메뉴 건너뛰기




Volumn 50, Issue 20, 2012, Pages 5734-5746

Optimal vehicle allocation for an Automated Materials Handling System using simulation optimisation

Author keywords

Automated Materials Handling System (AMHS); semiconductor manufacturing; simulation optimisation

Indexed keywords

AUTOMATED MATERIALS HANDLING SYSTEMS; CONCEPTUAL FRAMEWORKS; CYCLE TIME; DISCRETE-EVENT SIMULATION MODEL; EMPIRICAL PROBLEMS; INHERENT VARIABILITY; INTERBAY; MANUFACTURING PROCESS; MODEL AND SIMULATION; OPTIMAL VEHICLES; PHOTOBAY; PROCESSING TIME; SEMICONDUCTOR INDUSTRY; SEMICONDUCTOR MANUFACTURING; SIMULATION OPTIMISATION; STOCHASTICITY; VEHICLE ALLOCATION;

EID: 84867369737     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.622311     Document Type: Article
Times cited : (38)

References (20)
  • 4
    • 0012260296 scopus 로고    scopus 로고
    • Optimization for simulation: Theory vs. practice
    • Fu, M.C., 2002. Optimization for simulation: Theory vs. practice. INFORMS Journal on Computing, 14 (3), 192-215.
    • (2002) INFORMS Journal on Computing , vol.14 , Issue.3 , pp. 192-215
    • Fu, M.C.1
  • 5
    • 33644525898 scopus 로고    scopus 로고
    • Discrete optimization via simulation using COMPASS
    • Hong, L.J. and Nelson, B.L., 2004. Discrete optimization via simulation using COMPASS. Operations Research, 54 (1), 115-129.
    • (2004) Operations Research , vol.54 , Issue.1 , pp. 115-129
    • Hong, L.J.1    Nelson, B.L.2
  • 6
    • 0032003625 scopus 로고    scopus 로고
    • A stochastic model of empty-vehicle travel time and load request service time in light-traffic material handling systems
    • Kobza, J.E., Shen, Y.C., and Reasor, R.J., 1998. A stochastic model of empty-vehicle travel time and load request service time in light-traffic material handling systems. IIE Transactions, 30 (2), 133-142.
    • (1998) IIE Transactions , vol.30 , Issue.2 , pp. 133-142
    • Kobza, J.E.1    Shen, Y.C.2    Reasor, R.J.3
  • 9
    • 5144231627 scopus 로고    scopus 로고
    • Speed delivery: Dynamic OHT allocation and dispatching in large-Scale, 300-mm AMHS management
    • Liao, D.Y. and Fu, H.S., 2004. Speed delivery: Dynamic OHT allocation and dispatching in large-Scale, 300-mm AMHS Management. IEEE Robotics & Automation Magazine, pp. 22-32.
    • (2004) IEEE Robotics & Automation Magazine , pp. 22-32
    • Liao, D.Y.1    Fu, H.S.2
  • 10
  • 12
    • 0035872172 scopus 로고    scopus 로고
    • Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab
    • Lin, J.T., Wang, F.K., and Yen, P.Y., 2001. Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab. International Journal of Production Research, 39 (6), 1221-1238.
    • (2001) International Journal of Production Research , vol.39 , Issue.6 , pp. 1221-1238
    • Lin, J.T.1    Wang, F.K.2    Yen, P.Y.3
  • 13
    • 3142592494 scopus 로고    scopus 로고
    • Virtual vehicle in the connecting transport automated material-handling system (AMHS)
    • Lin, J.T., Wang, F.K., and Young, J.R., 2004. Virtual vehicle in the connecting transport automated material-handling system (AMHS). International Journal of Production Research, 42 (13), 2599-2610.
    • (2004) International Journal of Production Research , vol.42 , Issue.13 , pp. 2599-2610
    • Lin, J.T.1    Wang, F.K.2    Young, J.R.3
  • 14
    • 0035421294 scopus 로고    scopus 로고
    • A simulation-based experiment for comparing AMHS performance in a semiconductor fabrication facility
    • Mackulak, G.T. and Savory, P., 2001. A simulation-based experiment for comparing AMHS performance in a semiconductor fabrication facility. IEEE Transactions on Semiconductor Manufacturing, 14 (3), 273-280.
    • (2001) IEEE Transactions on Semiconductor Manufacturing , vol.14 , Issue.3 , pp. 273-280
    • Mackulak, G.T.1    Savory, P.2
  • 15
    • 0020140765 scopus 로고
    • Design of automatic guided vehicle systems
    • Maxwell, W.L. and Muckstadt, J.A., 1982. Design of automatic guided vehicle systems. IIE Transactions, 14 (2), 114-124.
    • (1982) IIE Transactions , vol.14 , Issue.2 , pp. 114-124
    • Maxwell, W.L.1    Muckstadt, J.A.2
  • 17
    • 33847067597 scopus 로고    scopus 로고
    • Analytical approach to estimating AMHS performance in 300mmfabs
    • Nazzal, D. and McGinnis, L.F., 2007. Analytical approach to estimating AMHS performance in 300mmfabs. International Journal of Production Research, 45 (3), 571-590.
    • (2007) International Journal of Production Research , vol.45 , Issue.3 , pp. 571-590
    • Nazzal, D.1    McGinnis, L.F.2
  • 18
    • 0002554762 scopus 로고
    • Determination of the total number of vehicles in an AGV-based material transport system
    • Tanchoco, J.M.A., Egbelu, P.J., and Taghabonl, F., 1987. Determination of the total number of vehicles in an AGV-based material transport system. Material Flow, 4, 33-51.
    • (1987) Material Flow , vol.4 , pp. 33-51
    • Tanchoco, J.M.A.1    Egbelu, P.J.2    Taghabonl, F.3
  • 19
    • 4744362915 scopus 로고    scopus 로고
    • Simulation optimization: A comprehensive review on theory and applications
    • Tekin, E. and Sabuncuoglu, I., 2004. Simulation optimization: A comprehensive review on theory and applications. IIE Transactions, 36 (11), 1067-1081.
    • (2004) IIE Transactions , vol.36 , Issue.11 , pp. 1067-1081
    • Tekin, E.1    Sabuncuoglu, I.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.