메뉴 건너뛰기




Volumn 43, Issue 9-10, 2009, Pages 949-958

Redesigning an assembly line through lean manufacturing tools

Author keywords

Assembly line; Kanban; Lean manufacturing; Parts flow; Value stream mapping

Indexed keywords

ASSEMBLY LINE; KANBAN; LEAN MANUFACTURING; PARTS FLOW; VALUE STREAM MAPPING;

EID: 67651222073     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-008-1772-2     Document Type: Article
Times cited : (102)

References (30)
  • 2
    • 14844283714 scopus 로고    scopus 로고
    • Lean, agile and traditional supply: how do they impact manufacturing performance?
    • R Cagliano F Caniato G Spina 2004 Lean, agile and traditional supply: how do they impact manufacturing performance? J Purch Supply Manag 10 4-5 151 164
    • (2004) J Purch Supply Manag , vol.10 , Issue.45 , pp. 151-164
    • Cagliano, R.1    Caniato, F.2    Spina, G.3
  • 3
    • 0037357671 scopus 로고    scopus 로고
    • Lean manufacturing: context, practice bundles, and performance
    • R Shah P Ward 2003 Lean manufacturing: context, practice bundles, and performance J Oper Manag 21 2 129 149
    • (2003) J Oper Manag , vol.21 , Issue.2 , pp. 129-149
    • Shah, R.1    Ward, P.2
  • 7
    • 33846919290 scopus 로고    scopus 로고
    • Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study
    • DOI:10.1016/j.ijpe.2006.09.009
    • FA Abdulmalek J Rajgopal 2007 Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study Int J Prod Econ 107 1 223 236 DOI:10.1016/j.ijpe.2006.09.009
    • (2007) Int J Prod Econ , vol.107 , Issue.1 , pp. 223-236
    • Abdulmalek, F.A.1    Rajgopal, J.2
  • 8
    • 46649112970 scopus 로고    scopus 로고
    • Evaluation of value stream mapping in manufacturing system redesign
    • DOI:10.1080/00207540601182302
    • I Serrano C Ochoa R de Castro 2008 Evaluation of value stream mapping in manufacturing system redesign Int J Prod Res 46 16 4409 4430 DOI:10.1080/00207540601182302
    • (2008) Int J Prod Res , vol.46 , Issue.16 , pp. 4409-4430
    • Serrano, I.1    Ochoa, C.2    De Castro, R.3
  • 9
    • 43449129498 scopus 로고    scopus 로고
    • Lean philosophy: Implementation in a forging company
    • DOI:10.1007/s00170-006-0870-2
    • AK Sahoo NK Singh R Shankar MK Tiwari 2008 Lean philosophy: implementation in a forging company Int J Adv Manuf Technol 36 5-6 451 462 DOI:10.1007/s00170-006-0870-2
    • (2008) Int J Adv Manuf Technol , vol.36 , Issue.56 , pp. 451-462
    • Sahoo, A.K.1    Singh, N.K.2    Shankar, R.3    Tiwari, M.K.4
  • 10
    • 0037804756 scopus 로고    scopus 로고
    • A study of system dynamics in just-in-time logistics
    • DOI:10.1016/S0924-0136(03)00083-9
    • CL Lai WB Lee WH Ip 2003 A study of system dynamics in just-in-time logistics J Mater Process Technol 138 1 265 269 DOI:10.1016/S0924-0136(03)00083- 9
    • (2003) J Mater Process Technol , vol.138 , Issue.1 , pp. 265-269
    • Lai, C.L.1    Lee, W.B.2    Ip, W.H.3
  • 11
    • 0035944508 scopus 로고    scopus 로고
    • Effect of kanban size on just-in-time manufacturing systems
    • DOI:10.1016/S0924-0136(01)01022-6
    • FTS Chan 2001 Effect of kanban size on just-in-time manufacturing systems J Mater Process Technol 116 2 146 160 DOI:10.1016/S0924-0136(01)01022-6
    • (2001) J Mater Process Technol , vol.116 , Issue.2 , pp. 146-160
