메뉴 건너뛰기




Volumn 111, Issue 1, 2011, Pages 84-112

A methodology for selecting assembly systems feeding policy

Author keywords

Assembly lines; Just in time; Manufacturing systems; Parts

Indexed keywords

ASSEMBLY LINE; ASSEMBLY SYSTEMS; CLASS-BASED; DECISION MAKING TOOL; DELIVERY METHODS; DELIVERY SYSTEMS; DESCRIPTIVE MODEL; DESIGN COMPONENT; DESIGN/METHODOLOGY/APPROACH; EARLY DECISION; FEEDING SYSTEM; JUST IN TIME; KITTING; MANUFACTURING SYSTEMS; OBJECTIVE PERFORMANCE MEASURES; PARTS; PERFORMANCE ANALYSIS; PRODUCTION MANAGER; QUANTITATIVE DECISION; REPRESENTATIVE CASE; SHOP FLOOR;

EID: 79951504916     PISSN: 02635577     EISSN: None     Source Type: Journal    
DOI: 10.1108/02635571111099749     Document Type: Article
Times cited : (93)

References (100)
  • 1
    • 0033225131 scopus 로고    scopus 로고
    • Overview of design and operational issues of kanban systems
    • Akturk, M.S. and Erhun, F. (1999), "An overview of design and operational issues of kanban systems", International Journal of Production Research, Vol. 37, pp. 3859-81. (Pubitemid 30531934)
    • (1999) International Journal of Production Research , vol.37 , Issue.17 , pp. 3859-3881
    • Akturk, M.S.1    Erhun, F.2
  • 3
    • 0027353436 scopus 로고
    • Determining the number of kanbans in multi-item just-in-time systems
    • Askin, R.G., Mitwasi, M.G. and Goldberg, J.B. (1993), "Determining the number of kanbans in multi-item just-in-time systems", IIE Transactions, Vol. 25, pp. 89-97.
    • (1993) IIE Transactions , vol.25 , pp. 89-97
    • Askin, R.G.1    Mitwasi, M.G.2    Goldberg, J.B.3
  • 4
    • 0032040777 scopus 로고    scopus 로고
    • A framework and a simulation generator for kanban-controlled manufacturing systems
    • PII S0360835297002805
    • Aytug, H. and Dogan, C.A. (1998), "A framework and a simulation generator for kanban-controlled manufacturing systems", Computers & Industrial Engineering, Vol. 34, pp. 337-50. (Pubitemid 128458242)
    • (1998) Computers and Industrial Engineering , vol.34 , Issue.2-4 , pp. 337-350
    • Aytug, H.1    Dogan, C.A.2
  • 6
    • 51249121803 scopus 로고    scopus 로고
    • Sequencing mixed-model assembly lines: Survey, classification and model critique
    • Boysen, N., Fliedner, M. and Scholl, A. (2009), "Sequencing mixed-model assembly lines: survey, classification and model critique", European Journal of Operational Research, Vol. 192, pp. 349-73.
    • (2009) European Journal of Operational Research , vol.192 , pp. 349-373
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 7
    • 38249010213 scopus 로고
    • Kitting versus line stocking: A conceptual framework and a descriptive model
    • Bozer, Y.A. and McGinnis, L.F. (1992), "Kitting versus line stocking: a conceptual framework and a descriptive model", International Journal of Production Economics, Vol. 28, pp. 1-19.
    • (1992) International Journal of Production Economics , vol.28 , pp. 1-19
    • Bozer, Y.A.1    McGinnis, L.F.2
  • 8
    • 18844403299 scopus 로고    scopus 로고
    • Impact of product structure on order review/evaluation procedures
    • DOI 10.1108/02635570510590138
    • Bragg, D.J., Duplaga, E.A. and Penlesky, R.J. (2005), "Impact of product structure on order review/evaluation procedures", Industrial Management & Data Systems, Vol. 105, pp. 307-24. (Pubitemid 40682966)
    • (2005) Industrial Management and Data Systems , vol.105 , Issue.3 , pp. 307-324
    • Bragg, D.J.1    Duplaga, E.A.2    Penlesky, R.J.3
  • 10
    • 0012935432 scopus 로고
    • Design and performance of kitting and order picking systems
    • Brynzér, H. and Johansson, M.I. (1995), "Design and performance of kitting and order picking systems", International Journal of Production Economics, Vol. 41 Nos 1-3, pp. 115-25.
