메뉴 건너뛰기




Volumn 13, Issue 4, 2002, Pages 239-252

A matrix formulation for integrating assembly trees and manufacturing resource planning with capacity constraints

Author keywords

Capacity planning; Machine planning; MRP; Reentrant flowline

Indexed keywords

ALGORITHMS; ASSEMBLY; CONSTRAINT THEORY; INFORMATION TECHNOLOGY; ITERATIVE METHODS; PLANNING; PROBLEM SOLVING; SCHEDULING;

EID: 0036681925     PISSN: 09565515     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1016060009229     Document Type: Article
Times cited : (8)

References (10)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.