Volumn 34, Issue 4, 2016, Pages 688-700

Are complexity and uncertainty distinct concepts in project management? A taxonomical examination from literature

Author keywords

Complexity; Project management; Research methods; Taxonomy; Uncertainty

Indexed keywords

SEMANTICS; TAXONOMIES; UNCERTAINTY ANALYSIS;

EID: 84963945143     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2016.02.009     Document Type: Article
Times cited : (79)

References (134)
  • 1
    • 84894229281 scopus 로고    scopus 로고
    • A new approach for project control under uncertainty. Going back to the basics
    • Acebes F., Pajares J., Galán J.M., López-Paredes A. A new approach for project control under uncertainty. Going back to the basics. Int. J. Proj. Manag. 2014, 32(3):423-434.
    • (2014) Int. J. Proj. Manag. , vol.32 , Issue.3 , pp. 423-434
    • Acebes, F.1    Pajares, J.2    Galán, J.M.3    López-Paredes, A.4
  • 2
    • 84908019045 scopus 로고    scopus 로고
    • Complex project management as complex problem solving: a distributed knowledge management perspective
    • Ahern T., Leavy B., Byrne P.J. Complex project management as complex problem solving: a distributed knowledge management perspective. Int. J. Proj. Manag. 2014, 32(8):1371-1381.
    • (2014) Int. J. Proj. Manag. , vol.32 , Issue.8 , pp. 1371-1381
    • Ahern, T.1    Leavy, B.2    Byrne, P.J.3
  • 3
    • 0037448869 scopus 로고    scopus 로고
    • Enterprise resource planning: a taxonomy of critical factors
    • Al-Mashari M., Al-Mudimigh A., Zairi M. Enterprise resource planning: a taxonomy of critical factors. Eur. J. Oper. Res. 2003, 146(2):352-364.
    • (2003) Eur. J. Oper. Res. , vol.146 , Issue.2 , pp. 352-364
    • Al-Mashari, M.1    Al-Mudimigh, A.2    Zairi, M.3
  • 4
    • 34547799657 scopus 로고    scopus 로고
    • Risk management in ERP project introduction: review of the literature
    • Aloini D., Dulmin R., Mininno V. Risk management in ERP project introduction: review of the literature. Inf. Manag. 2007, 44(6):547-567.
    • (2007) Inf. Manag. , vol.44 , Issue.6 , pp. 547-567
    • Aloini, D.1    Dulmin, R.2    Mininno, V.3
  • 6
    • 0342687040 scopus 로고    scopus 로고
    • Perspective: complexity theory and organization science
    • Anderson P. Perspective: complexity theory and organization science. Organ. Sci. 1999, 10(3):216-232.
    • (1999) Organ. Sci. , vol.10 , Issue.3 , pp. 216-232
    • Anderson, P.1
  • 7
    • 33751094291 scopus 로고    scopus 로고
    • Fundamental uncertainties in projects and the scope of project management
    • Atkinson R., Crawford L., Ward S. Fundamental uncertainties in projects and the scope of project management. Int. J. Proj. Manag. 2006, 24(8):687-698.
    • (2006) Int. J. Proj. Manag. , vol.24 , Issue.8 , pp. 687-698
    • Atkinson, R.1    Crawford, L.2    Ward, S.3
  • 9
    • 0030212023 scopus 로고    scopus 로고
    • The concept of project complexity-a review
    • Baccarini D. The concept of project complexity-a review. Int. J. Proj. Manag. 1996, 14(4):201-204.
    • (1996) Int. J. Proj. Manag. , vol.14 , Issue.4 , pp. 201-204
    • Baccarini, D.1
  • 10
    • 0344667723 scopus 로고    scopus 로고
    • Factors influencing project success: the impact of human resource management
    • Belout A., Gauvreau C. Factors influencing project success: the impact of human resource management. Int. J. Proj. Manag. 2004, 22(1):1-11.
    • (2004) Int. J. Proj. Manag. , vol.22 , Issue.1 , pp. 1-11
    • Belout, A.1    Gauvreau, C.2
  • 11
    • 33645038121 scopus 로고    scopus 로고
    • Toward a complexity theory of information systems development
    • Benbya H., McKelvey B. Toward a complexity theory of information systems development. Inf. Technol. People 2006, 19(1):12-34.
    • (2006) Inf. Technol. People , vol.19 , Issue.1 , pp. 12-34
    • Benbya, H.1    McKelvey, B.2
  • 12
    • 84865382282 scopus 로고    scopus 로고
    • Paradigms in project management research: examples from 15 years of IRNOP conferences
    • Biedenbach T., Müller R. Paradigms in project management research: examples from 15 years of IRNOP conferences. Int. J. Manag. Proj. Bus. 2011, 4(1):82-104.
    • (2011) Int. J. Manag. Proj. Bus. , vol.4 , Issue.1 , pp. 82-104
    • Biedenbach, T.1    Müller, R.2
  • 13
    • 79960062818 scopus 로고    scopus 로고
    • Grasping project complexity in large engineering projects: the TOE (Technical, Organizational and Environmental) framework
    • Bosch-Rekveldt M., Jongkind Y., Mooi H., Bakker H., Verbraeck A. Grasping project complexity in large engineering projects: the TOE (Technical, Organizational and Environmental) framework. Int. J. Proj. Manag. 2011, 29(6):728-739.
    • (2011) Int. J. Proj. Manag. , vol.29 , Issue.6 , pp. 728-739
    • Bosch-Rekveldt, M.1    Jongkind, Y.2    Mooi, H.3    Bakker, H.4    Verbraeck, A.5
  • 14
    • 0029203560 scopus 로고
    • Efficient estimation of arc criticalities in stochastic activity networks
    • Bowman R.A. Efficient estimation of arc criticalities in stochastic activity networks. Manag. Sci. 1995, 41(1):58-67.
    • (1995) Manag. Sci. , vol.41 , Issue.1 , pp. 58-67
    • Bowman, R.A.1
  • 15
    • 34347388420 scopus 로고    scopus 로고
    • Qualitative data analysis for health services research: developing taxonomy, themes, and theory
    • Bradley E.H., Curry L.A., Devers K.J. Qualitative data analysis for health services research: developing taxonomy, themes, and theory. Health Serv. Res. 2007, 42(4):1758-1772.
    • (2007) Health Serv. Res. , vol.42 , Issue.4 , pp. 1758-1772
    • Bradley, E.H.1    Curry, L.A.2    Devers, K.J.3
  • 16
    • 73449141068 scopus 로고    scopus 로고
    • From hero to hubris-reconsidering the project management of Heathrow's Terminal 5
    • Brady T., Davies A. From hero to hubris-reconsidering the project management of Heathrow's Terminal 5. Int. J. Proj. Manag. 2010, 28(2):151-157.
