메뉴 건너뛰기




Volumn 16, Issue 2, 2005, Pages 215-234

Integration of uncertain and imprecise orders in the MRP method

Author keywords

Fuzzy arithmetic; MRP; Possibility theory; Uncertainty

Indexed keywords

DATA ACQUISITION; DECISION MAKING; ENTERPRISE RESOURCE PLANNING; FUZZY SETS; MATHEMATICAL MODELS; PLANNING; RAW MATERIALS;

EID: 17444389311     PISSN: 09565515     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10845-004-5890-x     Document Type: Conference Paper
Times cited : (41)

References (48)
  • 2
    • 17444382549 scopus 로고    scopus 로고
    • Modelling non-linear demand forecasting and inventory management under uncertainty with SAP
    • Chandra, S., Ulgen, O., Tsui, L. and Kampfner, R. (2000) Modelling non-linear demand forecasting and inventory management under uncertainty with SAP, CEEP report brief, http://www.engin.umd.umich.edu/ceep/tech_day/Archives/ 2000/reports/IMSEreport2/IMSEreport2.htm.
    • (2000) CEEP Report Brief
    • Chandra, S.1    Ulgen, O.2    Tsui, L.3    Kampfner, R.4
  • 3
    • 0030305926 scopus 로고    scopus 로고
    • Pricing decisions under demand uncertainty: A Bayesian mixture model approach
    • Kalyanam, K. (1996) Pricing decisions under demand uncertainty: a Bayesian mixture model approach. Marketing Science, 15(3).
    • (1996) Marketing Science , vol.15 , Issue.3
    • Kalyanam, K.1
  • 7
    • 17444411021 scopus 로고    scopus 로고
    • The Bayesian newsvendors in supply chains with unobserved lost sales
    • Bisi, A., Glenn, D. and Puterman, M. (2003) The Bayesian newsvendors in supply chains with unobserved lost sales, Working Paper, http://people.commerce. ubc.ca/faculty/glenn/research.htm.
    • (2003) Working Paper
    • Bisi, A.1    Glenn, D.2    Puterman, M.3
  • 8
    • 84989412809 scopus 로고
    • Material requirements planning under uncertainty
    • Whybark, D. C. and Williams, J. G. (1976) Material requirements planning under uncertainty. Decision Science Journal, 7, 595-606.
    • (1976) Decision Science Journal , vol.7 , pp. 595-606
    • Whybark, D.C.1    Williams, J.G.2
  • 9
    • 0021427334 scopus 로고
    • A simulation based experimental of supply/timing uncertainty in MRP systems
    • Grasso, E. T. and Taylor, B. W. (1984) A simulation based experimental of supply/timing uncertainty in MRP systems. International Journal of Production Research, 22, 485-497.
    • (1984) International Journal of Production Research , vol.22 , pp. 485-497
    • Grasso, E.T.1    Taylor, B.W.2
  • 11
    • 84989457223 scopus 로고
    • Cost increased due to demand uncertainty in MRP lot sizing
    • Bodt, M. A. and Van Wassenhove, L. N. (1983) Cost increased due to demand uncertainty in MRP lot sizing. Decision Science Journal, 25, 345-362.
    • (1983) Decision Science Journal , vol.25 , pp. 345-362
    • Bodt, M.A.1    Van Wassenhove, L.N.2
  • 13
    • 0028511861 scopus 로고
    • Does protective capacity assist managers in competing along time-based dimensions?
    • Atwater, J. B. and Chakravorty, S. S. (1994) Does protective capacity assist managers in competing along time-based dimensions?. Production and Inventory Management Journal, 35, 53-59.
    • (1994) Production and Inventory Management Journal , vol.35 , pp. 53-59
    • Atwater, J.B.1    Chakravorty, S.S.2
  • 15
    • 0032143246 scopus 로고    scopus 로고
    • Correlating MRP system nervousness with forecast errors
    • Ho, C. J. and Ireland, T. C. (1998) Correlating MRP system nervousness with forecast errors. International Journal of Production Research, 36(8), 2289-2299.
    • (1998) International Journal of Production Research , vol.36 , Issue.8 , pp. 2289-2299
    • Ho, C.J.1    Ireland, T.C.2
  • 16
    • 0027624544 scopus 로고
    • A structured analysis of material requirement planning under combined demand and supply uncertainty
    • Brennan, L. and Gupta, S. M. (1993) A structured analysis of material requirement planning under combined demand and supply uncertainty. International Journal of Production Research, 31(7), 1689-1707.
    • (1993) International Journal of Production Research , vol.31 , Issue.7 , pp. 1689-1707