    • (1995) International Journal of Production Economics , vol.41 , Issue.1-3 , pp. 115-125
    • Brynzér, H.1    Johansson, M.I.2
  • 14
    • 0034288465 scopus 로고    scopus 로고
    • The extended kanban control system for production coordination of assembly manufacturing systems
    • Chaouiya, C., Liberopoulos, G. and Dallery, Y. (2000), "The extended kanban control system for production coordination of assembly manufacturing systems", IIE Transactions, Vol. 32 No. 10, pp. 999-1012.
    • (2000) IIE Transactions , vol.32 , Issue.10 , pp. 999-1012
    • Chaouiya, C.1    Liberopoulos, G.2    Dallery, Y.3
  • 16
    • 0038243091 scopus 로고    scopus 로고
    • Component allocation in multi-echelon assembly systems with linked substitutes
    • Chen, J.F. (2003), "Component allocation in multi-echelon assembly systems with linked substitutes", Computers & Industrial Engineering, Vol. 45, pp. 43-60.
    • (2003) Computers & Industrial Engineering , vol.45 , pp. 43-60
    • Chen, J.F.1
  • 17
    • 0027814043 scopus 로고
    • An evaluation of heuristics for allocating components to kits in small-lot, multiechelon assembly systems
    • Chen, J.F. and Wilhelm, W.E. (1993), "An evaluation of heuristics for allocating components to kits in small-lot, multiechelon assembly systems", International Journal of Production Research, Vol. 31, pp. 115-25.
    • (1993) International Journal of Production Research , vol.31 , pp. 115-125
    • Chen, J.F.1    Wilhelm, W.E.2
  • 18
    • 84989672523 scopus 로고
    • Optimizing the allocation of components to kits in small-lot, multiechelon assembly systems
    • Chen, J.F. and Wilhelm, W.E. (1994), "Optimizing the allocation of components to kits in small-lot, multiechelon assembly systems", Naval Research Logistics, Vol. 41, pp. 229-56.
    • (1994) Naval Research Logistics , vol.41 , pp. 229-256
    • Chen, J.F.1    Wilhelm, W.E.2
  • 19
    • 0031259061 scopus 로고    scopus 로고
    • Kitting in multi-echelon, multi-product assembly systems with parts substitutable
    • Chen, J.F. and Wilhelm, W.E. (1997), "Kitting in multiechelon, multiproduct assembly systems with parts substitutable", International Journal of Production Research, Vol. 35, pp. 2871-97. (Pubitemid 127564047)
    • (1997) International Journal of Production Research , vol.35 , Issue.10 , pp. 2871-2897
    • Chen, J.F.1    Wilhelm, W.E.2
  • 20
  • 21
    • 0036642734 scopus 로고    scopus 로고
    • A dynamic part-feeding system for an automotive assembly line
    • Choi, W. and Lee, Y. (2001), "A dynamic part-feeding system for an automotive assembly line", Computers & Industrial Engineering, Vol. 43, pp. 123-34.
    • (2001) Computers & Industrial Engineering , vol.43 , pp. 123-134
    • Choi, W.1    Lee, Y.2
  • 22
    • 2442516452 scopus 로고    scopus 로고
    • Material planning for production kits under uncertainty
    • Choobineh, F. and Mohebbi, E. (2004), "Material planning for production kits under uncertainty", Production Planning & Control, Vol. 15, pp. 63-70.