    • (2010) Int. J. Proj. Manag. , vol.28 , Issue.2 , pp. 151-157
    • Brady, T.1    Davies, A.2
  • 17
    • 84904410456 scopus 로고    scopus 로고
    • Managing structural and dynamic complexity: a tale of two projects
    • Brady T., Davies A. Managing structural and dynamic complexity: a tale of two projects. Proj. Manag. J. 2014, 45(4):21-38.
    • (2014) Proj. Manag. J. , vol.45 , Issue.4 , pp. 21-38
    • Brady, T.1    Davies, A.2
  • 18
    • 84908003243 scopus 로고    scopus 로고
    • Dealing with uncertainty in complex projects: revisiting Klein and Meckling
    • Brady T., Davies A., Nightingale P. Dealing with uncertainty in complex projects: revisiting Klein and Meckling. Int. J. Manag. Proj. Bus. 2012, 5(4):718-736.
    • (2012) Int. J. Manag. Proj. Bus. , vol.5 , Issue.4 , pp. 718-736
    • Brady, T.1    Davies, A.2    Nightingale, P.3
  • 19
    • 84890131957 scopus 로고    scopus 로고
    • Managing complex project process models with a process architecture framework
    • Browning T.R. Managing complex project process models with a process architecture framework. Int. J. Proj. Manag. 2014, 32(2):229-241.
    • (2014) Int. J. Proj. Manag. , vol.32 , Issue.2 , pp. 229-241
    • Browning, T.R.1
  • 20
    • 0036881796 scopus 로고    scopus 로고
    • Modeling impacts of process architecture on cost and schedule risk in product development
    • Browning T.R., Eppinger S.D. Modeling impacts of process architecture on cost and schedule risk in product development. IEEE Trans. Eng. Manag. 2002, 49(4):428-442.
    • (2002) IEEE Trans. Eng. Manag. , vol.49 , Issue.4 , pp. 428-442
    • Browning, T.R.1    Eppinger, S.D.2
  • 21
    • 27144537748 scopus 로고    scopus 로고
    • Kurt Lewin and complexity theories: back to the future?
    • Burnes B. Kurt Lewin and complexity theories: back to the future?. J. Chang. Manag. 2004, 4(4):309-325.
    • (2004) J. Chang. Manag. , vol.4 , Issue.4 , pp. 309-325
    • Burnes, B.1
  • 22
    • 0017559241 scopus 로고
    • Planning and dynamic control of projects under uncertainty
    • Burt J.M. Planning and dynamic control of projects under uncertainty. Manag. Sci. 1977, 24(3):249-258.
    • (1977) Manag. Sci. , vol.24 , Issue.3 , pp. 249-258
    • Burt, J.M.1
  • 23
    • 0035885517 scopus 로고    scopus 로고
    • Critical path analysis in the network with fuzzy activity times
    • Chanas S., Zieliński P. Critical path analysis in the network with fuzzy activity times. Fuzzy Sets Syst. 2001, 122(2):195-204.
    • (2001) Fuzzy Sets Syst. , vol.122 , Issue.2 , pp. 195-204
    • Chanas, S.1    Zieliński, P.2
  • 24
    • 33645999641 scopus 로고    scopus 로고
    • Key points of contention in framing assumptions for risk and uncertainty management
    • Chapman C. Key points of contention in framing assumptions for risk and uncertainty management. Int. J. Proj. Manag. 2006, 24(4):303-313.
    • (2006) Int. J. Proj. Manag. , vol.24 , Issue.4 , pp. 303-313
    • Chapman, C.1
  • 25
    • 0033721056 scopus 로고    scopus 로고
    • Estimation and evaluation of uncertainty: a minimalist first pass approach
    • Chapman C., Ward S. Estimation and evaluation of uncertainty: a minimalist first pass approach. Int. J. Proj. Manag. 2000, 18(6):369-383.
    • (2000) Int. J. Proj. Manag. , vol.18 , Issue.6 , pp. 369-383
    • Chapman, C.1    Ward, S.2
  • 26
    • 34249099938 scopus 로고    scopus 로고
    • Analysis of critical paths in a project network with fuzzy activity times
    • Chen S.P. Analysis of critical paths in a project network with fuzzy activity times. Eur. J. Oper. Res. 2007, 183(1):442-459.
    • (2007) Eur. J. Oper. Res. , vol.183 , Issue.1 , pp. 442-459
    • Chen, S.P.1
  • 27
    • 0031257870 scopus 로고    scopus 로고
    • An uncertainty importance measure of activities in PERT networks
    • Cho J.G., Yum B.J. An uncertainty importance measure of activities in PERT networks. Int. J. Prod. Res. 1997, 35(10):2737-2758.
    • (1997) Int. J. Prod. Res. , vol.35 , Issue.10 , pp. 2737-2758
    • Cho, J.G.1    Yum, B.J.2
  • 28
    • 23344432043 scopus 로고    scopus 로고
    • A simulation-based process model for managing complex design projects
    • Cho S.H., Eppinger S.D. A simulation-based process model for managing complex design projects. IEEE Trans. Eng. Manag. 2005, 52(3):316-328.
    • (2005) IEEE Trans. Eng. Manag. , vol.52 , Issue.3 , pp. 316-328
    • Cho, S.H.1    Eppinger, S.D.2
  • 29
    • 84986021426 scopus 로고    scopus 로고
    • A taxonomy for selecting global supply chain strategies
    • Christopher M., Peck H., Towill D. A taxonomy for selecting global supply chain strategies. Int. J. Logist. Manag. 2006, 17(2):277-287.
    • (2006) Int. J. Logist. Manag. , vol.17 , Issue.2 , pp. 277-287
    • Christopher, M.1    Peck, H.2    Towill, D.3
  • 30
    • 33750930667 scopus 로고    scopus 로고
    • Rethinking project management: researching the actuality of projects
    • Cicmil S., Williams T., Thomas J., Hodgson D. Rethinking project management: researching the actuality of projects. Int. J. Proj. Manag. 2006, 24(8):675-686.
    • (2006) Int. J. Proj. Manag. , vol.24 , Issue.8 , pp. 675-686
    • Cicmil, S.1    Williams, T.2    Thomas, J.3    Hodgson, D.4
  • 31
    • 32644460585 scopus 로고    scopus 로고
    • What can we learn from a theory of complexity?
    • Cilliers P. What can we learn from a theory of complexity?. Emergence 2000, 2(1):23-33.
    • (2000) Emergence , vol.2 , Issue.1 , pp. 23-33
    • Cilliers, P.1
  • 32
    • 64049087064 scopus 로고    scopus 로고
    • Project management approaches for dynamic environments
    • Collyer S., Warren C.M. Project management approaches for dynamic environments. Int. J. Proj. Manag. 2009, 27(4):355-364.
