메뉴 건너뛰기




Volumn 21, Issue 1, 2010, Pages 17-33

A review of manufacturing resources planning models under different uncertainties: State-of-the-art and future directions

Author keywords

[No Author keywords available]

Indexed keywords

COMBINED EFFECT; FUTURE RESEARCH DIRECTIONS; MANUFACTURING RESOURCE; MANUFACTURING RESOURCE PLANNING; MULTI-PERIOD; MULTIPLE PRODUCTS; UNCERTAIN CONDITION; UNCERTAINTY FACTORS;

EID: 77952624937     PISSN: 1012277X     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Review
Times cited : (20)

References (116)
  • 1
    • 29344471605 scopus 로고    scopus 로고
    • Managing uncertainty in ERP-controlled manufacturing environments in SMEs
    • Koh, S.C.L. & Saad, S.M 2006. Managing uncertainty in ERP-controlled manufacturing environments in SMEs, International Journal of Production Economics, 101(1), pp. 109-127.
    • (2006) International Journal of Production Economics , vol.101 , Issue.1 , pp. 109-127
    • Koh, S.C.L.1    Saad, S.M.2
  • 4
    • 0035866458 scopus 로고    scopus 로고
    • MRP performance effects due to lot size and planned lead-time settings
    • Enns, S.T., 2001. MRP performance effects due to lot size and planned lead-time settings, International Journal of Production Research, 39(3), pp. 461-480.
    • (2001) International Journal of Production Research , vol.39 , Issue.3 , pp. 461-480
    • Enns, S.T.1
  • 5
    • 0142217266 scopus 로고    scopus 로고
    • A holistic approach to diagnose uncertainty in ERPcontrolled manufacturing shop floor
    • Koh, S.C.L. & Saad, S.M. 2003. A holistic approach to diagnose uncertainty in ERPcontrolled manufacturing shop floor, International Journal of Production Planning and Control, 14(3), pp. 273-289.
    • (2003) International Journal of Production Planning and Control , vol.14 , Issue.3 , pp. 273-289
    • Koh, S.C.L.1    Saad, S.M.2
  • 6
    • 0024962824 scopus 로고
    • Production scheduling: Practice and theory
    • Buxey, G., 1989. Production scheduling: Practice and theory, European Journal of Operational Research, 39(1), pp. 17-31.
    • (1989) European Journal of Operational Research , vol.39 , Issue.1 , pp. 17-31
    • Buxey, G.1
  • 9
    • 0037448867 scopus 로고    scopus 로고
    • Pre-implementation attitudes and organizational readiness for implementing an Enterprise Resource Planning System
    • Adbinour-Heml, S., Legnick-Hall, M.L. & Legnick-Hall, C.A. 2003. Pre-implementation attitudes and organizational readiness for implementing an Enterprise Resource Planning System, European Journal of Operational Research, 146(2), pp. 258-273.
    • (2003) European Journal of Operational Research , vol.146 , Issue.2 , pp. 258-273
    • Adbinour-Heml, S.1    Legnick-Hall, M.L.2    Legnick-Hall, C.A.3
  • 11
    • 33645806554 scopus 로고    scopus 로고
    • A knowledge management approach for managing uncertainty in manufacturing
    • Koh, S.C.L. & Gunasekaran, A. 2006. A knowledge management approach for managing uncertainty in manufacturing, Industrial Management & Data Systems, 106(4), pp. 439-459.
    • (2006) Industrial Management & Data Systems , vol.106 , Issue.4 , pp. 439-459
    • Koh, S.C.L.1    Gunasekaran, A.2
  • 18
    • 85077032518 scopus 로고    scopus 로고
    • Uncertainty modeling and management in multidisciplinary analysis and synthesis
    • AIAA 2000-0422
    • Delaurentis, D.A. & Mavris, D.N. 2000. Uncertainty modeling and management in multidisciplinary analysis and synthesis, 38th Aerospace Sciences Meeting & Exhibition, pp. AIAA 2000-0422.
    • (2000) 38th Aerospace Sciences Meeting & Exhibition
    • Delaurentis, D.A.1    Mavris, D.N.2
  • 20
    • 8844246368 scopus 로고
    • Action taken to prevent the propagation of disturbances in manufacturing systems
    • Lindau, R.A. & Lumsden, K.R. 1995. Action taken to prevent the propagation of disturbances in manufacturing systems, International Journal of Production Economics, 41(1-3), pp. 241-248.
