메뉴 건너뛰기




Volumn 5, Issue 4, 2012, Pages 757-775

Critical success factors in projects: Pinto, Slevin, and Prescott – the elucidation of project success

Author keywords

Critical success factors; Project management; Project success; Success measures; Theory development

Indexed keywords


EID: 84958529668     PISSN: 17538378     EISSN: 17538386     Source Type: Journal    
DOI: 10.1108/17538371211269040     Document Type: Review
Times cited : (269)

References (56)
  • 1
    • 84861063167 scopus 로고    scopus 로고
    • (),British Stards Institution, London:
    • Association for Project Management (2000), APM Body of Knowledge, British Standards Institution, London.
    • (2000) APM Body of Knowledge
  • 2
    • 0032595622 scopus 로고    scopus 로고
    • Project management: cost, time, and quality, two best guesses and a phenomenon, its time to accept other success criteria
    • (), “” , -
    • Atkinson, R. (1999), “Project management: cost, time, and quality, two best guesses and a phenomenon, its time to accept other success criteria”, International Journal of Project Management, Vol. 17 No. 6, pp. 337-42.
    • (1999) International Journal of Project Management , vol.17 , Issue.6 , pp. 337-342
    • Atkinson, R.1
  • 4
    • 0030173778 scopus 로고    scopus 로고
    • A new framework for determining critical success/failure factors in projects
    • (), “” , -
    • Belassi, W. and Tukel, O.I. (1996), “A new framework for determining critical success/failure factors in projects”, International Journal of Project Management, Vol. 14 No. 3, pp. 141-52.
    • (1996) International Journal of Project Management , vol.14 , Issue.3 , pp. 141-152
    • Belassi, W.1    Tukel, O.I.2
  • 5
    • 84986161348 scopus 로고    scopus 로고
    • Intellectual capital ROI: a causal map of human capital antecedents and consequents
    • (), “” , -
    • Bontis, N. and Fitz-enz, J. (2002), “Intellectual capital ROI: a causal map of human capital antecedents and consequents”, Journal of Intellectual Capital, No. 3, pp. 223-47.
    • (2002) Journal of Intellectual Capital , Issue.3 , pp. 223-247
    • Bontis, N.1    Fitz-enz, J.2
  • 6
    • 0000345393 scopus 로고    scopus 로고
    • The knowledge toolbox: a review of the tools available to measure and manage intangible resources
    • (), “” , -
    • Bontis, N., Dragonetti, N., Jacobsen, K. and Roos, G. (1999), “The knowledge toolbox: a review of the tools available to measure and manage intangible resources”, European Management Journal, Vol. 17 No. 4, pp. 391-402.
    • (1999) European Management Journal , vol.17 , Issue.4 , pp. 391-402
    • Bontis, N.1    Dragonetti, N.2    Jacobsen, K.3    Roos, G.4
  • 7
    • 0021449280 scopus 로고
    • An assessment of critical success factors
    • (), “”
    • Boynton, A.C. and Zmud, R.W. (1984), “An assessment of critical success factors”, Sloan Management Review, Vol. 25 No. 4.
    • (1984) Sloan Management Review , vol.25 , Issue.4
    • Boynton, A.C.1    Zmud, R.W.2
  • 11
    • 29744460865 scopus 로고    scopus 로고
    • Project management maturity
    • (), “” , -
    • Hartman, F.T. and Skulmoski, G. (1998), “Project management maturity”, Project Management, Vol. 4 No. 1, pp. 74-8.
    • (1998) Project Management , vol.4 , Issue.1 , pp. 74-78
    • Hartman, F.T.1    Skulmoski, G.2
  • 12
    • 0035622790 scopus 로고    scopus 로고
    • Teamwork quality and success of innovation projects: a theoretical concept and empirical evidence
    • (), “” , -
    • Hoegl, M. and Gemünden, H.G. (2001), “Teamwork quality and success of innovation projects: a theoretical concept and empirical evidence”, Organization Science, Vol. 12 No. 4, pp. 435-49.
    • (2001) Organization Science , vol.12 , Issue.4 , pp. 435-449
    • Hoegl, M.1    Gemünden, H.G.2
  • 13
    • 0002559243 scopus 로고    scopus 로고
    • Assessing project management maturity
    • (), “” , -
    • Ibbs, C.W. and Kwak, Y.H. (2000), “Assessing project management maturity”, Project Management Journal, Vol. 31 No. 1, pp. 32-43.
    • (2000) Project Management Journal , vol.31 , Issue.1 , pp. 32-43
    • Ibbs, C.W.1    Kwak, Y.H.2
  • 14
    • 0442294978 scopus 로고    scopus 로고
