-
1
-
-
0026953171
-
Impact of some flexibility factors in FMSs-a performance evaluation approach
-
Barad, M, 1992, Impact of some flexibility factors in FMSs-a performance evaluation approach. international journai of Production Research, 30, 2587-2602.
-
(1992)
International Journai of Production Research
, vol.30
, pp. 2587-2602
-
-
Barad, M.1
-
2
-
-
11544305432
-
Real -time operational control of flexible manufacturing systems. PhD thesis
-
University of Nottingham, UK
-
CHATIMA, P., 1995, Real -time operational control of flexible manufacturing systems. PhD thesis, Department of Manufacturing Engineering and Operations Management, University of Nottingham, UK.
-
(1995)
Department of Manufacturing Engineering and Operations Management
-
-
Chatima, P.1
-
3
-
-
85008761764
-
-
Final Report, Analysis of types and structure of knowledge in job-shop scheduling
-
Esprit, 1989, OcS Year 3, ESPRIT Project 418, Final Report, September 1989, Analysis of types and structure of knowledge in job-shop scheduling.
-
(1989)
Ocs Year 3, ESPRIT Project
, vol.418
-
-
Esprit1
-
5
-
-
0042169333
-
A study on rescheduling policy based on real time information in production system
-
Li Ming (ed.), Taylor and Francis, New York
-
Fujii, S., and Watatani, Y., 1991, A study on rescheduling policy based on real time information in production system. In Li Ming (ed.) Proceedings of the Xlth international Conference on Production Research, Hefei, Anhui, China, 18-23 August (Taylor and Francis, New York), pp. 137-140.
-
(1991)
Proceedings of the Xlth International Conference on Production Research, Hefei, Anhui, China, 18-23 August
, pp. 137-140
-
-
Fujii, S.1
Watatani, Y.2
-
6
-
-
0000179682
-
Component grouping for cell formation using resource elements
-
Gndy, N. N. Z., Ratchev, T. M., and Case, K 1996, Component grouping for cell formation using resource elements. International Journal of Production Research, 34, 729-759.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 729-759
-
-
Gindy, N.N.Z.1
Ratchev, T.M.2
Case, K.3
-
7
-
-
1542524722
-
Factory model implementation, experimental investigation of resource-element-based and machine-based scheduling. Technical Report No
-
Gndy, N. N. Z., and Saad, S. M 1995, Factory model implementation, experimental investigation of resource-element-based and machine-based scheduling. Technical Report No. 2-2 EPSRC/GR-J90022.
-
(1995)
2-2 EPSRC/GR-J90022
-
-
Gndy, N.N.Z.1
Saad, S.M.2
-
8
-
-
0002973221
-
Resource-based scheduling in virtual manufacturing environments
-
Middlesex University, London, R. Gill and C. Syan (ed.), August 1996
-
Gndy, N. N. Z., and Saad, S. M, 1996, Resource-based scheduling in virtual manufacturing environments. In R. Gill and C. Syan (ed.) Proceedings of the 12th National Conference on CAD/cam Robotics and factory of the future, Middlesex University, London, 14-16 August 1996, pp. 710-715.
-
(1996)
Proceedings of the 12Th National Conference on CAD / Cam Robotics and Factory of the Future
, vol.14-16
, pp. 710-715
-
-
Gndy, N.N.Z.1
Saad, S.M.2
-
9
-
-
0025671016
-
A new scheduling method for manufacturing systems
-
Huang, W. V., and Tang, J., 1990, A new scheduling method for manufacturing systems. Computers industrial E ngineering, 19, pp. 22-26.
-
(1990)
Computers Industrial E Ngineering
, vol.19
, pp. 22-26
-
-
Huang, W.V.1
Tang, J.2
-
10
-
-
85008780841
-
Sequencing and dispatching in a dynamic manufacturing environment
-
Li Ming (ed.), August (Taylor and Francis, New York
-
Matsuura, H., Tsubone H., and Kanezashi, M., 1991, Sequencing and dispatching in a dynamic manufacturing environment. In Li Ming (ed.) proceedings of the X ith international Conference on Production Research, Hefei, Anhui, China, 18-23 August (Taylor and Francis, New York.), pp. 98-102.
-
(1991)
Proceedings of the X Ith International Conference on Production Research, Hefei, Anhui, China
, vol.18-23
, pp. 98-102
-
-
Matsuura, H.1
Tsubone, H.2
Kanezashi, M.3
-
11
-
-
0001046006
-
Reactive scheduling system for cellular manufacturing with failure-prone machines
-
Olumolade, M O, and Norrie, D. H., 1996, Reactive scheduling system for cellular manufacturing with failure-prone machines. International Journal of Computer integrated M anufacturing, 9, 131-144.
-
(1996)
International Journal of Computer Integrated M Anufacturing
, vol.9
, pp. 131-144
-
-
Olumolade, M.O.1
Norrie, D.H.2
-
12
-
-
0003493024
-
-
University of Nottingham, UK, PhD thesis, Department of Manufacturing Engineering and Operations Management
-
Saad, S. M, 1994, design and analysis of a flexible hybrid assembly system.PhD thesis, Department of Manufacturing Engineering and Operations Management, University of Nottingham, UK.
-
(1994)
Design and Analysis of a Flexible Hybrid Assembly System
-
-
Saad, S.M.1
|