-
1
-
-
0142031054
-
A case study of single shift planning and scheduling under annualized hours: A simple three step approach
-
Azmat C., and Widmer M. A case study of single shift planning and scheduling under annualized hours: A simple three step approach. European Journal of Operational Research 153 (2004) 148-175
-
(2004)
European Journal of Operational Research
, vol.153
, pp. 148-175
-
-
Azmat, C.1
Widmer, M.2
-
2
-
-
4043165740
-
Mixed integer programming to schedule a single-shift workforce under annualized hours
-
Azmat C., Hürlimann T., and Widmer M. Mixed integer programming to schedule a single-shift workforce under annualized hours. Annals of Operations Research 128 (2004) 199-215
-
(2004)
Annals of Operations Research
, vol.128
, pp. 199-215
-
-
Azmat, C.1
Hürlimann, T.2
Widmer, M.3
-
3
-
-
29344461227
-
Scenario-based planning for lot-sizing and scheduling with uncertain processing times
-
Beraldi P., Ghiani G., Guerriero E., and Grieco A. Scenario-based planning for lot-sizing and scheduling with uncertain processing times. International Journal of Production Economics 101 1 (2006) 140-149
-
(2006)
International Journal of Production Economics
, vol.101
, Issue.1
, pp. 140-149
-
-
Beraldi, P.1
Ghiani, G.2
Guerriero, E.3
Grieco, A.4
-
7
-
-
4043068041
-
Planning annualised hours with a finite set of weekly working hours and joint holidays
-
Corominas A., Lusa A., and Pastor R. Planning annualised hours with a finite set of weekly working hours and joint holidays. Annals of Operations Research 128 1-4 (2004) 217-233
-
(2004)
Annals of Operations Research
, vol.128
, Issue.1-4
, pp. 217-233
-
-
Corominas, A.1
Lusa, A.2
Pastor, R.3
-
9
-
-
51249168340
-
On solving stochastic production planning problems via scenario modelling
-
Escudero L.F., and Kamesam P.V. On solving stochastic production planning problems via scenario modelling. TOP 3 (1995) 69-95
-
(1995)
TOP
, vol.3
, pp. 69-95
-
-
Escudero, L.F.1
Kamesam, P.V.2
-
10
-
-
0035384304
-
Annualized hours as a capacity planning tool in make-to-order or assemble-to-order environment: An agricultural implements company case
-
Gonçalves E.V., and Marçola J.A. Annualized hours as a capacity planning tool in make-to-order or assemble-to-order environment: An agricultural implements company case. Production Planning and Control 12 (2001) 388-398
-
(2001)
Production Planning and Control
, vol.12
, pp. 388-398
-
-
Gonçalves, E.V.1
Marçola, J.A.2
-
11
-
-
0034250725
-
Short-term manpower management in manufacturing systems: New requirements and DSS prototyping
-
Grabot B., and Letouzey A. Short-term manpower management in manufacturing systems: New requirements and DSS prototyping. Computers in Industry 3 (2000) 11-29. 〈http://mally.eco.rug.nl/spbib.html〉
-
(2000)
Computers in Industry
, vol.3
, pp. 11-29
-
-
Grabot, B.1
Letouzey, A.2
-
13
-
-
0033320802
-
A multiple-shift workforce scheduling model under annualized hours
-
Hung R. A multiple-shift workforce scheduling model under annualized hours. Naval Research Logistics 46 (1999) 726-736
-
(1999)
Naval Research Logistics
, vol.46
, pp. 726-736
-
-
Hung, R.1
-
14
-
-
43549100941
-
-
Karabuk, S., Wu, D., 1999. Coordinating strategic capacity planning in the semiconductor industry. Technical Report 99T-11, Department of IMSE, Lehigh University.
-
Karabuk, S., Wu, D., 1999. Coordinating strategic capacity planning in the semiconductor industry. Technical Report 99T-11, Department of IMSE, Lehigh University.
-
-
-
-
15
-
-
5644288836
-
Technological progress and technology acquisition: Strategic decision under uncertainty
-
Li S., Lolou R., and Rahman A. Technological progress and technology acquisition: Strategic decision under uncertainty. Production and Operations Management 12 1 (2003) 102-119
-
(2003)
Production and Operations Management
, vol.12
, Issue.1
, pp. 102-119
-
-
Li, S.1
Lolou, R.2
Rahman, A.3
-
16
-
-
43549106865
-
-
Lynch, P., 1995. Annual hours: An idea whose time has come. Personnel Management, 46-50.