    • Organizations as responsible contributors to society: linking quality, sustainability and accountability
    • (), “” , -
    • Jonker, J. (2000), “Organizations as responsible contributors to society: linking quality, sustainability and accountability”, Total Quality Management, Vol. 11 Nos 4-6, pp. S741-8.
    • (2000) Total Quality Management , vol.11 , pp. S741-S748
    • Jonker, J.1
  • 16
    • 0031499080 scopus 로고    scopus 로고
    • The relative importance of project success dimensions
    • (), “” , -
    • Lipovetsky, S., Asher, T., Dov, D. and Aaron, S. (1997), “The relative importance of project success dimensions”, R&D Management, Vol. 27 No. 2, pp. 97-106.
    • (1997) R&D Management , vol.27 , Issue.2 , pp. 97-106
    • Lipovetsky, S.1    Asher, T.2    Dov, D.3    Aaron, S.4
  • 18
    • 0037398254 scopus 로고    scopus 로고
    • Beyond the balanced scorecard: refining the search for organizational success measures
    • (), “” , -
    • Maltz, A.C., Shenhar, A.J. and Reilly, R.R. (2003), “Beyond the balanced scorecard: refining the search for organizational success measures”, Long Range Planning, Vol. 36 No. 2, pp. 187-204.
    • (2003) Long Range Planning , vol.36 , Issue.2 , pp. 187-204
    • Maltz, A.C.1    Shenhar, A.J.2    Reilly, R.R.3
  • 20
    • 41449110770 scopus 로고    scopus 로고
    • Longitudinal analysis of project management maturity
    • (), “” , -
    • Mullaly, M. (2006), “Longitudinal analysis of project management maturity”, Project Management Journal, Vol. 37 No. 3, pp. 62-73.
    • (2006) Project Management Journal , vol.37 , Issue.3 , pp. 62-73
    • Mullaly, M.1
  • 23
    • 28344438887 scopus 로고    scopus 로고
    • Performance measurement system design: a literature review and research agenda
    • (), “” , -
    • Neely, A., Gregory, M. and Platts, K. (2005), “Performance measurement system design: a literature review and research agenda”, International Journal of Operations & Production Management, Vol. 25 No. 12, pp. 1128-263.
    • (2005) International Journal of Operations & Production Management , vol.25 , Issue.12 , pp. 1128-1263
    • Neely, A.1    Gregory, M.2    Platts, K.3
  • 24
    • 0000355582 scopus 로고
    • Inquiring into the temporary organization: new directions for project management
    • (), “” , -
    • Packendorf, J. (1995), “Inquiring into the temporary organization: new directions for project management”, Scandinavian Journal of Management, Vol. 11 No. 4, pp. 319-33.
    • (1995) Scandinavian Journal of Management , vol.11 , Issue.4 , pp. 319-333
    • Packendorf, J.1
  • 26
    • 84965760957 scopus 로고
    • Variations in critical success factors over the stages in the project life cycle
    • (), “” , -
    • Pinto, J.K. and Prescott, J.E. (1988), “Variations in critical success factors over the stages in the project life cycle”, Journal of Management, Vol. 14 No. 1, pp. 5-18.
    • (1988) Journal of Management , vol.14 , Issue.1 , pp. 5-18
    • Pinto, J.K.1    Prescott, J.E.2
  • 27
    • 84980300415 scopus 로고
    • Planning and tactical factors in project implementation success
    • (), “” , -
    • Pinto, J.K. and Prescott, J.E. (1990), “Planning and tactical factors in project implementation success”, Journal of Management Studies, Vol. 27 No. 3, pp. 305-28.
    • (1990) Journal of Management Studies , vol.27 , Issue.3 , pp. 305-328
    • Pinto, J.K.1    Prescott, J.E.2
  • 28
    • 0023292122 scopus 로고
    • The critical factors in successful project implementation
    • (), “” , -
    • Pinto, J.K. and Slevin, D.P. (1987), “The critical factors in successful project implementation”, IEEE Transactions on Engineering Management, Vol. 34 No. 1, pp. 22-8.
    • (1987) IEEE Transactions on Engineering Management , vol.34 , Issue.1 , pp. 22-28
    • Pinto, J.K.1    Slevin, D.P.2
  • 29
    • 0001926527 scopus 로고
    • Critical success factors across the project life cycle
    • (), “” , -
    • Pinto, J.K. and Slevin, D.P. (1988a), “Critical success factors across the project life cycle”, Project Management Journal, Vol. 19 No. 3, pp. 67-75.
    • (1988) Project Management Journal , vol.19 , Issue.3 , pp. 67-75
    • Pinto, J.K.1    Slevin, D.P.2
  • 30
    • 0001926527 scopus 로고
