메뉴 건너뛰기




Volumn 26, Issue 9-10, 2005, Pages 1157-1162

A combinatorial manufacturing resource planning model for long-term CNC machining industry

Author keywords

Combinatorial manufacturing resource planning; Just in time; Parallel machines; Probabilistic market

Indexed keywords

ALGORITHMS; COMPUTER CONTROL; COMPUTER PROGRAMMING; COMPUTER SOFTWARE; COSTS; JUST IN TIME PRODUCTION; MACHINING; MARKETING; NUMERICAL CONTROL SYSTEMS; PLANNING; PROBABILITY; PRODUCT DEVELOPMENT; PRODUCTIVITY; RESOURCE ALLOCATION; SALES; SCHEDULING;

EID: 27544508424     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-004-2090-y     Document Type: Article
Times cited : (8)

References (23)
  • 1
    • 0033120828 scopus 로고    scopus 로고
    • Development and validation of a theoretical model for cognitive skills acquisition
    • Tang KH, Koubek RJ, Lighner NJ, Salvendy G (1999) Development and validation of a theoretical model for cognitive skills acquisition. Int J Ind Ergon 24:25-38
    • (1999) Int J Ind Ergon , vol.24 , pp. 25-38
    • Tang, K.H.1    Koubek, R.J.2    Lighner, N.J.3    Salvendy, G.4
  • 2
    • 0030818944 scopus 로고    scopus 로고
    • Algorithms for sequencing mixed models on an assembly line in a JIT production system
    • Xiaobo Z, Ohno K (1997) Algorithms for sequencing mixed models on an assembly line in a JIT production system. Comput Ind Eng 32(1):47-56
    • (1997) Comput Ind Eng , vol.32 , Issue.1 , pp. 47-56
    • Xiaobo, Z.1    Ohno, K.2
  • 3
    • 0000505456 scopus 로고    scopus 로고
    • On a comparison of objective function in optimal design of flexible production line with the unreliable machines
    • Lan TS, Lan CH (2000) On a comparison of objective function in optimal design of flexible production line with the unreliable machines. J Inf Optim Sci 21(2):221-231
    • (2000) J Inf Optim Sci , vol.21 , Issue.2 , pp. 221-231
    • Lan, T.S.1    Lan, Ch.2
  • 4
    • 0035277173 scopus 로고    scopus 로고
    • The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity
    • Chen MS, Lan CH (2001) The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity. Int J Prod Econ 70(2):176-184
    • (2001) Int J Prod Econ , vol.70 , Issue.2 , pp. 176-184
    • Chen, M.S.1    Lan, Ch.2
  • 5
    • 0030160843 scopus 로고    scopus 로고
    • Scheduling of a machining center
    • Wang J, Luh PB (1996) Scheduling of a machining center. Math Comput Model 23:203-214
    • (1996) Math Comput Model , vol.23 , pp. 203-214
    • Wang, J.1    Luh, P.B.2
  • 6
    • 0348087750 scopus 로고
    • Fuzzy distribution problem of workers
    • Konno T, Ishii H (1995) Fuzzy distribution problem of workers. J Japan Soc Fuzzy Theory Syst 7(3):162-174
    • (1995) J Japan Soc Fuzzy Theory Syst , vol.7 , Issue.3 , pp. 162-174
    • Konno, T.1    Ishii, H.2
  • 7
    • 0032298790 scopus 로고    scopus 로고
    • Theory and methodology: Manpower allocation using genetic annealing
    • Abbound N, Inuiguchi M, Sakawa M, Uemura Y (1998) Theory and methodology: manpower allocation using genetic annealing. Eur J Oper Res 111:405-420
    • (1998) Eur J Oper Res , vol.111 , pp. 405-420
    • Abbound, N.1    Inuiguchi, M.2    Sakawa, M.3    Uemura, Y.4
  • 8
    • 0034250725 scopus 로고    scopus 로고
    • Short-term manpower management in manufacturing systems: New requirements and DSS prototyping
    • Grabot B, Letouzey A (2000) Short-term manpower management in manufacturing systems: new requirements and DSS prototyping. Comput Ind 43:11-29
    • (2000) Comput Ind , vol.43 , pp. 11-29
    • Grabot, B.1    Letouzey, A.2
  • 9
    • 0030115712 scopus 로고    scopus 로고
    • The use of RAS in manpower forecasting: A microeconomic approach
    • Eijs P, Borghans L (1996) The use of RAS in manpower forecasting: a microeconomic approach. Econ Model 13:257-287
    • (1996) Econ Model , vol.13 , pp. 257-287
    • Eijs, P.1    Borghans, L.2
  • 10
    • 0028090989 scopus 로고
    • Feature-based noncutting tool path selection
    • Jung J, Ahluwalia A (1995) Feature-Based Noncutting Tool Path Selection. J Manuf Syst 13(3):165-172
    • (1995) J Manuf Syst , vol.13 , Issue.3 , pp. 165-172
    • Jung, J.1    Ahluwalia, A.2
  • 11
    • 0036305227 scopus 로고    scopus 로고
    • Optimal machining project control with material removal rate