    • (1995) International Journal of Production Economics , vol.41 , Issue.1-3 , pp. 241-248
    • Lindau, R.A.1    Lumsden, K.R.2
  • 22
    • 0032287441 scopus 로고    scopus 로고
    • Handling internal and external disturbances in responsive manufacturing environments
    • Saad, S.M. & Gindy, N.N. 1998. Handling internal and external disturbances in responsive manufacturing environments, International Journal of Production Planning and Control, 9(8), pp. 760-770.
    • (1998) International Journal of Production Planning and Control , vol.9 , Issue.8 , pp. 760-770
    • Saad, S.M.1    Gindy, N.N.2
  • 23
    • 0037056090 scopus 로고    scopus 로고
    • Development of a business model for diagnosing uncertainty in ERP environments
    • Koh, S.C.L. & Saad, S.M. 2002. Development of a business model for diagnosing uncertainty in ERP environments, International Journal of Production Research, 40(13), pp. 3015-3039.
    • (2002) International Journal of Production Research , vol.40 , Issue.13 , pp. 3015-3039
    • Koh, S.C.L.1    Saad, S.M.2
  • 24
    • 2342595914 scopus 로고    scopus 로고
    • MRP-controlled batch-manufacturing environment under uncertainty
    • Koh, S.C.L. 2004. MRP-controlled batch-manufacturing environment under uncertainty, Journal of the Operational Research Society, 55, pp. 219-232.
    • (2004) Journal of the Operational Research Society , vol.55 , pp. 219-232
    • Koh, S.C.L.1
  • 26
    • 65549117898 scopus 로고    scopus 로고
    • July 8
    • "Uncertainty, BusinessDictionary.com, " July 8, 2008; http://www.businessdictionary.com/definition/uncertainty.html.
    • (2008) Uncertainty, BusinessDictionary.com
  • 27
    • 0024702296 scopus 로고
    • Evaluating the impact of operating environments on MRP system nervousness
    • Ho, C.J. 1989. Evaluating the impact of operating environments on MRP system nervousness, International Journal of Production Research, 27(7), pp. 1115-1135.
    • (1989) International Journal of Production Research , vol.27 , Issue.7 , pp. 1115-1135
    • Ho, C.J.1
  • 28
    • 0003276672 scopus 로고    scopus 로고
    • Uncertainty modeling in civil engineering with structural and reliability applications
    • Boca Raton, FL.: CRC Press
    • Ayyub, B.M. & Chao, R.U. 1997. Uncertainty modeling in civil engineering with structural and reliability applications, Uncertainty modeling and analysis in civil engineering, pp. 3-33, Boca Raton, FL.: CRC Press..
    • (1997) Uncertainty Modeling and Analysis in Civil Engineering , pp. 3-33
    • Ayyub, B.M.1    Chao, R.U.2
  • 30
    • 0034250264 scopus 로고    scopus 로고
    • Methodology for managing the effect of uncertainty in simulation based design
    • Du, X. & Chen, W. 2000. Methodology for managing the effect of uncertainty in simulation based design, AIAA Journal, 38(8), pp. 1471-1478.
    • (2000) AIAA Journal , vol.38 , Issue.8 , pp. 1471-1478
    • Du, X.1    Chen, W.2
  • 32
    • 65549159624 scopus 로고
    • Applied systems and cybernetics
    • New York: Academic Press
    • Sommer, G. 1981. Applied systems and cybernetics, Fuzzy inventory scheduling, New York: Academic Press.
    • (1981) Fuzzy Inventory Scheduling
    • Sommer, G.1
  • 34
    • 0035314299 scopus 로고    scopus 로고
    • Possibilistic programming in production planning of assemble-to-order environments
    • Hsu, H. & Wang, W. 2001. Possibilistic programming in production planning of assemble-to-order environments, Fuzzy Sets and Systems, 119(1), pp. 59-70.
    • (2001) Fuzzy Sets and Systems , vol.119 , Issue.1 , pp. 59-70
    • Hsu, H.1    Wang, W.2
  • 37
    • 20344396080 scopus 로고    scopus 로고
    • The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty
    • Mohebbi, E. & Choobineh, F. 2005. The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty, Omega, The International Journal of Management Science, 33, pp. 472-482.
    • (2005) Omega, the International Journal of Management Science , vol.33 , pp. 472-482
    • Mohebbi, E.1    Choobineh, F.2
  • 38
    • 0027624544 scopus 로고
    • A structured analysis of material requirements planning systems under combined demand and supply uncertainty
    • Brennan, L. & Gupta, S.M. 1993. A structured analysis of material requirements planning systems under combined demand and supply uncertainty, International Journal of Production Research, 31(7), pp. 1689-1707.