    • (2009) Int. J. Proj. Manag. , vol.27 , Issue.4 , pp. 355-364
    • Collyer, S.1    Warren, C.M.2
  • 33
    • 0018752002 scopus 로고
    • Estimating a project's completion time distribution using intelligent simulation methods
    • Cook T.M., Jennings R.H. Estimating a project's completion time distribution using intelligent simulation methods. J. Oper. Res. Soc. 1979, 30(12):1103-1108.
    • (1979) J. Oper. Res. Soc. , vol.30 , Issue.12 , pp. 1103-1108
    • Cook, T.M.1    Jennings, R.H.2
  • 34
    • 56549114674 scopus 로고    scopus 로고
    • Mapping the strange landscape of complexity theory, and its relationship to project management
    • Cooke-Davies T., Cicmil S., Crawford L., Richardson K. Mapping the strange landscape of complexity theory, and its relationship to project management. Proj. Manag. J. 2007, 38(2):50-61.
    • (2007) Proj. Manag. J. , vol.38 , Issue.2 , pp. 50-61
    • Cooke-Davies, T.1    Cicmil, S.2    Crawford, L.3    Richardson, K.4
  • 35
    • 0034195442 scopus 로고    scopus 로고
    • Determining validity in qualitative inquiry
    • Creswell J.W., Miller D.L. Determining validity in qualitative inquiry. Theory Pract. 2000, 39(3):124-130.
    • (2000) Theory Pract. , vol.39 , Issue.3 , pp. 124-130
    • Creswell, J.W.1    Miller, D.L.2
  • 36
    • 33847333101 scopus 로고    scopus 로고
    • Managing complex product development projects with design structure matrices and domain mapping matrices
    • Danilovic M., Browning T.R. Managing complex product development projects with design structure matrices and domain mapping matrices. Int. J. Proj. Manag. 2007, 25(3):300-314.
    • (2007) Int. J. Proj. Manag. , vol.25 , Issue.3 , pp. 300-314
    • Danilovic, M.1    Browning, T.R.2
  • 38
    • 0030573494 scopus 로고    scopus 로고
    • On the use of the complexity index as a measure of complexity in activity networks
    • De Reyck B., Herroelen W. On the use of the complexity index as a measure of complexity in activity networks. Eur. J. Oper. Res. 1996, 91(2):347-366.
    • (1996) Eur. J. Oper. Res. , vol.91 , Issue.2 , pp. 347-366
    • De Reyck, B.1    Herroelen, W.2
  • 39
    • 0033888428 scopus 로고    scopus 로고
    • The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects
    • Eden C., Williams T., Ackermann F., Howick S. The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects. J. Oper. Res. Soc. 2000, 51(3):291-300.
    • (2000) J. Oper. Res. Soc. , vol.51 , Issue.3 , pp. 291-300
    • Eden, C.1    Williams, T.2    Ackermann, F.3    Howick, S.4
  • 40
    • 0032646635 scopus 로고    scopus 로고
    • On the sensitivity of project variability to activity mean duration
    • Elmaghraby S.E., Fathi Y., Taner M.R. On the sensitivity of project variability to activity mean duration. Int. J. Prod. Econ. 1999, 62(3):219-232.
    • (1999) Int. J. Prod. Econ. , vol.62 , Issue.3 , pp. 219-232
    • Elmaghraby, S.E.1    Fathi, Y.2    Taner, M.R.3
  • 41
    • 0036604189 scopus 로고    scopus 로고
    • A real options approach to valuing strategic flexibility in uncertain construction projects
    • Ford D.N., Lander D.M., Voyer J.J. A real options approach to valuing strategic flexibility in uncertain construction projects. Constr. Manag. Econ. 2002, 20(4):343-351.
    • (2002) Constr. Manag. Econ. , vol.20 , Issue.4 , pp. 343-351
    • Ford, D.N.1    Lander, D.M.2    Voyer, J.J.3
  • 42
    • 43849091697 scopus 로고    scopus 로고
    • On faith, fact, and interaction in projects
    • Geraldi J., Adlbrecht G. On faith, fact, and interaction in projects. Proj. Manag. J. 2007, 38(1):32-43.
    • (2007) Proj. Manag. J. , vol.38 , Issue.1 , pp. 32-43
    • Geraldi, J.1    Adlbrecht, G.2
  • 43
    • 43849091925 scopus 로고    scopus 로고
    • The balance between order and chaos in multi-project firms: a conceptual model
    • Geraldi J.G. The balance between order and chaos in multi-project firms: a conceptual model. Int. J. Proj. Manag. 2008, 26(4):348-356.
    • (2008) Int. J. Proj. Manag. , vol.26 , Issue.4 , pp. 348-356
    • Geraldi, J.G.1
  • 44
    • 80052483747 scopus 로고    scopus 로고
    • Now, let's make it really complex (complicated): a systematic review of the complexities of projects
    • Geraldi J., Maylor H., Williams T. Now, let's make it really complex (complicated): a systematic review of the complexities of projects. Int. J. Oper. Prod. Manag. 2011, 31(9):966-990.
    • (2011) Int. J. Oper. Prod. Manag. , vol.31 , Issue.9 , pp. 966-990
    • Geraldi, J.1    Maylor, H.2    Williams, T.3
  • 45
    • 0000757833 scopus 로고    scopus 로고
    • Project complexity: the focal point of construction production planning
    • Gidado K.I. Project complexity: the focal point of construction production planning. Constr. Manag. Econ. 1996, 14(3):213-225.
    • (1996) Constr. Manag. Econ. , vol.14 , Issue.3 , pp. 213-225
    • Gidado, K.I.1
  • 46
    • 84865397107 scopus 로고    scopus 로고
    • Keeping it simple? A case study into the advantages and disadvantages of reducing complexity in mega project planning
    • Giezen M. Keeping it simple? A case study into the advantages and disadvantages of reducing complexity in mega project planning. Int. J. Proj. Manag. 2012, 30(7):781-790.
    • (2012) Int. J. Proj. Manag. , vol.30 , Issue.7 , pp. 781-790
    • Giezen, M.1
  • 47
    • 84872733124 scopus 로고    scopus 로고
    • Identifying and categorizing the sources of uncertainty in construction supply chains
    • Gosling J., Naim M., Towill D. Identifying and categorizing the sources of uncertainty in construction supply chains. J. Constr. Eng. Manag. 2012, 139(1):102-110.
    • (2012) J. Constr. Eng. Manag. , vol.139 , Issue.1 , pp. 102-110
    • Gosling, J.1    Naim, M.2    Towill, D.3
  • 49
    • 0000031487 scopus 로고
    • Letter to the Editor-Attempts to Validate Certain PERT Statistics or "Picking on PERT"
    • Grubbs F.E. Letter to the Editor-Attempts to Validate Certain PERT Statistics or "Picking on PERT". Oper. Res. 1962, 10(6):912-915.
