Volumn 19, Issue 1-2, 2003, Pages 157-171

MRP-controlled manufacturing environment disturbed by uncertainty

Author keywords

Batch manufacturing; MRP; Release logic; Uncertainty

Indexed keywords

COMPUTER SIMULATION; PRODUCTION ENGINEERING; SCHEDULING; UNCERTAIN SYSTEMS;

EID: 0037323569     PISSN: 07365845     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0736-5845(02)00073-X     Document Type: Conference Paper
Times cited : (48)

References (15)
  • 1
    • 0035866458 scopus 로고    scopus 로고
    • MRP performance effects due to lot size and planned lead-time settings
    • Enns S.T. MRP performance effects due to lot size and planned lead-time settings. Int J Prod Res. 39(3):2001;461-480.
    • (2001) Int J Prod Res , vol.39 , Issue.3 , pp. 461-480
    • Enns, S.T.1
  • 2
    • 0037054916 scopus 로고    scopus 로고
    • Uncertainty under MRP-planned manufacture: Review and categorisation
    • Koh S.C.L., Saad S.M., Jones M.H. Uncertainty under MRP-planned manufacture. review and categorisation Int J Prod Res. 40(10):2002;2399-2421.
    • (2002) Int J Prod Res , vol.40 , Issue.10 , pp. 2399-2421
    • Koh, S.C.L.1    Saad, S.M.2    Jones, M.H.3
  • 3
    • 0034175277 scopus 로고    scopus 로고
    • A review of techniques for buffering against uncertainty with MRP systems
    • Guide V.D.R., Srivastava R. A review of techniques for buffering against uncertainty with MRP systems. Prod Planning Control. 11:2000;223-233.
    • (2000) Prod Planning Control , vol.11 , pp. 223-233
    • Guide, V.D.R.1    Srivastava, R.2
  • 7
    • 0025206966 scopus 로고
    • Interaction effects on MRP nervousness
    • Minifie J.R., Davis R.A. Interaction effects on MRP nervousness. Int J Prod Res. 28:1990;173-183.
    • (1990) Int J Prod Res , vol.28 , pp. 173-183
    • Minifie, J.R.1    Davis, R.A.2
  • 8
    • 0027624544 scopus 로고
    • A structured analysis of material requirements planning systems under combined demand and supply uncertainty
    • Brennan L., Gupta S.M. A structured analysis of material requirements planning systems under combined demand and supply uncertainty. Int J Prod Res. 31:1993;1689-1707.
    • (1993) Int J Prod Res , vol.31 , pp. 1689-1707
    • Brennan, L.1    Gupta, S.M.2
  • 9
    • 0029734543 scopus 로고    scopus 로고
    • An investigation of alternative dampening procedures to cope with MRP system nervousness
    • Ho C.J., Carter P.L. An investigation of alternative dampening procedures to cope with MRP system nervousness. Int J Prod Res. 34:1996;137-156.
    • (1996) Int J Prod Res , vol.34 , pp. 137-156
    • Ho, C.J.1    Carter, P.L.2
  • 10
    • 0032634574 scopus 로고    scopus 로고
    • Finding optimal material release times using simulation-based optimisation
    • Homem-de-Mello T., Shapiro A., Spearman M.L. Finding optimal material release times using simulation-based optimisation. Int J Manage Sci. 45(1):1999;86-102.
    • (1999) Int J Manage Sci , vol.45 , Issue.1 , pp. 86-102
    • Homem-de-Mello, T.1    Shapiro, A.2    Spearman, M.L.3
  • 11
    • 0032366810 scopus 로고    scopus 로고
    • The value of using scheduling information in planning material requirements
    • Kanet J.J., Sridharan S.V. The value of using scheduling information in planning material requirements. Int J Decision Sci. 29:1998;479-496.
    • (1998) Int J Decision Sci , vol.29 , pp. 479-496
    • Kanet, J.J.1    Sridharan, S.V.2
  • 12
    • 0001900362 scopus 로고
    • Comparison between simple infinite loading and loading considering a workload status under uncertainty in job operation times
    • Matsuura H., Tsubone H., Kataoka K. Comparison between simple infinite loading and loading considering a workload status under uncertainty in job operation times. Int J Prod Econ. 40:1995;45-55.
    • (1995) Int J Prod Econ , vol.40 , pp. 45-55
    • Matsuura, H.1    Tsubone, H.2    Kataoka, K.3
  • 13
    • 0033330408 scopus 로고    scopus 로고
    • Developing a STEP-based integration environment to evaluate the impact of an engineering change on MRP
    • Yang C.O., Pei H.N. Developing a STEP-based integration environment to evaluate the impact of an engineering change on MRP. Int J Adv Manufacturing Technol. 15(11):1999;769-779.
    • (1999) Int J Adv Manufacturing Technol , vol.15 , Issue.11 , pp. 769-779
    • Yang, C.O.1    Pei, H.N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.