-
1
-
-
0026117415
-
Tandem configurations for automated guided vehicle systems and the analysis of single-vehicle loops
-
Bozer, Y. A., M. M. Srinivasan. 1991. Tandem configurations for automated guided vehicle systems and the analysis of single-vehicle loops. IIE Trans. 23, 72-82.
-
(1991)
IIE Trans.
, vol.23
, pp. 72-82
-
-
Bozer, Y.A.1
Srinivasan, M.M.2
-
3
-
-
0022736834
-
An analysis of automated storage and retrieval systems in manufacturing assembly lines
-
Chow, W. 1986. An analysis of automated storage and retrieval systems in manufacturing assembly lines. IIE Trans. 18, 204-214.
-
(1986)
IIE Trans.
, vol.18
, pp. 204-214
-
-
Chow, W.1
-
4
-
-
0001366593
-
Discrete variable extremum problems
-
Dantzig, G. B. 1957. Discrete variable extremum problems. Oper. Res. 5, 266-277.
-
(1957)
Oper. Res.
, vol.5
, pp. 266-277
-
-
Dantzig, G.B.1
-
5
-
-
0017494876
-
Note on the validity of marginal analysis for allocating servers in M/M/c queues
-
Dyer, M. E., L. G. Proll. 1977. Note on the validity of marginal analysis for allocating servers in M/M/c queues. Management Sci. 23, 1019-1022.
-
(1977)
Management Sci.
, vol.23
, pp. 1019-1022
-
-
Dyer, M.E.1
Proll, L.G.2
-
6
-
-
0002894516
-
The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system
-
Egbelu, P. J. 1987. The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system. Material Flow 4, 17-32.
-
(1987)
Material Flow
, vol.4
, pp. 17-32
-
-
Egbelu, P.J.1
-
7
-
-
0021423836
-
Characterization of automatic guided vehicle dispatching rules
-
_, J. M. A. Tanchoco. 1984. Characterization of automatic guided vehicle dispatching rules. Internat. J. Production Res. 22, 359-374.
-
(1984)
Internat. J. Production Res.
, vol.22
, pp. 359-374
-
-
Tanchoco, J.M.A.1
-
8
-
-
0022785934
-
Potentials for bi-directional guide-path for automated guided vehicle based systems
-
_, _. 1986. Potentials for bi-directional guide-path for automated guided vehicle based systems. Internat. J. Production Res. 24, 1075-1097.
-
(1986)
Internat. J. Production Res.
, vol.24
, pp. 1075-1097
-
-
-
9
-
-
20044384768
-
Unique AGV guidance system helps Apple
-
October
-
Frog Systems. 1990. Unique AGV guidance system helps Apple. Modern Materials Handling October 86-87.
-
(1990)
Modern Materials Handling
, pp. 86-87
-
-
-
10
-
-
0023349893
-
Flow path design for automated guided vehicle systems
-
Gaskin, R. J., J. M. A. Tanchoco. 1987. Flow path design for automated guided vehicle systems. Internat. J. Production Res. 25, 667-676.
-
(1987)
Internat. J. Production Res.
, vol.25
, pp. 667-676
-
-
Gaskin, R.J.1
Tanchoco, J.M.A.2
-
12
-
-
0023344017
-
Strong convexity results for queueing systems
-
Harel, A., P. H. Zipkin. 1987. Strong convexity results for queueing systems. Oper. Res. 35, 405-418.
-
(1987)
Oper. Res.
, vol.35
, pp. 405-418
-
-
Harel, A.1
Zipkin, P.H.2
-
13
-
-
0002418444
-
Developing control rules for an AGVS using Markov decision processes
-
Hodgson, T. J., R. E. King, S. K. Monteith, S. R. Schultz. 1987. Developing control rules for an AGVS using Markov decision processes. Material Flow 4, 85-96.
-
(1987)
Material Flow
, vol.4
, pp. 85-96
-
-
Hodgson, T.J.1
King, R.E.2
Monteith, S.K.3
Schultz, S.R.4
-
14
-
-
0026202916
-
Unit load size determination based on economic move quantity
-
Jackman, J. 1991. Unit load size determination based on economic move quantity. J. Operational Res. Soc. 42, 703-711.
-
(1991)
J. Operational Res. Soc.
, vol.42
, pp. 703-711
-
-
Jackman, J.1
-
15
-
-
0027875444
-
An analytic model for design of a multi-vehicle automated guided vehicle system
-
Johnson, M. E., M. L. Brandeau. 1993a. An analytic model for design of a multi-vehicle automated guided vehicle system. Management Sci. 39, 1477-1489.
-
(1993)
Management Sci.
, vol.39
, pp. 1477-1489
-
-
Johnson, M.E.1
Brandeau, M.L.2
-
16
-
-
13644256304
-
Application of analytic models for material handling system design: Analysis of stochastic effects
-
Braun-Brumfield, Inc., Ann Arbor, MI
-
_, _. 1993b. Application of analytic models for material handling system design: analysis of stochastic effects. Progress in Material Handling Res. Braun-Brumfield, Inc., Ann Arbor, MI, 97-120.
-
(1993)
Progress in Material Handling Res.
, pp. 97-120
-
-
-
17
-
-
0010908246
-
An analytic model for design of a single-vehicle asynchronous material handling system
-
_, _. 1994. An analytic model for design of a single-vehicle asynchronous material handling system. Transp. Sci. 28, 337-353.