    • Project success: definitions and measurement techniques
    • (), “” , -
    • Pinto, J.K. and Slevin, D.P. (1988b), “Project success: definitions and measurement techniques”, Project Management Journal, Vol. 19 No. 1, pp. 67-73.
    • (1988) Project Management Journal , vol.19 , Issue.1 , pp. 67-73
    • Pinto, J.K.1    Slevin, D.P.2
  • 31
    • 84958562525 scopus 로고    scopus 로고
    • (), Dennis Slevin, :(accessed 30 July 2011)
    • PITT (2011a), Dennis Slevin, available at: www.business.pitt.edu/faculty/slevin.php (accessed 30 July 2011).
    • (2011)
  • 32
    • 84958562526 scopus 로고    scopus 로고
    • (), John E. Prescott, :(accessed 30 July 2011)
    • PITT (2011b), John E. Prescott, available at: www.business.pitt.edu/faculty/prescott.php (accessed 30 July 2011).
    • (2011)
  • 33
    • 84958562527 scopus 로고    scopus 로고
    • (), Jeffrey Pinto, :Faculty Webpages/PintoJ/PintoJHome.htm (accessed 30 July 2011)
    • PSU (2011), Jeffrey Pinto, available at: www.pserie.psu.edu/schbus/SOB Faculty Webpages/PintoJ/PintoJHome.htm (accessed 30 July 2011).
    • (2011)
  • 34
    • 0011743841 scopus 로고
    • (),Project Management Institute, Upper Darby, PA:
    • Project Management Institute (1987), Project Management Body of Knowledge (PMBoK), Project Management Institute, Upper Darby, PA.
    • (1987) Project Management Body of Knowledge (PMBoK)
  • 35
    • 0003898887 scopus 로고    scopus 로고
    • (),Project Management Institute, Newtown Square, PA:
    • Project Management Institute (1996), A Guide to the Project Management Body of Knowledge, Project Management Institute, Newtown Square, PA.
    • (1996) A Guide to the Project Management Body of Knowledge
  • 36
    • 84855983657 scopus 로고    scopus 로고
    • (),Project Management Institute, Newtown Square, PA:
    • Project Management Institute (2008), A Guide to the Project Management Body of Knowledge, Project Management Institute, Newtown Square, PA.
    • (2008) A Guide to the Project Management Body of Knowledge
  • 37
    • 1342263583 scopus 로고    scopus 로고
    • The impact of a company's business strategy on its technological competence, network competence and innovation success
    • (), “” , -
    • Ritter, T. and Gemünden, H.G. (2004), “The impact of a company's business strategy on its technological competence, network competence and innovation success”, Journal of Business Research, Vol. 57 No. 5, pp. 548-56.
    • (2004) Journal of Business Research , vol.57 , Issue.5 , pp. 548-556
    • Ritter, T.1    Gemünden, H.G.2
  • 38
    • 0001582059 scopus 로고    scopus 로고
    • Toward a typological theory of project management
    • (), “” , -
    • Shenhar, A.J. and Dvir, D. (1996), “Toward a typological theory of project management”, Research Policy, Vol. 25 No. 4, pp. 607-32.
    • (1996) Research Policy , vol.25 , Issue.4 , pp. 607-632
    • Shenhar, A.J.1    Dvir, D.2
  • 39
    • 0002540586 scopus 로고    scopus 로고
    • Mapping the dimensions of project success
    • (), “” , -
    • Shenhar, A.J., Levy, O. and Dvir, D. (1997), “Mapping the dimensions of project success”, Project Management Journal, Vol. 28 No. 2, pp. 5-13.
    • (1997) Project Management Journal , vol.28 , Issue.2 , pp. 5-13
    • Shenhar, A.J.1    Levy, O.2    Dvir, D.3
  • 40
    • 0036001524 scopus 로고    scopus 로고
    • Refining the search for project success factors: a multivariate, typological approach
    • (), “” , -
    • Shenhar, A., Tishler, A., Dvir, D., Lipovetsky, S. and Lechler, T. (2002), “Refining the search for project success factors: a multivariate, typological approach”, R&D Management, Vol. 32 No. 2, pp. 111-26.
    • (2002) R&D Management , vol.32 , Issue.2 , pp. 111-126
    • Shenhar, A.1    Tishler, A.2    Dvir, D.3    Lipovetsky, S.4    Lechler, T.5
  • 41
    • 0002611771 scopus 로고
    • Project implementation profile: new tool for project managers
    • (), “” , -
    • Slevin, D.P. and Pinto, J.K. (1986), “Project implementation profile: new tool for project managers”, Project Management Journal, Vol. 17 No. 3, pp. 57-70.
    • (1986) Project Management Journal , vol.17 , Issue.3 , pp. 57-70
    • Slevin, D.P.1    Pinto, J.K.2
  • 42