    • (1993) International Journal of Production Research , vol.31 , Issue.7 , pp. 1689-1707
    • Brennan, L.1    Gupta, S.M.2
  • 41
    • 0035924657 scopus 로고    scopus 로고
    • Improving manufacturing costs and lead times with quality-oriented operating curves
    • Mayer, M. & Nusswald, M. 2001. Improving manufacturing costs and lead times with quality-oriented operating curves, Journal of Materials Processing Technology, 119(1-3), pp. 83-89.
    • (2001) Journal of Materials Processing Technology , vol.119 , Issue.1-3 , pp. 83-89
    • Mayer, M.1    Nusswald, M.2
  • 42
    • 70449383987 scopus 로고
    • Uncertainty dampening methods for reducing MRP system nervousness
    • Ho, C.J., Law, W.K. & Rampal, R. 1995. Uncertainty dampening methods for reducing MRP system nervousness, International Journal of Production Research, 33(2), pp. 483-496.
    • (1995) International Journal of Production Research , vol.33 , Issue.2 , pp. 483-496
    • Ho, C.J.1    Law, W.K.2    Rampal, R.3
  • 43
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacity-constrained MRP systems: Review formulation and problem reduction
    • Billington, P.J., McClain, J.O. & Thomas, L.J. 1983. Mathematical programming approaches to capacity-constrained MRP systems: Review formulation and problem reduction, Management Science, 29(10), pp. 1126-1141.
    • (1983) Management Science , vol.29 , Issue.10 , pp. 1126-1141
    • Billington, P.J.1    McClain, J.O.2    Thomas, L.J.3
  • 45
    • 0022161887 scopus 로고
    • Integrating the MRP-based control level and the multistage shop level of a manufacturing system via network simulation
    • Huang, P.Y., Rees, L.P. & Taylor, B.W. 1985. Integrating the MRP-based control level and the multistage shop level of a manufacturing system via network simulation, International Journal of Production Research, 23(6), pp. 1217-1231.
    • (1985) International Journal of Production Research , vol.23 , Issue.6 , pp. 1217-1231
    • Huang, P.Y.1    Rees, L.P.2    Taylor, B.W.3
  • 46
    • 59649096759 scopus 로고    scopus 로고
    • Production decisions under joint price and production uncertainty
    • Dalal, A.J. & Alghalith, M. 2009. Production decisions under joint price and production uncertainty, European Journal of Operational Research, 197(1), pp. 84-92.
    • (2009) European Journal of Operational Research , vol.197 , Issue.1 , pp. 84-92
    • Dalal, A.J.1    Alghalith, M.2
  • 47
    • 17444379378 scopus 로고    scopus 로고
    • Integrated quality and quantity modeling of a production line
    • Kim, J. & Gershwin, S.B. 2005. Integrated quality and quantity modeling of a production line, OR Spectrum, 27(2-3), pp. 287-314.
    • (2005) OR Spectrum , vol.27 , Issue.2-3 , pp. 287-314
    • Kim, J.1    Gershwin, S.B.2
  • 48
    • 0032320279 scopus 로고    scopus 로고
    • Manufacturing lot-sizing under MRP II environment: An improved analytical model & a heuristic procedure
    • Kim, H.J. & Hosni, Y.A. 1998. Manufacturing lot-sizing under MRP II environment: An improved analytical model & a heuristic procedure, Computers Ind. Engng, 35(3- 4), pp. 423-426.
    • (1998) Computers Ind. Engng , vol.35 , Issue.3-4 , pp. 423-426
    • Kim, H.J.1    Hosni, Y.A.2
  • 49
    • 0001267220 scopus 로고
    • The strategic use of capacity slack in the economic lot scheduling problem with random demand
    • Bourland, K.E. & Yano, C.A. 1994. The strategic use of capacity slack in the economic lot scheduling problem with random demand, Management Science, 40(12), pp. 1690-1704.
    • (1994) Management Science , vol.40 , Issue.12 , pp. 1690-1704
    • Bourland, K.E.1    Yano, C.A.2
  • 50
    • 0029734543 scopus 로고    scopus 로고
    • An investigation of alternative dampening procedures to cope with MRP system nervousness
    • Ho, C.J. & Carter, P.L. 1996. An investigation of alternative dampening procedures to cope with MRP system nervousness, International Journal of Production Research, 34(1), pp. 137-156.
    • (1996) International Journal of Production Research , vol.34 , Issue.1 , pp. 137-156
    • Ho, C.J.1    Carter, P.L.2
  • 51
    • 0005461851 scopus 로고
    • MRP modelling via scenarios
    • T. A. Ciriani & R. C. Leachman, eds., John Wiley & Sons
    • Escudero, L.F. & Kamesam, P.V. 1993. MRP modelling via scenarios, Optimization in Industry, T. A. Ciriani & R. C. Leachman, eds., pp. 101-111: John Wiley & Sons.
