-
2
-
-
0024621009
-
Decentralized control of a fixed route automatic guided vehicle system
-
J.J. Bartholdi III and L.K. Platzman, "Decentralized control of a fixed route automatic guided vehicle system," IIE Trans., vol. 21, no. 1, pp. 76-81, 1988.
-
(1988)
IIE Trans.
, vol.21
, Issue.1
, pp. 76-81
-
-
Bartholdi III, J.J.1
Platzman, L.K.2
-
3
-
-
0026966782
-
Tandem AGV systems: Partitioning algorithm and performance comparison with conventional AGV systems
-
Y.A. Bozer and M.M. Srinivasan, "Tandem AGV systems: Partitioning algorithm and performance comparison with conventional AGV systems," Eur. J. Oper. Res., vol. 63, pp. 173-191, 1992.
-
(1992)
Eur. J. Oper. Res.
, vol.63
, pp. 173-191
-
-
Bozer, Y.A.1
Srinivasan, M.M.2
-
4
-
-
0005585713
-
Cost efficient future automation and transport concepts
-
U. Bader, J. Dorner, J. Schlieber, T. Kaufmann, and M. Garbers, "Cost efficient future automation and transport concepts," in Proc. 7th IEEE Int. Symp. Semiconductor Manufacturing, pp. 57-60, 1998.
-
(1998)
Proc. 7th IEEE Int. Symp. Semiconductor Manufacturing
, pp. 57-60
-
-
Bader, U.1
Dorner, J.2
Schlieber, J.3
Kaufmann, T.4
Garbers, M.5
-
5
-
-
0035170521
-
A comparison of unified vs. segregated automated material handling systems for 300 mm fabs
-
San Joses, CA., USA
-
N. Bahri, J. Reiss, and B. Doherty, "A comparison of unified vs. segregated automated material handling systems for 300 mm fabs," in Proc. 2001 IEEE Int. Symp. Semiconductor Manufacturing, San Joses, CA., USA, 2001, pp. 3-6.
-
(2001)
Proc. 2001 IEEE Int. Symp. Semiconductor Manufacturing
, pp. 3-6
-
-
Bahri, N.1
Reiss, J.2
Doherty, B.3
-
6
-
-
0002893970
-
Simulation tool for design and management optimization of automated interbay material handling and storage systems for large wafer fab
-
G. Cardarelli and P.M. Pelagagge, "Simulation tool for design and management optimization of automated interbay material handling and storage systems for large wafer fab," IEEE Trans. Semiconduct. Manufact., vol. 8, no. 1, pp. 44-49, 1995.
-
(1995)
IEEE Trans. Semiconduct. Manufact.
, vol.8
, Issue.1
, pp. 44-49
-
-
Cardarelli, G.1
Pelagagge, P.M.2
-
7
-
-
0036476753
-
Multicyclic hoist scheduling with constant processing times
-
A. Che, C. Chu, and F. Chu, "Multicyclic hoist scheduling with constant processing times" IEEE Trans. Robot. Automat., vol. 18, no. 1, pp. 69-80, 2002.
-
(2002)
IEEE Trans. Robot. Automat.
, vol.18
, Issue.1
, pp. 69-80
-
-
Che, A.1
Chu, C.2
Chu, F.3
-
8
-
-
0032000755
-
Cyclic scheduling of a hoist with time window constraints
-
H. Chen, C. Chu, and J.-M. Proth, "Cyclic scheduling of a hoist with time window constraints," IEEE Trans. Robot. Automat., vol. 14, no. 1, pp. 144-152, 1998.
-
(1998)
IEEE Trans. Robot. Automat.
, vol.14
, Issue.1
, pp. 144-152
-
-
Chen, H.1
Chu, C.2
Proth, J.-M.3
-
9
-
-
0021423836
-
Characterization of automatic guided vehicle dispatching rules
-
P.J. Egbelu and J.M.A. Tanchoco, "Characterization of automatic guided vehicle dispatching rules," Int. J. Prod. Res., vol. 22, no. 3, pp. 359-374, 1984.
