메뉴 건너뛰기




Volumn 35, Issue 4, 1997, Pages 983-994

Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; COST ACCOUNTING; INDUSTRIAL ECONOMICS; INVENTORY CONTROL; OPTIMIZATION; PARAMETER ESTIMATION; RANDOM PROCESSES; SIMULATED ANNEALING;

EID: 0031123532     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075497195498     Document Type: Article
Times cited : (81)

References (8)
  • 1
    • 0021427334 scopus 로고
    • A simulation based investigation of supply/timing uncertainty in MRP systems
    • Grasso, E. T. and Taylor, B. W., III, 1984, A simulation based investigation of supply/timing uncertainty in MRP systems. International Journal of Production Research, 22(3), 485-497.
    • (1984) International Journal of Production Research , vol.22 , Issue.3 , pp. 485-497
    • Grasso, E.T.1    Taylor, B.W.2
  • 2
    • 0000757562 scopus 로고
    • MRP systems under supply and process uncertainty in an integrated shop floor control
    • Gupta, S. M. and Brennan, L., 1995, MRP systems under supply and process uncertainty in an integrated shop floor control. InternationalJournal of Production Research, 33(1), 205-220.
    • (1995) Internationaljournal of Production Research , vol.33 , Issue.1 , pp. 205-220
    • Gupta, S.M.1    Brennan, L.2
  • 5
    • 0016841636 scopus 로고
    • Safety stocks for requirements planning
    • New, C., 1975, Safety stocks for requirements planning. Production and Inventory Management, 16(2), 1-18.
    • (1975) Production and Inventory Management , vol.16 , Issue.2 , pp. 1-18
    • New, C.1
  • 7
    • 84989412809 scopus 로고
    • Material requirements under uncertainty
    • Whybark, D. C. and Williams, J. G., 1976, Material requirements under uncertainty. Decision Sciences, 7, 595-606.
    • (1976) Decision Sciences , vol.7 , pp. 595-606
    • Whybark, D.C.1    Williams, J.G.2
  • 8
    • 0023558979 scopus 로고
    • Stochastic Lead-times in Two-level Assembly Systems
    • Yano, C. A., 1987, Stochastic Lead-times in Two-level Assembly Systems. IIE Transactions, 19(4), 371 -377.
    • (1987) IIE Transactions , vol.19 , Issue.4
    • Yano, C.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.