메뉴 건너뛰기




Volumn 47, Issue 1, 1999, Pages 65-80

Design of an automated shop floor material handling system with inventory considerations

Author keywords

Applications; Automated systems; Design inventory production; Facilities equipment planning; Manufacturing

Indexed keywords


EID: 0010908050     PISSN: 0030364X     EISSN: None     Source Type: Journal    
DOI: 10.1287/opre.47.1.65     Document Type: Article
Times cited : (6)

References (33)
  • 1
    • 0026117415 scopus 로고
    • Tandem configurations for automated guided vehicle systems and the analysis of single-vehicle loops
    • Bozer, Y. A., M. M. Srinivasan. 1991. Tandem configurations for automated guided vehicle systems and the analysis of single-vehicle loops. IIE Trans. 23, 72-82.
    • (1991) IIE Trans. , vol.23 , pp. 72-82
    • Bozer, Y.A.1    Srinivasan, M.M.2
  • 3
    • 0022736834 scopus 로고
    • An analysis of automated storage and retrieval systems in manufacturing assembly lines
    • Chow, W. 1986. An analysis of automated storage and retrieval systems in manufacturing assembly lines. IIE Trans. 18, 204-214.
    • (1986) IIE Trans. , vol.18 , pp. 204-214
    • Chow, W.1
  • 4
    • 0001366593 scopus 로고
    • Discrete variable extremum problems
    • Dantzig, G. B. 1957. Discrete variable extremum problems. Oper. Res. 5, 266-277.
    • (1957) Oper. Res. , vol.5 , pp. 266-277
    • Dantzig, G.B.1
  • 5
    • 0017494876 scopus 로고
    • Note on the validity of marginal analysis for allocating servers in M/M/c queues
    • Dyer, M. E., L. G. Proll. 1977. Note on the validity of marginal analysis for allocating servers in M/M/c queues. Management Sci. 23, 1019-1022.
    • (1977) Management Sci. , vol.23 , pp. 1019-1022
    • Dyer, M.E.1    Proll, L.G.2
  • 6
    • 0002894516 scopus 로고
    • The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system
    • Egbelu, P. J. 1987. The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system. Material Flow 4, 17-32.
    • (1987) Material Flow , vol.4 , pp. 17-32
    • Egbelu, P.J.1
  • 7
    • 0021423836 scopus 로고
    • Characterization of automatic guided vehicle dispatching rules
    • _, J. M. A. Tanchoco. 1984. Characterization of automatic guided vehicle dispatching rules. Internat. J. Production Res. 22, 359-374.
    • (1984) Internat. J. Production Res. , vol.22 , pp. 359-374
    • Tanchoco, J.M.A.1
  • 8
    • 0022785934 scopus 로고
    • Potentials for bi-directional guide-path for automated guided vehicle based systems
    • _, _. 1986. Potentials for bi-directional guide-path for automated guided vehicle based systems. Internat. J. Production Res. 24, 1075-1097.
    • (1986) Internat. J. Production Res. , vol.24 , pp. 1075-1097
  • 9
    • 20044384768 scopus 로고
    • Unique AGV guidance system helps Apple
    • October
    • Frog Systems. 1990. Unique AGV guidance system helps Apple. Modern Materials Handling October 86-87.
    • (1990) Modern Materials Handling , pp. 86-87
  • 10
    • 0023349893 scopus 로고
    • Flow path design for automated guided vehicle systems
    • Gaskin, R. J., J. M. A. Tanchoco. 1987. Flow path design for automated guided vehicle systems. Internat. J. Production Res. 25, 667-676.
    • (1987) Internat. J. Production Res. , vol.25 , pp. 667-676
    • Gaskin, R.J.1    Tanchoco, J.M.A.2
  • 12
    • 0023344017 scopus 로고
    • Strong convexity results for queueing systems
    • Harel, A., P. H. Zipkin. 1987. Strong convexity results for queueing systems. Oper. Res. 35, 405-418.
    • (1987) Oper. Res. , vol.35 , pp. 405-418
    • Harel, A.1    Zipkin, P.H.2
  • 13
    • 0002418444 scopus 로고
    • Developing control rules for an AGVS using Markov decision processes
    • Hodgson, T. J., R. E. King, S. K. Monteith, S. R. Schultz. 1987. Developing control rules for an AGVS using Markov decision processes. Material Flow 4, 85-96.
    • (1987) Material Flow , vol.4 , pp. 85-96
    • Hodgson, T.J.1    King, R.E.2    Monteith, S.K.3    Schultz, S.R.4
  • 14
    • 0026202916 scopus 로고
    • Unit load size determination based on economic move quantity
    • Jackman, J. 1991. Unit load size determination based on economic move quantity. J. Operational Res. Soc. 42, 703-711.
    • (1991) J. Operational Res. Soc. , vol.42 , pp. 703-711
    • Jackman, J.1
  • 15
    • 0027875444 scopus 로고
    • An analytic model for design of a multi-vehicle automated guided vehicle system
    • Johnson, M. E., M. L. Brandeau. 1993a. An analytic model for design of a multi-vehicle automated guided vehicle system. Management Sci. 39, 1477-1489.
    • (1993) Management Sci. , vol.39 , pp. 1477-1489
    • Johnson, M.E.1    Brandeau, M.L.2
  • 16
    • 13644256304 scopus 로고
    • Application of analytic models for material handling system design: Analysis of stochastic effects
    • Braun-Brumfield, Inc., Ann Arbor, MI