    • (1993) Optimization in Industry , pp. 101-111
    • Escudero, L.F.1    Kamesam, P.V.2
  • 52
    • 0030086447 scopus 로고    scopus 로고
    • Adapting lot-sizing techniques to stochastic demand through production scheduling policy
    • Vargas, G.A. & Metters, R. 1996. Adapting lot-sizing techniques to stochastic demand through production scheduling policy, IIE Transactions, 28(2), pp. 141-148.
    • (1996) IIE Transactions , vol.28 , Issue.2 , pp. 141-148
    • Vargas, G.A.1    Metters, R.2
  • 53
    • 0031069689 scopus 로고    scopus 로고
    • A stochastic linear programming approach to hierarchical production planning
    • Kira, D., Kusy, M. & Rakita, I. 1997. A stochastic linear programming approach to hierarchical production planning, Journal of Operations Research Society, 48, pp. 207-211.
    • (1997) Journal of Operations Research Society , vol.48 , pp. 207-211
    • Kira, D.1    Kusy, M.2    Rakita, I.3
  • 55
    • 27344448554 scopus 로고    scopus 로고
    • MRP with flexible constraints: A fuzzy mathematical programming approach
    • Mula, J., Poler, R. & Garcia, J.P. 2006. MRP with flexible constraints: A fuzzy mathematical programming approach, Fuzzy Sets and Systems, 157, pp. 74-97.
    • (2006) Fuzzy Sets and Systems , vol.157 , pp. 74-97
    • Mula, J.1    Poler, R.2    Garcia, J.P.3
  • 56
    • 33750466515 scopus 로고    scopus 로고
    • Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions
    • Balakrishnan, J. & Cheng, C.H. 2007. Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions, European Journal of Operational Research, 177(1), pp. 281-309.
    • (2007) European Journal of Operational Research , vol.177 , Issue.1 , pp. 281-309
    • Balakrishnan, J.1    Cheng, C.H.2
  • 57
    • 33846833792 scopus 로고    scopus 로고
    • Material Requirement Planning with fuzzy constraints and fuzzy coefficients
    • Mula, J., Poler, R. & Garcia-Sabater, J.P. 2007. Material Requirement Planning with fuzzy constraints and fuzzy coefficients, Fuzzy Sets and Systems, 158, pp. 783- 793.
    • (2007) Fuzzy Sets and Systems , vol.158 , pp. 783-793
    • Mula, J.1    Poler, R.2    Garcia-Sabater, J.P.3
  • 58
    • 70349195949 scopus 로고    scopus 로고
    • An agent based approach for integrating manufacturing operations
    • doi:10.1016/j.ijpe.2006.10.013
    • Anosike, A.I. & Zhang, D.Z. 2007. An agent based approach for integrating manufacturing operations, International Journal of Production Economics, pp. doi:10.1016/j.ijpe.2006.10.013.
    • (2007) International Journal of Production Economics
    • Anosike, A.I.1    Zhang, D.Z.2
  • 59
    • 38349016573 scopus 로고    scopus 로고
    • Stability and optimality of a multi-product production and storage system under demand uncertainty
    • Arruda, E.F. & Do Val, J.B.R. 2008. Stability and optimality of a multi-product production and storage system under demand uncertainty, European Journal of Operational Research, 188(2), pp. 406-427.
    • (2008) European Journal of Operational Research , vol.188 , Issue.2 , pp. 406-427
    • Arruda, E.F.1    Do Val, J.B.R.2
  • 60
    • 34548668647 scopus 로고    scopus 로고
    • Integrated inventory and inspection policies for stochastic demand
    • Ben-Daya, M. & Noman, S.M. 2008. Integrated inventory and inspection policies for stochastic demand, European Journal of Operational Research, 185(1), pp. 159-169.
    • (2008) European Journal of Operational Research , vol.185 , Issue.1 , pp. 159-169
    • Ben-Daya, M.1    Noman, S.M.2
  • 61
    • 0032627275 scopus 로고    scopus 로고
    • A net present value to approach to safety stocks in a multi-level MRP system
    • Grubbstrom, R.W., 1999. A net present value to approach to safety stocks in a multi-level MRP system, International Journal of Production Economics, 59(1-3), pp. 361-375.
    • (1999) International Journal of Production Economics , vol.59 , Issue.1-3 , pp. 361-375
    • Grubbstrom, R.W.1
  • 63
    • 84867954072 scopus 로고    scopus 로고
    • A multi-stage stochastic integer programming approach for capacity expansion under uncertainty
    • Ahmed, S., King, A. & Parija, G., 2003. A multi-stage stochastic integer programming approach for capacity expansion under uncertainty, Journal of Global Optimization, 26, pp. 3-24.