-
(1984)
Int. J. Prod. Res.
, vol.22
, Issue.3
, pp. 359-374
-
-
Egbelu, P.J.1
Tanchoco, J.M.A.2
-
10
-
-
0023541856
-
Pull versus push strategy for automated guided vehicle load movement in a batch manufacturing system
-
P.J. Egbelu, "Pull versus push strategy for automated guided vehicle load movement in a batch manufacturing system," J. Manufacturing Syst., vol. 6, no. 3, pp. 209-220, 1987.
-
(1987)
J. Manufacturing Syst.
, vol.6
, Issue.3
, pp. 209-220
-
-
Egbelu, P.J.1
-
11
-
-
0022785934
-
Potentials for bi-directional guidepath for automated guided vehicle based systems
-
P.J. Egbelu and J.M.A. Tanchoco, "Potentials for bi-directional guidepath for automated guided vehicle based systems," Int. J. Prod. Res., vol. 24, no. 5, pp. 1075-1097, 1986.
-
(1986)
Int. J. Prod. Res.
, vol.24
, Issue.5
, pp. 1075-1097
-
-
Egbelu, P.J.1
Tanchoco, J.M.A.2
-
12
-
-
0035889165
-
Metaheuristics for the stochastic hoist scheduling problem (SHSP)
-
G. Fleury, M. Gourgand, and P. Lacomme, "Metaheuristics for the stochastic hoist scheduling problem (SHSP)," Int. J. Prod. Res., vol. 39, no. 15, pp. 3419-3457, 2001.
-
(2001)
Int. J. Prod. Res.
, vol.39
, Issue.15
, pp. 3419-3457
-
-
Fleury, G.1
Gourgand, M.2
Lacomme, P.3
-
13
-
-
0023349893
-
Flow path design for automated guided vehicle systems
-
R.J. Gaskins and J.M.A. Tanchoco, "Flow path design for automated guided vehicle systems," Int. J. Prod. Res., vol. 25, no. 5, pp. 667-676, 1987.
-
(1987)
Int. J. Prod. Res.
, vol.25
, Issue.5
, pp. 667-676
-
-
Gaskins, R.J.1
Tanchoco, J.M.A.2
-
15
-
-
0027875444
-
An analytic model for design of a multivehicle automated guided vehicle system
-
M.E. Johnson and M.L. Brandeau, "An analytic model for design of a multivehicle automated guided vehicle system," Manage. Sci., vol. 39, no. 12, pp. 1477-1489, 1993.
-
(1993)
Manage. Sci.
, vol.39
, Issue.12
, pp. 1477-1489
-
-
Johnson, M.E.1
Brandeau, M.L.2
-
16
-
-
0009338739
-
Optimal flow path design of unidirectional AGV systems
-
M. Kaspi and J.M.A. Tanchoco, "Optimal flow path design of unidirectional AGV systems" Int. J. Prod. Res., vol. 28, no. 6, pp. 1023-1030, 1990.
-
(1990)
Int. J. Prod. Res.
, vol.28
, Issue.6
, pp. 1023-1030
-
-
Kaspi, M.1
Tanchoco, J.M.A.2
-
17
-
-
0032646146
-
Multiple-part cyclic hoist scheduling using a sieve method
-
V. Kats, E. Levner, and L. Meyzin, "Multiple-part cyclic hoist scheduling using a sieve method," IEEE Trans. Robot. Automat., vol. 15, no. 4, pp. 704-713, 1999.
-
(1999)
IEEE Trans. Robot. Automat.
, vol.15
, Issue.4
, pp. 704-713
-
-
Kats, V.1
Levner, E.2
Meyzin, L.3
-
18
-
-
0031366854
-
AMHS for 300 mm wafer
-
R. Kurosaki, N. Nagao, H. Komada, Y. Watanabe, and H. Yano, "AMHS for 300 mm wafer," in Proc. 1997 IEEE Int. Symp. Semiconductor Manufacturing, 1997, pp. D-13-D-17.
