-
1
-
-
0032157764
-
A net present value approach to safety stocks in planned production
-
Grubbström R.W. A net present value approach to safety stocks in planned production. International Journal of Production Economics. 56/57:1998;213-229.
-
(1998)
International Journal of Production Economics
, vol.5657
, pp. 213-229
-
-
Grubbström, R.W.1
-
2
-
-
0030206269
-
Stochastic properties of a production-inventory process with planned production using transform methodology
-
Grubbström R.W. Stochastic properties of a production-inventory process with planned production using transform methodology. International Journal of Production Economics. 45:1996;407-419.
-
(1996)
International Journal of Production Economics
, vol.45
, pp. 407-419
-
-
Grubbström, R.W.1
-
3
-
-
0043026627
-
Asymptotic Behaviour of a Stochastic Multi-Period Inventory Process with Planned Production
-
Dept. of Production Economics, Linköping Institute of Technology, April
-
L.E. Andersson, R.W. Grubbström, Asymptotic Behaviour of a Stochastic Multi-Period Inventory Process with Planned Production, Working paper WP-210, Dept. of Production Economics, Linköping Institute of Technology, April 1994.
-
(1994)
Working Paper WP-210
-
-
Andersson, L.E.1
Grubbström, R.W.2
-
4
-
-
85031632630
-
Multi-level production and inventory control - related to MRP and cover-time planning
-
Linköping
-
A. Segerstedt, Multi-level production and inventory control - related to MRP and cover-time planning, Production-Economic Research in Linköping, PROFIL 14, Linköping, 1995.
-
(1995)
Production-Economic Research in Linköping, PROFIL
, vol.14
-
-
Segerstedt, A.1
-
5
-
-
0000005440
-
On the application of the Laplace transform to certain economic problems
-
Grubbström R.W. On the application of the Laplace transform to certain economic problems. Management Science. 13(7):1967;558-567.
-
(1967)
Management Science
, vol.13
, Issue.7
, pp. 558-567
-
-
Grubbström, R.W.1
-
11
-
-
0002893786
-
The use of mathematics in production and inventory control
-
Vazsonyi A. The use of mathematics in production and inventory control. Management Science. 1(1):1955;70-85.
-
(1955)
Management Science
, vol.1
, Issue.1
, pp. 70-85
-
-
Vazsonyi, A.1
-
12
-
-
0018990961
-
A principle for determining the correct capital costs of work-in-progress and inventory
-
Grubbström R.W. A principle for determining the correct capital costs of work-in-progress and inventory. International Journal of Production Research. 18(2):1980;259-271.
-
(1980)
International Journal of Production Research
, vol.18
, Issue.2
, pp. 259-271
-
-
Grubbström, R.W.1
-
13
-
-
0042024810
-
A survey and analysis of the application of the Laplace transform to present value problems
-
Grubbström R.W., Jiang Y. A survey and analysis of the application of the Laplace transform to present value problems. Revista di Matematica per le Scienze Economiche e Sociale. 12(1):1990;43-62.
-
(1990)
Revista di Matematica Per Le Scienze Economiche e Sociale
, vol.12
, Issue.1
, pp. 43-62
-
-
Grubbström, R.W.1
Jiang, Y.2
-
14
-
-
0041470372
-
Capital costs in inventory models - A discounted cash flow approach
-
Linköping
-
A. Thorstenson, Capital costs in inventory models - a discounted cash flow approach, Production-Economic Research in Linköping, PROFIL 8, Linköping, 1988.
-
(1988)
Production-Economic Research in Linköping, PROFIL
, vol.8
-
-
Thorstenson, A.1
-
15
-
-
0008344741
-
Theoretical analysis of the difference between the traditional and the annuity stream principles applied to inventory evaluation
-
R. Flavell. Heidelberg: Physica-Verlag
-
Thorstenson A., Grubbström R.W. Theoretical analysis of the difference between the traditional and the annuity stream principles applied to inventory evaluation. Flavell R. Modelling Reality and Personal Modelling. 1993;296-326 Physica-Verlag, Heidelberg.
-
(1993)
Modelling Reality and Personal Modelling
, pp. 296-326
-
-
Thorstenson, A.1
Grubbström, R.W.2
-
16
-
-
85031626904
-
Further developments on safety stocks in an MRP system applying Laplace transforms and input-output analysis
-
Osaka, 4-8 August
-
R.W. Grubbström, O. Tang, Further developments on safety stocks in an MRP system applying Laplace transforms and input-output analysis, Proceedings 14th International Conference on Production Research, Osaka, 4-8 August 1997, pp. 1718-1721.