    • (2003) Journal of Global Optimization , vol.26 , pp. 3-24
    • Ahmed, S.1    King, A.2    Parija, G.3
  • 64
    • 67649410319 scopus 로고    scopus 로고
    • Joint procurement and production decisions in remanufacturing under quality and demand uncertainty
    • Mukhopadhyay, S.K. & Ma, H. 2009. Joint procurement and production decisions in remanufacturing under quality and demand uncertainty, International Journal of Production Economics, 120(1), pp. 5-17.
    • (2009) International Journal of Production Economics , vol.120 , Issue.1 , pp. 5-17
    • Mukhopadhyay, S.K.1    Ma, H.2
  • 65
    • 0037063281 scopus 로고    scopus 로고
    • Planning and replanning the master production schedule under demand uncertainty
    • Tang, O. & Grubbström, R.W. 2002. Planning and replanning the master production schedule under demand uncertainty, International Journal of Production Economics, 78(3), pp. 323-334.
    • (2002) International Journal of Production Economics , vol.78 , Issue.3 , pp. 323-334
    • Tang, O.1    Grubbström, R.W.2
  • 66
    • 27544508424 scopus 로고    scopus 로고
    • A combinatorial manufacturing resource planning model for long-term CNC machining industry
    • Lan, C.H. & Lan, T.S. 2005. A combinatorial manufacturing resource planning model for long-term CNC machining industry, International Journal of Advanced Manufacturing Technology, 26, pp. 1157-1162.
    • (2005) International Journal of Advanced Manufacturing Technology , vol.26 , pp. 1157-1162
    • Lan, C.H.1    Lan, T.S.2
  • 67
    • 33847296636 scopus 로고    scopus 로고
    • A robust optimization model for multi-site production planning problem in an uncertain environment
    • Leung, S.C.H., Tsang, S.O.S, Ng, W.L. & Wu, W.L. 2007. A robust optimization model for multi-site production planning problem in an uncertain environment, European Journal of Operational Research, 181, pp. 224-238.
    • (2007) European Journal of Operational Research , vol.181 , pp. 224-238
    • Leung, S.C.H.1    Tsang, S.O.S.2    Ng, W.L.3    Wu, W.L.4
  • 68
    • 84867954072 scopus 로고    scopus 로고
    • A multi-stage stochastic integer programming approach for capacity expansion under uncertainty
    • Shabbir, A., Alan, J.K. & Gyana, P. 2003. A multi-stage stochastic integer programming approach for capacity expansion under uncertainty, Journal of Global Optimization, 26(1), pp. 3-24.
    • (2003) Journal of Global Optimization , vol.26 , Issue.1 , pp. 3-24
    • Shabbir, A.1    Alan, J.K.2    Gyana, P.3
  • 69
    • 46749128355 scopus 로고    scopus 로고
    • A meta-modeling paradigm of the manufacturing resources using mathematical logic for process planning
    • Xu, H.M. & Li, D.B. 2007. A meta-modeling paradigm of the manufacturing resources using mathematical logic for process planning, International Journal of Advanced Manufacturing Technology.
    • (2007) International Journal of Advanced Manufacturing Technology
    • Xu, H.M.1    Li, D.B.2
  • 70
    • 0029216440 scopus 로고
    • Effects of equipment failure uncertainty in batch production scheduling
    • Sanmartí, E., Espuña, A. & Puigjaner, L. 1995. Effects of equipment failure uncertainty in batch production scheduling, Computers & Chemical Engineering, 19 (Supplement 1), pp. 565-570.
    • (1995) Computers & Chemical Engineering , vol.19 , Issue.SUPPL. 1 , pp. 565-570
    • Sanmartí, E.1    Espuña, A.2    Puigjaner, L.3
  • 71
    • 70349195949 scopus 로고    scopus 로고
    • An agent-based approach for integrating manufacturing operations
    • Anosike, A.I. & Zhang, D.Z. 2009. An agent-based approach for integrating manufacturing operations, International Journal of Production Economics, 121(2), pp. 333-352.
    • (2009) International Journal of Production Economics , vol.121 , Issue.2 , pp. 333-352
    • Anosike, A.I.1    Zhang, D.Z.2
  • 72
    • 0037054916 scopus 로고    scopus 로고
    • Uncertainty under MRP-planned manufacture: Review and categorisation
    • Koh, S.C.L., Saad, S.M. & Jones, M.H. 2002. Uncertainty under MRP-planned manufacture: Review and categorisation, International Journal of Production Research, 40(10), pp. 2399-2421.
