-
1
-
-
45549116094
-
Possibilistic linear programming with triangular fuzzy numbers
-
Buckley J.J. Possibilistic linear programming with triangular fuzzy numbers. Fuzzy Sets and Systems 26 (1988) 135-138
-
(1988)
Fuzzy Sets and Systems
, vol.26
, pp. 135-138
-
-
Buckley, J.J.1
-
2
-
-
38249006262
-
Solving possibilistic programming problems
-
Buckley J.J. Solving possibilistic programming problems. Fuzzy Sets and Systems 31 (1988) 329-341
-
(1988)
Fuzzy Sets and Systems
, vol.31
, pp. 329-341
-
-
Buckley, J.J.1
-
3
-
-
0001788426
-
Evolutionary algorithm solution to fuzzy problems: fuzzy linear programming
-
Buckley J.J., and Feuring T. Evolutionary algorithm solution to fuzzy problems: fuzzy linear programming. Fuzzy Sets and Systems 109 (2000) 35-53
-
(2000)
Fuzzy Sets and Systems
, vol.109
, pp. 35-53
-
-
Buckley, J.J.1
Feuring, T.2
-
4
-
-
0036683729
-
On the sure criticality of tasks in activity networks with imprecise durations
-
Chanas S., Dubois D., and Zieliński P. On the sure criticality of tasks in activity networks with imprecise durations. IEEE Transactions on Systems, Man, and Cybernetics - Part B: Cybernetics 32 (2002) 393-407
-
(2002)
IEEE Transactions on Systems, Man, and Cybernetics - Part B: Cybernetics
, vol.32
, pp. 393-407
-
-
Chanas, S.1
Dubois, D.2
Zieliński, P.3
-
6
-
-
0035885517
-
Critical path analysis in the network with fuzzy activity times
-
Chanas S., and Zieliński P. Critical path analysis in the network with fuzzy activity times. Fuzzy Sets and Systems 122 (2001) 195-204
-
(2001)
Fuzzy Sets and Systems
, vol.122
, pp. 195-204
-
-
Chanas, S.1
Zieliński, P.2
-
7
-
-
0036466460
-
The computational complexity of the criticality problems in a network with interval activity times
-
Chanas S., and Zieliński P. The computational complexity of the criticality problems in a network with interval activity times. European Journal of Operational Research 136 (2002) 541-550
-
(2002)
European Journal of Operational Research
, vol.136
, pp. 541-550
-
-
Chanas, S.1
Zieliński, P.2
-
8
-
-
0037211593
-
On the hardness of evaluating criticality of activities in a planar network with duration intervals
-
Chanas S., and Zielinski P. On the hardness of evaluating criticality of activities in a planar network with duration intervals. Operations Research Letters 31 (2003) 53-59
-
(2003)
Operations Research Letters
, vol.31
, pp. 53-59
-
-
Chanas, S.1
Zielinski, P.2
-
9
-
-
0037410243
-
On latest starting times and floats in activity networks with ill-known durations
-
Dubois D., Fargier H., and Galvagnon V. On latest starting times and floats in activity networks with ill-known durations. European Journal of Operational Research 147 (2003) 266-280
-
(2003)
European Journal of Operational Research
, vol.147
, pp. 266-280
-
-
Dubois, D.1
Fargier, H.2
Galvagnon, V.3
-
10
-
-
0030230803
-
Ranking and defuzzification methods based on area compensation
-
Fortemps P., and Roubens M. Ranking and defuzzification methods based on area compensation. Fuzzy Sets and Systems 82 (1996) 319-330
-
(1996)
Fuzzy Sets and Systems
, vol.82
, pp. 319-330
-
-
Fortemps, P.1
Roubens, M.2
-
14
-
-
0037061486
-
Efficient Monte Carlo simulation method of GERT-type network for project management
-
Kurihara K., and Nishiuchi N. Efficient Monte Carlo simulation method of GERT-type network for project management. Computers & Industrial Engineering 42 (2002) 521-531
-
(2002)
Computers & Industrial Engineering
, vol.42
, pp. 521-531
-
-
Kurihara, K.1
Nishiuchi, N.2
-
15
-
-
34249109497
-
-
Lingo User's Guide, LINDO Systems Inc., Chicago, 1999.
-
-
-
-
16
-
-
38249025383
-
The current state of network simulation in project management theory and practice
-
Ragsdale C. The current state of network simulation in project management theory and practice. Omega 17 (1989) 21-25
-
(1989)
Omega
, vol.17
, pp. 21-25
-
-
Ragsdale, C.1
-
17
-
-
0031084308
-
BIFPET methodology versus PERT in project management: fuzzy probability instead of the beta distribution
-
Shipley M.F., de Korvin A., and Omer K. BIFPET methodology versus PERT in project management: fuzzy probability instead of the beta distribution. Journal of Engineering and Technology Management 14 (1997) 49-65
-
(1997)
Journal of Engineering and Technology Management
, vol.14
, pp. 49-65
-
-
Shipley, M.F.1
de Korvin, A.2
Omer, K.3
-
18
-
-
0037410241
-
Fuzzy temporal characteristics of operations for project management on the network models basis
-
Slyeptsov A.I., and Tyshchuk T.A. Fuzzy temporal characteristics of operations for project management on the network models basis. European Journal of Operational Research 147 (2003) 253-265
-
(2003)
European Journal of Operational Research
, vol.147
, pp. 253-265
-
-
Slyeptsov, A.I.1
Tyshchuk, T.A.2
-
20
-
-
0012304671
-
Measurement of membership functions and their acquisition
-
Turksen I.B. Measurement of membership functions and their acquisition. Fuzzy Sets and Systems 40 (1991) 5-38
-
(1991)
Fuzzy Sets and Systems
, vol.40
, pp. 5-38
-
-
Turksen, I.B.1
-
22
-
-
0019585325
-
A procedure for ordering fuzzy subsets of the unit interval
-
Yager R.R. A procedure for ordering fuzzy subsets of the unit interval. Information Sciences 24 (1981) 143-161
-
(1981)
Information Sciences
, vol.24
, pp. 143-161
-
-
Yager, R.R.1
-
23
-
-
49349133217
-
Fuzzy sets as a basis for a theory of possibility
-
Zadeh L.A. Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets and Systems 1 (1978) 3-28
-
(1978)
Fuzzy Sets and Systems
, vol.1
, pp. 3-28
-
-
Zadeh, L.A.1
-
24
-
-
11144288983
-
On computing the latest starting times and floats of activities in a network with imprecise durations
-
Zieliński P. On computing the latest starting times and floats of activities in a network with imprecise durations. Fuzzy Sets and Systems 150 (2005) 53-76
-
(2005)
Fuzzy Sets and Systems
, vol.150
, pp. 53-76
-
-
Zieliński, P.1
|