메뉴 건너뛰기




Volumn 48, Issue 6, 2000, Pages 927-938

Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance

Author keywords

[No Author keywords available]

Indexed keywords

CONTRACTS; COST BENEFIT ANALYSIS; PROBABILITY DISTRIBUTIONS; RISK ASSESSMENT; STOCHASTIC PROGRAMMING;

EID: 0034313858     PISSN: 0030364X     EISSN: None     Source Type: Journal    
DOI: 10.1287/opre.48.6.927.12398     Document Type: Article
Times cited : (37)

References (18)
  • 1
    • 0000077256 scopus 로고    scopus 로고
    • Rationalization of the supplier base in the presence of yield uncertainty
    • Agrawal, N., S. Nahmias. 1997. Rationalization of the supplier base in the presence of yield uncertainty. Production Oper. Management 6(3) 291-308.
    • (1997) Production Oper. Management , vol.6 , Issue.3 , pp. 291-308
    • Agrawal, N.1    Nahmias, S.2
  • 2
    • 0001001215 scopus 로고
    • Diversification under supply uncertainty
    • Anupindi, R., R. Akella. 1993. Diversification under supply uncertainty. Management Sci. 39(8) 944-963.
    • (1993) Management Sci. , vol.39 , Issue.8 , pp. 944-963
    • Anupindi, R.1    Akella, R.2
  • 3
    • 0025701907 scopus 로고
    • Project bidding under deterministic and probabilistic activity durations
    • Elmaghraby, S. E. 1990. Project bidding under deterministic and probabilistic activity durations. Euro. J Oper. Res. 49 14-34.
    • (1990) Euro. J Oper. Res. , vol.49 , pp. 14-34
    • Elmaghraby, S.E.1
  • 4
    • 0001853287 scopus 로고    scopus 로고
    • The estimation of some network parameters in the pert model of activity networks
    • Slowinski, Wenglary, eds. Elsevier Amsterdam, The Netherlands
    • _. 1998. The estimation of some network parameters in the PERT model of activity networks. Slowinski, Wenglary, Advances in Project Scheduling. eds. Elsevier Amsterdam, The Netherlands.
    • (1998) Advances in Project Scheduling
  • 5
    • 0001382704 scopus 로고
    • Association of random variables, with applications
    • Esary, J. D., F. Proschan, D. W. Walkup. 1967. Association of random variables, with applications. Ann. Math. Statist. 38 1466-1474.
    • (1967) Ann. Math. Statist. , vol.38 , pp. 1466-1474
    • Esary, J.D.1    Proschan, F.2    Walkup, D.W.3
  • 6
    • 0026899199 scopus 로고
    • On the effect of demand randomness on inventories and costs
    • Gerchak, Y., D. Mossman. 1992. On the effect of demand randomness on inventories and costs. Oper. Res. 40 804-807.
    • (1992) Oper. Res. , vol.40 , pp. 804-807
    • Gerchak, Y.1    Mossman, D.2
  • 7
    • 84989730175 scopus 로고
    • Yield randomness, cost tradeoffs and diversification in the EOQ model
    • _, M. Parlar 1990. Yield randomness, cost tradeoffs and diversification in the EOQ model. Naval Res. Logist. 37 341-354.
    • (1990) Naval Res. Logist. , vol.37 , pp. 341-354
    • Parlar, M.1
  • 9
    • 0343360020 scopus 로고
    • Classes of orderings of measures and related correlation inequalities
    • Karlin, S., Y. Rinott. 1980. Classes of orderings of measures and related correlation inequalities. J. Multivariate Analy. 10 485-486.
    • (1980) J. Multivariate Analy. , vol.10 , pp. 485-486
    • Karlin, S.1    Rinott, Y.2
  • 10
    • 0000739250 scopus 로고
    • Some concepts of dependence
    • Lehmann, E. L. 1967. Some concepts of dependence. Ann. Math. Statist. 37 1137-1153.
    • (1967) Ann. Math. Statist. , vol.37 , pp. 1137-1153
    • Lehmann, E.L.1
  • 11
    • 0024637525 scopus 로고
    • You can manage construction risks
    • Macomber, J. 1989. You can manage construction risks. Harvard Bus. Rev. 67(2) 155-165.
    • (1989) Harvard Bus. Rev. , vol.67 , Issue.2 , pp. 155-165
    • Macomber, J.1
  • 15
    • 0001509312 scopus 로고
    • Positively correlated normal random variables are associated
    • Pitt, L.D. 1982. Positively correlated normal random variables are associated. Ann. Probab. 10 496-499.
    • (1982) Ann. Probab. , vol.10 , pp. 496-499
    • Pitt, L.D.1
  • 16
    • 0038654496 scopus 로고
    • Why projects are "always" late
    • Schonberger, R. J. 1981. Why projects are "always" late. Interfaces II(5) 66-67.
    • (1981) Interfaces , vol.2 , Issue.5 , pp. 66-67
    • Schonberger, R.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.