-
(1997)
Proceedings 14th International Conference on Production Research
, pp. 1718-1721
-
-
Grubbström, R.W.1
Tang, O.2
-
17
-
-
0030205776
-
Stochastic considerations of Grubbström-Molinder model of MRP, input-output and multi-echelon inventory systems
-
Bogataj L., Horvat L. Stochastic considerations of Grubbström-Molinder model of MRP, input-output and multi-echelon inventory systems. International Journal of Production Economics. 45:1996;329-336.
-
(1996)
International Journal of Production Economics
, vol.45
, pp. 329-336
-
-
Bogataj, L.1
Horvat, L.2
-
18
-
-
0043026624
-
Lead times and other delays in inventory systems
-
in: L. Bogataj (Ed.), ISIR, Budapest
-
L. Bogataj, Lead times and other delays in inventory systems, in: L. Bogataj (Ed.), Inventory Modelling, Lecture Notes of the International Postgraduate Summer School, vol. 1, ISIR, Budapest, 1995, pp. 23-35.
-
(1995)
Inventory Modelling, Lecture Notes of the International Postgraduate Summer School
, vol.1
, pp. 23-35
-
-
Bogataj, L.1
-
19
-
-
0008338611
-
The application of game theory to MRP, input-output and multi-echelon inventory systems with exponentially distributed external demand
-
Portoro z , Slovenia
-
L. Bogataj, L. Horvat, The application of game theory to MRP, input-output and multi-echelon inventory systems with exponentially distributed external demand, Proceedings of the International Symposium on Operations Research SOR '95, Portoro z , Slovenia, 1995, pp. 25-36.
-
(1995)
Proceedings of the International Symposium on Operations Research SOR '95
, pp. 25-36
-
-
Bogataj, L.1
Horvat, L.2
-
20
-
-
0043026623
-
Material requirements planning and manufacturing resource planning
-
M. Warner. London: Routledge
-
Grubbström R.W. Material requirements planning and manufacturing resource planning. Warner M. International Encyclopedia of Business and Management. 1996;Routledge, London.
-
(1996)
International Encyclopedia of Business and Management
-
-
Grubbström, R.W.1
-
21
-
-
0028444293
-
Further theoretical considerations on the relationship between MRP, Input-output analysis and multi-echelon inventory systems
-
Grubbström R.W., Molinder A. Further theoretical considerations on the relationship between MRP, Input-output analysis and multi-echelon inventory systems. International Journal of Production Economics. 35:1994;299-311.
-
(1994)
International Journal of Production Economics
, vol.35
, pp. 299-311
-
-
Grubbström, R.W.1
Molinder, A.2
-
22
-
-
0026819457
-
Intertemporal generalization of the relationship between material requirements planning and input-output analysis
-
Grubbström R.W., Ovrin P. Intertemporal generalization of the relationship between material requirements planning and input-output analysis. International Journal of Production Economics. 26:1992;311-318.
-
(1992)
International Journal of Production Economics
, vol.26
, pp. 311-318
-
-
Grubbström, R.W.1
Ovrin, P.2
-
23
-
-
0008309707
-
MRP, input-output analysis and multi-echelon inventory systems with exponentially distributed external demand
-
Bangalore, India
-
L. Horvat, L. Bogataj, MRP, input-output analysis and multi-echelon inventory systems with exponentially distributed external demand, Proceedings of GLOCOSM Conference, Bangalore, India, 1996, pp. 149-154.
-
(1996)
Proceedings of GLOCOSM Conference
, pp. 149-154
-
-
Horvat, L.1
Bogataj, L.2
-
24
-
-
0042525675
-
Game theory aspects of MRP, input-output and multi-echelon inventory systems
-
Pre-prints, Igls/Innsbruck
-
L. Horvat, L. Bogataj, Game theory aspects of MRP, input-output and multi-echelon inventory systems, Pre-prints, vol. 3 Ninth International Working Seminar on Production Economics, Igls/Innsbruck, 1996, pp. 1-12.
-
(1996)
Ninth International Working Seminar on Production Economics
, vol.3
, pp. 1-12
-
-
Horvat, L.1
Bogataj, L.2
-
26
-
-
2642511837
-
Material requirements planning employing input-output analysis and Laplace transforms
-
Linköping
-
A. Molinder, Material requirements planning employing input-output analysis and Laplace transforms, Production-Economic Research in Linköping, PROFIL 14, Linköping, 1995.
-
(1995)
Production-Economic Research in Linköping, PROFIL
, vol.14
-
-
Molinder, A.1
|