    • (2004) Production Planning & Control , vol.15 , pp. 63-70
    • Choobineh, F.1    Mohebbi, E.2
  • 24
    • 0036272637 scopus 로고    scopus 로고
    • A case study of a principally new way of materials kitting - An evaluation of time consumption and physical workload
    • DOI 10.1016/S0169-8141(02)00077-X, PII S016981410200077X
    • Christmansoon, M., Medbo, L., Hansson, G.A., Ohlsson, K., Unge Byström, J., Möller, T. and Forsman, M. (2002), "A case study of a principally new way of materials kitting: an evaluation of time consumption and physical workload", International Journal of Industrial Ergonomics, Vol. 30, pp. 49-65. (Pubitemid 34606029)
    • (2002) International Journal of Industrial Ergonomics , vol.30 , Issue.1 , pp. 49-65
    • Christmansson, M.1    Medbo, L.2    Hansson, G.-A.3    Ohlsson, K.4    Unge Bystrom, J.5    Moller, T.6    Forsman, M.7
  • 25
    • 0022670306 scopus 로고
    • Process approach to planning a successful kitting systems is outlined
    • Conrad, S. and Pukanic, R. (1986), "Process approach to planning a successful kitting systems is outlined", Industrial Engineering, Vol. 18, pp. 58-71.
    • (1986) Industrial Engineering , vol.18 , pp. 58-71
    • Conrad, S.1    Pukanic, R.2
  • 26
    • 79951501299 scopus 로고    scopus 로고
    • Master thesis in Industrial Management :8080/dspace/bitstream/2320/4544/ 1/AlperCorakci.pdf (accessed February
    • Corakci, M.A. (2008), "An evaluation of kitting systems in lean production", Master thesis in Industrial Management, No. 15/2008, University of Boras, Boras, available at: http://dspace. bib.hb.se:8080/dspace/ bitstream/2320/4544/1/AlperCorakci.pdf (accessed February 2009).
    • (2008) An Evaluation of Kitting Systems in Lean Production , Issue.15
    • Corakci, M.A.1
  • 29
    • 34249713980 scopus 로고    scopus 로고
    • A brief survey of just-in-time sequencing for mixed-model systems
    • Dhamala, T.N. and Kubiak, W. (2005), "A brief survey of just-in-time sequencing for mixed-model systems", International Journal of Operations Research, Vol. 2, pp. 38-42.
    • (2005) International Journal of Operations Research , vol.2 , pp. 38-42
    • Dhamala, T.N.1    Kubiak, W.2
  • 30
    • 4744343629 scopus 로고
    • Kitting in JIT production: A kitting project at a tractor plant
    • September
    • Ding, F.Y. (1992), "Kitting in JIT production: a kitting project at a tractor plant", IE Solutions, September, pp. 42-4.
    • (1992) IE Solutions , pp. 42-44
    • Ding, F.Y.1
  • 31
    • 2442421405 scopus 로고
    • Kitting in just-in-time production
    • Ding, F.Y. and Balakrishnan, P. (1990), "Kitting in just-in-time production", Production & Inventory Management Journal, Vol. 31 No. 4, pp. 25-8.
    • (1990) Inventory Management Journal , vol.31 , Issue.4 , pp. 25-28
    • Ding, F.Y.1    Balakrishnan, P.2
  • 33
    • 0242333198 scopus 로고    scopus 로고
    • Interaction of design and operational parameters in periodic review kanban systems
    • Erhun, F., Akturk, M.S. and Turkcan, A. (2003), "Interaction of design and operational parameters in periodic review kanban systems", International Journal of Production Research, Vol. 41, pp. 3315-38.
    • (2003) International Journal of Production Research , vol.41 , pp. 3315-3338
    • Erhun, F.1    Akturk, M.S.2    Turkcan, A.3
  • 34
    • 67650705244 scopus 로고    scopus 로고
    • A proposal for integrating production control and quality control
    • Fernandes, F.C.F., Filho, M.G. and Bonney, M. (2009), "A proposal for integrating production control and quality control", Industrial Management & Data Systems, Vol. 109 No. 5, pp. 683-707.
