메뉴 건너뛰기




Volumn 45, Issue 3, 2007, Pages 571-590

Analytical approach to estimating AMHS performance in 300mm fabs

Author keywords

AMHS; Markov chain; Semiconductor manufacturing; Vehicle blocking

Indexed keywords

COMPUTATIONAL METHODS; COMPUTER SIMULATION; DECISION SUPPORT SYSTEMS; MARKOV PROCESSES; MATERIALS HANDLING; PRODUCTION CONTROL; STATISTICAL METHODS;

EID: 33847067597     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600792333     Document Type: Conference Paper
Times cited : (28)

References (31)
  • 1
    • 33144464532 scopus 로고    scopus 로고
    • A new low cost approach in 200 mm and 300 mm AMHS
    • available online at
    • Arzt, T. and Bulcke, F., A new low cost approach in 200 mm and 300 mm AMHS. Semiconductor Fabtech, 1999, available online at: http://www.fabtech.org.
    • (1999) Semiconductor Fabtech
    • Arzt, T.1    Bulcke, F.2
  • 3
    • 0024621009 scopus 로고
    • Decentralized control of automated guided vehicles on a simple loop
    • Bartholdi III, J.J. and Platzman, L.K., Decentralized control of automated guided vehicles on a simple loop. IIE Trans, 1989, 21, 76-81.
    • (1989) IIE Trans , vol.21 , pp. 76-81
    • Bartholdi III, J.J.1    Platzman, L.K.2
  • 4
    • 0036565412 scopus 로고    scopus 로고
    • Modeling and analysis of congestion in the design facility layouts
    • Benjaafar, S., Modeling and analysis of congestion in the design facility layouts. Manage. Sci., 2002, 48, 679-705.
    • (2002) Manage. Sci , vol.48 , pp. 679-705
    • Benjaafar, S.1
  • 5
    • 0035366091 scopus 로고    scopus 로고
    • New tools and fab demand 300mm automation optimization
    • Bonora, T. and Feindel, D., New tools and fab demand 300mm automation optimization. Solid State Technol., 2001, 44, 87-89.
    • (2001) Solid State Technol , vol.44 , pp. 87-89
    • Bonora, T.1    Feindel, D.2
  • 6
    • 0026117415 scopus 로고
    • Tandem configurations for Automated Guided Vehicle systems and the analysis of Single vehicle loops
    • Bozer, Y.A., Srinivasan, M.M. and Myeonsig, C., Tandem configurations for Automated Guided Vehicle systems and the analysis of Single vehicle loops. IIE Trans., 1991, 23, 72-82.
    • (1991) IIE Trans , vol.23 , pp. 72-82
    • Bozer, Y.A.1    Srinivasan, M.M.2    Myeonsig, C.3
  • 7
    • 0028428473 scopus 로고
    • Expected waiting times in single-device trip-based material handling systems
    • Bozer, Y.A., Myeonsig, C. and Srinivasan, M.M., Expected waiting times in single-device trip-based material handling systems. Eur. J. Oper. Res, 1994, 75, 200-216.
    • (1994) Eur. J. Oper. Res , vol.75 , pp. 200-216
    • Bozer, Y.A.1    Myeonsig, C.2    Srinivasan, M.M.3
  • 8
    • 0242364696 scopus 로고    scopus 로고
    • Queueing network model for a class of material-handling systems
    • Curry, G.L., Peters, B.A. and Lee, M., Queueing network model for a class of material-handling systems. Int. J. Prod. Res, 2003, 41, 3901-3920.
    • (2003) Int. J. Prod. Res , vol.41 , pp. 3901-3920
    • Curry, G.L.1    Peters, B.A.2    Lee, M.3
  • 9
    • 1642522573 scopus 로고    scopus 로고
    • Simulation analysis of a semiconductor handling and processing system: Process instability can lead to wasted modeling efforts
    • Gaxiola, G. and Mackulak, G., Simulation analysis of a semiconductor handling and processing system: process instability can lead to wasted modeling efforts. in Proceedings of the 31st Annual Summer Computer Simulation Conference, 1999, pp. 137-142.
    • (1999) Proceedings of the 31st Annual Summer Computer Simulation Conference , pp. 137-142
    • Gaxiola, G.1    Mackulak, G.2
  • 11
    • 0035883115 scopus 로고    scopus 로고
    • Modeling empty vehicle traffic in AGVS design
    • Johnson, M.E., Modeling empty vehicle traffic in AGVS design. Int. J. Prod. Res., 2001, 39, 2615-2633.
    • (2001) Int. J. Prod. Res , vol.39 , pp. 2615-2633
    • Johnson, M.E.1
  • 12
    • 0010908246 scopus 로고
    • An analytic model for design and analysis of single-vehicle asynchronous material handling systems
    • Johnson, M.E. and Brandeau, M.L, An analytic model for design and analysis of single-vehicle asynchronous material handling systems. Transport. Sci., 1994, 28, 337-353.
    • (1994) Transport. Sci , vol.28 , pp. 337-353
    • Johnson, M.E.1    Brandeau, M.L.2
  • 13
    • 0029253844 scopus 로고
    • Designing multiple-load automated guided vehicle systems for delivering material from a central depot
    • Johnson, M.E. and Brandeau, M.L, Designing multiple-load automated guided vehicle systems for delivering material from a central depot. Trans. ASME J. Engng Industry, 1995, 117, 33-41.
    • (1995) Trans. ASME J. Engng Industry , vol.117 , pp. 33-41