-
(1997)
Proc. 1997 IEEE Int. Symp. Semiconductor Manufacturing
-
-
Kurosaki, R.1
Nagao, N.2
Komada, H.3
Watanabe, Y.4
Yano, H.5
-
19
-
-
0034583802
-
Low cost and short lead time AMHS design using interbay/intrabay diverging and converging method for 300 mm fab
-
R. Kurosaki, T. Shimura, H. Komada, T. Kojima, and Y. Watanabe, "Low cost and short lead time AMHS design using interbay/intrabay diverging and converging method for 300 mm fab," in Proc. 9th IEEE Int. Symp. Semiconductor Manufacturing, 1999, pp. 23-26.
-
(1999)
Proc. 9th IEEE Int. Symp. Semiconductor Manufacturing
, pp. 23-26
-
-
Kurosaki, R.1
Shimura, T.2
Komada, H.3
Kojima, T.4
Watanabe, Y.5
-
20
-
-
0030082467
-
Composite dispatching rules for multiple-vehicle AGV systems
-
J. Lee, "Composite dispatching rules for multiple-vehicle AGV systems," Simulation, vol. 66, no. 2, pp. 121-130, 1996.
-
(1996)
Simulation
, vol.66
, Issue.2
, pp. 121-130
-
-
Lee, J.1
-
21
-
-
0035872172
-
Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab
-
J.-T. Lin, F.-K. Wang, and P.-Y. Yen, "Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab" Int. J. Prod. Res., vol. 39, no. 6, pp. 1221-1238, 2001.
-
(2001)
Int. J. Prod. Res.
, vol.39
, Issue.6
, pp. 1221-1238
-
-
Lin, J.-T.1
Wang, F.-K.2
Yen, P.-Y.3
-
22
-
-
0020140765
-
Design of automatic guided vehicle systems
-
W.L. Maxwell and J.A. Muckstadt, "Design of automatic guided vehicle systems," IIE Trans., vol. 14, no. 2, pp. 114-124, 1982.
-
(1982)
IIE Trans.
, vol.14
, Issue.2
, pp. 114-124
-
-
Maxwell, W.L.1
Muckstadt, J.A.2
-
23
-
-
0035421294
-
A simulation-based experiment for comparing AMHS performance in semiconductor fabrication facility
-
G.T. Mackulak and P. Savory, "A simulation-based experiment for comparing AMHS performance in semiconductor fabrication facility," IEEE Trans. Semiconduct. Manufact., vol. 14, no. 3, pp. 273-280, 2001.
-
(2001)
IEEE Trans. Semiconduct. Manufact.
, vol.14
, Issue.3
, pp. 273-280
-
-
Mackulak, G.T.1
Savory, P.2
-
24
-
-
0009351726
-
Simulation model calculates how many automated guided vehicles are needed
-
D. Newton, "Simulation model calculates how many automated guided vehicles are needed," Ind. Eng., vol. 17, no. 2, pp. 68-78, 1985.
-
(1985)
Ind. Eng.
, vol.17
, Issue.2
, pp. 68-78
-
-
Newton, D.1
-
25
-
-
0033320285
-
Integration of 300 mm fab layouts and material handling automation
-
D. Pillai, T. Quinn, K. Kryder, and D. Charison, "Integration of 300 mm fab layouts and material handling automation," in Proc. 1999 IEEE Int. Symp. Semiconductor Manufacturing, 1999, pp. 23-26.
-
(1999)
Proc. 1999 IEEE Int. Symp. Semiconductor Manufacturing
, pp. 23-26
-
-
Pillai, D.1
Quinn, T.2
Kryder, K.3
Charison, D.4
-
26
-
-
0010908934
-
-
Tech. Rep.: CAIS-TR-99-26, Center Advanced Inform. Syst., School Appl. Sci., Nanyang Technological Univ
-
L. Qiu and W.-J. Hsu, "Scheduling and routing algorithms for AGVs: A survey," Tech. Rep.: CAIS-TR-99-26, Center Advanced Inform. Syst., School Appl. Sci., Nanyang Technological Univ., 1999.