    • (2009) Industrial Management & Data Systems , vol.109 , Issue.5 , pp. 683-707
    • Fernandes, F.C.F.1    Filho, M.G.2    Bonney, M.3
  • 35
    • 33644546045 scopus 로고    scopus 로고
    • Operations and logistics issues in modular assembly processes: Cases from the automotive sector
    • Fredriksson, P. (2006), "Operations and logistics issues in modular assembly processes: cases from the automotive sector", Journal of Manufacturing Technology Management, Vol. 17 No. 2, pp. 168-86.
    • (2006) Journal of Manufacturing Technology Management , vol.17 , Issue.2 , pp. 168-186
    • Fredriksson, P.1
  • 37
    • 76049116045 scopus 로고    scopus 로고
    • Analyzing supplier development criteria for an automobile industry
    • Govindan, K. and Devika, K. (2010), "Analyzing supplier development criteria for an automobile industry", Industrial Management & Data Systems, Vol. 110 No. 1, pp. 43-62.
    • (2010) Industrial Management & Data Systems , vol.110 , Issue.1 , pp. 43-62
    • Govindan, K.1    Devika, K.2
  • 38
    • 0030174001 scopus 로고    scopus 로고
    • Component kitting in semi-automated printed circuit board assembly
    • Gunther, H.O., Gronalt, M. and Piller, F. (1996), "Component kitting in semi-automated printed circuit board assembly", International Journal of Production Economics, Vol. 43 Nos 2-3, pp. 213-26. (Pubitemid 126370177)
    • (1996) International Journal of Production Economics , vol.43 , Issue.2-3 , pp. 213-226
    • Gunther, H.O.1    Gronalt, M.2    Piller, F.3
  • 39
    • 0031103287 scopus 로고    scopus 로고
    • An algorithm to dynamically adjust the number of Kanbans in stochastic processing times and variable demand environment
    • Gupta, S.M. and Al-Turki, Y.A.Y. (1997), "An algorithm to dynamically adjust the number of kanbans in stochastic processing times and variable demand environment", Production Planning & Control, Vol. 8, pp. 133-41. (Pubitemid 127652359)
    • (1997) Production Planning and Control , vol.8 , Issue.2 , pp. 133-141
    • Gupta, S.M.1    Al-Turki, Y.A.Y.2
  • 41
    • 79951499326 scopus 로고    scopus 로고
    • Thesis for the Degree of Licentiate of Engineering, Report L2009: 031, Department of Technology Management and Economics Division of Logistics and Transportation, Chalmers University of Technology, Göteborg
    • Hanson, R. (2009), "On the options available in the design of in-plant materials supply systems", Thesis for the Degree of Licentiate of Engineering, Report L2009:031, Department of Technology Management and Economics Division of Logistics and Transportation, Chalmers University of Technology, Göteborg, available at: https://document.chalmers.se/ download? docid266470246 (accessed January 2010).
    • (2009) On the options available in the design of in-plant materials supply systems
    • Hanson, R.1
  • 43
    • 46749096878 scopus 로고    scopus 로고
    • Implementing a hybrid simulation model for a kanban-based material handling system
    • Hao, Q. and Shen, W. (2008), "Implementing a hybrid simulation model for a kanban-based material handling system", Robotics & Computer-integrated Manufacturing, Vol. 24, pp. 635-46.
    • (2008) Robotics & Computer-integrated Manufacturing , vol.24 , pp. 635-646
    • Hao, Q.1    Shen, W.2
  • 44
    • 74549216440 scopus 로고    scopus 로고
    • Research issues on factors influencing the choice of kitting versus line stocking
    • Hua, S.Y. and Johnson, D.J. (2008), "Research issues on factors influencing the choice of kitting versus line stocking", International Journal of Production Research, Vol. 48 No. 3, pp. 779-800.
