메뉴 건너뛰기




Volumn 47, Issue 8, 2009, Pages 2217-2229

Information management for materials supply systems design

Author keywords

Concurrent engineering; Information management; Materials supply; Product development project

Indexed keywords

DEVELOPMENT PROJECT; LITTLE RESEARCH; MULTIPLE SOURCE; ONE DIMENSION; PRODUCTION SYSTEM; SUPPLY SYSTEM;

EID: 66149120164     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540802036257     Document Type: Conference Paper
Times cited : (6)

References (27)
  • 4
    • 11144299339 scopus 로고
    • A model-based method for organizing tasks in product development
    • Eppinger, S.D., et al., 1994. A model-based method for organizing tasks in product development. Research in Engineering Design, 6 (1), 1-13.
    • (1994) Research in Engineering Design , vol.6 , Issue.1 , pp. 1-13
    • Eppinger, S.D.1
  • 6
    • 14844350336 scopus 로고    scopus 로고
    • Product architecture assessment: A tool to link product, process, and supply chain design decisions
    • Fixson, S.K., 2005. Product architecture assessment: a tool to link product, process, and supply chain design decisions. Journal of Operations Management, 23 (3-4), 345-369.
    • (2005) Journal of Operations Management , vol.23 , Issue.3-4 , pp. 345-369
    • Fixson, S.K.1
  • 7
    • 0038292122 scopus 로고    scopus 로고
    • Problems in concurrent new product development: An in-depth comparative study of three companies
    • Haque, B., 2003. Problems in concurrent new product development: an in-depth comparative study of three companies. Integrated Manufacturing Systems, 14 (3), 191-207.
    • (2003) Integrated Manufacturing Systems , vol.14 , Issue.3 , pp. 191-207
    • Haque, B.1
  • 8
    • 0030143181 scopus 로고    scopus 로고
    • The influence of process concurrency on project outcomes in product development: An empirical study of cross-functional teams
    • Hauptman, O. and Hirji, K.K., 1996. The influence of process concurrency on project outcomes in product development: an empirical study of cross-functional teams. IEEE Transactions on Engineering Management, 43 (2), 153-164.
    • (1996) IEEE Transactions on Engineering Management , vol.43 , Issue.2 , pp. 153-164
    • Hauptman, O.1    Hirji, K.K.2
  • 9
    • 1542316039 scopus 로고    scopus 로고
    • A research agenda for the nexus of product development and supply chain management processes
    • Hult, G.T.M. and Swan, K.S., 2003. A research agenda for the nexus of product development and supply chain management processes. Journal of Product Innovation Management, 20 (5), 427-428.
    • (2003) Journal of Product Innovation Management , vol.20 , Issue.5 , pp. 427-428
    • Hult, G.T.M.1    Swan, K.S.2
  • 10
    • 4344595114 scopus 로고    scopus 로고
    • The information gap between design engineering and materials supply systems design
    • Johansson, E. and Johansson, M.I., 2004. The information gap between design engineering and materials supply systems design. International Journal of Production Research, 42 (17), 3787-3801.
    • (2004) International Journal of Production Research , vol.42 , Issue.17 , pp. 3787-3801
    • Johansson, E.1    Johansson, M.I.2
  • 11
    • 9444252821 scopus 로고    scopus 로고
    • On the use of product data in the design of the materials supply system
    • Johansson, E. and Medbo, L., 2004. On the use of product data in the design of the materials supply system. Journal of Manufacturing Technology Management, 15 (7), 641-650.
    • (2004) Journal of Manufacturing Technology Management , vol.15 , Issue.7 , pp. 641-650
    • Johansson, E.1    Medbo, L.2
  • 14
    • 0031108561 scopus 로고    scopus 로고
    • A model-based framework to overlap product development activities
    • Krishnan, V., Eppinger, S.D., and Whitney, D.E., 1997. A model-based framework to overlap product development activities. Management Science, 43 (4), 437-451.
    • (1997) Management Science , vol.43 , Issue.4 , pp. 437-451
    • Krishnan, V.1    Eppinger, S.D.2    Whitney, D.E.3
  • 15
    • 0036885487 scopus 로고    scopus 로고