-
(1999)
Scheduling and Routing Algorithms for AGVs: A Survey
-
-
Qiu, L.1
Hsu, W.-J.2
-
27
-
-
0031635825
-
A dispatching-rule-based algorithm for automated guided vehicle systems design
-
Y.-C. Shen and J.E. Kobza, "A dispatching-rule-based algorithm for automated guided vehicle systems design," Prod. Planning Control, vol. 9, no. 1, pp. 47-59, 1998.
-
(1998)
Prod. Planning Control
, vol.9
, Issue.1
, pp. 47-59
-
-
Shen, Y.-C.1
Kobza, J.E.2
-
28
-
-
0024029390
-
Hoist scheduling for a PCB electroplating facility
-
G.W. Shapiro and H.L.W. Nuttle, "Hoist scheduling for a PCB electroplating facility," IIE Trans., vol. 20, pp. 157-167, 1988.
-
(1988)
IIE Trans.
, vol.20
, pp. 157-167
-
-
Shapiro, G.W.1
Nuttle, H.L.W.2
-
29
-
-
0000331266
-
The centroid projection method for locating pick-up and delivery stations in single-loop AGV systems
-
D. Sinriech and J.M.A. Tanchoco, "The centroid projection method for locating pick-up and delivery stations in single-loop AGV systems," J. Manufacturing Syst., vol. 11, no. 4, pp. 297-307, 1992.
-
(1992)
J. Manufacturing Syst.
, vol.11
, Issue.4
, pp. 297-307
-
-
Sinriech, D.1
Tanchoco, J.M.A.2
-
30
-
-
0027558925
-
Solution methods for the mathematical models of single-loop AGV systems
-
D. Sinriech and J.M.A. Tanchoco, "Solution methods for the mathematical models of single-loop AGV systems," Int. J. Prod. Res., vol. 31, no. 3, pp. 705-725, 1993.
-
(1993)
Int. J. Prod. Res.
, vol.31
, Issue.3
, pp. 705-725
-
-
Sinriech, D.1
Tanchoco, J.M.A.2
-
31
-
-
0026837787
-
OSL - Optimal single-loop guide paths for AGVS
-
J.M.A. Tanchoco and D. Sinriech, "OSL - Optimal single-loop guide Paths for AGVS," Int. J. Prod. Res., vol. 30, no. 3, pp. 665-681, 1992.
-
(1992)
Int. J. Prod. Res.
, vol.30
, Issue.3
, pp. 665-681
-
-
Tanchoco, J.M.A.1
Sinriech, D.2
-
32
-
-
0002554762
-
Determination of the total number of vehicles in an AGV-based material transport system
-
J.M.A. Tanchoco, P.J. Egbelu, and F. Taghaboni, "Determination of the total number of vehicles in an AGV-based material transport system," Material Flow, vol. 4, no. 1-2, pp. 35-51, 1987.
-
(1987)
Material Flow
, vol.4
, Issue.1-2
, pp. 35-51
-
-
Tanchoco, J.M.A.1
Egbelu, P.J.2
Taghaboni, F.3
-
33
-
-
0034634803
-
Unidirectional circular layout for overhead material handling systems
-
J.-H. Ting and J.M.A. Tanchoco, "Unidirectional circular layout for overhead material handling systems," Int. J. Prod. Res., vol. 38, no. 16, pp. 3913-3935, 2000.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.16
, pp. 3913-3935
-
-
Ting, J.-H.1
Tanchoco, J.M.A.2
-
34
-
-
0008941947
-
Resolution of the cyclic multi-hoists scheduling problem with overlapping partitions
-
C. Varnier, A. Bachelu, and P. Baptiste, "Resolution of the cyclic multi-hoists scheduling problem with overlapping partitions," INFOR J., vol. 35, no. 4, pp. 309-324, 1997.
-
(1997)
INFOR J.
, vol.35
, Issue.4
, pp. 309-324
-
-
Varnier, C.1
Bachelu, A.2
Baptiste, P.3
|