    • (2008) International Journal of Production Research , vol.48 , Issue.3 , pp. 779-800
    • Hua, S.Y.1    Johnson, D.J.2
  • 45
    • 0037061484 scopus 로고    scopus 로고
    • An integrated model for the design of end-of-aisle order picking system and the determination of unit load sizes of AGVs
    • DOI 10.1016/S0360-8352(02)00058-X, PII S036083520200058X
    • Hwang, H., Moon, S. and Gen, M. (2002), "An integrated model for the design of end-of-aisle order picking system and the determination of unit load sizes for AGVs", Computers & Industrial Engineering, Vol. 42, pp. 249-58. (Pubitemid 34410752)
    • (2002) Computers and Industrial Engineering , vol.42 , Issue.2-4 , pp. 249-258
    • Hwang, H.1    Moon, S.2    Gen, M.3
  • 47
    • 66149120164 scopus 로고    scopus 로고
    • Information management for materials supply systems design
    • Johansson, E. (2009), "Information management for materials supply systems design", International Journal of Production Research, Vol. 47, pp. 2217-29.
    • (2009) International Journal of Production Research , vol.47 , pp. 2217-2229
    • Johansson, E.1
  • 48
    • 32644487062 scopus 로고    scopus 로고
    • Evaluation of materials supply systems during product development projects
    • DOI 10.1080/00207540500338104, PII T7861625720451
    • Johansson, E., Bellgran, M. and Johansson, M.I. (2006), "Evaluation of materials supply systems during product development projects", International Journal of Production Research, Vol. 44, pp. 903-17. (Pubitemid 43245738)
    • (2006) International Journal of Production Research , vol.44 , Issue.5 , pp. 903-917
    • Johansson, E.1    Bellgran, M.2    Johansson, M.I.3
  • 50
    • 33644676202 scopus 로고
    • Kitting systems for small parts in manual assembly systems
    • Pridham, M. and OBrien, C. (Eds) Taylor & Francis, London
    • Johansson, M.I. (1991), "Kitting systems for small parts in manual assembly systems", in Pridham, M. and OBrien, C. (Eds), Production Research - Approaching the 21st Century, Taylor & Francis, London, pp. 225-30.
    • (1991) Production Research - Approaching the 21st Century , pp. 225-230
    • Johansson, M.I.1
  • 51
    • 0010908050 scopus 로고    scopus 로고
    • Design of an automated shop floor material handling system with inventory considerations
    • Johnson, M.E. and Brandeau, M.L. (1999), "Design of an automated shop floor material handling system with inventory considerations", Operations Research, Vol. 47 No. 1, pp. 65-80. (Pubitemid 129700858)
    • (1999) Operations Research , vol.47 , Issue.1 , pp. 65-80
    • Johnson, M.E.1    Brandeau, M.L.2
  • 52
    • 0034294071 scopus 로고    scopus 로고
    • A performance comparison of pull type control mechanisms for multi-stage manufacturing
    • Karaesmen, F. and Dallery, Y. (2000), "A performance comparison of pull type control mechanisms for multi-stage manufacturing", International Journal of Production Economics, Vol. 68, pp. 59-71.
    • (2000) International Journal of Production Economics , vol.68 , pp. 59-71
    • Karaesmen, F.1    Dallery, Y.2
  • 53
    • 0033882294 scopus 로고    scopus 로고
    • Integrated material handling system for a truck assembly plant
    • Kozan, E. (2000), "An integrated material handling system for a truck assembly plant", Journal of the Operational Research Society, Vol. 51 No. 3, pp. 263-71. (Pubitemid 30566170)
    • (2000) Journal of the Operational Research Society , vol.51 , Issue.3 , pp. 263-271
    • Kozan, E.1
  • 56
    • 34548424438 scopus 로고    scopus 로고
    • Supply chain product co-development, product modularity and product performance: Empirical evidence from Hong Kong manufacturers
    • DOI 10.1108/02635570710816739
    • Lau, A.K.W., Yam, R.C.M. and Tang, E.P.Y. (2007), "Supply chain product co-development, product modularity and product performance: empirical evidence from Hong Kong manufacturers", Industrial Management & Data Systems, Vol. 107 No. 7, pp. 1036-65. (Pubitemid 47366144)
    • (2007) Industrial Management and Data Systems , vol.107 , Issue.7 , pp. 1036-1065
    • Lau, A.K.W.1    Yam, R.C.M.2    Tang, E.P.Y.3
  • 57
    • 79951484345 scopus 로고    scopus 로고
    • Lean Management Institute
    • Lean Management Institute (1997), "Toyotas new material-handling system shows TPSs flexibility", available at: www.leaninstituut.nl/ publications/1106/ToyotaNewMaterial HandlingSystem.pdf (accessed February 2009).
