메뉴 건너뛰기




Volumn 113, Issue 2, 2008, Pages 957-968

A multistage scenario optimisation procedure to plan annualised working hours under demand uncertainty

Author keywords

Optimisation; Planning; Scenario analysis; Uncertainty

Indexed keywords

MATHEMATICAL MODELS; OPTIMIZATION; PLANNING; PROBABILITY DISTRIBUTIONS; PRODUCTION; ROBUST CONTROL;

EID: 43549092616     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2007.11.009     Document Type: Article
Times cited : (17)

References (27)
  • 1
    • 0142031054 scopus 로고    scopus 로고
    • A case study of single shift planning and scheduling under annualized hours: A simple three step approach
    • Azmat C., and Widmer M. A case study of single shift planning and scheduling under annualized hours: A simple three step approach. European Journal of Operational Research 153 (2004) 148-175
    • (2004) European Journal of Operational Research , vol.153 , pp. 148-175
    • Azmat, C.1    Widmer, M.2
  • 2
    • 4043165740 scopus 로고    scopus 로고
    • Mixed integer programming to schedule a single-shift workforce under annualized hours
    • Azmat C., Hürlimann T., and Widmer M. Mixed integer programming to schedule a single-shift workforce under annualized hours. Annals of Operations Research 128 (2004) 199-215
    • (2004) Annals of Operations Research , vol.128 , pp. 199-215
    • Azmat, C.1    Hürlimann, T.2    Widmer, M.3
  • 7
    • 4043068041 scopus 로고    scopus 로고
    • Planning annualised hours with a finite set of weekly working hours and joint holidays
    • Corominas A., Lusa A., and Pastor R. Planning annualised hours with a finite set of weekly working hours and joint holidays. Annals of Operations Research 128 1-4 (2004) 217-233
    • (2004) Annals of Operations Research , vol.128 , Issue.1-4 , pp. 217-233
    • Corominas, A.1    Lusa, A.2    Pastor, R.3
  • 9
    • 51249168340 scopus 로고
    • On solving stochastic production planning problems via scenario modelling
    • Escudero L.F., and Kamesam P.V. On solving stochastic production planning problems via scenario modelling. TOP 3 (1995) 69-95
    • (1995) TOP , vol.3 , pp. 69-95
    • Escudero, L.F.1    Kamesam, P.V.2
  • 10
    • 0035384304 scopus 로고    scopus 로고
    • Annualized hours as a capacity planning tool in make-to-order or assemble-to-order environment: An agricultural implements company case
    • Gonçalves E.V., and Marçola J.A. Annualized hours as a capacity planning tool in make-to-order or assemble-to-order environment: An agricultural implements company case. Production Planning and Control 12 (2001) 388-398
    • (2001) Production Planning and Control , vol.12 , pp. 388-398
    • Gonçalves, E.V.1    Marçola, J.A.2
  • 11
    • 0034250725 scopus 로고    scopus 로고
    • Short-term manpower management in manufacturing systems: New requirements and DSS prototyping
    • Grabot B., and Letouzey A. Short-term manpower management in manufacturing systems: New requirements and DSS prototyping. Computers in Industry 3 (2000) 11-29. 〈http://mally.eco.rug.nl/spbib.html〉
    • (2000) Computers in Industry , vol.3 , pp. 11-29
    • Grabot, B.1    Letouzey, A.2
  • 13
    • 0033320802 scopus 로고    scopus 로고
    • A multiple-shift workforce scheduling model under annualized hours
    • Hung R. A multiple-shift workforce scheduling model under annualized hours. Naval Research Logistics 46 (1999) 726-736
    • (1999) Naval Research Logistics , vol.46 , pp. 726-736
    • Hung, R.1
  • 14
    • 43549100941 scopus 로고    scopus 로고
    • Karabuk, S., Wu, D., 1999. Coordinating strategic capacity planning in the semiconductor industry. Technical Report 99T-11, Department of IMSE, Lehigh University.
    • Karabuk, S., Wu, D., 1999. Coordinating strategic capacity planning in the semiconductor industry. Technical Report 99T-11, Department of IMSE, Lehigh University.
  • 15
    • 5644288836 scopus 로고    scopus 로고
    • Technological progress and technology acquisition: Strategic decision under uncertainty
    • Li S., Lolou R., and Rahman A. Technological progress and technology acquisition: Strategic decision under uncertainty. Production and Operations Management 12 1 (2003) 102-119
