메뉴 건너뛰기




Volumn 14, Issue 3, 2003, Pages 273-289

A holistic approach to diagnose uncertainty in ERP-controlled manufacturing shop floor

Author keywords

ERP; Holistic approach; Mixed mode manufacturing; Uncertainty diagnosis

Indexed keywords

COMPUTER SIMULATION; MATHEMATICAL MODELS; MATRIX ALGEBRA; PLANNING; RESOURCE ALLOCATION;

EID: 0142217266     PISSN: 09537287     EISSN: None     Source Type: Journal    
DOI: 10.1080/0953728031000111487     Document Type: Article
Times cited : (33)

References (27)
  • 2
    • 0027624544 scopus 로고
    • A structured analysis of material requirements planning systems under combined demand and supply uncertainty
    • BRENNAN, L., and GUPTA, S. M., 1993, A structured analysis of material requirements planning systems under combined demand and supply uncertainty. International Journal of Production Research, 31, 1689-1707.
    • (1993) International Journal of Production Research , vol.31 , pp. 1689-1707
    • Brennan, L.1    Gupta, S.M.2
  • 4
    • 0035866458 scopus 로고    scopus 로고
    • MRP performance effects due to lot size and planned lead-time settings
    • ENNS, S. T., 2001, MRP performance effects due to lot size and planned lead-time settings. International Journal of Production Research, 39, 461-480.
    • (2001) International Journal of Production Research , vol.39 , pp. 461-480
    • Enns, S.T.1
  • 5
    • 0021427334 scopus 로고
    • A simulation based experimental investigation of supply/timing uncertainty in MRP systems
    • GRASSO, E. T., and TAYLOR, B. W., 1984, A simulation based experimental investigation of supply/timing uncertainty in MRP systems. International Journal of Production Research, 22, 485-497.
    • (1984) International Journal of Production Research , vol.22 , pp. 485-497
    • Grasso, E.T.1    Taylor, B.W.2
  • 6
    • 0034175277 scopus 로고    scopus 로고
    • A review of techniques for buffering against uncertainty with MRP systems
    • GUIDE, V. D. R., and SRIVASTAVA, R., 2000, A review of techniques for buffering against uncertainty with MRP systems. Production Planning and Control, 11, 223-233.
    • (2000) Production Planning and Control , vol.11 , pp. 223-233
    • Guide, V.D.R.1    Srivastava, R.2
  • 12
    • 0037056090 scopus 로고    scopus 로고
    • Development of a business model for diagnosing uncertainty in ERP environments
    • KOH, S. C. L., and SAAD, S. M., 2002b, Development of a business model for diagnosing uncertainty in ERP environments. International Journal of Production Research, 40, 3015-3039.
    • (2002) International Journal of Production Research , vol.40 , pp. 3015-3039
    • Koh, S.C.L.1    Saad, S.M.2
  • 13
    • 0005275041 scopus 로고    scopus 로고
    • Identifying and measuring underlying causes and effects of uncertainty in Material Requirements Planning (MRP) environments
    • Bangkok, Thailand
    • KOH, S. C. L, JONES, M. H., and SAAD, S. M., 2000a, Identifying and measuring underlying causes and effects of uncertainty in Material Requirements Planning (MRP) environments. Proceedings of the Special International Conference on Production Research, Bangkok, Thailand.
    • (2000) Proceedings of the Special International Conference on Production Research
    • Koh, S.C.L.1    Jonesm, H.2    Saad, S.M.3
  • 19
    • 0017417271 scopus 로고
    • Reschedule the reschedules you just rescheduled - Way of life for MRP
    • MATHER, H., 1977, Reschedule the reschedules you just rescheduled - way of life for MRP. Production and Inventory Management Journal, 18, 60-79.
    • (1977) Production and Inventory Management Journal , vol.18 , pp. 60-79
    • Mather, H.1
  • 20
    • 0023979749 scopus 로고
    • A systems approach to the implementation of JIT methodologies in Lucas Industries
    • PARNABY, J., 1988, A systems approach to the implementation of JIT methodologies in Lucas Industries. International Journal of Production Research, 26.
    • (1988) International Journal of Production Research , vol.26
    • Parnaby, J.1
  • 22
    • 0032287441 scopus 로고    scopus 로고
    • Handling internal and external disturbances in responsive manufacturing environments
    • SAAD, S. M., and GINDY, N. N., 1998, Handling internal and external disturbances in responsive manufacturing environments. Production Planning and Control, 9, 760-770.
    • (1998) Production Planning and Control , vol.9 , pp. 760-770
    • Saad, S.M.1    Gindy, N.N.2
  • 24
    • 0024897682 scopus 로고
    • Guidelines for selecting and using simulation model verification techniques
    • Washington DC, USA
    • WHITNER, R. B., and BALCI, O., 1989, Guidelines for selecting and using simulation model verification techniques. Proceedings of the 1989 Winter Simulation Conference, Washington DC, USA, pp. 559-568.
    • (1989) Proceedings of the 1989 Winter Simulation Conference , pp. 559-568
    • Whitner, R.B.1    Balci, O.2
  • 25
    • 84989412809 scopus 로고
    • Material requirements planning under uncertainty
    • WHYBARK, D. C., and WILLIAMS, J. G., 1976, Material requirements planning under uncertainty. Decision Sciences Journal, 7, 595-606.
    • (1976) Decision Sciences Journal , vol.7 , pp. 595-606
    • Whybark, D.C.1    Williams, J.G.2
  • 26
    • 0033330408 scopus 로고    scopus 로고
    • Developing a STEP-based integration environment to evaluate the impact of an engineering change on MRP
    • YANG, C. O., and PEI, H. N., 1999, Developing a STEP-based integration environment to evaluate the impact of an engineering change on MRP. International Journal of Advanced Manufacturing Technology, 15, 769-779.
    • (1999) International Journal of Advanced Manufacturing Technology , vol.15 , pp. 769-779
    • Yang, C.O.1    Pei, H.N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.