    • (1997) Toyotas New Material-handling System Shows TPSs Flexibility
  • 58
    • 0345856379 scopus 로고    scopus 로고
    • Effect of stochasticity, capacity and lead time cost drivers on WIP and throughput in a pull production environment
    • DOI 10.1006/mare.2001.0161, PII S1044500501901611
    • Leitch, R.A. (2001), "Effect of stochasticity, capacity and lead time cost drivers on WIP and throughput in a pull production environment", Management Accounting Research, Vol. 12, pp. 167-96. (Pubitemid 33658410)
    • (2001) Management Accounting Research , vol.12 , Issue.2 , pp. 167-196
    • Leitch, R.A.1
  • 61
    • 0005006167 scopus 로고    scopus 로고
    • Influences of process location on materials handling: Cases from the automotive industry
    • Mathisson-Ojmertz, B. and Johansson, M.I. (2000), "Influences of process location on materials handling: cases from the automotive industry", International Journal of Logistics, Vol. 3, pp. 25-39.
    • (2000) International Journal of Logistics , vol.3 , pp. 25-39
    • Mathisson-Ojmertz, B.1    Johansson, M.I.2
  • 62
    • 0013148005 scopus 로고    scopus 로고
    • working paper, Department of Transportation and Logistics, Chalmers University of Technology Goteborg
    • Medbo, L. (1999), "Material kitting system design", working paper, Department of Transportation and Logistics, Chalmers University of Technology, Goteborg.
    • (1999) Material kitting system design
    • Medbo, L.1
  • 63
    • 0037393168 scopus 로고    scopus 로고
    • Assembly work execution and materials kit functionality in parallel flow assembly systems
    • DOI 10.1016/S0169-8141(02)00220-2
    • Medbo, L. (2003), "Assembly work execution and materials kit functionality in parallel flow assembly systems", International Journal of Industrial Ergonomics, Vol. 31, pp. 263-81. (Pubitemid 36172494)
    • (2003) International Journal of Industrial Ergonomics , vol.31 , Issue.4 , pp. 263-281
    • Medbo, L.1
  • 66
    • 0031641970 scopus 로고    scopus 로고
    • Optimum number of Kanbans between two adjacent stations
    • Nori, V.S. and Sarker, B.R. (1998), "Optimum number of kanbans between two adjacent stations", Production Planning & Control, Vol. 9, pp. 60-5. (Pubitemid 128623415)
    • (1998) Production Planning and Control , vol.9 , Issue.1 , pp. 60-65
    • Nori, V.S.1    Sarker, B.R.2
  • 67
    • 0032598176 scopus 로고    scopus 로고
    • Optimization of kanban-based manufacturing systems
    • Panayiotou, G. and Cassandras, G. (1999), "Optimization of kanban-based manufacturing systems", Automatica, Vol. 35, pp. 1521-33.
    • (1999) Automatica , vol.35 , pp. 1521-1533
    • Panayiotou, G.1    Cassandras, G.2
  • 68
    • 77951824802 scopus 로고    scopus 로고
    • An integrative framework for supplier relationship management
    • Park, J., Shin, K., Chang, T.W. and Park, J. (2010), "An integrative framework for supplier relationship management", Industrial Management & Data Systems, Vol. 110 No. 4, pp. 495-515.