    • (1962) Oper. Res. , vol.10 , Issue.6 , pp. 912-915
    • Grubbs, F.E.1
  • 50
    • 0037091912 scopus 로고    scopus 로고
    • Agile manufacturing: a taxonomy of strategic and technological imperatives
    • Gunasekaran A., Yusuf Y.Y. Agile manufacturing: a taxonomy of strategic and technological imperatives. Int. J. Prod. Res. 2002, 40(6):1357-1385.
    • (2002) Int. J. Prod. Res. , vol.40 , Issue.6 , pp. 1357-1385
    • Gunasekaran, A.1    Yusuf, Y.Y.2
  • 51
    • 0034313858 scopus 로고    scopus 로고
    • Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance
    • Gutierrez G., Paul A. Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance. Oper. Res. 2000, 48(6):927-938.
    • (2000) Oper. Res. , vol.48 , Issue.6 , pp. 927-938
    • Gutierrez, G.1    Paul, A.2
  • 53
    • 77953872383 scopus 로고    scopus 로고
    • A survey of variants and extensions of the resource-constrained project scheduling problem
    • Hartmann S., Briskorn D. A survey of variants and extensions of the resource-constrained project scheduling problem. Eur. J. Oper. Res. 2010, 207(1):1-14.
    • (2010) Eur. J. Oper. Res. , vol.207 , Issue.1 , pp. 1-14
    • Hartmann, S.1    Briskorn, D.2
  • 54
    • 1542502674 scopus 로고    scopus 로고
    • Robust and reactive project scheduling: a review and classification of procedures
    • Herroelen W., Leus R. Robust and reactive project scheduling: a review and classification of procedures. Int. J. Prod. Res. 2004, 42(8):1599-1620.
    • (2004) Int. J. Prod. Res. , vol.42 , Issue.8 , pp. 1599-1620
    • Herroelen, W.1    Leus, R.2
  • 55
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: survey and research potentials
    • Herroelen W., Leus R. Project scheduling under uncertainty: survey and research potentials. Eur. J. Oper. Res. 2005, 165(2):289-306.
    • (2005) Eur. J. Oper. Res. , vol.165 , Issue.2 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 56
    • 0032042933 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: a survey of recent developments
    • Herroelen W., De Reyck B., Demeulemeester E. Resource-constrained project scheduling: a survey of recent developments. Comput. Oper. Res. 1998, 25(4):279-302.
    • (1998) Comput. Oper. Res. , vol.25 , Issue.4 , pp. 279-302
    • Herroelen, W.1    De Reyck, B.2    Demeulemeester, E.3
  • 57
    • 0008677341 scopus 로고    scopus 로고
    • Product complexity, innovation and industrial organisation
    • Hobday M. Product complexity, innovation and industrial organisation. Res. Policy 1998, 26(6):689-710.
    • (1998) Res. Policy , vol.26 , Issue.6 , pp. 689-710
    • Hobday, M.1
  • 58
    • 76749159306 scopus 로고    scopus 로고
    • A project contingency framework based on uncertainty and its consequences
    • Howell D., Windahl C., Seidel R. A project contingency framework based on uncertainty and its consequences. Int. J. Proj. Manag. 2010, 28(3):256-264.
    • (2010) Int. J. Proj. Manag. , vol.28 , Issue.3 , pp. 256-264
    • Howell, D.1    Windahl, C.2    Seidel, R.3
  • 59
    • 0034830442 scopus 로고    scopus 로고
    • The impact of disruption and delay when compressing large projects: going for incentives?
    • Howick S., Eden C. The impact of disruption and delay when compressing large projects: going for incentives?. J. Oper. Res. Soc. 2001, 26-34.
    • (2001) J. Oper. Res. Soc. , pp. 26-34
    • Howick, S.1    Eden, C.2
  • 60
    • 33847258333 scopus 로고    scopus 로고
    • Human resource management in the project-oriented company: a review
    • Huemann M., Keegan A., Turner J.R. Human resource management in the project-oriented company: a review. Int. J. Proj. Manag. 2007, 25(3):315-323.
    • (2007) Int. J. Proj. Manag. , vol.25 , Issue.3 , pp. 315-323
    • Huemann, M.1    Keegan, A.2    Turner, J.R.3
  • 61
    • 77955780774 scopus 로고    scopus 로고
    • Project success as a topic in project management journals
    • Ika L.A. Project success as a topic in project management journals. Proj. Manag. J. 2009, 40(4):6-19.
    • (2009) Proj. Manag. J. , vol.40 , Issue.4 , pp. 6-19
    • Ika, L.A.1
  • 62
    • 0035254835 scopus 로고    scopus 로고
    • Management of risks, uncertainties and opportunities on projects: time for a fundamental shift
    • Jaafari A. Management of risks, uncertainties and opportunities on projects: time for a fundamental shift. Int. J. Proj. Manag. 2001, 19(2):89-101.
    • (2001) Int. J. Proj. Manag. , vol.19 , Issue.2 , pp. 89-101
    • Jaafari, A.1
  • 63
    • 84865355527 scopus 로고    scopus 로고
    • Breaking out of the straitjacket of project research: in search of contribution
    • Jacobsson M., Söderholm A. Breaking out of the straitjacket of project research: in search of contribution. Int. J. Manag. Proj. Bus. 2011, 4(3):378-388.
    • (2011) Int. J. Manag. Proj. Bus. , vol.4 , Issue.3 , pp. 378-388
    • Jacobsson, M.1    Söderholm, A.2
  • 64
    • 30744471887 scopus 로고    scopus 로고
    • Project relationships-a model for analyzing interactional uncertainty
    • Jensen C., Johansson S., Löfström M. Project relationships-a model for analyzing interactional uncertainty. Int. J. Proj. Manag. 2006, 24(1):4-12.
    • (2006) Int. J. Proj. Manag. , vol.24 , Issue.1 , pp. 4-12
    • Jensen, C.1    Johansson, S.2    Löfström, M.3
  • 65
    • 33749994598 scopus 로고    scopus 로고
    • A retrospective look at our evolving understanding of project success
    • Jugdev K., Müller R. A retrospective look at our evolving understanding of project success. Proj. Manag. J. 2005, 36(4):19-31.
    • (2005) Proj. Manag. J. , vol.36 , Issue.4 , pp. 19-31
    • Jugdev, K.1    Müller, R.2
  • 66
    • 27344451676 scopus 로고    scopus 로고
    • The current state of project management research: trends, interpretations, and predictions
    • Kloppenborg T.J., Opfer W.A. The current state of project management research: trends, interpretations, and predictions. Proj. Manag. J. 2002, 33(2):5-18.