    • (2002) International Journal of Production Research , vol.40 , Issue.10 , pp. 2399-2421
    • Koh, S.C.L.1    Saad, S.M.2    Jones, M.H.3
  • 73
    • 0034175277 scopus 로고    scopus 로고
    • A review of techniques for buffering against uncertainty with MRP systems
    • Guide, V.D.R. & Srivastava, R. 2000. A review of techniques for buffering against uncertainty with MRP systems, Production Planning & Control, 11(3), pp. 223-233.
    • (2000) Production Planning & Control , vol.11 , Issue.3 , pp. 223-233
    • Guide, V.D.R.1    Srivastava, R.2
  • 74
    • 33646384940 scopus 로고    scopus 로고
    • Product line design with component commonality and cost-reduction effort
    • Heese, H.S. & Swaminathan, J.M. 2006. Product line design with component commonality and cost-reduction effort, Manufacturing & Service Operations Management, 8(2), pp. 206-219.
    • (2006) Manufacturing & Service Operations Management , vol.8 , Issue.2 , pp. 206-219
    • Heese, H.S.1    Swaminathan, J.M.2
  • 77
    • 0031069765 scopus 로고    scopus 로고
    • Heuristics, optimal, static, and dynamic schedules when processing times are uncertain
    • Lawrence, S.R. & Sewell, E.C. 1997. Heuristics, optimal, static, and dynamic schedules when processing times are uncertain, Journal of Operations Management, 15(1), pp. 71-82.
    • (1997) Journal of Operations Management , vol.15 , Issue.1 , pp. 71-82
    • Lawrence, S.R.1    Sewell, E.C.2
  • 78
    • 0023327068 scopus 로고
    • Manufacturing strategy, environmental uncertainty and performance: A path analytic model
    • Swamidass, P.M. & Newell, W.T. 1987. Manufacturing strategy, environmental uncertainty and performance: A path analytic model, Management Science, 33(4), pp. 509-524.
    • (1987) Management Science , vol.33 , Issue.4 , pp. 509-524
    • Swamidass, P.M.1    Newell, W.T.2
  • 80
    • 0000470092 scopus 로고
    • The impact of safety stock on schedule instability, cost and service
    • Sridharan, V. & LaForge, R.L. 1989. The impact of safety stock on schedule instability, cost and service, Journal of Operations Management, 8, pp. 327-347.
    • (1989) Journal of Operations Management , vol.8 , pp. 327-347
    • Sridharan, V.1    LaForge, R.L.2
  • 81
    • 0028756018 scopus 로고
    • Safety stock versus safety lead-time in MRP controlled production systems
    • Buzacott, J.A. & Shanthikumar, J.G. 1994. Safety stock versus safety lead-time in MRP controlled production systems, Management Science, 40, pp. 1678-1689.
    • (1994) Management Science , vol.40 , pp. 1678-1689
    • Buzacott, J.A.1    Shanthikumar, J.G.2
  • 82
    • 0033101952 scopus 로고    scopus 로고
    • A multiple-method study of environmental uncertainty and manufacturing flexibility
    • Pagell, M. & Krause, D.R. 1999. A multiple-method study of environmental uncertainty and manufacturing flexibility, Journal of Operations Management, 17(3), pp. 307-325.
    • (1999) Journal of Operations Management , vol.17 , Issue.3 , pp. 307-325
    • Pagell, M.1    Krause, D.R.2
  • 83
    • 0036532654 scopus 로고    scopus 로고
    • MRP performance effects due to forecast bias and demand uncertainty
    • Enns, S.T. 2002. MRP performance effects due to forecast bias and demand uncertainty, European Journal of Operational Research, 138(1), pp. 87-102.
    • (2002) European Journal of Operational Research , vol.138 , Issue.1 , pp. 87-102
    • Enns, S.T.1
  • 86
    • 0031123532 scopus 로고    scopus 로고
    • Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
    • Molinder, A. 1997. Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system, International Journal of Production Research, 35(4), pp. 983-994.
    • (1997) International Journal of Production Research , vol.35 , Issue.4 , pp. 983-994
    • Molinder, A.1
  • 87
    • 0028546481 scopus 로고
    • Quantification of parametric uncertainty via an interval model
    • Lew, J.S., Keel, L.H. & Juang, J.N. 1994. Quantification of parametric uncertainty via an interval model, Journal of Guidance, Control and Dynamics, 17(6), pp. 1212- 1218.
    • (1994) Journal of Guidance, Control and Dynamics , vol.17 , Issue.6 , pp. 1212-1218
    • Lew, J.S.1    Keel, L.H.2    Juang, J.N.3
  • 88
    • 0004293209 scopus 로고
    • Englewood Cliffs, NJ: Prentice Hall
    • Moore, R.E. 1966. Interval analysis, Englewood Cliffs, NJ: Prentice Hall.