    • Lan CH, Lan TS, Yeh LJ (2002) Optimal machining project control with material removal rate. Trans Can Soc Mech Eng 26(1):75-86
    • (2002) Trans Can Soc Mech Eng , vol.26 , Issue.1 , pp. 75-86
    • Lan, Ch.1    Lan, T.S.2    Yeh, L.J.3
  • 12
    • 0344514051 scopus 로고    scopus 로고
    • The design of a multi-conveyor system for profit maximization
    • Lan CH (2003) The design of a multi-conveyor system for profit maximization. Int J Adv Manuf Technol 22(7-8):510-521
    • (2003) Int J Adv Manuf Technol , vol.22 , Issue.7-8 , pp. 510-521
    • Lan, Ch.1
  • 13
    • 0037609688 scopus 로고    scopus 로고
    • Dynamic machining project control model under order quantity and deadline constraints
    • Lan TS, Lan CH, Yeh LJ (2002) Dynamic machining project control model under order quantity and deadline constraints. J Oper Res Soc Japan 45(1):83-92
    • (2002) J Oper Res Soc Japan , vol.45 , Issue.1 , pp. 83-92
    • Lan, T.S.1    Lan, Ch.2    Yeh, L.J.3
  • 14
    • 0037186637 scopus 로고    scopus 로고
    • The optimal control of material removal rate with fixed tool life and speed limitation
    • Yeh LJ, Lan TS (2002) The optimal control of material removal rate with fixed tool life and speed limitation. J Mater Process Technol 121(2-3):238-242
    • (2002) J Mater Process Technol , vol.121 , Issue.2-3 , pp. 238-242
    • Yeh, L.J.1    Lan, T.S.2
  • 16
    • 0035152163 scopus 로고    scopus 로고
    • Long-term capacity management: Linking the perspectives from manufacturing strategy and sales and operations planning
    • Olhager J, Rudberg M, Wikner J (2001) Long-term capacity management: linking the perspectives from manufacturing strategy and sales and operations planning. Int J Prod Econ 69:215-225
    • (2001) Int J Prod Econ , vol.69 , pp. 215-225
    • Olhager, J.1    Rudberg, M.2    Wikner, J.3
  • 17
    • 21344469814 scopus 로고    scopus 로고
    • An informational externality in a competitive market
    • Creane A (1996) An informational externality in a competitive market. Int J Ind Organ 14:331-344
    • (1996) Int J Ind Organ , vol.14 , pp. 331-344
    • Creane, A.1
  • 18
    • 0035400730 scopus 로고    scopus 로고
    • A common due-date assignment problem on parallel identical machines
    • Mosheiov G (2001) A common due-date assignment problem on parallel identical machines. Comput Oper Res 28:719-732
    • (2001) Comput Oper Res , vol.28 , pp. 719-732
    • Mosheiov, G.1
  • 19
    • 0030410144 scopus 로고    scopus 로고
    • Responding to customer enquiries in make-to-order companies: Problem and solutions
    • Kingsman B, Hendry L, Mercer A, Souza A (1996) Responding to customer enquiries in make-to-order companies: Problem and solutions. Int J Prod Econ 46-47:219-231
    • (1996) Int J Prod Econ , vol.46-47 , pp. 219-231
    • Kingsman, B.1    Hendry, L.2    Mercer, A.3    Souza, A.4
  • 20
    • 0033102034 scopus 로고    scopus 로고
    • Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs
    • Soroush H (1999) Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs. Eur J Oper Res 113:450-468
    • (1999) Eur J Oper Res , vol.113 , pp. 450-468
    • Soroush, H.1
  • 21
    • 0025403319 scopus 로고
    • An example of disbenefits of centralized stocking
    • Chen MS, Lin CT (1990) An example of disbenefits of centralized stocking. J Oper Res Soc 41(3):259-262
    • (1990) J Oper Res Soc , vol.41 , Issue.3 , pp. 259-262
    • Chen, M.S.1    Lin, C.T.2
  • 22
    • 0025383603 scopus 로고
    • Risk in inventory models: The case of the newsboy problem optimality condition
    • Chung KH (1990) Risk in inventory models: the case of the newsboy problem optimality condition. J Oper Res Soc 41(2):625-632
    • (1990) J Oper Res Soc , vol.41 , Issue.2 , pp. 625-632
    • Chung, K.H.1
  • 23
    • 0027147723 scopus 로고
    • Customer enquiry management: Part of a hierarchical system to control lead times in make-to-order companies
    • Hendry LC, Kingsman BG (1993) Customer enquiry management: part of a hierarchical system to control lead times in make-to-order companies. J Oper Res Soc 44(1):61-70
    • (1993) J Oper Res Soc , vol.44 , Issue.1 , pp. 61-70
    • Hendry, L.C.1    Kingsman, B.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.