    • (2002) Proj. Manag. J. , vol.33 , Issue.2 , pp. 5-18
    • Kloppenborg, T.J.1    Opfer, W.A.2
  • 67
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: theory and computation
    • Kolisch R. Serial and parallel resource-constrained project scheduling methods revisited: theory and computation. Eur. J. Oper. Res. 1996, 90(2):320-333.
    • (1996) Eur. J. Oper. Res. , vol.90 , Issue.2 , pp. 320-333
    • Kolisch, R.1
  • 68
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolisch R., Padman R. An integrated survey of deterministic project scheduling. Omega 2001, 29(3):249-272.
    • (2001) Omega , vol.29 , Issue.3 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 69
    • 79953286735 scopus 로고    scopus 로고
    • The strategy of parallel approaches in projects with unforeseeable uncertainty: the Manhattan case in retrospect
    • Lenfle S. The strategy of parallel approaches in projects with unforeseeable uncertainty: the Manhattan case in retrospect. Int. J. Proj. Manag. 2011, 29(4):359-373.
    • (2011) Int. J. Proj. Manag. , vol.29 , Issue.4 , pp. 359-373
    • Lenfle, S.1
  • 70
    • 0038033626 scopus 로고    scopus 로고
    • Applications and limitations of complexity theory in organization theory and strategy
    • Levy D.L. Applications and limitations of complexity theory in organization theory and strategy. Public Adm. Public Policy 2000, 79:67-88.
    • (2000) Public Adm. Public Policy , vol.79 , pp. 67-88
    • Levy, D.L.1
  • 71
    • 78650207645 scopus 로고    scopus 로고
    • 25 years of stakeholder theory in project management literature (1984-2009)
    • Littau P., Jujagiri N.J., Adlbrecht G. 25 years of stakeholder theory in project management literature (1984-2009). Proj. Manag. J. 2010, 41(4):17-29.
    • (2010) Proj. Manag. J. , vol.41 , Issue.4 , pp. 17-29
    • Littau, P.1    Jujagiri, N.J.2    Adlbrecht, G.3
  • 73
    • 84922592342 scopus 로고    scopus 로고
    • Measurement model of project complexity for large-scale projects from task and organization perspective
    • Lu Y., Luo L., Wang H., Le Y., Shi Q. Measurement model of project complexity for large-scale projects from task and organization perspective. Int. J. Proj. Manag. 2015, 33(3):610-622.
    • (2015) Int. J. Proj. Manag. , vol.33 , Issue.3 , pp. 610-622
    • Lu, Y.1    Luo, L.2    Wang, H.3    Le, Y.4    Shi, Q.5
  • 74
    • 0002641538 scopus 로고
    • An analytical study of the PERT assumptions
    • MacCrimmon K.R., Ryavec C.A. An analytical study of the PERT assumptions. Oper. Res. 1964, 12(1):16-37.
    • (1964) Oper. Res. , vol.12 , Issue.1 , pp. 16-37
    • MacCrimmon, K.R.1    Ryavec, C.A.2
  • 75
    • 0034911501 scopus 로고    scopus 로고
    • Simplifying complexity: a review of complexity theory
    • Manson S.M. Simplifying complexity: a review of complexity theory. Geoforum 2001, 32(3):405-414.
    • (2001) Geoforum , vol.32 , Issue.3 , pp. 405-414
    • Manson, S.M.1
  • 76
    • 84899992653 scopus 로고    scopus 로고
    • Identifying, framing and managing uncertainties in project portfolios
    • Martinsuo M., Korhonen T., Laine T. Identifying, framing and managing uncertainties in project portfolios. Int. J. Proj. Manag. 2014, 32(5):732-746.
    • (2014) Int. J. Proj. Manag. , vol.32 , Issue.5 , pp. 732-746
    • Martinsuo, M.1    Korhonen, T.2    Laine, T.3
  • 77
    • 84880636914 scopus 로고    scopus 로고
    • How hard can it be? Actively managing complexity in technology projects
    • Maylor H.R., Turner N.W., Murray-Webster R. How hard can it be? Actively managing complexity in technology projects. Res. Technol. Manag. 2013, 56(4):45-51.
    • (2013) Res. Technol. Manag. , vol.56 , Issue.4 , pp. 45-51
    • Maylor, H.R.1    Turner, N.W.2    Murray-Webster, R.3
  • 78
    • 67650811997 scopus 로고    scopus 로고
    • Managerial complexity in project-based operations: a grounded model and its implications for practice
    • Maylor H., Vidgen R., Carver S. Managerial complexity in project-based operations: a grounded model and its implications for practice. Proj. Manag. J. 2008, 39(S1):S15-S26.
    • (2008) Proj. Manag. J. , vol.39 , pp. S15-S26
    • Maylor, H.1    Vidgen, R.2    Carver, S.3
  • 79
    • 79955948494 scopus 로고    scopus 로고
    • Quantifying project characteristics related to uncertainty
    • McLain D. Quantifying project characteristics related to uncertainty. Proj. Manag. J. 2009, 40(4):60-73.
    • (2009) Proj. Manag. J. , vol.40 , Issue.4 , pp. 60-73
    • McLain, D.1
  • 80
    • 84900533261 scopus 로고    scopus 로고
    • A semantic approach for extracting domain taxonomies from text
    • Meijer K., Frasincar F., Hogenboom F. A semantic approach for extracting domain taxonomies from text. Decis. Support. Syst. 2014, 62:78-93.
    • (2014) Decis. Support. Syst. , vol.62 , pp. 78-93
    • Meijer, K.1    Frasincar, F.2    Hogenboom, F.3
  • 82
    • 84937313687 scopus 로고
    • A taxonomy of manufacturing strategies
    • Miller J.G., Roth A.V. A taxonomy of manufacturing strategies. Manag. Sci. 1994, 40(3):285-304.
    • (1994) Manag. Sci. , vol.40 , Issue.3 , pp. 285-304
    • Miller, J.G.1    Roth, A.V.2
  • 83
    • 84859500057 scopus 로고
    • Paradigms, metaphors, and puzzle solving in organization theory
    • Morgan G. Paradigms, metaphors, and puzzle solving in organization theory. Adm. Sci. Q. 1980, 25(4):605-622.
    • (1980) Adm. Sci. Q. , vol.25 , Issue.4 , pp. 605-622
    • Morgan, G.1
  • 84
    • 84958527656 scopus 로고    scopus 로고
    • Research and the future of project management
    • Morris P.W. Research and the future of project management. Int. J. Manag. Proj. Bus. 2010, 3(1):139-146.