    • AIMQ: A methodology for information quality assessment
    • Lee, Y.W., et al., 2002. AIMQ: a methodology for information quality assessment. Information and Management, 40 (2), 133-146.
    • (2002) Information and Management , vol.40 , Issue.2 , pp. 133-146
    • Lee, Y.W.1
  • 16
    • 0032140351 scopus 로고    scopus 로고
    • Communication and uncertainty in concurrent engineering
    • Loch, C.H. and Terwiesch, C, 1998. Communication and uncertainty in concurrent engineering. Management Science, 44 (8), 1032-1048.
    • (1998) Management Science , vol.44 , Issue.8 , pp. 1032-1048
    • Loch, C.H.1    Terwiesch, C.2
  • 18
    • 0031223342 scopus 로고    scopus 로고
    • Capturing and assessing formal interaction at task level in product development
    • Oehlmann, R., Thoben, K.-D., and Weber, F., 1997. Capturing and assessing formal interaction at task level in product development. Computers in Industry, 33 (2-3), 179-189.
    • (1997) Computers in Industry , vol.33 , Issue.2-3 , pp. 179-189
    • Oehlmann, R.1    Thoben, K.-D.2    Weber, F.3
  • 19
    • 14844352863 scopus 로고    scopus 로고
    • Coordinating product design, process design, and supply chain design decisions. Part A: Topic motivation, performance implications, and article review process
    • Rungtusanatham, M. and Forza, C, 2005. Coordinating product design, process design, and supply chain design decisions. Part A: topic motivation, performance implications, and article review process. Journal of Operations Management, 23 (3-4), 257-265.
    • (2005) Journal of Operations Management , vol.23 , Issue.3-4 , pp. 257-265
    • Rungtusanatham, M.1    Forza, C.2
  • 21
    • 14844351304 scopus 로고    scopus 로고
    • Evaluation of postponement structures to accommodate mass customisation
    • Su, J.C.P., Chang, Y.-L., and Ferguson, M., 2005. Evaluation of postponement structures to accommodate mass customisation. Journal of Operations Management, 23 (3), 305-318.
    • (2005) Journal of Operations Management , vol.23 , Issue.3 , pp. 305-318
    • Su, J.C.P.1    Chang, Y.-L.2    Ferguson, M.3
  • 22
    • 0002856695 scopus 로고
    • Development of a model for predicting design for manufacturability effectiveness
    • G.I. Susman, ed, New York, NY: Oxford University Press
    • Susman, G.I. and Dean, J.W.J., 1992. Development of a model for predicting design for manufacturability effectiveness, In: G.I. Susman, ed. Integrating design and manufacturing for competitive advantage. New York, NY: Oxford University Press, 207-227.
    • (1992) Integrating design and manufacturing for competitive advantage , pp. 207-227
    • Susman, G.I.1    Dean, J.W.J.2
  • 23
    • 0036638665 scopus 로고    scopus 로고
    • Exchanging preliminary information in concurrent engineering: Alternative coordination strategies
    • Terwiesch, C., Loch, C.H., and De Meyer, A., 2002. Exchanging preliminary information in concurrent engineering: alternative coordination strategies. Organization Science, 13 (4), 402-419.
    • (2002) Organization Science , vol.13 , Issue.4 , pp. 402-419
    • Terwiesch, C.1    Loch, C.H.2    De Meyer, A.3
  • 24
    • 0033891822 scopus 로고    scopus 로고
    • The effect of 'front-loading' problem-solving on product development performance
    • Thomke, S. and Fujimoto, T., 2000. The effect of 'front-loading' problem-solving on product development performance. Journal of Product Innovation Management, 17 (2), 128-142.
    • (2000) Journal of Product Innovation Management , vol.17 , Issue.2 , pp. 128-142
    • Thomke, S.1    Fujimoto, T.2
  • 26
    • 0242332693 scopus 로고    scopus 로고
    • Complex concurrent engineering and the design structure matrix method
    • Yassine, A. and Braha, D., 2003. Complex concurrent engineering and the design structure matrix method. Concurrent Engineering: Research and Applications, 11 (3), 165-176.
    • (2003) Concurrent Engineering: Research and Applications , vol.11 , Issue.3 , pp. 165-176
    • Yassine, A.1    Braha, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.