메뉴 건너뛰기




Volumn 9, Issue 8, 1998, Pages 760-770

Handling internal and external disturbances in responsive manufacturing environments

Author keywords

Manufacturing disturbances; Manufacturing responsiveness; Resource elements; Scheduling; Simulation

Indexed keywords

COMPUTER SIMULATION; FLEXIBLE MANUFACTURING SYSTEMS; PROBLEM SOLVING; PROCESS CONTROL; RESOURCE ALLOCATION; SCHEDULING;

EID: 0032287441     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/095372898233533     Document Type: Article
Times cited : (37)

References (12)
  • 1
    • 0026953171 scopus 로고
    • Impact of some flexibility factors in FMSs-a performance evaluation approach
    • Barad, M, 1992, Impact of some flexibility factors in FMSs-a performance evaluation approach. international journai of Production Research, 30, 2587-2602.
    • (1992) International Journai of Production Research , vol.30 , pp. 2587-2602
    • Barad, M.1
  • 2
    • 11544305432 scopus 로고
    • Real -time operational control of flexible manufacturing systems. PhD thesis
    • University of Nottingham, UK
    • CHATIMA, P., 1995, Real -time operational control of flexible manufacturing systems. PhD thesis, Department of Manufacturing Engineering and Operations Management, University of Nottingham, UK.
    • (1995) Department of Manufacturing Engineering and Operations Management
    • Chatima, P.1
  • 3
    • 85008761764 scopus 로고
    • Final Report, Analysis of types and structure of knowledge in job-shop scheduling
    • Esprit, 1989, OcS Year 3, ESPRIT Project 418, Final Report, September 1989, Analysis of types and structure of knowledge in job-shop scheduling.
    • (1989) Ocs Year 3, ESPRIT Project , vol.418
    • Esprit1
  • 7
    • 1542524722 scopus 로고
    • Factory model implementation, experimental investigation of resource-element-based and machine-based scheduling. Technical Report No
    • Gndy, N. N. Z., and Saad, S. M 1995, Factory model implementation, experimental investigation of resource-element-based and machine-based scheduling. Technical Report No. 2-2 EPSRC/GR-J90022.
    • (1995) 2-2 EPSRC/GR-J90022
    • Gndy, N.N.Z.1    Saad, S.M.2
  • 8
    • 0002973221 scopus 로고    scopus 로고
    • Resource-based scheduling in virtual manufacturing environments
    • Middlesex University, London, R. Gill and C. Syan (ed.), August 1996
    • Gndy, N. N. Z., and Saad, S. M, 1996, Resource-based scheduling in virtual manufacturing environments. In R. Gill and C. Syan (ed.) Proceedings of the 12th National Conference on CAD/cam Robotics and factory of the future, Middlesex University, London, 14-16 August 1996, pp. 710-715.
    • (1996) Proceedings of the 12Th National Conference on CAD / Cam Robotics and Factory of the Future , vol.14-16 , pp. 710-715
    • Gndy, N.N.Z.1    Saad, S.M.2
  • 9
    • 0025671016 scopus 로고
    • A new scheduling method for manufacturing systems
    • Huang, W. V., and Tang, J., 1990, A new scheduling method for manufacturing systems. Computers industrial E ngineering, 19, pp. 22-26.
    • (1990) Computers Industrial E Ngineering , vol.19 , pp. 22-26
    • Huang, W.V.1    Tang, J.2
  • 12
    • 0003493024 scopus 로고
    • University of Nottingham, UK, PhD thesis, Department of Manufacturing Engineering and Operations Management
    • Saad, S. M, 1994, design and analysis of a flexible hybrid assembly system.PhD thesis, Department of Manufacturing Engineering and Operations Management, University of Nottingham, UK.
    • (1994) Design and Analysis of a Flexible Hybrid Assembly System
    • Saad, S.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.