    • (2010) Int. J. Manag. Proj. Bus. , vol.3 , Issue.1 , pp. 139-146
    • Morris, P.W.1
  • 85
    • 0032670945 scopus 로고    scopus 로고
    • Risk assessment in construction schedules
    • Mulholland B., Christian J. Risk assessment in construction schedules. J. Constr. Eng. Manag. 1999, 125(1):8-15.
    • (1999) J. Constr. Eng. Manag. , vol.125 , Issue.1 , pp. 8-15
    • Mulholland, B.1    Christian, J.2
  • 86
    • 84958529668 scopus 로고    scopus 로고
    • Critical success factors in projects: Pinto, Slevin, and Prescott-the elucidation of project success
    • Müller R., Jugdev K. Critical success factors in projects: Pinto, Slevin, and Prescott-the elucidation of project success. Int. J. Manag. Proj. Bus. 2012, 5(4):757-775.
    • (2012) Int. J. Manag. Proj. Bus. , vol.5 , Issue.4 , pp. 757-775
    • Müller, R.1    Jugdev, K.2
  • 87
    • 0031540888 scopus 로고    scopus 로고
    • Measuring uncertainty and criticality in network planning by PERT-path technique
    • Mummolo G. Measuring uncertainty and criticality in network planning by PERT-path technique. Int. J. Proj. Manag. 1997, 15(6):377-387.
    • (1997) Int. J. Proj. Manag. , vol.15 , Issue.6 , pp. 377-387
    • Mummolo, G.1
  • 90
    • 84860382814 scopus 로고    scopus 로고
    • Project portfolios in dynamic environments: organizing for uncertainty
    • Petit Y. Project portfolios in dynamic environments: organizing for uncertainty. Int. J. Proj. Manag. 2012, 30(5):539-553.
    • (2012) Int. J. Proj. Manag. , vol.30 , Issue.5 , pp. 539-553
    • Petit, Y.1
  • 91
    • 78650198255 scopus 로고    scopus 로고
    • Project portfolios in dynamic environments: sources of uncertainty and sensing mechanisms
    • Petit Y., Hobbs B. Project portfolios in dynamic environments: sources of uncertainty and sensing mechanisms. Proj. Manag. J. 2010, 41(4):46-58.
    • (2010) Proj. Manag. J. , vol.41 , Issue.4 , pp. 46-58
    • Petit, Y.1    Hobbs, B.2
  • 92
    • 0036697280 scopus 로고    scopus 로고
    • On uncertainty, ambiguity, and complexity in project management
    • Pich M.T., Loch C.H., Meyer A.D. On uncertainty, ambiguity, and complexity in project management. Manag. Sci. 2002, 48(8):1008-1023.
    • (2002) Manag. Sci. , vol.48 , Issue.8 , pp. 1008-1023
    • Pich, M.T.1    Loch, C.H.2    Meyer, A.D.3
  • 93
    • 33847324008 scopus 로고    scopus 로고
    • The changing paradigms of project management
    • Pollack J. The changing paradigms of project management. Int. J. Proj. Manag. 2007, 25(3):266-274.
    • (2007) Int. J. Proj. Manag. , vol.25 , Issue.3 , pp. 266-274
    • Pollack, J.1
  • 94
    • 84912150660 scopus 로고    scopus 로고
    • Emergent trends and passing fads in project management research: a scientometric analysis of changes in the field
    • Pollack J., Adler D. Emergent trends and passing fads in project management research: a scientometric analysis of changes in the field. Int. J. Proj. Manag. 2015, 33(1):236-248.
    • (2015) Int. J. Proj. Manag. , vol.33 , Issue.1 , pp. 236-248
    • Pollack, J.1    Adler, D.2
  • 95
    • 84912150739 scopus 로고    scopus 로고
    • Analysing the organizational factors of project complexity using structural equation modelling
    • Qureshi S.M., Kang C. Analysing the organizational factors of project complexity using structural equation modelling. Int. J. Proj. Manag. 2015, 33(1):165-176.
    • (2015) Int. J. Proj. Manag. , vol.33 , Issue.1 , pp. 165-176
    • Qureshi, S.M.1    Kang, C.2
  • 96
    • 84898069994 scopus 로고    scopus 로고
    • A conceptual framework for tackling knowable unknown unknowns in project management
    • Ramasesh R.V., Browning T.R. A conceptual framework for tackling knowable unknown unknowns in project management. J. Oper. Manag. 2014, 32(4):190-204.
    • (2014) J. Oper. Manag. , vol.32 , Issue.4 , pp. 190-204
    • Ramasesh, R.V.1    Browning, T.R.2
  • 97
    • 39149135522 scopus 로고    scopus 로고
    • The financial analyst forecasting literature: a taxonomy with suggestions for further research
    • Ramnath S., Rock S., Shane P. The financial analyst forecasting literature: a taxonomy with suggestions for further research. Int. J. Forecast. 2008, 24(1):34-75.
    • (2008) Int. J. Forecast. , vol.24 , Issue.1 , pp. 34-75
    • Ramnath, S.1    Rock, S.2    Shane, P.3
  • 98
    • 0031672864 scopus 로고    scopus 로고
    • System dynamics in project management: assessing the impacts of client behaviour on project performance
    • Rodrigues A.G., Williams T.M. System dynamics in project management: assessing the impacts of client behaviour on project performance. J. Oper. Res. Soc. 1998, 2-15.
    • (1998) J. Oper. Res. Soc. , pp. 2-15
    • Rodrigues, A.G.1    Williams, T.M.2
  • 100
    • 84859217917 scopus 로고    scopus 로고
    • Risk, uncertainty and governance in megaprojects: a critical discussion of alternative explanations
    • Sanderson J. Risk, uncertainty and governance in megaprojects: a critical discussion of alternative explanations. Int. J. Proj. Manag. 2012, 30(4):432-443.
    • (2012) Int. J. Proj. Manag. , vol.30 , Issue.4 , pp. 432-443
    • Sanderson, J.1
  • 101
    • 84916619913 scopus 로고    scopus 로고
    • Conceptualising uncertainty in safety-critical projects: a practitioner perspective
    • Saunders F.C., Gale A.W., Sherry A.H. Conceptualising uncertainty in safety-critical projects: a practitioner perspective. Int. J. Proj. Manag. 2015, 33(2):467-478.
    • (2015) Int. J. Proj. Manag. , vol.33 , Issue.2 , pp. 467-478
    • Saunders, F.C.1    Gale, A.W.2    Sherry, A.H.3
  • 102
    • 78650140084 scopus 로고    scopus 로고
    • Beyond frontiers of traditional project management: an approach to evolutionary, self-organizational principles and the complexity theory-results of the research program
    • Saynisch M. Beyond frontiers of traditional project management: an approach to evolutionary, self-organizational principles and the complexity theory-results of the research program. Proj. Manag. J. 2010, 41(2):21-37.
