-
1
-
-
0002726139
-
Line balancing-sequencing for mixed-model assembly
-
N. T. Thomopoulos. Line balancing-sequencing for mixed-model assembly. Mgmt. Sci. 14, 59-75 (1967).
-
(1967)
Mgmt. Sci.
, vol.14
, pp. 59-75
-
-
Thomopoulos, N.T.1
-
2
-
-
0016554171
-
Assembly line sequencing for model mix
-
E. M. Dar-El and R. F. Cother. Assembly line sequencing for model mix. Int. J. Prod. Res. 13, 463-477 (1975).
-
(1975)
Int. J. Prod. Res.
, vol.13
, pp. 463-477
-
-
Dar-El, E.M.1
Cother, R.F.2
-
3
-
-
34548564307
-
Optimal mixed-model sequencing for balanced assembly lines
-
E. M. Dar-El and S. Cucuy. Optimal mixed-model sequencing for balanced assembly lines. Omega 5, 333-342 (1977).
-
(1977)
Omega
, vol.5
, pp. 333-342
-
-
Dar-El, E.M.1
Cucuy, S.2
-
4
-
-
0014614936
-
Optimum schedule control of conveyor line
-
S. Mitsumori. Optimum schedule control of conveyor line. IEEE Trans. Auto. Control AC-14, 633-639 (1969).
-
(1969)
IEEE Trans. Auto. Control
, vol.AC-14
, pp. 633-639
-
-
Mitsumori, S.1
-
5
-
-
0018469357
-
A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor
-
K. Okamura and H. Yamashina. A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor. Int. J. Prod. Res. 17, 233-247 (1979).
-
(1979)
Int. J. Prod. Res.
, vol.17
, pp. 233-247
-
-
Okamura, K.1
Yamashina, H.2
-
6
-
-
0015681053
-
Computer simulation for mixed-model production lines
-
J. L. C. Macaskill. Computer simulation for mixed-model production lines. Mgmt. Sci. 20, 341-348 (1973).
-
(1973)
Mgmt. Sci.
, vol.20
, pp. 341-348
-
-
Macaskill, J.L.C.1
-
7
-
-
0000298775
-
Sequencing to minimize work overload in assembly lines with product options
-
C.A. Yano and R. Rachamadugu. Sequencing to minimize work overload in assembly lines with product options. Mgmt. Sci. 37, 572-586 (1991).
-
(1991)
Mgmt. Sci.
, vol.37
, pp. 572-586
-
-
Yano, C.A.1
Rachamadugu, R.2
-
8
-
-
0026745702
-
An analytic framework for sequencing mixed model assembly lines
-
J. F. Bard, E. Dar-El and A. Shtub. An analytic framework for sequencing mixed model assembly lines. Int. J. Prod. Res. 30, 35-48 (1992).
-
(1992)
Int. J. Prod. Res.
, vol.30
, pp. 35-48
-
-
Bard, J.F.1
Dar-El, E.2
Shtub, A.3
-
10
-
-
0001360372
-
Level schedules for mixed-model assembly lines in just-in-time production systems
-
J. Miltenburg. Level schedules for mixed-model assembly lines in just-in-time production systems. Mgmt. Sci. 35, 192-207 (1989).
-
(1989)
Mgmt. Sci.
, vol.35
, pp. 192-207
-
-
Miltenburg, J.1
-
11
-
-
0024731470
-
Scheduling mixed-model multi-level just-in-time production systems
-
J. Miltenburg and G. Sinnamon. Scheduling mixed-model multi-level just-in-time production systems. Int. J. Prod. Res. 27, 1487-1509 (1989).
-
(1989)
Int. J. Prod. Res.
, vol.27
, pp. 1487-1509
-
-
Miltenburg, J.1
Sinnamon, G.2
-
12
-
-
0001602291
-
Sequencing JIT mixed-model assembly lines
-
R. R. Inman and R. L. Bulfin. Sequencing JIT mixed-model assembly lines. Mgmt. Sci. 37, 901-904 (1991).
-
(1991)
Mgmt. Sci.
, vol.37
, pp. 901-904
-
-
Inman, R.R.1
Bulfin, R.L.2
-
13
-
-
0025868004
-
A note on "level schedules for mixed-model assembly lines in just-in-time production systems"
-
W. Kubiak and S. Sethi. A note on "level schedules for mixed-model assembly lines in just-in-time production systems". Mgmt. Sci. 37, 121-122 (1991).
-
(1991)
Mgmt. Sci.
, vol.37
, pp. 121-122
-
-
Kubiak, W.1
Sethi, S.2
-
14
-
-
0027595182
-
Minimizing variation of production rates in just-in-time systems: A survey
-
W. Kubiak. Minimizing variation of production rates in just-in-time systems: a survey. Eur. J. Opl. Res. 66, 259-271 (1993).
-
(1993)
Eur. J. Opl. Res.
, vol.66
, pp. 259-271
-
-
Kubiak, W.1
-
15
-
-
0027614669
-
Level schedules for mixed-model, just-in-time processes
-
G. Steiner and S. Yeomans. Level schedules for mixed-model, just-in-time processes. Mgmt. Sci. 39, 728-735 (1993).
-
(1993)
Mgmt. Sci.
, vol.39
, pp. 728-735
-
-
Steiner, G.1
Yeomans, S.2
-
16
-
-
0026624344
-
A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system
-
R. T Sumichrast, R. S. Russell and B. W. Taylor. A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system. Int. J. Prod. Res. 30, 199-214 (1992).
-
(1992)
Int. J. Prod. Res.
, vol.30
, pp. 199-214
-
-
Sumichrast, R.T.1
Russell, R.S.2
Taylor, B.W.3
-
17
-
-
0000363908
-
Sequencing mixed-model assembly lines to level parts usage and minimize line length
-
J. F. Bard, A. Shtub and S. B. Joshi. Sequencing mixed-model assembly lines to level parts usage and minimize line length. Int. J. Prod. Res. 32, 2431-2454 (1994).
-
(1994)
Int. J. Prod. Res.
, vol.32
, pp. 2431-2454
-
-
Bard, J.F.1
Shtub, A.2
Joshi, S.B.3
-
18
-
-
0002686137
-
A sequencing problem for a mixed-model assembly line in a JIT production system
-
Z. Xiaobo and K. Ohno. A sequencing problem for a mixed-model assembly line in a JIT production system. Computers Ind. Engng. 27, 71-74 (1994).
-
(1994)
Computers Ind. Engng.
, vol.27
, pp. 71-74
-
-
Xiaobo, Z.1
Ohno, K.2
|