    • Brennan, L.1    Gupta, S.M.2
  • 17
    • 0032658271 scopus 로고    scopus 로고
    • Lot sizing for varying degrees of demand uncertainty
    • Johansen, S. G. (1999) Lot sizing for varying degrees of demand uncertainty. International Journal of Production Economics, 59(1-3), 405-414.
    • (1999) International Journal of Production Economics , vol.59 , Issue.1-3 , pp. 405-414
    • Johansen, S.G.1
  • 18
    • 0032366810 scopus 로고    scopus 로고
    • The value of using scheduling information in planning material requirements
    • Kanet, J. J. and Sridharan, V. (1998) The value of using scheduling information in planning material requirements. Decision Sciences Journal, 29(2), 479-498.
    • (1998) Decision Sciences Journal , vol.29 , Issue.2 , pp. 479-498
    • Kanet, J.J.1    Sridharan, V.2
  • 19
    • 17444371115 scopus 로고
    • The planned use of safety stocks in MRP
    • Brown, T. W. (1984) The planned use of safety stocks in MRP. Control Magazine, 10(3), 28-29.
    • (1984) Control Magazine , vol.10 , Issue.3 , pp. 28-29
    • Brown, T.W.1
  • 21
    • 0035815865 scopus 로고    scopus 로고
    • Simulation of supply chain behaviour and performance in an uncertain environment
    • Petrovic, D. (2001) Simulation of supply chain behaviour and performance in an uncertain environment. International Journal of Production Economics, 71(1-3), 429-438.
    • (2001) International Journal of Production Economics , vol.71 , Issue.1-3 , pp. 429-438
    • Petrovic, D.1
  • 23
    • 0034175277 scopus 로고    scopus 로고
    • A review of techniques for buffering against uncertainty with MRP systems
    • Guide, V. D. R. Jr. and Srivastava, R. (2000) A review of techniques for buffering against uncertainty with MRP systems. Production Planning and Control, 11(3), 223-233.
    • (2000) Production Planning and Control , vol.11 , Issue.3 , pp. 223-233
    • Guide Jr., V.D.R.1    Srivastava, R.2
  • 24
    • 0037054916 scopus 로고    scopus 로고
    • Uncertainty under MRP-planned manufacture: Review and categorization
    • Koh, S. C. L., Saad, S. M. and Jones, M. H. (2002) Uncertainty under MRP-planned manufacture: review and categorization. International Journal of Production Research, 40(10), 2399-2421.
    • (2002) International Journal of Production Research , vol.40 , Issue.10 , pp. 2399-2421
    • Koh, S.C.L.1    Saad, S.M.2    Jones, M.H.3
  • 26
    • 0002958558 scopus 로고
    • A diagnostic analysis of the impact of forecast errors on production planning via MRP system nervousness
    • Ho, C. and Ireland, T. C. (1993) A diagnostic analysis of the impact of forecast errors on production planning via MRP system nervousness. Production Planning and Control, 4, 311-322.
    • (1993) Production Planning and Control , vol.4 , pp. 311-322
    • Ho, C.1    Ireland, T.C.2
  • 27
    • 70449383987 scopus 로고
    • Uncertainty dampening methods for reducing MRP system nervousness
    • Ho, C. J., Law, W. K. and Rampal, R. (1995) Uncertainty dampening methods for reducing MRP system nervousness. International Journal of Production Research, 33(2), 483-496.
    • (1995) International Journal of Production Research , vol.33 , Issue.2 , pp. 483-496
    • Ho, C.J.1    Law, W.K.2    Rampal, R.3
  • 28
    • 0029734543 scopus 로고    scopus 로고
    • An investigation of alternative dampening procedures to cope with MRP system nervousness
    • Ho, C. and Carter, P. L. (1996) An investigation of alternative dampening procedures to cope with MRP system nervousness. International Journal of Production Research, 34(1), 137-156.
    • (1996) International Journal of Production Research , vol.34 , Issue.1 , pp. 137-156
    • Ho, C.1    Carter, P.L.2
  • 29
    • 0029389855 scopus 로고
    • Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty
    • Kadipasaoglu, S. N. and Sridharan, V. (1995) Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty. Journal of Operations Management, 13, 193-211.
    • (1995) Journal of Operations Management , vol.13 , pp. 193-211
    • Kadipasaoglu, S.N.1    Sridharan, V.2
  • 30
    • 0030205776 scopus 로고    scopus 로고