    • Johnson, M.E.1    Brandeau, M.L.2
  • 14
    • 3142521941 scopus 로고    scopus 로고
    • 300 mm perceptions and realities
    • Jones, S., 300 mm perceptions and realities. Semiconductor Int., 2003, 26, 69-72.
    • (2003) Semiconductor Int , vol.26 , pp. 69-72
    • Jones, S.1
  • 15
    • 0032003625 scopus 로고    scopus 로고
    • A stochastic model of empty-vehicle travel time and load request service time in light-traffic material handling systems
    • Kobza, J.E., Yu-Cheng, S. and Reasor, R.J., A stochastic model of empty-vehicle travel time and load request service time in light-traffic material handling systems. IIE Trans., 1998, 30, 133-142.
    • (1998) IIE Trans , vol.30 , pp. 133-142
    • Kobza, J.E.1    Yu-Cheng, S.2    Reasor, R.J.3
  • 16
    • 0041958041 scopus 로고    scopus 로고
    • Connecting transport AMHS in a wafer fab
    • Lin, J.T., Wang, F.K.G. and Wu, C.K., Connecting transport AMHS in a wafer fab. Int. J. Prod. Res., 2003, 41, 529-544.
    • (2003) Int. J. Prod. Res , vol.41 , pp. 529-544
    • Lin, J.T.1    Wang, F.K.G.2    Wu, C.K.3
  • 17
    • 0035421294 scopus 로고    scopus 로고
    • A simulation based experiment for comparing AMHS performance in a semiconductor fabrication facility
    • Mackulak, G. and Savory, P., A simulation based experiment for comparing AMHS performance in a semiconductor fabrication facility. IEEE Trans. Semiconductor Manuf, 2001, 14, 273-280.
    • (2001) IEEE Trans. Semiconductor Manuf , vol.14 , pp. 273-280
    • Mackulak, G.1    Savory, P.2
  • 19
    • 0028731002 scopus 로고    scopus 로고
    • Simulation in automated material handling systems design for semiconductor manufacturing
    • Nadoli, G. and Pillai, D., Simulation in automated material handling systems design for semiconductor manufacturing. in Proceedings of the 1994 Winter Simulation Conference, pp. 892-899.
    • Proceedings of the 1994 Winter Simulation Conference , pp. 892-899
    • Nadoli, G.1    Pillai, D.2
  • 20
    • 0031200370 scopus 로고    scopus 로고
    • Integrated facility layout and material handling system design in semiconductor fabrication facilities
    • Peters, B.A. and Yang, T., Integrated facility layout and material handling system design in semiconductor fabrication facilities. IEEE Trans. Semiconductor Manuf., 1997, 10, 360-369.
    • (1997) IEEE Trans. Semiconductor Manuf , vol.10 , pp. 360-369
    • Peters, B.A.1    Yang, T.2
  • 22
    • 17744394327 scopus 로고    scopus 로고
    • A Queuing network approximation of semiconductor automated material handling systems: How much information do we really need?
    • Roeder, T., Govind, N. and Schruben, L., A Queuing network approximation of semiconductor automated material handling systems: how much information do we really need? In Proceedings of the 2004 Winter Simulation Conference, pp. 1956-1961.
    • Proceedings of the 2004 Winter Simulation Conference , pp. 1956-1961
    • Roeder, T.1    Govind, N.2    Schruben, L.3
  • 25
    • 33847063456 scopus 로고    scopus 로고
    • SEMATECH Report. 1997, Global joint guidelines for 300mm semiconductor factories I300I/J300. Available online at International SEMATECH website: http://www.sematech.org.
    • SEMATECH Report. 1997, Global joint guidelines for 300mm semiconductor factories I300I/J300. Available online at International SEMATECH website: http://www.sematech.org.
  • 26
    • 0028195172 scopus 로고
    • Trip-based material handling systems: Throughput capacity analysis
    • Srinivasan, M.M., Bozer, Y.A. and Myeonsig, C., Trip-based material handling systems: throughput capacity analysis. IIE Trans., 1994, 26, 70-89.
    • (1994) IIE Trans , vol.26 , pp. 70-89
    • Srinivasan, M.M.1    Bozer, Y.A.2    Myeonsig, C.3
  • 28
    • 0034634803 scopus 로고    scopus 로고
    • Unidirectional circular layout for overhead material handling systems
    • Ting, J.H. and Tanchoco, J.M., Unidirectional circular layout for overhead material handling systems. Int. J. Prod. Res., 2000, 38, 3913-3936.
    • (2000) Int. J. Prod. Res , vol.38 , pp. 3913-3936
    • Ting, J.H.1    Tanchoco, J.M.2
  • 30
    • 0020103086 scopus 로고
    • Poisson arrivals see time averages
    • Wolff, R.W., Poisson arrivals see time averages. Oper. Res., 1982, 30, 223-231.
    • (1982) Oper. Res , vol.30 , pp. 223-231
    • Wolff, R.W.1
  • 31
    • 33847044359 scopus 로고    scopus 로고
    • Vis, I.F., Survey of research in the design and control of automated guided vehicle systems. Eur. J. Oper. Res., in press. Available online November 2004.
    • Vis, I.F., Survey of research in the design and control of automated guided vehicle systems. Eur. J. Oper. Res., in press. Available online November 2004.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.