    • (2010) Proj. Manag. J. , vol.41 , Issue.2 , pp. 21-37
    • Saynisch, M.1
  • 103
    • 78650147675 scopus 로고    scopus 로고
    • Mastering complexity and changes in projects, economy, and society via Project Management Second Order (PM-2)
    • Saynisch M. Mastering complexity and changes in projects, economy, and society via Project Management Second Order (PM-2). Proj. Manag. J. 2010, 41(5):4-20.
    • (2010) Proj. Manag. J. , vol.41 , Issue.5 , pp. 4-20
    • Saynisch, M.1
  • 104
    • 0038654496 scopus 로고
    • Why projects are "always" late: a rationale based on manual simulation of a PERT/CPM network
    • Schonberger R.J. Why projects are "always" late: a rationale based on manual simulation of a PERT/CPM network. Interfaces 1981, 11(5):66-70.
    • (1981) Interfaces , vol.11 , Issue.5 , pp. 66-70
    • Schonberger, R.J.1
  • 105
    • 84875025525 scopus 로고    scopus 로고
    • Relationships between project complexity and communication
    • Senescu R.R., Aranda-Mena G., Haymaker J.R. Relationships between project complexity and communication. J. Manag. Eng. 2012, 29(2):183-197.
    • (2012) J. Manag. Eng. , vol.29 , Issue.2 , pp. 183-197
    • Senescu, R.R.1    Aranda-Mena, G.2    Haymaker, J.R.3
  • 106
    • 0035295082 scopus 로고    scopus 로고
    • One size does not fit all projects: exploring classical contingency domains
    • Shenhar A.J. One size does not fit all projects: exploring classical contingency domains. Manag. Sci. 2001, 47(3):394-414.
    • (2001) Manag. Sci. , vol.47 , Issue.3 , pp. 394-414
    • Shenhar, A.J.1
  • 107
    • 0001582059 scopus 로고    scopus 로고
    • Toward a typological theory of project management
    • Shenhar A.J., Dvir D. Toward a typological theory of project management. Res. Policy 1996, 25(4):607-632.
    • (1996) Res. Policy , vol.25 , Issue.4 , pp. 607-632
    • Shenhar, A.J.1    Dvir, D.2
  • 108
    • 34047153781 scopus 로고    scopus 로고
    • An epistemological evaluation of research into projects and their management: methodological issues
    • Smyth H.J., Morris P.W. An epistemological evaluation of research into projects and their management: methodological issues. Int. J. Proj. Manag. 2007, 25(4):423-436.
    • (2007) Int. J. Proj. Manag. , vol.25 , Issue.4 , pp. 423-436
    • Smyth, H.J.1    Morris, P.W.2
  • 109
    • 1342309160 scopus 로고    scopus 로고
    • Building theories of project management: past research, questions for the future
    • Söderlund J. Building theories of project management: past research, questions for the future. Int. J. Proj. Manag. 2004, 22(3):183-191.
    • (2004) Int. J. Proj. Manag. , vol.22 , Issue.3 , pp. 183-191
    • Söderlund, J.1
  • 110
    • 8344229311 scopus 로고    scopus 로고
    • Selectionism and learning in projects with complexity and unforeseeable uncertainty
    • Sommer S.C., Loch C.H. Selectionism and learning in projects with complexity and unforeseeable uncertainty. Manag. Sci. 2004, 50(10):1334-1347.
    • (2004) Manag. Sci. , vol.50 , Issue.10 , pp. 1334-1347
    • Sommer, S.C.1    Loch, C.H.2
  • 111
    • 67549119369 scopus 로고    scopus 로고
    • Incentive contracts in projects with unforeseeable uncertainty
    • Sommer S.C., Loch C.H. Incentive contracts in projects with unforeseeable uncertainty. Prod. Oper. Manag. 2009, 18(2):185-196.
    • (2009) Prod. Oper. Manag. , vol.18 , Issue.2 , pp. 185-196
    • Sommer, S.C.1    Loch, C.H.2
  • 112
    • 67349175338 scopus 로고    scopus 로고
    • Taxonomy for change causes and effects in construction projects
    • Sun M., Meng X. Taxonomy for change causes and effects in construction projects. Int. J. Proj. Manag. 2009, 27(6):560-572.
    • (2009) Int. J. Proj. Manag. , vol.27 , Issue.6 , pp. 560-572
    • Sun, M.1    Meng, X.2
  • 113
    • 84916889793 scopus 로고    scopus 로고
    • Rethinking project management: a structured literature review with a critical look at the brave new world
    • Svejvig P., Andersen P. Rethinking project management: a structured literature review with a critical look at the brave new world. Int. J. Proj. Manag. 2015, 33(2):278-290.
    • (2015) Int. J. Proj. Manag. , vol.33 , Issue.2 , pp. 278-290
    • Svejvig, P.1    Andersen, P.2
  • 114
    • 0003115510 scopus 로고    scopus 로고
    • Technology novelty, project complexity, and product development project execution success: a deeper look at task uncertainty in product innovation
    • Tatikonda M.V., Rosenthal S.R. Technology novelty, project complexity, and product development project execution success: a deeper look at task uncertainty in product innovation. IEEE Trans. Eng. Manag. 2000, 47(1):74-87.
    • (2000) IEEE Trans. Eng. Manag. , vol.47 , Issue.1 , pp. 74-87
    • Tatikonda, M.V.1    Rosenthal, S.R.2
  • 115
    • 56349126091 scopus 로고    scopus 로고
    • Project management learning: what the literature has to say
    • Tesch D., Kloppenborg T.J., Stemmer J.K. Project management learning: what the literature has to say. Proj. Manag. J. 2003, 34(4):33-39.
    • (2003) Proj. Manag. J. , vol.34 , Issue.4 , pp. 33-39
    • Tesch, D.1    Kloppenborg, T.J.2    Stemmer, J.K.3
  • 116
    • 84885129216 scopus 로고    scopus 로고
    • Managing risks in complex projects
    • Thamhain H. Managing risks in complex projects. Proj. Manag. J. 2013, 44(2):20-35.
    • (2013) Proj. Manag. J. , vol.44 , Issue.2 , pp. 20-35
    • Thamhain, H.1
  • 117
    • 41449083858 scopus 로고    scopus 로고
    • Preparing project managers to deal with complexity-Advanced project management education
    • Thomas J., Mengel T. Preparing project managers to deal with complexity-Advanced project management education. Int. J. Proj. Manag. 2008, 26(3):304-315.