    • Stochastic considerations of Grubbström-Molinder model of MRP, input-output and multi-echelon inventory systems
    • Bogataj, L. and Horvat, L. (1996) Stochastic considerations of Grubbström-Molinder model of MRP, input-output and multi-echelon inventory systems. International Journal of Production Economics, 45, 329-336.
    • (1996) International Journal of Production Economics , vol.45 , pp. 329-336
    • Bogataj, L.1    Horvat, L.2
  • 31
    • 0000354915 scopus 로고
    • Resolving uncertainty in manufacturing systems
    • Schimitt, T. G. (1984) Resolving uncertainty in manufacturing systems. Journal of Operation Management, 4(4), 331-345.
    • (1984) Journal of Operation Management , vol.4 , Issue.4 , pp. 331-345
    • Schimitt, T.G.1
  • 32
    • 0037143048 scopus 로고    scopus 로고
    • Evaluating dampening effect of alternative Jot-sizing rules to reduce MRP system nervousness
    • Ho, C. J. (2002) Evaluating dampening effect of alternative Jot-sizing rules to reduce MRP system nervousness. International Journal of Production Research, 40(11), 2633-2652.
    • (2002) International Journal of Production Research , vol.40 , Issue.11 , pp. 2633-2652
    • Ho, C.J.1
  • 33
    • 0034333693 scopus 로고    scopus 로고
    • New lotsize formulation for less nervous production schedules
    • Kazan, O., Nagi, R. and Rump, C. M. (2000) New lotsize formulation for less nervous production schedules. Computers & Operations Research, (27), 1325-1345.
    • (2000) Computers & Operations Research , Issue.27 , pp. 1325-1345
    • Kazan, O.1    Nagi, R.2    Rump, C.M.3
  • 36
    • 0031268178 scopus 로고    scopus 로고
    • Jobshop scheduling with imprecise durations: A fuzzy approach
    • Fortemps, P. (1997) Jobshop scheduling with imprecise durations: a fuzzy approach. IEEE Transactions on Fuzzy Systems, 5(4), 557-569.
    • (1997) IEEE Transactions on Fuzzy Systems , vol.5 , Issue.4 , pp. 557-569
    • Fortemps, P.1
  • 39
    • 0001247245 scopus 로고    scopus 로고
    • Scheduling system design: Three fuzzy theory approaches
    • D. Dubois, H. Prade and R. Yager (eds.), John Wiley & Sons
    • Türksen, I. B. (1997) Scheduling system design: three fuzzy theory approaches, in Fuzzy Information Engineering: A Guided Tour of Applications, D. Dubois, H. Prade and R. Yager (eds.), John Wiley & Sons, pp. 669-693.
    • (1997) Fuzzy Information Engineering: A Guided Tour of Applications , pp. 669-693
    • Türksen, I.B.1
  • 40
    • 0030085607 scopus 로고    scopus 로고
    • A decision support system for production activity control
    • Grabot, B., Binda, C. and Blanc, J. C. (1996) A decision support system for production activity control. Decision Support Systems, 16, 87-101.
    • (1996) Decision Support Systems , vol.16 , pp. 87-101
    • Grabot, B.1    Binda, C.2    Blanc, J.C.3
  • 41
    • 0024017013 scopus 로고
    • OPAL: A multi-knowledge based system for industrial jobshop scheduling
    • Bensana, E., Bel, G. and Dubois, D. (1988) OPAL: a multi-knowledge based system for industrial jobshop scheduling. International Journal of Production Research, 26(3), 795-815.
    • (1988) International Journal of Production Research , vol.26 , Issue.3 , pp. 795-815
    • Bensana, E.1    Bel, G.2    Dubois, D.3
  • 43
  • 45
    • 33645854036 scopus 로고    scopus 로고
    • The use of possibilistic decision theory in manufacturing planning and control
    • R. Slowinski and M. Hapke (eds.), Springer-Verlag
    • Fargier, H. and Thierry, C. (2000) The use of possibilistic decision theory in manufacturing planning and control, in Fuzzy Master Production Scheduling in Scheduling under Fuzziness, R. Slowinski and M. Hapke (eds.), Springer-Verlag, pp. 45-59.
    • (2000) Fuzzy Master Production Scheduling in Scheduling under Fuzziness , pp. 45-59
    • Fargier, H.1    Thierry, C.2
  • 46
  • 48
    • 45549116322 scopus 로고
    • Single value simulation of fuzzy variable
    • Chanas, S. and Nowakowski, M. (1988) Single value simulation of fuzzy variable. Fuzzy Sets and Systems, 25(1), 43-57.
    • (1988) Fuzzy Sets and Systems , vol.25 , Issue.1 , pp. 43-57
    • Chanas, S.1    Nowakowski, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.