메뉴 건너뛰기




Volumn 108, Issue 1, 1998, Pages 74-93

Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system

Author keywords

End product inventory position; Kitting in assembly; Manufacturing; Markov renewal process; Material requirements planning (MRP) control; Modeling

Indexed keywords

ASSEMBLY; INVENTORY CONTROL; MARKOV PROCESSES; MATHEMATICAL MODELS; PERFORMANCE; PLANNING; PROBABILITY; PRODUCTION CONTROL; RANDOM PROCESSES;

EID: 0032121661     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(97)00047-7     Document Type: Article
Times cited : (22)

References (22)
  • 1
    • 0028392043 scopus 로고
    • Single-stage, multi-product production/inventory systems with backorders
    • T. Altiok, G.A. Shiue, Single-stage, multi-product production/inventory systems with backorders, IIE Transactions 26 (2) (1994) 52-61.
    • (1994) IIE Transactions , vol.26 , Issue.2 , pp. 52-61
    • Altiok, T.1    Shiue, G.A.2
  • 2
    • 0024719991 scopus 로고
    • Queueing models of kanban and MRP controlled production systems
    • J.A. Buzacott, Queueing models of kanban and MRP controlled production systems. Engineering Costs and Production Economics 17 (1989) 3-20.
    • (1989) Engineering Costs and Production Economics , vol.17 , pp. 3-20
    • Buzacott, J.A.1
  • 3
    • 0011525421 scopus 로고
    • Service Level in multistage MRP and base stock controlled production systems
    • G. Fandel, T. Gulledge, A. Jones (Eds.), Springer, Berlin
    • J.A. Buzacott, S.M. Price, J.G. Shantikumar, Service Level in multistage MRP and base stock controlled production systems, in: G. Fandel, T. Gulledge, A. Jones (Eds.), New Directions for Operations Research in Manufacturing Systems, Springer, Berlin, 1992, pp. 445-463.
    • (1992) New Directions for Operations Research in Manufacturing Systems , pp. 445-463
    • Buzacott, J.A.1    Price, S.M.2    Shantikumar, J.G.3
  • 5
    • 0028756018 scopus 로고
    • Safety stock versus safety lead time in MRP controlled production systems
    • J.A. Buzacott, J.G. Shantikumar, Safety stock versus safety lead time in MRP controlled production systems, Management Science 40 (12)(1994)1678-1689.
    • (1994) Management Science , vol.40 , Issue.12 , pp. 1678-1689
    • Buzacott, J.A.1    Shantikumar, J.G.2
  • 6
    • 0011744219 scopus 로고
    • The interchangeability of safety stocks and safety lead time
    • C.A. Chang, The interchangeability of safety stocks and safety lead time, Journal of Operations Management 6 (1) (1985) 35-42.
    • (1985) Journal of Operations Management , vol.6 , Issue.1 , pp. 35-42
    • Chang, C.A.1
  • 9
    • 0029774986 scopus 로고    scopus 로고
    • An analytical method for performance evaluation of kanban controlled production systems
    • M. Di Mascolo, Y. Frein, Y. Dallery, An analytical method for performance evaluation of kanban controlled production systems, Operations Research 44 (1) (1996) 50-64.
    • (1996) Operations Research , vol.44 , Issue.1 , pp. 50-64
    • Mascolo, M.D.1    Frein, Y.2    Dallery, Y.3
  • 11
    • 0019058488 scopus 로고
    • A one-product production/inventory problem under continuous review policy
    • B. Gavish, S.C. Graves, A one-product production/inventory problem under continuous review policy, Operations Research 28 (5) (1980) 1228-1236.
    • (1980) Operations Research , vol.28 , Issue.5 , pp. 1228-1236
    • Gavish, B.1    Graves, S.C.2
  • 12
    • 0019704140 scopus 로고
    • Production/inventory systems with a stochastic production rate under a continuous review policy
    • B. Gavish, S.C. Graves, Production/inventory systems with a stochastic production rate under a continuous review policy, Computers and Operations Research 8 (3) (1981) 169-183.
    • (1981) Computers and Operations Research , vol.8 , Issue.3 , pp. 169-183
    • Gavish, B.1    Graves, S.C.2
  • 16
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • M.L. Spearman, M.A. Zazanis, Push and pull production systems: Issues and comparisons, Operations Research 40 (3) (1992) 521-532.
    • (1992) Operations Research , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 17
  • 19
    • 38249043033 scopus 로고
    • Management of component accumulation in small-lot assembly systems
    • W.E. Wilhelm, L. Wang, Management of component accumulation in small-lot assembly systems, Journal of Manufacturing Systems 5 (1) (1986) 27-39.
    • (1986) Journal of Manufacturing Systems , vol.5 , Issue.1 , pp. 27-39
    • Wilhelm, W.E.1    Wang, L.2
  • 20
    • 0023207074 scopus 로고
    • Setting planned lead times in serial production systems with tardiness costs
    • C.A. Yano, Setting planned lead times in serial production systems with tardiness costs, Management Science 33 (1) (1987) 95-106.
    • (1987) Management Science , vol.33 , Issue.1 , pp. 95-106
    • Yano, C.A.1
  • 21
    • 0022562253 scopus 로고
    • Models for design and control of stochastic multi-item batch production systems
    • P. Zipkin, Models for design and control of stochastic multi-item batch production systems, Operations Research 34 (1) (1986) 91-104.
    • (1986) Operations Research , vol.34 , Issue.1 , pp. 91-104
    • Zipkin, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.