-
1
-
-
0026153765
-
Determining the number of kanbans in a multi-product, multi-stage production system
-
Bard, J.F., Golany, B., 1991. Determining the number of kanbans in a multi-product, multi-stage production system. Int. J. Prod. Res. 29, 881-895.
-
(1991)
Int. J. Prod. Res.
, vol.29
, pp. 881-895
-
-
Bard, J.F.1
Golany, B.2
-
2
-
-
0027595682
-
Setting minimum performance levels for two-card kanban-controlled lines
-
Berkley, B.J., 1993. Setting minimum performance levels for two-card kanban-controlled lines, Int. J. Prod. Res. 31, 1003-1021.
-
(1993)
Int. J. Prod. Res.
, vol.31
, pp. 1003-1021
-
-
Berkley, B.J.1
-
3
-
-
0026954975
-
Simulation studies in JIT production
-
Chu, C., Shih, W., 1992. Simulation studies in JIT production. Int. J. Prod. Res. 30, 2573-2586.
-
(1992)
Int. J. Prod. Res.
, vol.30
, pp. 2573-2586
-
-
Chu, C.1
Shih, W.2
-
4
-
-
0342443827
-
Dynamic simulation of a Kanban production inventory system
-
Ebrahimpour, M., Fathi, B.M., 1984. Dynamic simulation of a Kanban production inventory system. Int. J. Oper. Mgmt. 5, 5-14.
-
(1984)
Int. J. Oper. Mgmt.
, vol.5
, pp. 5-14
-
-
Ebrahimpour, M.1
Fathi, B.M.2
-
6
-
-
0027684952
-
The determination of optimal number of kanbans in a just-in-time production system
-
Fukukawa, T., Hong S.C., 1993. The determination of optimal number of kanbans in a just-in-time production system. Comput. Ind. Engng. 24, 551-559.
-
(1993)
Comput. Ind. Engng.
, vol.24
, pp. 551-559
-
-
Fukukawa, T.1
Hong, S.C.2
-
7
-
-
0026137976
-
The just-in-time philosophy: A literature review
-
Golhar, D.Y., Stamm, C.L., 1991. The just-in-time philosophy: a literature review. Int. J. Prod. Res. 29, 657-676.
-
(1991)
Int. J. Prod. Res.
, vol.29
, pp. 657-676
-
-
Golhar, D.Y.1
Stamm, C.L.2
-
8
-
-
0026869895
-
Economic manufacturing quantity in a just-in-time delivery system
-
Golhar, D.Y., Sarker, B.R., 1992. Economic manufacturing quantity in a just-in-time delivery system. Int J. Prod. Res. 30, 961-972.
-
(1992)
Int J. Prod. Res.
, vol.30
, pp. 961-972
-
-
Golhar, D.Y.1
Sarker, B.R.2
-
9
-
-
84989486136
-
A simulation analysis of the Japanese just-in-time technique (with kanbans) for a multi-line, multi-stage production systems
-
Huang, P.Y., Rees, L.P., Taylor, R.W., 1983. A simulation analysis of the Japanese just-in-time technique (with kanbans) for a multi-line, multi-stage production systems. Dec. Sci. 14, 326-344.
-
(1983)
Dec. Sci.
, vol.14
, pp. 326-344
-
-
Huang, P.Y.1
Rees, L.P.2
Taylor, R.W.3
-
10
-
-
0026187108
-
Optimal hybrid push/pull control strategies for parallel multistage system: Part II
-
Hodgson, T.J., Wang, D., 1991. Optimal hybrid push/pull control strategies for parallel multistage system: part II. Int. J. Prod. Res. 29, 1453-1460.
-
(1991)
Int. J. Prod. Res.
, vol.29
, pp. 1453-1460
-
-
Hodgson, T.J.1
Wang, D.2
-
11
-
-
0025416434
-
An integrated push-pull manufacturing strategy
-
Olhager, J., Ostlung, B., 1990. An integrated push-pull manufacturing strategy. Eur. J. Oper. Res. 45, 135-142.
-
(1990)
Eur. J. Oper. Res.
, vol.45
, pp. 135-142
-
-
Olhager, J.1
Ostlung, B.2
-
13
-
-
0024748621
-
The performance of push and pull systems: A simulation and comparative study
-
Sarker, B.R., Fitzsimmons, J.A., 1989. The performance of push and pull systems: a simulation and comparative study. Int. J. Prod. Res. 27, 1715-1731.
-
(1989)
Int. J. Prod. Res.
, vol.27
, pp. 1715-1731
-
-
Sarker, B.R.1
Fitzsimmons, J.A.2
-
14
-
-
3943049520
-
Determining the number of kanbans: A step toward non-stock production
-
Wang, H., Wang, H., 1990. Determining the number of kanbans: a step toward non-stock production. Int. J. Prod. Res. 28, 2101-2115.
-
(1990)
Int. J. Prod. Res.
, vol.28
, pp. 2101-2115
-
-
Wang, H.1
Wang, H.2
-
15
-
-
0024735993
-
Modeling and analysis of a production line operated according to demand
-
Yamashita, H., Nakazawa, K., Nagasuka, H., Suzuki, S., 1989. Modeling and analysis of a production line operated according to demand. JSME: Int. J. Ser. III 32, 491-497.
-
(1989)
JSME: Int. J. Ser. III
, vol.32
, pp. 491-497
-
-
Yamashita, H.1
Nakazawa, K.2
Nagasuka, H.3
Suzuki, S.4
-
16
-
-
0028529848
-
Towards a more economic production and just-in-time delivery system
-
Zhuang, L., 1994. Towards a more economic production and just-in-time delivery system. Int. J. Prod. Econom. 36, 307-313.
-
(1994)
Int. J. Prod. Econom.
, vol.36
, pp. 307-313
-
-
Zhuang, L.1
|