    • (1966) Interval Analysis
    • Moore, R.E.1
  • 91
    • 0031098319 scopus 로고    scopus 로고
    • Generalizing interval matrix operations for design
    • Chen, R. & Ward, A.C. 1997. Generalizing interval matrix operations for design, Journal of Mechanical Design, 119(1), pp. 65-72.
    • (1997) Journal of Mechanical Design , vol.119 , Issue.1 , pp. 65-72
    • Chen, R.1    Ward, A.C.2
  • 92
    • 0345918863 scopus 로고    scopus 로고
    • Uncertainty model of the gradient constraint and quantitative reliability measures of optical flow
    • Kubota, S. & Hori, O. 1999. Uncertainty model of the gradient constraint and quantitative reliability measures of optical flow, Systems and Computers in Japan, 30(7), pp. 9-19.
    • (1999) Systems and Computers in Japan , vol.30 , Issue.7 , pp. 9-19
    • Kubota, S.1    Hori, O.2
  • 93
    • 0036563578 scopus 로고    scopus 로고
    • Efficient estimation of structural reliability for problems with uncertain intervals
    • Penmetsa, R.C. & Grandhi, R.V. 2002. Efficient estimation of structural reliability for problems with uncertain intervals, Computers and Structures, 80(12), pp. 1103- 1112.
    • (2002) Computers and Structures , vol.80 , Issue.12 , pp. 1103-1112
    • Penmetsa, R.C.1    Grandhi, R.V.2
  • 94
    • 0026981981 scopus 로고
    • Convex models for uncertain imperfection control in multimode dynamic buckling
    • Lindberg, H.E. 1992. Convex models for uncertain imperfection control in multimode dynamic buckling, Journal of Applied Mechanics, 59(4), pp. 937-945.
    • (1992) Journal of Applied Mechanics , vol.59 , Issue.4 , pp. 937-945
    • Lindberg, H.E.1
  • 95
    • 0028167365 scopus 로고
    • Non-probabilistic concept of reliability
    • Ben-Haim, Y. 1994. Non-probabilistic concept of reliability, Structural Safety, 14(4), pp. 227-245.
    • (1994) Structural Safety , vol.14 , Issue.4 , pp. 227-245
    • Ben-Haim, Y.1
  • 97
    • 0006212175 scopus 로고    scopus 로고
    • Robust reliability of structures
    • Ben-Haim, Y. 1997. Robust reliability of structures, Advances in Applied Mechanics, 33(1), pp. 1-40.
    • (1997) Advances in Applied Mechanics , vol.33 , Issue.1 , pp. 1-40
    • Ben-Haim, Y.1
  • 98
    • 0036495367 scopus 로고    scopus 로고
    • Uncertainty analysis in structural number determination in flexible pavement design- A convex model approach
    • Attoh-Okine, N.O. 2002. Uncertainty analysis in structural number determination in flexible pavement design - A convex model approach, Construction and Building Materials, 16(2), pp. 67-71.
    • (2002) Construction and Building Materials , vol.16 , Issue.2 , pp. 67-71
    • Attoh-Okine, N.O.1
  • 102
    • 0002137289 scopus 로고
    • Engineering design calculations with fuzzy parameters
    • Wood, K.L., Otto, K.N. & Antonsson, E.K. 1992. Engineering design calculations with fuzzy parameters, Fuzzy Sets and Systems, 52(1), pp. 1-20.
    • (1992) Fuzzy Sets and Systems , vol.52 , Issue.1 , pp. 1-20
    • Wood, K.L.1    Otto, K.N.2    Antonsson, E.K.3
  • 103
    • 0001829246 scopus 로고
    • Introduction to grey system theory
    • Deng, J. 1989. Introduction to grey system theory, Journal of Grey System, 1(1), pp. 1-24.
    • (1989) Journal of Grey System , vol.1 , Issue.1 , pp. 1-24
    • Deng, J.1
  • 105
    • 0001044028 scopus 로고
    • Planning horizons for master production scheduling
    • Chung, C.H. & Krajewski, L.J. 1984. Planning horizons for master production scheduling, Journal of Operations Management, 4(4), pp. 389-406.
    • (1984) Journal of Operations Management , vol.4 , Issue.4 , pp. 389-406
    • Chung, C.H.1    Krajewski, L.J.2
  • 106
    • 0035410522 scopus 로고    scopus 로고
    • Modelling practical lot-sizing problems as mixed integer programs
    • Belvaux, G. & Wolsey, L.A. 2001. Modelling practical lot-sizing problems as mixed integer programs, Management Science, 47(7), pp. 993-1007.
