메뉴 건너뛰기




Volumn 37, Issue 17, 1999, Pages 3859-3881

An overview of design and operational issues of kanban systems

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER INTEGRATED MANUFACTURING; COMPUTER SIMULATION; CONTROL SYSTEMS; DATA PROCESSING; SCHEDULING; SMART CARDS;

EID: 0033225131     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075499189808     Document Type: Article
Times cited : (77)

References (35)
  • 2
    • 0027353436 scopus 로고
    • Determining the number of kanbans in multi-item just-in-time systems
    • Askin, R. G., Mitwasi, M. G. and Goldberg, J. B., 1993, Determining the number of kanbans in multi-item just-in-time systems. IIE Transactions, 25, 89-97.
    • (1993) IIE Transactions , vol.25 , pp. 89-97
    • Askin, R.G.1    Mitwasi, M.G.2    Goldberg, J.B.3
  • 3
    • 0026153765 scopus 로고
    • Determining the number of kanbans in a multiproduct, multistage production system
    • Bard, J. F. and Golony, B., 1991, Determining the number of kanbans in a multiproduct, multistage production system. International Journal of Production Research, 29, 881 895.
    • (1991) International Journal of Production Research , vol.29 , Issue.881 , pp. 895
    • Bard, J.F.1    Golony, B.2
  • 4
    • 84986958388 scopus 로고
    • A review of the kanban production control research literature
    • Berkley, B. J., 1992, A review of the kanban production control research literature. Production and Operations Management, 1, 393-411.
    • (1992) Production and Operations Management , vol.1 , pp. 393-411
    • Berkley, B.J.1
  • 5
    • 84990578213 scopus 로고
    • Simulation tests of FCFS and SPT sequencing in kanban systems
    • Berkley, B. J., 1993, Simulation tests of FCFS and SPT sequencing in kanban systems. Decision Sciences, 24, 218-227.
    • (1993) Decision Sciences , vol.24 , pp. 218-227
    • Berkley, B.J.1
  • 6
    • 0030401255 scopus 로고    scopus 로고
    • A simulation study of container size in two-card kanban system
    • Berkley, B. J., 1996, A simulation study of container size in two-card kanban system. International Journal of Production Research, 34, 3417-3445.
    • (1996) International Journal of Production Research , vol.34 , pp. 3417-3445
    • Berkley, B.J.1
  • 7
    • 84985803928 scopus 로고
    • A simulation study of sequencing rules in a kanban- controlled flow shop
    • Berkley, B. J. and Kiran, A. S., 1991, A simulation study of sequencing rules in a kanban- controlled flow shop. Decision Sciences, 22, 559-582.
    • (1991) Decision Sciences , vol.22 , pp. 559-582
    • Berkley, B.J.1    Kiran, A.S.2
  • 8
    • 0023330726 scopus 로고
    • A mathematical programming approach to a determi nistic kanban system
    • Bitran, G. R. and Chang, L., 1987, A mathematical programming approach to a determi nistic kanban system. Management Science, 33, 427-441.
    • (1987) Management Science , vol.33 , pp. 427-441
    • Bitran, G.R.1    Chang, L.2
  • 9
    • 0037629284 scopus 로고
    • The just-in-time system
    • edited by S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (Amsterdam: Elsevier
    • Groenevelt, H., 1993, The just-in-time system. In: Handbooks in OR & MS volume 4, edited by S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (Amsterdam: Elsevier), pp. 629-670.
    • (1993) Handbooks in OR & MS Volume , vol.4 , pp. 629-670
    • Groenevelt, H.1
  • 10
    • 0024607145 scopus 로고
    • A system dynamics model for a multi-stage, multi-line dual-card JIT-kanban system
    • Gupta, Y. P. and Gupta, M. C., 1989, A system dynamics model for a multi-stage, multi-line dual-card JIT-kanban system. International Journal of Production Research, 27, 309 352.
    • (1989) International Journal of Production Research , vol.27 , Issue.309 , pp. 352
    • Gupta, Y.P.1    Gupta, M.C.2
  • 12
    • 84989486136 scopus 로고
    • Simulation analysis of the Japanese just-in-time technique (With kanbans) for a multiline, multistage production system
    • Huang, P. Y., Rees, P. L. and Taylor, B. W. III, 1983, Simulation analysis of the Japanese just-in-time technique (with kanbans) for a multiline, multistage production system. Decision Sciences, 14, 326-344.
    • (1983) Decision Sciences , vol.14 , pp. 326-344
    • Huang, P.Y.1    Rees, P.L.2    Taylor, B.3
  • 13
    • 77950506731 scopus 로고
    • Manufacturing lead times, order release and capacity loading
    • volume 4, edited by S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (Amsterdam: Elsevier)
    • Karmarkar, U., 1993, Manufacturing lead times, order release and capacity loading. In: Handbooks in OR & MS volume 4, edited by S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (Amsterdam: Elsevier), pp. 287-329.
    • (1993) Handbooks in OR & MS , pp. 287-329
    • Karmarkar, U.1
  • 15
    • 84952179325 scopus 로고
    • Design and analysis of pull system: A method of multi stage production control
    • Kimura, O. and Terada, H., 1981, Design and analysis of pull system: a method of multi stage production control. International Journal of Production Research, 19, 241-253.
