-
1
-
-
0023418695
-
Priority assignment procedures in multi-level assembly job shops
-
Adams, N. R., Bertrand, J. W. M. and Surkis, J., 1987, Priority assignment procedures in multi-level assembly job shops. IIE Transactions, 19, 317-328.
-
(1987)
IIE Transactions
, vol.19
, pp. 317-328
-
-
Adams, N.R.1
Bertrand, J.W.M.2
Surkis, J.3
-
2
-
-
0027627910
-
Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops
-
Adams, N. R., Bertrand, J. W. M., Morehead, J. C. and Surkis, J., 1993, Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops. European Journal of Operational Research, 68, 79-92.
-
(1993)
European Journal of Operational Research
, vol.68
, pp. 79-92
-
-
Adams, N.R.1
Bertrand, J.W.M.2
Morehead, J.C.3
Surkis, J.4
-
3
-
-
0004286084
-
-
(Sewickley: Systems Modeling Corp.)
-
ARENA User's Guide, 1994 (Sewickley: Systems Modeling Corp.)
-
(1994)
ARENA User's Guide
-
-
-
4
-
-
4243370917
-
Requirements planning
-
In S. C. Graves, A. H. G. Rinnoy Kan and P. H. Zipkin (eds.); (Amsterdam: Elsevier)
-
Baker, K. R., 1993, Requirements planning. In S. C. Graves, A. H. G. Rinnoy Kan and P. H. Zipkin (eds.), Handbooks in Operations Research and Management Science: Logistics and Production Inventory, Vol. 4 (Amsterdam: Elsevier), pp. 571-627.
-
(1993)
Handbooks in Operations Research and Management Science: Logistics and Production Inventory
, vol.4
, pp. 571-627
-
-
Baker, K.R.1
-
5
-
-
0026367452
-
Safety stock and service levels in periodic review systems
-
Benton, W. C., 1991, Safety stock and service levels in periodic review systems. Journal of the Operation Research Society, 42, 1087-1095.
-
(1991)
Journal of the Operation Research Society
, vol.42
, pp. 1087-1095
-
-
Benton, W.C.1
-
6
-
-
84989486124
-
The effect and cost of forecast error bias for multiple-stage production-inventory systems
-
Biggs, J. R. and Campion, W. M., 1982, The effect and cost of forecast error bias for multiple-stage production-inventory systems. Decision Sciences, 13, 570-584.
-
(1982)
Decision Sciences
, vol.13
, pp. 570-584
-
-
Biggs, J.R.1
Campion, W.M.2
-
8
-
-
0010844329
-
MRP performance effects due to forecast bias and demand uncertainty
-
Department of Mechanical and Manufacturing Engineering Working Paper, University of Calgary
-
Enns, S. T., 1999, MRP performance effects due to forecast bias and demand uncertainty. Department of Mechanical and Manufacturing Engineering Working Paper, University of Calgary.
-
(1999)
-
-
Enns, S.T.1
-
9
-
-
0003719707
-
Demand uncertainty and lot sizing in manufacturing systems: The value of forecasting
-
Lancaster University Working Paper MS 01/97
-
Fildes, R. and Kingsman, B., 1997, Demand uncertainty and lot sizing in manufacturing systems: the value of forecasting. Lancaster University Working Paper MS 01/97.
-
(1997)
-
-
Fildes, R.1
Kingsman, B.2
-
10
-
-
0001857828
-
Which lot-sizing techniques are used in material requirements planning?
-
Haddock, J. and Hubicki, D. E., 1989, Which lot-sizing techniques are used in material requirements planning? Production and Inventory Management Journal, 30, 53-56.
-
(1989)
Production and Inventory Management Journal
, vol.30
, pp. 53-56
-
-
Haddock, J.1
Hubicki, D.E.2
-
11
-
-
0002903488
-
Dynamic lead times that fit today's dynamic planning (Q.U.O.A.T. lead times)
-
Hoyt, J., 1978, Dynamic lead times that fit today's dynamic planning (Q.U.O.A.T. lead times). Production and Inventory Management, 19, 63-72.
-
(1978)
Production and Inventory Management
, vol.19
, pp. 63-72
-
-
Hoyt, J.1
-
12
-
-
0023310940
-
Lot sizes, lead times and in-process inventories
-
Karmarkar, U. S., 1987, Lot sizes, lead times and in-process inventories. Management Science, 33, 409-418.
-
(1987)
Management Science
, vol.33
, pp. 409-418
-
-
Karmarkar, U.S.1
-
13
-
-
0026853018
-
Multi-item batching heuristics for minimization of queueing delays
-
Karmarkar, U. S., Kekre, S. and Kekre, S., 1992, Multi-item batching heuristics for minimization of queueing delays. European Journal of Operational Research, 58, 99-111.
-
(1992)
European Journal of Operational Research
, vol.58
, pp. 99-111
-
-
Karmarkar, U.S.1
Kekre, S.2
Kekre, S.3
-
14
-
-
77950506731
-
Manufacturing lead times, order release and capacity loading
-
In S. C. Graves, A. H. G. Rinnoy Kan and P. H. Zipkin (eds); (Amsterdam: Elsevier)
-
Karmarkar, U. S., 1993, Manufacturing lead times, order release and capacity loading. In S. C. Graves, A. H. G. Rinnoy Kan and P. H. Zipkin (eds), Handbooks in Operations Research and Management Science: Logistics and Production Inventory, Vol. 4 (Amsterdam: Elsevier), pp. 287-329.
-
(1993)
Handbooks in Operations Research and Management Science: Logistics and Production Inventory
, vol.4
, pp. 287-329
-
-
Karmarkar, U.S.1
-
15
-
-
0000602739
-
Forecasting error evaluation in material requirements planning (MRP) inventory systems
-
Lee, T. S. and Adam, E. E., 1986, Forecasting error evaluation in material requirements planning (MRP) inventory systems. Management Science, 32, 1186-1205.
-
(1986)
Management Science
, vol.32
, pp. 1186-1205
-
-
Lee, T.S.1
Adam, E.E.2
-
16
-
-
0031123532
-
Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
-
Molinder, A., 1997, Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system. International Journal of Production Research, 35, 983-994.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 983-994
-
-
Molinder, A.1
-
18
-
-
0003929853
-
-
(Homewood, IL: Irwin)
-
Vollmann, T. E., Berry, W. L. and Whybark, D. C., 1992, Manufacturing Planning and Control Systems, 3rd edn (Homewood, IL: Irwin).
-
(1992)
Manufacturing Planning and Control Systems, 3rd Edn
-
-
Vollmann, T.E.1
Berry, W.L.2
Whybark, D.C.3
-
19
-
-
84989412809
-
Material requirements planning under uncertainty
-
Whybark, D. C. and Williams, J. G., 1976, Material requirements planning under uncertainty. Decision Sciences, 7, 595-606.
-
(1976)
Decision Sciences
, vol.7
, pp. 595-606
-
-
Whybark, D.C.1
Williams, J.G.2
-
20
-
-
0032000895
-
Parameters affecting the effectiveness of MRP systems: A review
-
Yeung, J. H. Y., Wong, W. C. K. and Ma, L., 1998, Parameters affecting the effectiveness of MRP systems: a review. International Journal of Production Research, 36, 313-331.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 313-331
-
-
Yeung, J.H.Y.1
Wong, W.C.K.2
Ma, L.3
|