-
(1994)
Transp. Sci.
, vol.28
, pp. 337-353
-
-
-
18
-
-
0030287203
-
Stochastic modeling for automated material handling system design and control
-
_, _. 1996. Stochastic modeling for automated material handling system design and control. Transp. Sci. 30, 330-350.
-
(1996)
Transp. Sci.
, vol.30
, pp. 330-350
-
-
-
19
-
-
0009338739
-
Optimal flow path design of unidirectional AGV systems
-
Kaspi, M., J. M. A. Tanchoco. 1990. Optimal flow path design of unidirectional AGV systems. International J. Production Res. 28, 1023-1030.
-
(1990)
International J. Production Res.
, vol.28
, pp. 1023-1030
-
-
Kaspi, M.1
Tanchoco, J.M.A.2
-
20
-
-
0343076621
-
Queueing processes associated with airline passenger checkin
-
Lee, A. M., P. A. Longton. 1957. Queueing processes associated with airline passenger checkin. Opr. Res. Quarterly 10, 56-71.
-
(1957)
Opr. Res. Quarterly
, vol.10
, pp. 56-71
-
-
Lee, A.M.1
Longton, P.A.2
-
21
-
-
0020930476
-
A note on the convexity of performance measures of the M/M/c queueing systems
-
_, M. A. Cohen. 1983. A note on the convexity of performance measures of the M/M/c queueing systems. J. Applied Prob. 20, 920-923.
-
(1983)
J. Applied Prob.
, vol.20
, pp. 920-923
-
-
Cohen, M.A.1
-
22
-
-
20044371677
-
Manufacturing the MAC with automated material handling
-
February
-
Manji, J. F. 1991. Manufacturing the MAC with automated material handling. Automation February, 16-22.
-
(1991)
Automation
, pp. 16-22
-
-
Manji, J.F.1
-
23
-
-
0020140765
-
Design of automatic guided vehicle systems
-
Maxwell, W. L., J. A. Muckstadt. 1982. Design of automatic guided vehicle systems. IIE Trans. 14, 114-124.
-
(1982)
IIE Trans.
, vol.14
, pp. 114-124
-
-
Maxwell, W.L.1
Muckstadt, J.A.2
-
24
-
-
0004323381
-
-
Oper. Res. Dept., Stanford University, Stanford, CA
-
Murtagh, B. A., M. A. Saunders. 1983. MINOS User's Guide. Oper. Res. Dept., Stanford University, Stanford, CA.
-
(1983)
MINOS User's Guide
-
-
Murtagh, B.A.1
Saunders, M.A.2
-
25
-
-
0000061021
-
A quadratically convergent algorithm for general nonlinear programming problems
-
Robinson, S. M. 1972. A quadratically convergent algorithm for general nonlinear programming problems. Math. Programming 3, 145-156.
-
(1972)
Math. Programming
, vol.3
, pp. 145-156
-
-
Robinson, S.M.1
-
26
-
-
0043158618
-
A note on marginal allocation in multiple-server service systems
-
Rolfe, A. 1971. A note on marginal allocation in multiple-server service systems. Management Sci. 17, 656-658.
-
(1971)
Management Sci.
, vol.17
, pp. 656-658
-
-
Rolfe, A.1
-
27
-
-
0025417539
-
An analytical method for configuring fixed-path closed-loop material handling systems. Internat
-
Sharp, G. P., F. F. Liu. 1990. An analytical method for configuring fixed-path closed-loop material handling systems. Internat. J. Production Res. 28, 757-783.
-
(1990)
J. Production Res.
, vol.28
, pp. 757-783
-
-
Sharp, G.P.1
Liu, F.F.2
-
29
-
-
0002554762
-
Determination of the total number of vehicles in an AGV-based material transport system
-
Tanchoco, J. M. A., P. J. Egbelu, F. Taghaboni. 1987. Determination of the total number of vehicles in an AGV-based material transport system. Material Flow 4, 33-51.
-
(1987)
Material Flow
, vol.4
, pp. 33-51
-
-
Tanchoco, J.M.A.1
Egbelu, P.J.2
Taghaboni, F.3
-
30
-
-
0030285202
-
Designing a single-vehicle automated guided vehicle system with multiple-load capacity
-
Thonemann, U. W., M. L. Brandeau. 1996. Designing a single-vehicle automated guided vehicle system with multiple-load capacity. Transp. Sci. 30, 351-363.
-
(1996)
Transp. Sci.
, vol.30
, pp. 351-363
-
-
Thonemann, U.W.1
Brandeau, M.L.2
-
31
-
-
0031271644
-
Designing a zoned automated guided vehicle system with multiple vehicles and multiple load capacity
-
_, _. 1997. Designing a zoned automated guided vehicle system with multiple vehicles and multiple load capacity. Oper. Res. 45, 857-873.
-
(1997)
Oper. Res.
, vol.45
, pp. 857-873
-
-
-
33
-
-
20044396031
-
The increasing importance of AGVs in inventory control
-
November
-
Vester, J. 1987. The increasing importance of AGVs in inventory control. PSIM Review November, 36-39.
-
(1987)
PSIM Review
, pp. 36-39
-
-
Vester, J.1
|