메뉴 건너뛰기




Volumn 30, Issue 1, 2002, Pages 49-65

A case study of a principally new way of materials kitting - An evaluation of time consumption and physical workload

Author keywords

Case study; Manual materials handling; Materials kitting; Order picking; Physical workload; Production systems; Time consumption

Indexed keywords

AUTOMOBILE PLANTS; MUSCULOSKELETAL SYSTEM;

EID: 0036272637     PISSN: 01698141     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0169-8141(02)00077-X     Document Type: Article
Times cited : (59)

References (22)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.