    • (2001) Management Science , vol.47 , Issue.7 , pp. 993-1007
    • Belvaux, G.1    Wolsey, L.A.2
  • 107
    • 0036681925 scopus 로고    scopus 로고
    • A matrix formulation for integrating assembly trees and manufacturing resource planning with capacity constraints
    • Harris, B., Lewis, F. & Cook, D.J. 2002. A matrix formulation for integrating assembly trees and manufacturing resource planning with capacity constraints, Journal of Intelligent Manufacturing, 13, pp. 239-252.
    • (2002) Journal of Intelligent Manufacturing , vol.13 , pp. 239-252
    • Harris, B.1    Lewis, F.2    Cook, D.J.3
  • 108
    • 3242739177 scopus 로고    scopus 로고
    • Multi-product capacity-constrained lot sizing with economic objectives
    • Choi, S. & Enns, S.T. 2004. Multi-product capacity-constrained lot sizing with economic objectives, International Journal of Production Economics, 91(1), pp. 47-62.
    • (2004) International Journal of Production Economics , vol.91 , Issue.1 , pp. 47-62
    • Choi, S.1    Enns, S.T.2
  • 109
    • 43549092616 scopus 로고    scopus 로고
    • A multistage scenario optimisation procedure to plan annualised working hours under demand uncertainty
    • Lusa, A., Corominas, A. & Munõz, N. 2008. A multistage scenario optimisation procedure to plan annualised working hours under demand uncertainty, International Journal of Production Economics, 113(2), pp. 957-968.
    • (2008) International Journal of Production Economics , vol.113 , Issue.2 , pp. 957-968
    • Lusa, A.1    Corominas, A.2    Munõz, N.3
  • 110
    • 34548565651 scopus 로고    scopus 로고
    • Optimal batch sizing in a multistage production system with rework consideration
    • Sarker, B.R., Jamal, A.M.M. & Mondal, S. 2008. Optimal batch sizing in a multistage production system with rework consideration, European Journal of Operational Research, 184(3), pp. 915-929.
    • (2008) European Journal of Operational Research , vol.184 , Issue.3 , pp. 915-929
    • Sarker, B.R.1    Jamal, A.M.M.2    Mondal, S.3
  • 111
    • 58849151362 scopus 로고    scopus 로고
    • On optimal batch sizing in a multi-stage production system with rework consideration
    • Cárdenas-Barrón, L.E. 2009. On optimal batch sizing in a multi-stage production system with rework consideration, European Journal of Operational Research, 196(3), pp. 1238-1244.
    • (2009) European Journal of Operational Research , vol.196 , Issue.3 , pp. 1238-1244
    • Cárdenas-Barrón, L.E.1
  • 112
    • 2942642469 scopus 로고    scopus 로고
    • An extended production/recycling model with stationary demand and return rates
    • Dobos, I. & Richter, K. 2004. An extended production/recycling model with stationary demand and return rates, International Journal of Production Economics, 90(3), pp. 311-323.
    • (2004) International Journal of Production Economics , vol.90 , Issue.3 , pp. 311-323
    • Dobos, I.1    Richter, K.2
  • 113
    • 33748945682 scopus 로고    scopus 로고
    • A production/recycling model with quality consideration
    • Dobos, I. & Richter, K. 2006. A production/recycling model with quality consideration, International Journal of Production Economics, 104(2), pp. 571-579.
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 571-579
    • Dobos, I.1    Richter, K.2
  • 114
    • 0038183847 scopus 로고    scopus 로고
    • Multi-stage newsboy problem: A dynamic model
    • Kogan, K. & Lou, S. 2003. Multi-stage newsboy problem: A dynamic model, European Journal of Operational Research, 149(2), pp. 448-458.
    • (2003) European Journal of Operational Research , vol.149 , Issue.2 , pp. 448-458
    • Kogan, K.1    Lou, S.2
  • 115
    • 77952590579 scopus 로고    scopus 로고
    • An integrated production-inventory system in a multi-stage multi-firm supply chain
    • In press, corrected proof
    • Leung, K.N.F. 2009. An integrated production-inventory system in a multi-stage multi-firm supply chain, Transportation Research Part E: Logistics and Transportation Review, In press, corrected proof.
    • (2009) Transportation Research Part E: Logistics and Transportation Review
    • Leung, K.N.F.1
  • 116
    • 43549087399 scopus 로고    scopus 로고
    • Optimization of fuzzy production inventory model with unrepairable defective products
    • Chen, S.H. & Chang, S.M. 2008. Optimization of fuzzy production inventory model with unrepairable defective products, International Journal of Production Economics, 113(2), pp. 887-894.
    • (2008) International Journal of Production Economics , vol.113 , Issue.2 , pp. 887-894
    • Chen, S.H.1    Chang, S.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.