    • (2010) Industrial Management & Data Systems , vol.110 , Issue.4 , pp. 495-515
    • Park, J.1    Shin, K.2    Chang, T.W.3    Park, J.4
  • 71
    • 4744374113 scopus 로고    scopus 로고
    • Performance analysis of a kitting process in stochastic assembly systems
    • Ramachandran, S. and Delen, D. (2005), "Performance analysis of a kitting process in stochastic assembly systems", Computers & Operations Research, Vol. 32, pp. 449-63.
    • (2005) Computers & Operations Research , vol.32 , pp. 449-463
    • Ramachandran, S.1    Delen, D.2
  • 74
    • 39149117020 scopus 로고    scopus 로고
    • Stronger upper and lower bounds for a hard batching problem to feed assembly line
    • Salles da Cunha, A. and de Souza, M.C. (2008), "Stronger upper and lower bounds for a hard batching problem to feed assembly line", Electronic Notes in Discrete Mathematics, Vol. 30, pp. 159-64.
    • (2008) Electronic Notes in Discrete Mathematics , vol.30 , pp. 159-164
    • Salles Da Cunha, A.1    De Souza, M.C.2
  • 76
    • 0031234628 scopus 로고    scopus 로고
    • Simulation analysis of a pull-push system for an electronic assembly line
    • PII S0925527397000558
    • Savsar, M. (1997), "Simulation analysis of a pull-push system for an electronic assembly line", International Journal of Production Economics, Vol. 51, pp. 205-14. (Pubitemid 127403527)
    • (1997) International Journal of Production Economics , vol.51 , Issue.3 , pp. 205-214
    • Savsar, M.1
  • 78
    • 0013148631 scopus 로고
    • Part kitting in robotic facilities
    • Sellers, C.J. and Nof, S.Y. (1986), "Part kitting in robotic facilities", Material Flow, Vol. 3, pp. 163-74.
    • (1986) Material Flow , vol.3 , pp. 163-174
    • Sellers, C.J.1    Nof, S.Y.2
  • 80
    • 38549134027 scopus 로고    scopus 로고
    • Hybrid analytical hierarchy process model for supplier selection
    • DOI 10.1108/02635570810844124
    • Sevkli, M., Koh, S.C.L., Zaim, S., Demirbag, M. and Tatoglu, E. (2008), "Hybrid analytical hierarchy process model for supplier selection", Industrial Management & Data Systems, Vol. 108 No. 1, pp. 122-42. (Pubitemid 351153321)
    • (2008) Industrial Management and Data Systems , vol.108 , Issue.1 , pp. 122-142
    • Sevkli, M.1    Koh, S.C.L.2    Zaim, S.3    Demirbag, M.4    Tatoglu, E.5
  • 83
    • 77954799757 scopus 로고    scopus 로고
    • Partner selection for strategic alliances
    • Solesvik, M. and Westhead, P. (2010), "Partner selection for strategic alliances", Industrial Management & Data Systems, Vol. 110 No. 6, pp. 841-60.
    • (2010) Industrial Management & Data Systems , vol.110 , Issue.6 , pp. 841-860
    • Solesvik, M.1    Westhead, P.2
  • 84
    • 21844514415 scopus 로고
    • Kitting process in a stochastic assembly system
    • Som, P., Wilhelm, W.E. and Disney, R.L. (1994), "Kitting process in a stochastic assembly system", Queueing Systems, Vol. 17, pp. 471-90.
    • (1994) Queueing Systems , vol.17 , pp. 471-490
    • Som, P.1    Wilhelm, W.E.2    Disney, R.L.3
  • 85
    • 0036604840 scopus 로고    scopus 로고
    • Decentralized reactive Kanban system
    • DOI 10.1016/S0377-2217(01)00358-7, PII S0377221701003587
    • Takahashi, K. and Nakamura, N. (2002), "Decentralized reactive kanban system", European Journal of Operational Research, Vol. 139, pp. 262-76. (Pubitemid 34201238)
    • (2002) European Journal of Operational Research , vol.139 , Issue.2 , pp. 262-276
    • Takahashi, K.1    Nakamura, N.2
  • 87
    • 0026371648 scopus 로고
    • Design method of robot kitting system for flexible assembly
    • Tamaki, K. and Nof, S.Y. (1991), "Design method of robot kitting system for flexible assembly", Robotics and Autonomous Systems, Vol. 8 No. 4, pp. 255-73.
