-
2
-
-
14844283714
-
Lean, agile and traditional supply: how do they impact manufacturing performance?
-
R Cagliano F Caniato G Spina 2004 Lean, agile and traditional supply: how do they impact manufacturing performance? J Purch Supply Manag 10 4-5 151 164
-
(2004)
J Purch Supply Manag
, vol.10
, Issue.45
, pp. 151-164
-
-
Cagliano, R.1
Caniato, F.2
Spina, G.3
-
3
-
-
0037357671
-
Lean manufacturing: context, practice bundles, and performance
-
R Shah P Ward 2003 Lean manufacturing: context, practice bundles, and performance J Oper Manag 21 2 129 149
-
(2003)
J Oper Manag
, vol.21
, Issue.2
, pp. 129-149
-
-
Shah, R.1
Ward, P.2
-
7
-
-
33846919290
-
Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study
-
DOI:10.1016/j.ijpe.2006.09.009
-
FA Abdulmalek J Rajgopal 2007 Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study Int J Prod Econ 107 1 223 236 DOI:10.1016/j.ijpe.2006.09.009
-
(2007)
Int J Prod Econ
, vol.107
, Issue.1
, pp. 223-236
-
-
Abdulmalek, F.A.1
Rajgopal, J.2
-
8
-
-
46649112970
-
Evaluation of value stream mapping in manufacturing system redesign
-
DOI:10.1080/00207540601182302
-
I Serrano C Ochoa R de Castro 2008 Evaluation of value stream mapping in manufacturing system redesign Int J Prod Res 46 16 4409 4430 DOI:10.1080/00207540601182302
-
(2008)
Int J Prod Res
, vol.46
, Issue.16
, pp. 4409-4430
-
-
Serrano, I.1
Ochoa, C.2
De Castro, R.3
-
9
-
-
43449129498
-
Lean philosophy: Implementation in a forging company
-
DOI:10.1007/s00170-006-0870-2
-
AK Sahoo NK Singh R Shankar MK Tiwari 2008 Lean philosophy: implementation in a forging company Int J Adv Manuf Technol 36 5-6 451 462 DOI:10.1007/s00170-006-0870-2
-
(2008)
Int J Adv Manuf Technol
, vol.36
, Issue.56
, pp. 451-462
-
-
Sahoo, A.K.1
Singh, N.K.2
Shankar, R.3
Tiwari, M.K.4
-
10
-
-
0037804756
-
A study of system dynamics in just-in-time logistics
-
DOI:10.1016/S0924-0136(03)00083-9
-
CL Lai WB Lee WH Ip 2003 A study of system dynamics in just-in-time logistics J Mater Process Technol 138 1 265 269 DOI:10.1016/S0924-0136(03)00083- 9
-
(2003)
J Mater Process Technol
, vol.138
, Issue.1
, pp. 265-269
-
-
Lai, C.L.1
Lee, W.B.2
Ip, W.H.3
-
11
-
-
0035944508
-
Effect of kanban size on just-in-time manufacturing systems
-
DOI:10.1016/S0924-0136(01)01022-6
-
FTS Chan 2001 Effect of kanban size on just-in-time manufacturing systems J Mater Process Technol 116 2 146 160 DOI:10.1016/S0924-0136(01)01022-6
-
(2001)
J Mater Process Technol
, vol.116
, Issue.2
, pp. 146-160
-
-
Chan, F.T.S.1
-
12
-
-
33750482244
-
A lean route to manufacturing survival
-
DOI:10.1108/01445150610705155
-
A Lee-Mortimer 2006 A lean route to manufacturing survival Assem Autom 26 4 265 272 DOI:10.1108/01445150610705155
-
(2006)
Assem Autom
, vol.26
, Issue.4
, pp. 265-272
-
-
Lee-Mortimer, A.1
-
13
-
-
34247111842
-
Materials flow improvement in a lean assembly line: a case study
-
DOI:10.1108/01445150710733379
-
R Domingo R Álvarez MM Peña R Calvo 2007 Materials flow improvement in a lean assembly line: a case study Assem Autom 27 2 141 147 DOI:10.1108/01445150710733379
-
(2007)
Assem Autom
, vol.27
, Issue.2
, pp. 141-147
-
-
Domingo, R.1
R. Álvarez2
M.M. Peña3
Calvo, R.4
-
15
-
-
57649084221
-
Reconceptualizing the effects of lean on production costs with evidence from the F-22 program
-
Browning TR, Heath RD (2008) Reconceptualizing the effects of lean on production costs with evidence from the F-22 program. J Oper Manag. doi: 10.1016/j.jom.2008.03.009
-
(2008)
J Oper Manag
-
-
Browning, T.R.1
Heath, R.D.2
-
16
-
-
34248550363
-
Defining and developing measures of lean production
-
DOI:10.1016/j.jom.2007.01.019
-
R Shah PT Ward 2007 Defining and developing measures of lean production J Oper Manag 25 4 785 805 DOI:10.1016/j.jom.2007.01.019
-
(2007)
J Oper Manag
, vol.25
, Issue.4
, pp. 785-805
-
-
Shah, R.1
Ward, P.T.2
-
17
-
-
33847363196
-
Literature review of JIT-kanban system
-
DOI:10.1007/s00170-005-0340-2
-
CS Kumar R Panneerselvam 2007 Literature review of JIT-kanban system Int J Adv Manuf Technol 32 3-4 393 408 DOI:10.1007/s00170-005-0340-2
-
(2007)
