-
1
-
-
0026108478
-
A model for fleet sizing and vehicle allocation
-
Beaujon, G.J. and Turnquist, M.A., "A Model for Fleet Sizing and Vehicle Allocation," Transportation Science, Vol. 29, No. 1, pp. 19-45 (1991).
-
(1991)
Transportation Science
, vol.29
, Issue.1
, pp. 19-45
-
-
Beaujon, G.J.1
Turnquist, M.A.2
-
2
-
-
0028428473
-
Expected waiting times in single-device trip-based material handling systems
-
Bozer, Y.A., Cho, M.-G., and Srinivasan, M.M., "Expected Waiting Times in Single-Device Trip-Based Material Handling Systems," European Journal of Operational Research, Vol. 75, No. 1, pp. 200-216 (1994).
-
(1994)
European Journal of Operational Research
, vol.75
, Issue.1
, pp. 200-216
-
-
Bozer, Y.A.1
Cho, M.-G.2
Srinivasan, M.M.3
-
3
-
-
22344451873
-
Design of a 2-stations automated guided vehicle systems
-
A. Kolse, M.G. Speranza, and L.N. Van Wassnhove (Eds.), Springer, Germany
-
Chevalier, P., Pochet, Y., and Talbot, L., "Design of a 2-Stations Automated Guided Vehicle Systems," Quantitative Approaches to Distribution Logistics and Supply Chain Management, A. Kolse, M.G. Speranza, and L.N. Van Wassnhove (Eds.), Springer, Germany, pp. 309-329 (2002).
-
(2002)
Quantitative Approaches to Distribution Logistics and Supply Chain Management
, pp. 309-329
-
-
Chevalier, P.1
Pochet, Y.2
Talbot, L.3
-
4
-
-
0031069708
-
Fleet sizing and emply equipment redistribution for center-terminal transportation networks
-
Du, Y. and Hall, R., "Fleet Sizing and Emply Equipment Redistribution for Center-Terminal Transportation Networks," Management Science, Vol. 43, No. 2, pp. 145-157 (1997).
-
(1997)
Management Science
, vol.43
, Issue.2
, pp. 145-157
-
-
Du, Y.1
Hall, R.2
-
5
-
-
0027543063
-
Concurrent specification of unit load sizes and automated guided vehicle fleet size in manufacturing system
-
Egbelu, P.J., "Concurrent Specification of Unit Load Sizes and Automated Guided Vehicle Fleet Size in Manufacturing System," International Journal of Production Economics, Vol. 29, pp. 49-64 (1993).
-
(1993)
International Journal of Production Economics
, vol.29
, pp. 49-64
-
-
Egbelu, P.J.1
-
6
-
-
0002894516
-
The use of non-simulation approaches in estimating vehicle requirements in an AGV-based transport System
-
Egbelu, P.J., "The Use of Non-Simulation Approaches in Estimating Vehicle Requirements in an AGV-Based Transport System," Material Flow, Vol. 4, Nos. 1-2, pp. 17-32 (1987).
-
(1987)
Material Flow
, vol.4
, Issue.1-2
, pp. 17-32
-
-
Egbelu, P.J.1
-
7
-
-
0021423836
-
Characterization of automated guided vehicle dispatching rules
-
Egbelu P.J. and Tanchoco, J.M.A., "Characterization of Automated Guided Vehicle Dispatching Rules," International Journal of Production Research, Vol. 22, No. 3, pp. 359-374 (1984).
-
(1984)
International Journal of Production Research
, vol.22
, Issue.3
, pp. 359-374
-
-
Egbelu, P.J.1
Tanchoco, J.M.A.2
-
8
-
-
0032375676
-
Design and operational issues in AGV-served manufacturing systems
-
Ganesharajah T., Hall, N.G., and Sriskandarajah, C., "Design and Operational Issues in AGV-Served Manufacturing Systems," Annals of Operational Research, Vol. 76, pp. 109-154 (1998).
-
(1998)
Annals of Operational Research
, vol.76
, pp. 109-154
-
-
Ganesharajah, T.1
Hall, N.G.2
Sriskandarajah, C.3
-
9
-
-
0005867176
-
Approximating for the mean waiting time in the GI/G/s queue
-
Kimura, T., "Approximating for the Mean Waiting Time in the GI/G/s Queue," Journal of the Operations Research Society of Japan, Vol. 34, No. 2, pp. 173-186 (1991).
-
(1991)
Journal of the Operations Research Society of Japan
, vol.34
, Issue.2
, pp. 173-186
-
-
Kimura, T.1
-
10
-
-
0032003625
-
A stochastic model of empty-vehicle travel time and load request service time in light-traffic material handling systems
-
Kobza, J.E., Shen, Y.-C., and Reasor, R.J., "A Stochastic Model of Empty-Vehicle Travel Time and Load Request Service Time in Light-Traffic Material Handling Systems," IIE Transactions, Vol. 30, pp. 133-142 (1998).
