; Data driven; Short term; Turning point

Indexed keywords

BOTTLENECK DETECTION; BOTTLENECK LOCATION; DATA DRIVEN; DATA-DRIVEN METHODS; INDUSTRIAL CASE STUDY; LONG TERM; MANUFACTURING RESOURCE; MANUFACTURING SYSTEM; OPERATION MANAGEMENT; PLANT FLOORS; PRODUCTION CONSTRAINTS; PRODUCTION LINE; SHORT TERM; SIMULATION MODEL; SYSTEM THROUGHPUT; TOTAL COSTS; TURNING POINTS;

EID: 70449688157     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540701881860     Document Type: Article
Times cited : (157)

References (19)
  • 1
    • 34247645931 scopus 로고    scopus 로고
    • General Motors increases its production throughput
    • Alden, J.M., et al., 2006. General Motors increases its production throughput. Interfaces, 36 (1), 6-25.
    • (2006) Interfaces , vol.36 , Issue.1 , pp. 6-25
    • Alden, J.M.1
  • 2
    • 31044437924 scopus 로고    scopus 로고
    • An analytical formula for throughput of a production line with identical stations and random failures
    • Blumenfeld, D.E. and Li, J., 2005. An analytical formula for throughput of a production line with identical stations and random failures. Mathematical Problems in Engineering, 2005 (3), 293-308.
    • (2005) Mathematical Problems in Engineering , vol.2005 , Issue.3 , pp. 293-308
    • Blumenfeld, D.E.1    Li, J.2
  • 6
  • 9
    • 0345854809 scopus 로고    scopus 로고
    • C-Bottlenecks in serial production lines: Identification and application
    • Chiang, S.Y., Kuo, C.T., and Meerkov, S.M., 2001. c-Bottlenecks in serial production lines: Identification and application. Mathematical Problems in Engineering, 7 (6), 543-578.
    • (2001) Mathematical Problems in Engineering , vol.7 , Issue.6 , pp. 543-578
    • Chiang, S.Y.1    Kuo, C.T.2    Meerkov, S.M.3
  • 10
    • 0023315347 scopus 로고
    • An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking
    • Gershwin, S.B., 1987. An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking. Operations Research, 35 (2), 291-305.
    • (1987) Operations Research , vol.35 , Issue.2 , pp. 291-305
    • Gershwin, S.B.1
  • 12
    • 0029291550 scopus 로고
    • A system-theoretic property of serial production lines: Improvability
    • Jacobs, D. and Meerkov, S.M., 1995. A system-theoretic property of serial production lines: Improvability. International Journal of Systems Science, 26 (4), 755-785.
    • (1995) International Journal of Systems Science , vol.26 , Issue.4 , pp. 755-785
    • Jacobs, D.1    Meerkov, S.M.2
  • 13
    • 0012354474 scopus 로고    scopus 로고
    • Bottlenecks in serial production lines: A systemtheoretic approach
    • Kuo, C.T., Lim, J.T., and Meerkov, S.M., 1996. Bottlenecks in serial production lines: a systemtheoretic approach. Mathematical Problems in Engineering, 2 (3), 233-276.
    • (1996) Mathematical Problems in Engineering , vol.2 , Issue.3 , pp. 233-276
    • Kuo, C.T.1    Lim, J.T.2    Meerkov, S.M.3
  • 14
    • 0032266422 scopus 로고    scopus 로고
    • Simulation of manufacturing systems
    • 13-16 December, Grand Hyatt Washington, Washington, DC
    • Law, A.M. and McComas, M.G., 1998. Simulation of manufacturing systems. In: Proceedings of the 1998 Winter Simulation Conference, 13-16 December, Grand Hyatt Washington, Washington, DC, 49-52.
    • (1998) Proceedings of the 1998 Winter Simulation Conference , pp. 49-52
    • Law, A.M.1    McComas, M.G.2
  • 16
    • 0346992882 scopus 로고    scopus 로고
    • Bottlenecks with respect to due-time performance in pull serial production lines
    • Li, J. and Meerkov, S.M., 2000. Bottlenecks with respect to due-time performance in pull serial production lines. Mathematical Problems in Engineering, 5 (6), 479-498.
    • (2000) Mathematical Problems in Engineering , vol.5 , Issue.6 , pp. 479-498
    • Li, J.1    Meerkov, S.M.2
  • 17
    • 0025432495 scopus 로고
    • Homogeneous, asymptotically reliable serial production lines: Theory and a case study
    • Lim, J.T., Meerkov, S.M., and Top, F., 1990. Homogeneous, asymptotically reliable serial production lines: theory and a case study. IEEE Transactions on Automatic Control, 35 (5), 524-532.
    • (1990) IEEE Transactions on Automatic Control , vol.35 , Issue.5 , pp. 524-532
    • Lim, J.T.1    Meerkov, S.M.2    Top, F.3
  • 18
    • 1642518638 scopus 로고    scopus 로고
    • Comparison of bottleneck detection methods for AGV systems
    • 7-10 December, New Orleans, LA
    • Roser, C., Nakano, M., and Tanaka, M., 2003. Comparison of bottleneck detection methods for AGV systems. In: Proceedings of the 2003 Winter Simulation Conference, 7-10 December, New Orleans, LA, 1192-1198.
    • (2003) Proceedings of the 2003 Winter Simulation Conference , pp. 1192-1198
    • Roser, C.1    Nakano, M.2    Tanaka, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.