    • (1991) Robotics and Autonomous Systems , vol.8 , Issue.4 , pp. 255-273
    • Tamaki, K.1    Nof, S.Y.2
  • 88
    • 0035898986 scopus 로고    scopus 로고
    • An adaptive approach to controlling kanban systems
    • DOI 10.1016/S0377-2217(00)00119-3, PII S0377221700001193
    • Tardif, V. and Maaseidvaag, L. (2001), "An adaptive approach to controlling kanban systems", European Journal of Operational Research, Vol. 132, pp. 411-24. (Pubitemid 32385030)
    • (2001) European Journal of Operational Research , vol.132 , Issue.2 , pp. 411-424
    • Tardif, V.1    Maaseidvaag, L.2
  • 90
    • 8344220512 scopus 로고    scopus 로고
    • An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy
    • Wang, S. and Sarker, B.R. (2005), "An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy", European Journal of Operational Research, Vol. 162, pp. 153-72.
    • (2005) European Journal of Operational Research , vol.162 , pp. 153-172
    • Wang, S.1    Sarker, B.R.2
  • 91
    • 57849146060 scopus 로고    scopus 로고
    • The impact of materials feeding design on assembly process performance
    • Wänström, C. and Medbo, L. (2008), "The impact of materials feeding design on assembly process performance", Journal of Manufacturing Technology Management, Vol. 20, pp. 30-51.
    • (2008) Journal of Manufacturing Technology Management , vol.20 , pp. 30-51
    • Wänström, C.1    Medbo, L.2
  • 92
    • 0032121661 scopus 로고    scopus 로고
    • Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system
    • PII S0377221797000477
    • Wilhelm, W.E. and Som, P. (1998), "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system", European Journal of Operational Research, Vol. 108, pp. 74-93. (Pubitemid 128372588)
    • (1998) European Journal of Operational Research , vol.108 , Issue.1 , pp. 74-93
    • Wilhelm, W.E.1    Som, P.2
  • 93
    • 21044448255 scopus 로고    scopus 로고
    • Analysis of stochastic assembly with GI-distributed assembly time
    • Wilhelm, W.E. and Som, P. (1999), "Analysis of stochastic assembly with GI-distributed assembly time", INFORMS Journal on Computing, Vol. 11, pp. 104-16.
    • (1999) INFORMS Journal on Computing , vol.11 , pp. 104-116
    • Wilhelm, W.E.1    Som, P.2
  • 94
    • 0026916131 scopus 로고
    • A model for implementing a paradigm of time managed material flow control in certain assembly systems
    • Wilhelm, W.E., Som, P. and Carroll, B. (1992), "A model for implementing a paradigm of time managed material flow control in certain assembly systems", International Journal of Production Research, Vol. 30, pp. 2063-86.
    • (1992) International Journal of Production Research , vol.30 , pp. 2063-2086
    • Wilhelm, W.E.1    Som, P.2    Carroll, B.3
  • 96
    • 67650706262 scopus 로고    scopus 로고
    • Supplier selection under uncertainty: A switching options perspective
    • Wu, L.C. (2009), "Supplier selection under uncertainty: a switching options perspective", Industrial Management & Data Systems, Vol. 109 No. 2, pp. 191-205.
    • (2009) Industrial Management & Data Systems , vol.109 , Issue.2 , pp. 191-205
    • Wu, L.C.1
  • 99
    • 0030818944 scopus 로고    scopus 로고
    • Algorithms for sequencing mixed models on an assembly line in a JIT production system
    • Zhao, X. and Katsuhisa, O. (1997), "Algorithms for sequencing mixed models on an assembly line in a JIT production system", Computers & Industrial Engineering, Vol. 32, pp. 47-56.
    • (1997) Computers & Industrial Engineering , vol.32 , pp. 47-56
    • Zhao, X.1    Katsuhisa, O.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.