    • Chan, F.T.S.1
  • 12
    • 33750482244 scopus 로고    scopus 로고
    • A lean route to manufacturing survival
    • DOI:10.1108/01445150610705155
    • A Lee-Mortimer 2006 A lean route to manufacturing survival Assem Autom 26 4 265 272 DOI:10.1108/01445150610705155
    • (2006) Assem Autom , vol.26 , Issue.4 , pp. 265-272
    • Lee-Mortimer, A.1
  • 13
    • 34247111842 scopus 로고    scopus 로고
    • Materials flow improvement in a lean assembly line: a case study
    • DOI:10.1108/01445150710733379
    • R Domingo R Álvarez MM Peña R Calvo 2007 Materials flow improvement in a lean assembly line: a case study Assem Autom 27 2 141 147 DOI:10.1108/01445150710733379
    • (2007) Assem Autom , vol.27 , Issue.2 , pp. 141-147
    • Domingo, R.1    R. Álvarez2    M.M. Peña3    Calvo, R.4
  • 15
    • 57649084221 scopus 로고    scopus 로고
    • Reconceptualizing the effects of lean on production costs with evidence from the F-22 program
    • Browning TR, Heath RD (2008) Reconceptualizing the effects of lean on production costs with evidence from the F-22 program. J Oper Manag. doi: 10.1016/j.jom.2008.03.009
    • (2008) J Oper Manag
    • Browning, T.R.1    Heath, R.D.2
  • 16
    • 34248550363 scopus 로고    scopus 로고
    • Defining and developing measures of lean production
    • DOI:10.1016/j.jom.2007.01.019
    • R Shah PT Ward 2007 Defining and developing measures of lean production J Oper Manag 25 4 785 805 DOI:10.1016/j.jom.2007.01.019
    • (2007) J Oper Manag , vol.25 , Issue.4 , pp. 785-805
    • Shah, R.1    Ward, P.T.2
  • 17
    • 33847363196 scopus 로고    scopus 로고
    • Literature review of JIT-kanban system
    • DOI:10.1007/s00170-005-0340-2
    • CS Kumar R Panneerselvam 2007 Literature review of JIT-kanban system Int J Adv Manuf Technol 32 3-4 393 408 DOI:10.1007/s00170-005-0340-2
    • (2007) Int J Adv Manuf Technol , vol.32 , Issue.34 , pp. 393-408
    • Kumar, C.S.1    Panneerselvam, R.2
  • 18
    • 33746266501 scopus 로고    scopus 로고
    • Application of mahalanobis distance as a lean assessment metric
    • DOI:10.1007/s00170-005-0004-2
    • J Srinivasaraghavan V Allada 2006 Application of mahalanobis distance as a lean assessment metric Int J Adv Manuf Technol 29 11-12 1159 1168 DOI:10.1007/s00170-005-0004-2
    • (2006) Int J Adv Manuf Technol , vol.29 , Issue.1112 , pp. 1159-1168
    • Srinivasaraghavan, J.1    Allada, V.2
  • 19
    • 33847417402 scopus 로고    scopus 로고
    • The genealogy of lean production
    • DOI:10.1016/j.jom.2006.04.001
    • M Holweg 2007 The genealogy of lean production J Oper Manag 25 2 420 437 DOI:10.1016/j.jom.2006.04.001
    • (2007) J Oper Manag , vol.25 , Issue.2 , pp. 420-437
    • Holweg, M.1
  • 20
    • 0035311608 scopus 로고    scopus 로고
    • One-piece flow manufacturing on U-shaped production lines: a tutorial
    • J Miltenburg 2001 One-piece flow manufacturing on U-shaped production lines: a tutorial IIE Trans 33 4 303 321
    • (2001) IIE Trans , vol.33 , Issue.4 , pp. 303-321
    • Miltenburg, J.1
  • 21
    • 41549093092 scopus 로고    scopus 로고
    • Operational flexibility quantification in a make-to-order assembly system
    • DOI:10.1007/s10696-008-9037-9
