메뉴 건너뛰기




Volumn 32, Issue 3, 2005, Pages 449-463

Performance analysis of a kitting process in stochastic assembly systems

Author keywords

Assembly operations; Double ended queue; Kitting; Performance analysis

Indexed keywords

COMPUTER AIDED DESIGN; COSTS; MATHEMATICAL MODELS; PARAMETER ESTIMATION; PROBABILITY; ROTORS; SEMICONDUCTOR MATERIALS; STOCHASTIC CONTROL SYSTEMS;

EID: 4744374113     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0548(03)00247-8     Document Type: Article
Times cited : (33)

References (22)
  • 2
    • 0027814043 scopus 로고
    • An evaluation of heuristics for allocating components to kits in small-lot, multi-echelon assembly systems
    • Chen J.F., Wilhelm W.E. An evaluation of heuristics for allocating components to kits in small-lot, multi-echelon assembly systems. International Journal of Production Research. 31(12):1993;2835-2856.
    • (1993) International Journal of Production Research , vol.31 , Issue.12 , pp. 2835-2856
    • Chen, J.F.1    Wilhelm, W.E.2
  • 3
    • 0031259061 scopus 로고    scopus 로고
    • Kitting in multi-echelon, multi-product assembly systems with part substitutable
    • Chen J.F., Wilhelm W.E. Kitting in multi-echelon, multi-product assembly systems with part substitutable. International Journal of Production Research. 35(10):1997;2871-2897.
    • (1997) International Journal of Production Research , vol.35 , Issue.10 , pp. 2871-2897
    • Chen, J.F.1    Wilhelm, W.E.2
  • 5
    • 4744343629 scopus 로고
    • Kitting in JIT production: A kitting project at a tractor plant
    • September
    • Ding FY. Kitting in JIT production: a kitting project at a tractor plant. IE Solutions, September 1992. p. 42-4.
    • (1992) IE Solutions , pp. 42-44
    • Ding, F.Y.1
  • 6
    • 0026916131 scopus 로고
    • A model for implementing a paradigm of time managed material flow control in certain assembly systems
    • Wilhelm W.E., Som P., Carroll B. A model for implementing a paradigm of time managed material flow control in certain assembly systems. International Journal of Production Research. 30(9):1992;2063-2086.
    • (1992) International Journal of Production Research , vol.30 , Issue.9 , pp. 2063-2086
    • Wilhelm, W.E.1    Som, P.2    Carroll, B.3
  • 7
    • 0032121661 scopus 로고    scopus 로고
    • Analysis of single-stage, single-product, stochastic, MRP controlled assembly system
    • Wilhelm W.E., Som P. Analysis of single-stage, single-product, stochastic, MRP controlled assembly system. European Journal of Operations Research. 108:1998;74-93.
    • (1998) European Journal of Operations Research , vol.108 , pp. 74-93
    • Wilhelm, W.E.1    Som, P.2
  • 8
    • 4744341907 scopus 로고    scopus 로고
    • Re-examining the performance of push, pull and hybrid material control strategies for multi-product flexible manufacturing systems
    • December
    • Ananth K, Suri R, Vernon M. Re-examining the performance of push, pull and hybrid material control strategies for multi-product flexible manufacturing systems. Technical Report. December 2000. p. 1-28.
    • (2000) Technical Report , pp. 1-28
    • Ananth, K.1    Suri, R.2    Vernon, M.3
  • 14
    • 4744350083 scopus 로고
    • Performance analysis of production networks involving assembly operations
    • Spring
    • Kamath M, Leung YT. Performance analysis of production networks involving assembly operations. INFORMS Los Angeles National Meeting, Spring 1995.
    • (1995) INFORMS Los Angeles National Meeting
    • Kamath, M.1    Leung, Y.T.2
  • 15
    • 0037375169 scopus 로고    scopus 로고
    • Admission control policies for two-stage tandem queues with no waiting spaces
    • Chang K.H., Chen W.F. Admission control policies for two-stage tandem queues with no waiting spaces. Computers and Operations Research. 30:2003;589-601.
    • (2003) Computers and Operations Research , vol.30 , pp. 589-601
    • Chang, K.H.1    Chen, W.F.2
  • 16
    • 21844514415 scopus 로고
    • Kitting process in a stochastic assembly system
    • Som P., Wilhelm W.E., Disney R.L. Kitting process in a stochastic assembly system. Queueing Systems. 17:1994;471-490.
    • (1994) Queueing Systems , vol.17 , pp. 471-490
    • Som, P.1    Wilhelm, W.E.2    Disney, R.L.3
  • 19
    • 0037395315 scopus 로고    scopus 로고
    • Performance analysis and buffer allocations in some open assembly systems
    • Hemachandra N., Eedupuganti S.K. Performance analysis and buffer allocations in some open assembly systems. Computers and Operations Research. 30(5):2003;695-704.
    • (2003) Computers and Operations Research , vol.30 , Issue.5 , pp. 695-704
    • Hemachandra, N.1    Eedupuganti, S.K.2
  • 21
    • 4744343630 scopus 로고
    • A double-ended queueing problem of Kendall
    • Dobbie J.M. A double-ended queueing problem of Kendall. Operations Research. 9:1961;755-757.
    • (1961) Operations Research , vol.9 , pp. 755-757
    • Dobbie, J.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.