Int J Adv Manuf Technol
, vol.32
, Issue.34
, pp. 393-408
-
-
Kumar, C.S.1
Panneerselvam, R.2
-
18
-
-
33746266501
-
Application of mahalanobis distance as a lean assessment metric
-
DOI:10.1007/s00170-005-0004-2
-
J Srinivasaraghavan V Allada 2006 Application of mahalanobis distance as a lean assessment metric Int J Adv Manuf Technol 29 11-12 1159 1168 DOI:10.1007/s00170-005-0004-2
-
(2006)
Int J Adv Manuf Technol
, vol.29
, Issue.1112
, pp. 1159-1168
-
-
Srinivasaraghavan, J.1
Allada, V.2
-
19
-
-
33847417402
-
The genealogy of lean production
-
DOI:10.1016/j.jom.2006.04.001
-
M Holweg 2007 The genealogy of lean production J Oper Manag 25 2 420 437 DOI:10.1016/j.jom.2006.04.001
-
(2007)
J Oper Manag
, vol.25
, Issue.2
, pp. 420-437
-
-
Holweg, M.1
-
20
-
-
0035311608
-
One-piece flow manufacturing on U-shaped production lines: a tutorial
-
J Miltenburg 2001 One-piece flow manufacturing on U-shaped production lines: a tutorial IIE Trans 33 4 303 321
-
(2001)
IIE Trans
, vol.33
, Issue.4
, pp. 303-321
-
-
Miltenburg, J.1
-
21
-
-
41549093092
-
Operational flexibility quantification in a make-to-order assembly system
-
DOI:10.1007/s10696-008-9037-9
-
R Calvo R Domingo MA Sebastián 2007 Operational flexibility quantification in a make-to-order assembly system Int J Flex Manuf Syst 19 3 247 263 DOI:10.1007/s10696-008-9037-9
-
(2007)
Int J Flex Manuf Syst
, vol.19
, Issue.3
, pp. 247-263
-
-
Calvo, R.1
Domingo, R.2
Sebastián, M.A.3
-
22
-
-
33750016925
-
Flexible and reconfigurable manufacturing systems paradigms
-
DOI:10.1007/s10696-006-9028-7
-
HA ElMaraghy 2005 Flexible and reconfigurable manufacturing systems paradigms Int J Flex Manuf Syst 17 4 261 276 DOI:10.1007/s10696-006-9028-7
-
(2005)
Int J Flex Manuf Syst
, vol.17
, Issue.4
, pp. 261-276
-
-
ElMaraghy, H.A.1
-
23
-
-
25144508112
-
To pull or not to pull: what is the question?
-
WJ Hopp ML Spearman 2004 To pull or not to pull: what is the question? Manuf Serv Oper Manag 6 2 133 148
-
(2004)
Manuf Serv Oper Manag
, vol.6
, Issue.2
, pp. 133-148
-
-
Hopp, W.J.1
Spearman, M.L.2
-
24
-
-
67651208607
-
-
3rd edn Engineering and Management Press Norcross, GA
-
Monden Y (1998) Toyota production system: an integrated approach to just-in-time, 3rd edn. Engineering and Management Press, Norcross, GA
-
(1998)
-
-
Monden, Y.1
-
25
-
-
0025430443
-
CONWIP: a pull alternative to kanban
-
DOI:10.1080/00207549008942761
-
ML Spearman DL Woodruff WJ Hopp 1990 CONWIP: a pull alternative to kanban Int J Prod Res 28 5 879 894 DOI:10.1080/00207549008942761
-
(1990)
Int J Prod Res
, vol.28
, Issue.5
, pp. 879-894
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
26
-
-
0012706318
-
Managing a flow line with single-kanban, dual-kanban or CONWIP
-
KK Yang 2000 Managing a flow line with single-kanban, dual-kanban or CONWIP Prod Oper Manag 9 4 349 366
-
(2000)
Prod Oper Manag
, vol.9
, Issue.4
, pp. 349-366
-
-
Yang, K.K.1
-
27
-
-
67651213844
-
Analyzing kanban and CONWIP controlled assembly systems
-
University of Tsukuba, Japan. Available at
-
Ghamari YK (2006) Analyzing kanban and CONWIP controlled assembly systems. MSc Thesis, University of Tsukuba, Japan. Available at http://infoshako.sk.tsukuba.ac.jp/rsato/pdffiles/Yaghoub2006.pdf
-
(2006)
MSc Thesis
-
-
Ghamari, Y.K.1
-
28
-
-
0032156317
-
A rule induction approach for determining the number of kanbans in a just-in-time production system
-
DOI:10.1016/S0360-8352(98)00099-0
-
IS Markham RG Mathieu BA Wray 1998 A rule induction approach for determining the number of kanbans in a just-in-time production system Comput Ind Eng 34 4 717 727 DOI:10.1016/S0360-8352(98)00099-0
-
(1998)
Comput Ind Eng
, vol.34
, Issue.4
, pp. 717-727
-
-
Markham, I.S.1
Mathieu, R.G.2
Wray, B.A.3
-
29
-
-
34249027911
-
Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator
-
DOI:10.1080/00207540600791590
-
Y-H Lian H Van Landeghem 2007 Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator Int J Prod Res 45 13 3037 3058 DOI:10.1080/00207540600791590
-
(2007)
Int J Prod Res
, vol.45
, Issue.13
, pp. 3037-3058
-
-
Lian Y-H1
Van Landeghem, H.2
|