-
Lynch, P., 1995. Annual hours: An idea whose time has come. Personnel Management, 46-50.
-
-
-
-
18
-
-
0001913255
-
Coming: The annual workweeks
-
Mazur L. Coming: The annual workweeks. Across the Board 32 (1995) 42-45
-
(1995)
Across the Board
, vol.32
, pp. 42-45
-
-
Mazur, L.1
-
19
-
-
21344469142
-
An enhanced decomposition algorithm for multistage stochastic hydroelectric scheduling
-
Morton D.P. An enhanced decomposition algorithm for multistage stochastic hydroelectric scheduling. Annals of Operations Research 64 (1996) 211-235
-
(1996)
Annals of Operations Research
, vol.64
, pp. 211-235
-
-
Morton, D.P.1
-
21
-
-
0141907801
-
Financial planning via multi-stage stochastic optimization
-
Mulvey J., and Shetty B. Financial planning via multi-stage stochastic optimization. Computers and Operations Research 31 1 (2004) 1-20
-
(2004)
Computers and Operations Research
, vol.31
, Issue.1
, pp. 1-20
-
-
Mulvey, J.1
Shetty, B.2
-
22
-
-
43549086255
-
-
Oke, A., 2000. Linking human resource flexibility with manufacturing flexibility: Enablers of labour capacity flexibility in manufacturing plants. In: Proceedings of the First World Conference on Production and Operations Management (POM), Sevilla, August 27-September 1.
-
Oke, A., 2000. Linking human resource flexibility with manufacturing flexibility: Enablers of labour capacity flexibility in manufacturing plants. In: Proceedings of the First World Conference on Production and Operations Management (POM), Sevilla, August 27-September 1.
-
-
-
-
23
-
-
43549118715
-
-
Pallotino, P., Sechi, G.M., Zuddas, P., 2002. A DSS for water resources management under uncertainty. In: Proceedings of the International Environmental Modelling and Software Society, vol. 2.
-
Pallotino, P., Sechi, G.M., Zuddas, P., 2002. A DSS for water resources management under uncertainty. In: Proceedings of the International Environmental Modelling and Software Society, vol. 2.
-
-
-
-
24
-
-
43549114851
-
-
Ramos, A., 1992. Integrated model for capacity planning for manufacturing systems. Technical Report IIT-92-022, Universidad Pontificia de Comillas, Madrid.
-
Ramos, A., 1992. Integrated model for capacity planning for manufacturing systems. Technical Report IIT-92-022, Universidad Pontificia de Comillas, Madrid.
-
-
-
-
25
-
-
43549121752
-
-
Rockafellar, R.T., Wets, R.J.-B., 1987. The principle of scenario aggregation in optimization under uncertainty, Manuscript, University of Washington, May 1987.
-
Rockafellar, R.T., Wets, R.J.-B., 1987. The principle of scenario aggregation in optimization under uncertainty, Manuscript, University of Washington, May 1987.
-
-
-
-
26
-
-
69649105932
-
-
Ruszczynski, A., Shapiro, A., 2003. Stochastic progamming models. In: Ruszczynski, A., Shapiro, A. (Eds.), Handbooks in OR & MS, 10: Stochastic Programming (Chapter 1).
-
Ruszczynski, A., Shapiro, A., 2003. Stochastic progamming models. In: Ruszczynski, A., Shapiro, A. (Eds.), Handbooks in OR & MS, 10: Stochastic Programming (Chapter 1).
-
-
-
-
27
-
-
77957099013
-
Stochastic programming
-
Nemhauser G.L., et al. (Ed), Elsevier, Amsterdam 〈www.35h.travail.gouv.fr/〉 Ministére de l'Emploi et de la Solidarité, France, 15/09/2006
-
Wets R.J.-B. Stochastic programming. In: Nemhauser G.L., et al. (Ed). Handbooks in OR&MS vol. 1 (1989), Elsevier, Amsterdam 573-629. http://www.35h.travail.gouv.fr/ 〈www.35h.travail.gouv.fr/〉 Ministére de l'Emploi et de la Solidarité, France, 15/09/2006
-
(1989)
Handbooks in OR&MS
, vol.1
, pp. 573-629
-
-
Wets, R.J.-B.1
|