    • R Calvo R Domingo MA Sebastián 2007 Operational flexibility quantification in a make-to-order assembly system Int J Flex Manuf Syst 19 3 247 263 DOI:10.1007/s10696-008-9037-9
    • (2007) Int J Flex Manuf Syst , vol.19 , Issue.3 , pp. 247-263
    • Calvo, R.1    Domingo, R.2    Sebastián, M.A.3
  • 22
    • 33750016925 scopus 로고    scopus 로고
    • Flexible and reconfigurable manufacturing systems paradigms
    • DOI:10.1007/s10696-006-9028-7
    • HA ElMaraghy 2005 Flexible and reconfigurable manufacturing systems paradigms Int J Flex Manuf Syst 17 4 261 276 DOI:10.1007/s10696-006-9028-7
    • (2005) Int J Flex Manuf Syst , vol.17 , Issue.4 , pp. 261-276
    • ElMaraghy, H.A.1
  • 23
    • 25144508112 scopus 로고    scopus 로고
    • To pull or not to pull: what is the question?
    • WJ Hopp ML Spearman 2004 To pull or not to pull: what is the question? Manuf Serv Oper Manag 6 2 133 148
    • (2004) Manuf Serv Oper Manag , vol.6 , Issue.2 , pp. 133-148
    • Hopp, W.J.1    Spearman, M.L.2
  • 24
    • 67651208607 scopus 로고    scopus 로고
    • 3rd edn Engineering and Management Press Norcross, GA
    • Monden Y (1998) Toyota production system: an integrated approach to just-in-time, 3rd edn. Engineering and Management Press, Norcross, GA
    • (1998)
    • Monden, Y.1
  • 25
    • 0025430443 scopus 로고
    • CONWIP: a pull alternative to kanban
    • DOI:10.1080/00207549008942761
    • ML Spearman DL Woodruff WJ Hopp 1990 CONWIP: a pull alternative to kanban Int J Prod Res 28 5 879 894 DOI:10.1080/00207549008942761
    • (1990) Int J Prod Res , vol.28 , Issue.5 , pp. 879-894
    • Spearman, M.L.1    Woodruff, D.L.2    Hopp, W.J.3
  • 26
    • 0012706318 scopus 로고    scopus 로고
    • Managing a flow line with single-kanban, dual-kanban or CONWIP
    • KK Yang 2000 Managing a flow line with single-kanban, dual-kanban or CONWIP Prod Oper Manag 9 4 349 366
    • (2000) Prod Oper Manag , vol.9 , Issue.4 , pp. 349-366
    • Yang, K.K.1
  • 27
    • 67651213844 scopus 로고    scopus 로고
    • Analyzing kanban and CONWIP controlled assembly systems
    • University of Tsukuba, Japan. Available at
    • Ghamari YK (2006) Analyzing kanban and CONWIP controlled assembly systems. MSc Thesis, University of Tsukuba, Japan. Available at http://infoshako.sk.tsukuba.ac.jp/rsato/pdffiles/Yaghoub2006.pdf
    • (2006) MSc Thesis
    • Ghamari, Y.K.1
  • 28
    • 0032156317 scopus 로고    scopus 로고
    • A rule induction approach for determining the number of kanbans in a just-in-time production system
    • DOI:10.1016/S0360-8352(98)00099-0
    • IS Markham RG Mathieu BA Wray 1998 A rule induction approach for determining the number of kanbans in a just-in-time production system Comput Ind Eng 34 4 717 727 DOI:10.1016/S0360-8352(98)00099-0
    • (1998) Comput Ind Eng , vol.34 , Issue.4 , pp. 717-727
    • Markham, I.S.1    Mathieu, R.G.2    Wray, B.A.3
  • 29
    • 34249027911 scopus 로고    scopus 로고
    • Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator
    • DOI:10.1080/00207540600791590
    • Y-H Lian H Van Landeghem 2007 Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator Int J Prod Res 45 13 3037 3058 DOI:10.1080/00207540600791590
    • (2007) Int J Prod Res , vol.45 , Issue.13 , pp. 3037-3058
    • Lian Y-H1    Van Landeghem, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.