-
1
-
-
0033120828
-
Development and validation of a theoretical model for cognitive skills acquisition
-
Tang KH, Koubek RJ, Lighner NJ, Salvendy G (1999) Development and validation of a theoretical model for cognitive skills acquisition. Int J Ind Ergon 24:25-38
-
(1999)
Int J Ind Ergon
, vol.24
, pp. 25-38
-
-
Tang, K.H.1
Koubek, R.J.2
Lighner, N.J.3
Salvendy, G.4
-
2
-
-
0030818944
-
Algorithms for sequencing mixed models on an assembly line in a JIT production system
-
Xiaobo Z, Ohno K (1997) Algorithms for sequencing mixed models on an assembly line in a JIT production system. Comput Ind Eng 32(1):47-56
-
(1997)
Comput Ind Eng
, vol.32
, Issue.1
, pp. 47-56
-
-
Xiaobo, Z.1
Ohno, K.2
-
3
-
-
0000505456
-
On a comparison of objective function in optimal design of flexible production line with the unreliable machines
-
Lan TS, Lan CH (2000) On a comparison of objective function in optimal design of flexible production line with the unreliable machines. J Inf Optim Sci 21(2):221-231
-
(2000)
J Inf Optim Sci
, vol.21
, Issue.2
, pp. 221-231
-
-
Lan, T.S.1
Lan, Ch.2
-
4
-
-
0035277173
-
The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity
-
Chen MS, Lan CH (2001) The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity. Int J Prod Econ 70(2):176-184
-
(2001)
Int J Prod Econ
, vol.70
, Issue.2
, pp. 176-184
-
-
Chen, M.S.1
Lan, Ch.2
-
5
-
-
0030160843
-
Scheduling of a machining center
-
Wang J, Luh PB (1996) Scheduling of a machining center. Math Comput Model 23:203-214
-
(1996)
Math Comput Model
, vol.23
, pp. 203-214
-
-
Wang, J.1
Luh, P.B.2
-
6
-
-
0348087750
-
Fuzzy distribution problem of workers
-
Konno T, Ishii H (1995) Fuzzy distribution problem of workers. J Japan Soc Fuzzy Theory Syst 7(3):162-174
-
(1995)
J Japan Soc Fuzzy Theory Syst
, vol.7
, Issue.3
, pp. 162-174
-
-
Konno, T.1
Ishii, H.2
-
7
-
-
0032298790
-
Theory and methodology: Manpower allocation using genetic annealing
-
Abbound N, Inuiguchi M, Sakawa M, Uemura Y (1998) Theory and methodology: manpower allocation using genetic annealing. Eur J Oper Res 111:405-420
-
(1998)
Eur J Oper Res
, vol.111
, pp. 405-420
-
-
Abbound, N.1
Inuiguchi, M.2
Sakawa, M.3
Uemura, Y.4
-
8
-
-
0034250725
-
Short-term manpower management in manufacturing systems: New requirements and DSS prototyping
-
Grabot B, Letouzey A (2000) Short-term manpower management in manufacturing systems: new requirements and DSS prototyping. Comput Ind 43:11-29
-
(2000)
Comput Ind
, vol.43
, pp. 11-29
-
-
Grabot, B.1
Letouzey, A.2
-
9
-
-
0030115712
-
The use of RAS in manpower forecasting: A microeconomic approach
-
Eijs P, Borghans L (1996) The use of RAS in manpower forecasting: a microeconomic approach. Econ Model 13:257-287
-
(1996)
Econ Model
, vol.13
, pp. 257-287
-
-
Eijs, P.1
Borghans, L.2
-
10
-
-
0028090989
-
Feature-based noncutting tool path selection
-
Jung J, Ahluwalia A (1995) Feature-Based Noncutting Tool Path Selection. J Manuf Syst 13(3):165-172
-
(1995)
J Manuf Syst
, vol.13
, Issue.3
, pp. 165-172
-
-
Jung, J.1
Ahluwalia, A.2
-
11
-
-
0036305227
-
Optimal machining project control with material removal rate
-
Lan CH, Lan TS, Yeh LJ (2002) Optimal machining project control with material removal rate. Trans Can Soc Mech Eng 26(1):75-86
-
(2002)
Trans Can Soc Mech Eng
, vol.26
, Issue.1
, pp. 75-86
-
-
Lan, Ch.1
Lan, T.S.2
Yeh, L.J.3
-
12
-
-
0344514051
-
The design of a multi-conveyor system for profit maximization
