메뉴 건너뛰기




Volumn 162, Issue 1, 2005, Pages 153-172

An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy

Author keywords

Inventory control; Kanban; Mixed integer nonlinear programming; Supply chain

Indexed keywords

ASSEMBLY; INTEGER PROGRAMMING; INVENTORY CONTROL; JUST IN TIME PRODUCTION; NONLINEAR PROGRAMMING; PROBLEM SOLVING; PUBLIC POLICY;

EID: 8344220512     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2003.10.038     Document Type: Conference Paper
Times cited : (43)

References (20)
  • 2
    • 0029288837 scopus 로고
    • Multi-stage, pull-type production/inventory systems
    • Altiok T., Ranjan R. Multi-stage, pull-type production/inventory systems. IIE Transactions. 27:1995;190-200.
    • (1995) IIE Transactions , vol.27 , pp. 190-200
    • Altiok, T.1    Ranjan, R.2
  • 4
    • 0022902024 scopus 로고
    • An outer-approximation algorithm for a class of mixed-integer nonlinear programs
    • Duran M.A., Grossmann N.E. An outer-approximation algorithm for a class of mixed-integer nonlinear programs. Mathematical Programming. 36:1986;307-339.
    • (1986) Mathematical Programming , vol.36 , pp. 307-339
    • Duran, M.A.1    Grossmann, N.E.2
  • 5
    • 0031103287 scopus 로고    scopus 로고
    • An algorithm to dynamically adjust the number of kanbans in stochastic processing times and variable demand environment
    • Gupta S.M., Al-Turki Y.A.Y. An algorithm to dynamically adjust the number of kanbans in stochastic processing times and variable demand environment. Production Planning and Control. 8:1997;133-141.
    • (1997) Production Planning and Control , vol.8 , pp. 133-141
    • Gupta, S.M.1    Al-Turki, Y.A.Y.2
  • 6
    • 0034691907 scopus 로고    scopus 로고
    • Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops - Part 2
    • Hemamalini B., Rajendran C. Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops - Part 2. International Journal of Production Research. 38:2000;2549-2572.
    • (2000) International Journal of Production Research , vol.38 , pp. 2549-2572
    • Hemamalini, B.1    Rajendran, C.2
  • 8
    • 0035247219 scopus 로고    scopus 로고
    • Project surface regions: A decision support methodology for multitasking workers assignment in JIT systems
    • Horng H.C., Cochran J.K. Project surface regions: A decision support methodology for multitasking workers assignment in JIT systems. Computers and Industrial Engineering. 39:2001;159-171.
    • (2001) Computers and Industrial Engineering , vol.39 , pp. 159-171
    • Horng, H.C.1    Cochran, J.K.2
  • 10
    • 0029774986 scopus 로고    scopus 로고
    • An analytical method for performance evaluation of kanban controlled production systems
    • Mascolo M.D., Frein Y., Dallery Y. An analytical method for performance evaluation of kanban controlled production systems. Operations Research. 44:1996;50-64.
    • (1996) Operations Research , vol.44 , pp. 50-64
    • Mascolo, M.D.1    Frein, Y.2    Dallery, Y.3
  • 11
    • 0030194294 scopus 로고    scopus 로고
    • Cyclic scheduling for a multi-product, single-facility production system operating under a just-in-time delivery policy
    • Nori V.S., Sarker B.R. Cyclic scheduling for a multi-product, single-facility production system operating under a just-in-time delivery policy. Journal of the Operational Research Society. 47:1996;930-935.
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 930-935
    • Nori, V.S.1    Sarker, B.R.2
  • 12
    • 0031641970 scopus 로고    scopus 로고
    • Optimum number of kanbans between two adjacent stations
    • Nori V.S., Sarker B.R. Optimum number of kanbans between two adjacent stations. Production Planning and Control. 9:1998;60-65.
    • (1998) Production Planning and Control , vol.9 , pp. 60-65
    • Nori, V.S.1    Sarker, B.R.2
  • 13
    • 0033317962 scopus 로고    scopus 로고
    • Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers
    • Parija G.R., Sarker B.R. Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers. IIE Transactions. 31(11):1999;1075-1082.
    • (1999) IIE Transactions , vol.31 , Issue.11 , pp. 1075-1082
    • Parija, G.R.1    Sarker, B.R.2
  • 15
    • 0033099220 scopus 로고    scopus 로고
    • Formulations and heuristic for scheduling in a kanban flowshop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers
    • Rajendran C. Formulations and heuristic for scheduling in a kanban flowshop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers. International Journal of Production Research. 37:1999;1137-1158.
    • (1999) International Journal of Production Research , vol.37 , pp. 1137-1158
    • Rajendran, C.1
  • 16
    • 0030269796 scopus 로고    scopus 로고
    • Operations planning for kanbans between two adjacent workstations
    • Sarker B.R., Balan C.V. Operations planning for kanbans between two adjacent workstations. Computers and Industrial Engineering. 31:1996;221-224.
    • (1996) Computers and Industrial Engineering , vol.31 , pp. 221-224
    • Sarker, B.R.1    Balan, C.V.2
  • 17
    • 0031999406 scopus 로고    scopus 로고
    • Operations planning for a single-stage kanban system operating under linear demand
    • Sarker B.R., Balan C.V. Operations planning for a single-stage kanban system operating under linear demand. International Journal of Production Research. 36:1998;357-375.
    • (1998) International Journal of Production Research , vol.36 , pp. 357-375
    • Sarker, B.R.1    Balan, C.V.2
  • 20
    • 8344262533 scopus 로고    scopus 로고
    • Ph.D. Dissertation, Department of Industrial and Manufacturing Systems Engineering, Louisiana State University, Baton Rouge, LA 70803
    • Wang, S., 2001. Control of Supply Chain Systems by Kanban Mechanism. Ph.D. Dissertation, Department of Industrial and Manufacturing Systems Engineering, Louisiana State University, Baton Rouge, LA 70803.
    • (2001) Control of Supply Chain Systems by Kanban Mechanism
    • Wang, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.