    • (2003) Production and Operations Management , vol.12 , Issue.1 , pp. 102-119
    • Li, S.1    Lolou, R.2    Rahman, A.3
  • 16
    • 43549106865 scopus 로고    scopus 로고
    • Lynch, P., 1995. Annual hours: An idea whose time has come. Personnel Management, 46-50.
    • Lynch, P., 1995. Annual hours: An idea whose time has come. Personnel Management, 46-50.
  • 18
    • 0001913255 scopus 로고
    • Coming: The annual workweeks
    • Mazur L. Coming: The annual workweeks. Across the Board 32 (1995) 42-45
    • (1995) Across the Board , vol.32 , pp. 42-45
    • Mazur, L.1
  • 19
    • 21344469142 scopus 로고    scopus 로고
    • An enhanced decomposition algorithm for multistage stochastic hydroelectric scheduling
    • Morton D.P. An enhanced decomposition algorithm for multistage stochastic hydroelectric scheduling. Annals of Operations Research 64 (1996) 211-235
    • (1996) Annals of Operations Research , vol.64 , pp. 211-235
    • Morton, D.P.1
  • 21
    • 0141907801 scopus 로고    scopus 로고
    • Financial planning via multi-stage stochastic optimization
    • Mulvey J., and Shetty B. Financial planning via multi-stage stochastic optimization. Computers and Operations Research 31 1 (2004) 1-20
    • (2004) Computers and Operations Research , vol.31 , Issue.1 , pp. 1-20
    • Mulvey, J.1    Shetty, B.2
  • 22
    • 43549086255 scopus 로고    scopus 로고
    • Oke, A., 2000. Linking human resource flexibility with manufacturing flexibility: Enablers of labour capacity flexibility in manufacturing plants. In: Proceedings of the First World Conference on Production and Operations Management (POM), Sevilla, August 27-September 1.
    • Oke, A., 2000. Linking human resource flexibility with manufacturing flexibility: Enablers of labour capacity flexibility in manufacturing plants. In: Proceedings of the First World Conference on Production and Operations Management (POM), Sevilla, August 27-September 1.
  • 23
    • 43549118715 scopus 로고    scopus 로고
    • Pallotino, P., Sechi, G.M., Zuddas, P., 2002. A DSS for water resources management under uncertainty. In: Proceedings of the International Environmental Modelling and Software Society, vol. 2.
    • Pallotino, P., Sechi, G.M., Zuddas, P., 2002. A DSS for water resources management under uncertainty. In: Proceedings of the International Environmental Modelling and Software Society, vol. 2.
  • 24
    • 43549114851 scopus 로고    scopus 로고
    • Ramos, A., 1992. Integrated model for capacity planning for manufacturing systems. Technical Report IIT-92-022, Universidad Pontificia de Comillas, Madrid.
    • Ramos, A., 1992. Integrated model for capacity planning for manufacturing systems. Technical Report IIT-92-022, Universidad Pontificia de Comillas, Madrid.
  • 25
    • 43549121752 scopus 로고    scopus 로고
    • Rockafellar, R.T., Wets, R.J.-B., 1987. The principle of scenario aggregation in optimization under uncertainty, Manuscript, University of Washington, May 1987.
    • Rockafellar, R.T., Wets, R.J.-B., 1987. The principle of scenario aggregation in optimization under uncertainty, Manuscript, University of Washington, May 1987.
  • 26
    • 69649105932 scopus 로고    scopus 로고
    • Ruszczynski, A., Shapiro, A., 2003. Stochastic progamming models. In: Ruszczynski, A., Shapiro, A. (Eds.), Handbooks in OR & MS, 10: Stochastic Programming (Chapter 1).
    • Ruszczynski, A., Shapiro, A., 2003. Stochastic progamming models. In: Ruszczynski, A., Shapiro, A. (Eds.), Handbooks in OR & MS, 10: Stochastic Programming (Chapter 1).
  • 27
    • 77957099013 scopus 로고
    • Stochastic programming
    • Nemhauser G.L., et al. (Ed), Elsevier, Amsterdam 〈www.35h.travail.gouv.fr/〉 Ministére de l'Emploi et de la Solidarité, France, 15/09/2006
    • Wets R.J.-B. Stochastic programming. In: Nemhauser G.L., et al. (Ed). Handbooks in OR&MS vol. 1 (1989), Elsevier, Amsterdam 573-629. http://www.35h.travail.gouv.fr/ 〈www.35h.travail.gouv.fr/〉 Ministére de l'Emploi et de la Solidarité, France, 15/09/2006
    • (1989) Handbooks in OR&MS , vol.1 , pp. 573-629
    • Wets, R.J.-B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.