-
(1998)
IIE Transactions
, vol.30
, pp. 133-142
-
-
Kobza, J.E.1
Shen, Y.-C.2
Reasor, R.J.3
-
11
-
-
0036640167
-
Vehicle travel time models for AGV systems under various dispatching rules
-
Koo, P.-H. and Jang, J., "Vehicle Travel Time Models for AGV Systems under Various Dispatching Rules," International Journal of Flexible Manufacturing Systems, Vol. 14, No. 3, pp. 249-261 (2002).
-
(2002)
International Journal of Flexible Manufacturing Systems
, vol.14
, Issue.3
, pp. 249-261
-
-
Koo, P.-H.1
Jang, J.2
-
12
-
-
17444390083
-
Fleet sizing and vehicle routing for container transportation in a static environment
-
Koo, P.-H., Lee, W.S., and Jang, D.W., "Fleet Sizing and Vehicle Routing for Container Transportation in a Static Environment," OR Spectrum, Vol. 26, No. 2, pp. 193-209 (2004).
-
(2004)
OR Spectrum
, vol.26
, Issue.2
, pp. 193-209
-
-
Koo, P.-H.1
Lee, W.S.2
Jang, D.W.3
-
13
-
-
0004370851
-
Assignment of AGVs with different vehicle types
-
Leung, L.C., Khator, S.K., and Kimbler, D.L., "Assignment of AGVs with Different Vehicle Types," Material Flow, Vol. 4, Nos. 1-2, pp. 65-72 (1987).
-
(1987)
Material Flow
, vol.4
, Issue.1-2
, pp. 65-72
-
-
Leung, L.C.1
Khator, S.K.2
Kimbler, D.L.3
-
14
-
-
0025482436
-
Design of an automated guided vehicle-based material handling system for a flexible manufacturing system
-
Mahadevan, B. and Narendran, T.T., "Design of an Automated Guided Vehicle-Based Material Handling System for a Flexible Manufacturing System," International Journal of Production Research, Vol. 28, No. 9, pp. 1611-1622 (1990).
-
(1990)
International Journal of Production Research
, vol.28
, Issue.9
, pp. 1611-1622
-
-
Mahadevan, B.1
Narendran, T.T.2
-
15
-
-
0027627027
-
Estimation of number of AGVs for a flexible manufacturing system: An analytical model
-
Mahadevan, B. and Narendran, T.T., "Estimation of Number of AGVs for a Flexible Manufacturing System: An Analytical Model," International Journal of Production Research, Vol. 31, No. 7, pp. 1655-1670 (1993).
-
(1993)
International Journal of Production Research
, vol.31
, Issue.7
, pp. 1655-1670
-
-
Mahadevan, B.1
Narendran, T.T.2
-
16
-
-
0000687077
-
A model for the design of zone control automated guided vehicle systems
-
Malmborg, C.J., "A Model for the Design of Zone Control Automated Guided Vehicle Systems," International Journal of Production Research, Vol. 28, No. 10, pp. 1741-1758 (1990).
-
(1990)
International Journal of Production Research
, vol.28
, Issue.10
, pp. 1741-1758
-
-
Malmborg, C.J.1
-
17
-
-
0025921206
-
Tightened analytical bounds on the impact of dispatching rules in AGVS
-
Malmborg, C.J., "Tightened Analytical Bounds on the Impact of Dispatching Rules in AGVS," Applied Mathematical Modeling, Vol. 15, No. 6, pp. 305-311 (1991).
-
(1991)
Applied Mathematical Modeling
, vol.15
, Issue.6
, pp. 305-311
-
-
Malmborg, C.J.1
-
18
-
-
0020140765
-
Design of automated guided vehicle systems
-
Maxwell, W.L. and Muckstadt, J.A., "Design of Automated Guided Vehicle Systems," IIE Transactions, Vol. 14, No. 2, pp. 114-124 (1982).
-
(1982)
IIE Transactions
, vol.14
, Issue.2
, pp. 114-124
-
-
Maxwell, W.L.1
Muckstadt, J.A.2
-
19
-
-
0025252024
-
On arrivals that see time averages
-
Melamed, B. and Whitt, W., "On Arrivals That See Time Averages," Operations Research, Vol. 38, No. 1, pp. 156-172 (1990).