    • (1981) International Journal of Production Research , vol.19 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 18
    • 0025894459 scopus 로고
    • A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system
    • Li, A. and Co, H. C., 1991, A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system. International Journal of Production Research, 29, 1-16.
    • (1991) International Journal of Production Research , vol.29 , pp. 1-16
    • Li, A.1    Co, H.C.2
  • 19
    • 0029387149 scopus 로고
    • A simulation analysis of sequencing alternatives for JIT lines using kanbans
    • Lummus, R. R., 1995, A simulation analysis of sequencing alternatives for JIT lines using kanbans. Journal of Operations Management, 13, 183-191.
    • (1995) Journal of Operations Management , vol.13 , pp. 183-191
    • Lummus, R.R.1
  • 20
    • 0025564738 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines. I
    • Mitra, D. and Mitrani, I., 1990, Analysis of a kanban discipline for cell coordination in production lines. I. Management Science, 36, 1548-1566.
    • (1990) Management Science , vol.36 , pp. 1548-1566
    • Mitra, D.1    Mitrani, I.2
  • 23
    • 0011725678 scopus 로고
    • The optimal operation planning of kan ban to minimize the total operation cost
    • Miyazaki, S., Ohta, H. and Nishiyama, N., 1988, The optimal operation planning of kan ban to minimize the total operation cost. International Journal of Production Research, 26, 1605-1611.
    • (1988) International Journal of Production Research , vol.26 , pp. 1605-1611
    • Miyazaki, S.1    Ohta, H.2    Nishiyama, N.3
  • 24
    • 84985765951 scopus 로고
    • A simulation analysis of the Japanese just-in-time technique (With kan bans) for a multiline, multistage production system: A comment
    • Monden, Y., 1984, A simulation analysis of the Japanese just-in-time technique (with kan bans) for a multiline, multistage production system: a comment. Decision Sciences, 15, 445-447.
    • (1984) Decision Sciences , vol.15 , pp. 445-447
    • Monden, Y.1
  • 28
    • 0029734386 scopus 로고    scopus 로고
    • Simultaneously determining the number of kanbans, container sizes, and the ® nal-assembly sequence of products in a just-in-time shop
    • Philipoom, P. R., Rees, L. P. and Taylor, B. W. III, 1996, Simultaneously determining the number of kanbans, container sizes, and the ® nal-assembly sequence of products in a just-in-time shop. International Journal of Production Research, 34, 51-69.
    • (1996) International Journal of Production Research , vol.34 , pp. 51-69
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, B.3
  • 29
    • 0025262876 scopus 로고
    • A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal kanbans
    • Philipoom, P. R., Rees, L. P., Taylor, B. W. III, and Huang, P. Y., 1990, A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal kanbans. International Journal of Production Research, 28, 1-15.
    • (1990) International Journal of Production Research , vol.28 , pp. 1-15
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, B.3    Huang, P.Y.4
  • 31
    • 0023365980 scopus 로고
    • Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of leadtime
    • Rees, L. P., Philipoom, P. R., Taylor, B. W. III, and Huang, P. Y., 1987, Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of leadtime. IIE Transactions, 19, 199-207.
    • (1987) IIE Transactions , vol.19 , pp. 199-207
    • Rees, L.P.1    Philipoom, P.R.2    Taylor, B.W.3    Huang, P.Y.4
  • 32
    • 0030269846 scopus 로고    scopus 로고
    • Effects of kanban withdrawal policies and other factors on the performance of JIT systems-a simulation study
    • Savsar, M., 1996, Effects of kanban withdrawal policies and other factors on the performance of JIT systems-a simulation study. International Journal of Production Research, 34, 2879-2899.
    • (1996) International Journal of Production Research , vol.34 , pp. 2879-2899
    • Savsar, M.1
  • 33
    • 0242297534 scopus 로고
    • Determining the number of kanbans for unbalanced serial production systems
    • Takahashi, K., 1994, Determining the number of kanbans for unbalanced serial production systems. Computers and Industrial Engineering, 27, 213-216.
    • (1994) Computers and Industrial Engineering , vol.27 , pp. 213-216
    • Takahashi, K.1
  • 34
    • 3943049520 scopus 로고
    • Determining the number of kanbans: A step toward non stock-production
    • Wang, H. and Wang, H. P., 1990, Determining the number of kanbans: A step toward non stock-production. International Journal of Production Research, 28, 2101-2115.
    • (1990) International Journal of Production Research , vol.28 , pp. 2101-2115
    • Wang, H.1    Wang, H.P.2
  • 35
    • 9644287019 scopus 로고
    • Job and family scheduling of a flow-line manu facturing cell: A simulation study
    • Wemmerlov, U. and Vakharia, A. J., 1991, Job and family scheduling of a flow-line manu facturing cell: a simulation study. IEE Transactions, 23, 383-394.
    • (1991) IEE Transactions , vol.23 , pp. 383-394
    • Wemmerlov, U.1    Vakharia, A.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.