    • _, _. 1993b. Application of analytic models for material handling system design: analysis of stochastic effects. Progress in Material Handling Res. Braun-Brumfield, Inc., Ann Arbor, MI, 97-120.
    • (1993) Progress in Material Handling Res. , pp. 97-120
  • 17
    • 0010908246 scopus 로고
    • An analytic model for design of a single-vehicle asynchronous material handling system
    • _, _. 1994. An analytic model for design of a single-vehicle asynchronous material handling system. Transp. Sci. 28, 337-353.
    • (1994) Transp. Sci. , vol.28 , pp. 337-353
  • 18
    • 0030287203 scopus 로고    scopus 로고
    • Stochastic modeling for automated material handling system design and control
    • _, _. 1996. Stochastic modeling for automated material handling system design and control. Transp. Sci. 30, 330-350.
    • (1996) Transp. Sci. , vol.30 , pp. 330-350
  • 19
    • 0009338739 scopus 로고
    • Optimal flow path design of unidirectional AGV systems
    • Kaspi, M., J. M. A. Tanchoco. 1990. Optimal flow path design of unidirectional AGV systems. International J. Production Res. 28, 1023-1030.
    • (1990) International J. Production Res. , vol.28 , pp. 1023-1030
    • Kaspi, M.1    Tanchoco, J.M.A.2
  • 20
    • 0343076621 scopus 로고
    • Queueing processes associated with airline passenger checkin
    • Lee, A. M., P. A. Longton. 1957. Queueing processes associated with airline passenger checkin. Opr. Res. Quarterly 10, 56-71.
    • (1957) Opr. Res. Quarterly , vol.10 , pp. 56-71
    • Lee, A.M.1    Longton, P.A.2
  • 21
    • 0020930476 scopus 로고
    • A note on the convexity of performance measures of the M/M/c queueing systems
    • _, M. A. Cohen. 1983. A note on the convexity of performance measures of the M/M/c queueing systems. J. Applied Prob. 20, 920-923.
    • (1983) J. Applied Prob. , vol.20 , pp. 920-923
    • Cohen, M.A.1
  • 22
    • 20044371677 scopus 로고
    • Manufacturing the MAC with automated material handling
    • February
    • Manji, J. F. 1991. Manufacturing the MAC with automated material handling. Automation February, 16-22.
    • (1991) Automation , pp. 16-22
    • Manji, J.F.1
  • 23
    • 0020140765 scopus 로고
    • Design of automatic guided vehicle systems
    • Maxwell, W. L., J. A. Muckstadt. 1982. Design of automatic guided vehicle systems. IIE Trans. 14, 114-124.
    • (1982) IIE Trans. , vol.14 , pp. 114-124
    • Maxwell, W.L.1    Muckstadt, J.A.2
  • 24
  • 25
    • 0000061021 scopus 로고
    • A quadratically convergent algorithm for general nonlinear programming problems
    • Robinson, S. M. 1972. A quadratically convergent algorithm for general nonlinear programming problems. Math. Programming 3, 145-156.
    • (1972) Math. Programming , vol.3 , pp. 145-156
    • Robinson, S.M.1
  • 26
    • 0043158618 scopus 로고
    • A note on marginal allocation in multiple-server service systems
    • Rolfe, A. 1971. A note on marginal allocation in multiple-server service systems. Management Sci. 17, 656-658.
    • (1971) Management Sci. , vol.17 , pp. 656-658
    • Rolfe, A.1
  • 27
    • 0025417539 scopus 로고
    • An analytical method for configuring fixed-path closed-loop material handling systems. Internat
    • Sharp, G. P., F. F. Liu. 1990. An analytical method for configuring fixed-path closed-loop material handling systems. Internat. J. Production Res. 28, 757-783.
    • (1990) J. Production Res. , vol.28 , pp. 757-783
    • Sharp, G.P.1    Liu, F.F.2
  • 29
    • 0002554762 scopus 로고
    • Determination of the total number of vehicles in an AGV-based material transport system
    • Tanchoco, J. M. A., P. J. Egbelu, F. Taghaboni. 1987. Determination of the total number of vehicles in an AGV-based material transport system. Material Flow 4, 33-51.
    • (1987) Material Flow , vol.4 , pp. 33-51
    • Tanchoco, J.M.A.1    Egbelu, P.J.2    Taghaboni, F.3
  • 30
    • 0030285202 scopus 로고    scopus 로고
    • Designing a single-vehicle automated guided vehicle system with multiple-load capacity
    • Thonemann, U. W., M. L. Brandeau. 1996. Designing a single-vehicle automated guided vehicle system with multiple-load capacity. Transp. Sci. 30, 351-363.
    • (1996) Transp. Sci. , vol.30 , pp. 351-363
    • Thonemann, U.W.1    Brandeau, M.L.2
  • 31
    • 0031271644 scopus 로고    scopus 로고
    • Designing a zoned automated guided vehicle system with multiple vehicles and multiple load capacity
    • _, _. 1997. Designing a zoned automated guided vehicle system with multiple vehicles and multiple load capacity. Oper. Res. 45, 857-873.
    • (1997) Oper. Res. , vol.45 , pp. 857-873
  • 33
    • 20044396031 scopus 로고
    • The increasing importance of AGVs in inventory control
    • November
    • Vester, J. 1987. The increasing importance of AGVs in inventory control. PSIM Review November, 36-39.
    • (1987) PSIM Review , pp. 36-39
    • Vester, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.