    • (2008) Int. J. Proj. Manag. , vol.26 , Issue.3 , pp. 304-315
    • Thomas, J.1    Mengel, T.2
  • 118
    • 0037210846 scopus 로고    scopus 로고
    • On the nature of the project as a temporary organization
    • Turner J.R., Müller R. On the nature of the project as a temporary organization. Int. J. Proj. Manag. 2003, 21(1):1-8.
    • (2003) Int. J. Proj. Manag. , vol.21 , Issue.1 , pp. 1-8
    • Turner, J.R.1    Müller, R.2
  • 119
    • 33746652960 scopus 로고    scopus 로고
    • The project manager's leadership style as a success factor on projects: a literature review
    • Turner J.R., Müller R. The project manager's leadership style as a success factor on projects: a literature review. Proj. Manag. J. 2005, 36(1):49-61.
    • (2005) Proj. Manag. J. , vol.36 , Issue.1 , pp. 49-61
    • Turner, J.R.1    Müller, R.2
  • 120
    • 19744379632 scopus 로고    scopus 로고
    • The use of buffers in project management: the trade-off between stability and makespan
    • Van de Vonder S., Demeulemeester E., Herroelen W., Leus R. The use of buffers in project management: the trade-off between stability and makespan. Int. J. Prod. Econ. 2005, 97(2):227-240.
    • (2005) Int. J. Prod. Econ. , vol.97 , Issue.2 , pp. 227-240
    • Van de Vonder, S.1    Demeulemeester, E.2    Herroelen, W.3    Leus, R.4
  • 121
    • 51349136241 scopus 로고    scopus 로고
    • Understanding project complexity: implications on project management
    • Vidal L.A., Marle F. Understanding project complexity: implications on project management. Kybernetes 2008, 37(8):1094-1110.
    • (2008) Kybernetes , vol.37 , Issue.8 , pp. 1094-1110
    • Vidal, L.A.1    Marle, F.2
  • 122
    • 79960036627 scopus 로고    scopus 로고
    • Measuring project complexity using the Analytic Hierarchy Process
    • Vidal L.A., Marle F., Bocquet J.C. Measuring project complexity using the Analytic Hierarchy Process. Int. J. Proj. Manag. 2011, 29(6):718-727.
    • (2011) Int. J. Proj. Manag. , vol.29 , Issue.6 , pp. 718-727
    • Vidal, L.A.1    Marle, F.2    Bocquet, J.C.3
  • 123
    • 0037292985 scopus 로고    scopus 로고
    • Transforming project risk management into project uncertainty management
    • Ward S., Chapman C. Transforming project risk management into project uncertainty management. Int. J. Proj. Manag. 2003, 21(2):97-105.
    • (2003) Int. J. Proj. Manag. , vol.21 , Issue.2 , pp. 97-105
    • Ward, S.1    Chapman, C.2
  • 124
    • 46049098782 scopus 로고    scopus 로고
    • Stakeholders and uncertainty management in projects
    • Ward S., Chapman C. Stakeholders and uncertainty management in projects. Constr. Manag. Econ. 2008, 26(6):563-577.
    • (2008) Constr. Manag. Econ. , vol.26 , Issue.6 , pp. 563-577
    • Ward, S.1    Chapman, C.2
  • 125
    • 61349091786 scopus 로고    scopus 로고
    • And then came complex project management (revised)
    • Whitty S.J., Maylor H. And then came complex project management (revised). Int. J. Proj. Manag. 2009, 27(3):304-310.
    • (2009) Int. J. Proj. Manag. , vol.27 , Issue.3 , pp. 304-310
    • Whitty, S.J.1    Maylor, H.2
  • 127
    • 27744465195 scopus 로고    scopus 로고
    • Assessing and moving on from the dominant project management discourse in the light of project overruns
    • Williams T. Assessing and moving on from the dominant project management discourse in the light of project overruns. IEEE Trans. Eng. Manag. 2005, 52(4):497-508.
    • (2005) IEEE Trans. Eng. Manag. , vol.52 , Issue.4 , pp. 497-508
    • Williams, T.1
  • 128
    • 78650152321 scopus 로고    scopus 로고
    • Issues in front-end decision making on projects
    • Williams T., Samset K. Issues in front-end decision making on projects. Proj. Manag. J. 2010, 41(2):38-49.
    • (2010) Proj. Manag. J. , vol.41 , Issue.2 , pp. 38-49
    • Williams, T.1    Samset, K.2
  • 129
    • 0026854670 scopus 로고
    • Criticality in stochastic networks
    • Williams T.M. Criticality in stochastic networks. J. Oper. Res. Soc. 1992, 353-357.
    • (1992) J. Oper. Res. Soc. , pp. 353-357
    • Williams, T.M.1
  • 130
    • 0032653583 scopus 로고    scopus 로고
    • The need for new paradigms for complex projects
    • Williams T.M. The need for new paradigms for complex projects. Int. J. Proj. Manag. 1999, 17(5):269-273.
    • (1999) Int. J. Proj. Manag. , vol.17 , Issue.5 , pp. 269-273
    • Williams, T.M.1
  • 131
    • 33750933500 scopus 로고    scopus 로고
    • Directions for future research in project management: the main findings of a UK government-funded research network
    • Winter M., Smith C., Morris P., Cicmil S. Directions for future research in project management: the main findings of a UK government-funded research network. Int. J. Proj. Manag. 2006, 24(8):638-649.
    • (2006) Int. J. Proj. Manag. , vol.24 , Issue.8 , pp. 638-649
    • Winter, M.1    Smith, C.2    Morris, P.3    Cicmil, S.4
  • 132
    • 4243137230 scopus 로고    scopus 로고
    • Grasping the complexity of IS development projects
    • Xia W., Lee G. Grasping the complexity of IS development projects. Commun. ACM 2004, 47(5):68-74.
    • (2004) Commun. ACM , vol.47 , Issue.5 , pp. 68-74
    • Xia, W.1    Lee, G.2
  • 133
    • 23744456455 scopus 로고    scopus 로고
    • Complexity of information systems development projects: conceptualization and measurement development
    • Xia W., Lee G. Complexity of information systems development projects: conceptualization and measurement development. J. Manag. Inf. Syst. 2005, 22(1):45-83.
    • (2005) J. Manag. Inf. Syst. , vol.22 , Issue.1 , pp. 45-83
    • Xia, W.1    Lee, G.2
  • 134
    • 14044250131 scopus 로고    scopus 로고
    • A hierarchical taxonomy of leadership behavior: integrating a half century of behavior research
    • Yukl G., Gordon A., Taber T. A hierarchical taxonomy of leadership behavior: integrating a half century of behavior research. J. Leadersh. Org. Stud. 2002, 9(1):15-32.
    • (2002) J. Leadersh. Org. Stud. , vol.9 , Issue.1 , pp. 15-32
    • Yukl, G.1    Gordon, A.2    Taber, T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.