-
Lan CH (2003) The design of a multi-conveyor system for profit maximization. Int J Adv Manuf Technol 22(7-8):510-521
-
(2003)
Int J Adv Manuf Technol
, vol.22
, Issue.7-8
, pp. 510-521
-
-
Lan, Ch.1
-
13
-
-
0037609688
-
Dynamic machining project control model under order quantity and deadline constraints
-
Lan TS, Lan CH, Yeh LJ (2002) Dynamic machining project control model under order quantity and deadline constraints. J Oper Res Soc Japan 45(1):83-92
-
(2002)
J Oper Res Soc Japan
, vol.45
, Issue.1
, pp. 83-92
-
-
Lan, T.S.1
Lan, Ch.2
Yeh, L.J.3
-
14
-
-
0037186637
-
The optimal control of material removal rate with fixed tool life and speed limitation
-
Yeh LJ, Lan TS (2002) The optimal control of material removal rate with fixed tool life and speed limitation. J Mater Process Technol 121(2-3):238-242
-
(2002)
J Mater Process Technol
, vol.121
, Issue.2-3
, pp. 238-242
-
-
Yeh, L.J.1
Lan, T.S.2
-
16
-
-
0035152163
-
Long-term capacity management: Linking the perspectives from manufacturing strategy and sales and operations planning
-
Olhager J, Rudberg M, Wikner J (2001) Long-term capacity management: linking the perspectives from manufacturing strategy and sales and operations planning. Int J Prod Econ 69:215-225
-
(2001)
Int J Prod Econ
, vol.69
, pp. 215-225
-
-
Olhager, J.1
Rudberg, M.2
Wikner, J.3
-
17
-
-
21344469814
-
An informational externality in a competitive market
-
Creane A (1996) An informational externality in a competitive market. Int J Ind Organ 14:331-344
-
(1996)
Int J Ind Organ
, vol.14
, pp. 331-344
-
-
Creane, A.1
-
18
-
-
0035400730
-
A common due-date assignment problem on parallel identical machines
-
Mosheiov G (2001) A common due-date assignment problem on parallel identical machines. Comput Oper Res 28:719-732
-
(2001)
Comput Oper Res
, vol.28
, pp. 719-732
-
-
Mosheiov, G.1
-
19
-
-
0030410144
-
Responding to customer enquiries in make-to-order companies: Problem and solutions
-
Kingsman B, Hendry L, Mercer A, Souza A (1996) Responding to customer enquiries in make-to-order companies: Problem and solutions. Int J Prod Econ 46-47:219-231
-
(1996)
Int J Prod Econ
, vol.46-47
, pp. 219-231
-
-
Kingsman, B.1
Hendry, L.2
Mercer, A.3
Souza, A.4
-
20
-
-
0033102034
-
Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs
-
Soroush H (1999) Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs. Eur J Oper Res 113:450-468
-
(1999)
Eur J Oper Res
, vol.113
, pp. 450-468
-
-
Soroush, H.1
-
21
-
-
0025403319
-
An example of disbenefits of centralized stocking
-
Chen MS, Lin CT (1990) An example of disbenefits of centralized stocking. J Oper Res Soc 41(3):259-262
-
(1990)
J Oper Res Soc
, vol.41
, Issue.3
, pp. 259-262
-
-
Chen, M.S.1
Lin, C.T.2
-
22
-
-
0025383603
-
Risk in inventory models: The case of the newsboy problem optimality condition
-
Chung KH (1990) Risk in inventory models: the case of the newsboy problem optimality condition. J Oper Res Soc 41(2):625-632
-
(1990)
J Oper Res Soc
, vol.41
, Issue.2
, pp. 625-632
-
-
Chung, K.H.1
-
23
-
-
0027147723
-
Customer enquiry management: Part of a hierarchical system to control lead times in make-to-order companies
-
Hendry LC, Kingsman BG (1993) Customer enquiry management: part of a hierarchical system to control lead times in make-to-order companies. J Oper Res Soc 44(1):61-70
-
(1993)
J Oper Res Soc
, vol.44
, Issue.1
, pp. 61-70
-
-
Hendry, L.C.1
Kingsman, B.G.2
|