-
(1990)
Operations Research
, vol.38
, Issue.1
, pp. 156-172
-
-
Melamed, B.1
Whitt, W.2
-
20
-
-
0024065468
-
A simulation study of multiple-load-carrying AGVs in a flexible manufacturing system
-
Ozden, M., "A Simulation Study of Multiple-Load-Carrying AGVs in a Flexible Manufacturing System," International Journal of Production Research, Vol. 26, No. 8, pp. 1353-1366 (1988).
-
(1988)
International Journal of Production Research
, vol.26
, Issue.8
, pp. 1353-1366
-
-
Ozden, M.1
-
21
-
-
21844525941
-
Dynamic vehicle routing: Status and prospect
-
Psaraftis, H.N., "Dynamic Vehicle Routing: Status and Prospect," Annals of Operations Research, Vol. 61, pp. 143-164 (1995).
-
(1995)
Annals of Operations Research
, vol.61
, pp. 143-164
-
-
Psaraftis, H.N.1
-
22
-
-
0032071781
-
Determination of optimal AGV fleet size for an FMS
-
Rajotia, S., Shanker, K., and Batra, J.L., "Determination of Optimal AGV Fleet Size for an FMS," International Journal of Production Research, Vol. 36, No. 5, pp. 1177-1198 (1998).
-
(1998)
International Journal of Production Research
, vol.36
, Issue.5
, pp. 1177-1198
-
-
Rajotia, S.1
Shanker, K.2
Batra, J.L.3
-
23
-
-
0031635825
-
A dispatching-rule based algorithm for guided vehicle systems design
-
Shen, Y.C. and Kobza, J.E., "A Dispatching-Rule Based Algorithm for Guided Vehicle Systems Design," Production Planning and Control, Vol. 9, No. 1, pp. 47-59 (1998).
-
(1998)
Production Planning and Control
, vol.9
, Issue.1
, pp. 47-59
-
-
Shen, Y.C.1
Kobza, J.E.2
-
24
-
-
0026880738
-
An economic model for determining AGV fleet size
-
Sinriech, D. and Tanchoco, J.M.A., "An Economic Model for Determining AGV Fleet Size," International Journal of Production Research, Vol. 30, No. 6, pp. 1255-1268 (1992a).
-
(1992)
International Journal of Production Research
, vol.30
, Issue.6
, pp. 1255-1268
-
-
Sinriech, D.1
Tanchoco, J.M.A.2
-
25
-
-
0026938781
-
The impact of empty vehicle flow on the performance of single-loop guide paths
-
Sinriech, D. and Tanchoco, J.M.A., "The Impact of Empty Vehicle Flow on the Performance of Single-Loop Guide Paths," International Journal of Production Research, Vol. 30, No. 10, pp. 2237-2252 (1992b).
-
(1992)
International Journal of Production Research
, vol.30
, Issue.10
, pp. 2237-2252
-
-
Sinriech, D.1
Tanchoco, J.M.A.2
-
26
-
-
22344457849
-
-
Report No. DOT-ATC-89-2, School of Industrial Engineering, Purdue University, IN
-
Solberg, J.J., Stochastic Modeling of Large-Scale Transportation Networks, Report No. DOT-ATC-89-2, School of Industrial Engineering, Purdue University, IN (1980).
-
(1980)
Stochastic Modeling of Large-scale Transportation Networks
-
-
Solberg, J.J.1
-
27
-
-
0002554762
-
Determination of the total number of vehicles in a AGV-based material transport system
-
Tanchoco, J.M.A., Egbelu, P.J., and Taghaboni, F., "Determination of the Total Number of Vehicles in a AGV-Based Material Transport System," Material Flow, Vol. 4, pp. 33-51 (1987).
-
(1987)
Material Flow
, vol.4
, pp. 33-51
-
-
Tanchoco, J.M.A.1
Egbelu, P.J.2
Taghaboni, F.3
-
28
-
-
0035312115
-
Determination of the number of AGVs required at a semi-automated container terminal
-
Vis, I.F.A., de Koster, R., Roodbergen, K.J., and Peeters, L.W.P., Determination of the Number of AGVs Required at a Semi-Automated Container Terminal, Journal of the Operational Research Society, Vol. 52, No. 4, pp. 409-417 (2001).
-
(2001)
Journal of the Operational Research Society
, vol.52
, Issue.4
, pp. 409-417
-
-
Vis, I.F.A.1
De Koster, R.2
Roodbergen, K.J.3
Peeters, L.W.P.4
-
29
-
-
0020103086
-
Poisson arrivals see time averages
-
Wolff, R.W., "Poisson Arrivals See Time Averages," Operations Research, Vol. 30, No. 2, pp. 223-231 (1982).
-
(1982)
Operations Research
, vol.30
, Issue.2
, pp. 223-231
-
-
Wolff, R.W.1
|