MRP performance effects due to lot size and planned lead-time settings
-
Enns S.T. MRP performance effects due to lot size and planned lead-time settings. Int J Prod Res. 39(3):2001;461-480.
-
(2001)
Int J Prod Res
, vol.39
, Issue.3
, pp. 461-480
-
-
Enns, S.T.1
-
2
-
-
0037054916
-
Uncertainty under MRP-planned manufacture: Review and categorisation
-
Koh S.C.L., Saad S.M., Jones M.H. Uncertainty under MRP-planned manufacture. review and categorisation Int J Prod Res. 40(10):2002;2399-2421.
-
(2002)
Int J Prod Res
, vol.40
, Issue.10
, pp. 2399-2421
-
-
Koh, S.C.L.1
Saad, S.M.2
Jones, M.H.3
-
3
-
-
0034175277
-
A review of techniques for buffering against uncertainty with MRP systems
-
Guide V.D.R., Srivastava R. A review of techniques for buffering against uncertainty with MRP systems. Prod Planning Control. 11:2000;223-233.
-
(2000)
Prod Planning Control
, vol.11
, pp. 223-233
-
-
Guide, V.D.R.1
Srivastava, R.2
-
7
-
-
0025206966
-
Interaction effects on MRP nervousness
-
Minifie J.R., Davis R.A. Interaction effects on MRP nervousness. Int J Prod Res. 28:1990;173-183.
-
(1990)
Int J Prod Res
, vol.28
, pp. 173-183
-
-
Minifie, J.R.1
Davis, R.A.2
-
8
-
-
0027624544
-
A structured analysis of material requirements planning systems under combined demand and supply uncertainty
-
Brennan L., Gupta S.M. A structured analysis of material requirements planning systems under combined demand and supply uncertainty. Int J Prod Res. 31:1993;1689-1707.
-
(1993)
Int J Prod Res
, vol.31
, pp. 1689-1707
-
-
Brennan, L.1
Gupta, S.M.2
-
9
-
-
0029734543
-
An investigation of alternative dampening procedures to cope with MRP system nervousness
-
Ho C.J., Carter P.L. An investigation of alternative dampening procedures to cope with MRP system nervousness. Int J Prod Res. 34:1996;137-156.
-
(1996)
Int J Prod Res
, vol.34
, pp. 137-156
-
-
Ho, C.J.1
Carter, P.L.2
-
10
-
-
0032634574
-
Finding optimal material release times using simulation-based optimisation
-
Homem-de-Mello T., Shapiro A., Spearman M.L. Finding optimal material release times using simulation-based optimisation. Int J Manage Sci. 45(1):1999;86-102.
-
(1999)
Int J Manage Sci
, vol.45
, Issue.1
, pp. 86-102
-
-
Homem-de-Mello, T.1
Shapiro, A.2
Spearman, M.L.3
-
11
-
-
0032366810
-
The value of using scheduling information in planning material requirements
-
Kanet J.J., Sridharan S.V. The value of using scheduling information in planning material requirements. Int J Decision Sci. 29:1998;479-496.
-
(1998)
Int J Decision Sci
, vol.29
, pp. 479-496
-
-
Kanet, J.J.1
Sridharan, S.V.2
-
12
-
-
0001900362
-
Comparison between simple infinite loading and loading considering a workload status under uncertainty in job operation times
-
Matsuura H., Tsubone H., Kataoka K. Comparison between simple infinite loading and loading considering a workload status under uncertainty in job operation times. Int J Prod Econ. 40:1995;45-55.
-
(1995)
Int J Prod Econ
, vol.40
, pp. 45-55
-
-
Matsuura, H.1
Tsubone, H.2
Kataoka, K.3
-
13
-
-
0033330408
-
Developing a STEP-based integration environment to evaluate the impact of an engineering change on MRP
-
Yang C.O., Pei H.N. Developing a STEP-based integration environment to evaluate the impact of an engineering change on MRP. Int J Adv Manufacturing Technol. 15(11):1999;769-779.
-
(1999)
Int J Adv Manufacturing Technol
, vol.15
, Issue.11
, pp. 769-779
-
-
Yang, C.O.1
Pei, H.N.2
|