    • 84993009121 scopus 로고    scopus 로고
    • Creating business value through intangibles
    • (), “” , -
    • Sussland, W.A. (2001), “Creating business value through intangibles”, Journal of Business Strategy, Vol. 22 No. 6, pp. 23-8.
    • (2001) Journal of Business Strategy , vol.22 , Issue.6 , pp. 23-28
    • Sussland, W.A.1
  • 45
    • 0031996797 scopus 로고    scopus 로고
    • How can IS/IT projects be measured for success?
    • (), “” , -
    • Wateridge, J. (1998), “How can IS/IT projects be measured for success?”, International Journal of Project Management, Vol. 16 No. 1, pp. 59-63.
    • (1998) International Journal of Project Management , vol.16 , Issue.1 , pp. 59-63
    • Wateridge, J.1
  • 46
    • 0001842404 scopus 로고    scopus 로고
    • The logical framework method for defining project success
    • (), “” , -
    • Baccarini, D. (1999), “The logical framework method for defining project success”, Project Management Journal, Vol. 30 No. 4, pp. 25-32.
    • (1999) Project Management Journal , vol.30 , Issue.4 , pp. 25-32
    • Baccarini, D.1
  • 48
    • 33749569777 scopus 로고
    • Measurement of project success
    • (), “” , -
    • de Wit, A. (1988), “Measurement of project success”, International Journal of Project Management, Vol. 6 No. 3, pp. 164-70.
    • (1988) International Journal of Project Management , vol.6 , Issue.3 , pp. 164-170
    • de Wit, A.1
  • 49
    • 0347269141 scopus 로고    scopus 로고
    • Plans are nothing, changing plans is everything: the impact of changes on project success
    • (), “” , -
    • Dvir, D. and Lechler, T. (2004), “Plans are nothing, changing plans is everything: the impact of changes on project success”, Research Policy, Vol. 33 No. 1, pp. 1-15.
    • (2004) Research Policy , vol.33 , Issue.1 , pp. 1-15
    • Dvir, D.1    Lechler, T.2
  • 50
    • 33745632620 scopus 로고    scopus 로고
    • Location, location, location: how network embeddedness affects project success in open source systems
    • (), “” , -
    • Grewal, R., Lilien, G.L. and Mallapragada, G. (2006), “Location, location, location: how network embeddedness affects project success in open source systems”, Management Science, Vol. 52 No. 7, pp. 1043-56.
    • (2006) Management Science , vol.52 , Issue.7 , pp. 1043-1056
    • Grewal, R.1    Lilien, G.L.2    Mallapragada, G.3
  • 51
    • 84943458951 scopus 로고
    • Significance of project management structure on development success
    • (), “” , -
    • Larson, E.W. and Gobeli, D.H. (1989), “Significance of project management structure on development success”, IEEE Transactions on Engineering Management, Vol. 36 No. 2, pp. 119-25.
    • (1989) IEEE Transactions on Engineering Management , vol.36 , Issue.2 , pp. 119-125
    • Larson, E.W.1    Gobeli, D.H.2
  • 52
    • 0033177685 scopus 로고    scopus 로고
    • Criteria for project success: an exploratory re-examination
    • (), “” , -
    • Lim, C.S. and Mohamed, M.Z. (1999), “Criteria for project success: an exploratory re-examination”, International Journal of Project Management, Vol. 17 No. 4, pp. 243-8.
    • (1999) International Journal of Project Management , vol.17 , Issue.4 , pp. 243-248
    • Lim, C.S.1    Mohamed, M.Z.2
  • 53
    • 0030123663 scopus 로고    scopus 로고
    • The role of project management in achieving project success
    • (), “” , -
    • Munns, A.K. and Bjeirmi, B.F. (1996), “The role of project management in achieving project success”, International Journal of Project Management, Vol. 14 No. 2, pp. 81-7.
    • (1996) International Journal of Project Management , vol.14 , Issue.2 , pp. 81-87
    • Munns, A.K.1    Bjeirmi, B.F.2
  • 54
    • 84958562528 scopus 로고    scopus 로고
    • (), BrainyQuote.com, :(accessed 18 December 2011)
    • Pablo Picasso (2011), BrainyQuote.com, available at: www.brainyquote.com/quotes/quotes/p/pablopicas400529.html (accessed 18 December 2011).
    • (2011)
    • Pablo Picasso, P.P.1
  • 55
    • 0031999653 scopus 로고    scopus 로고
    • From theory to practice: toward a typology of project-management styles
    • (), “” , -
    • Shenhar, A. (1998), “From theory to practice: toward a typology of project-management styles”, IEEE Transactions on Engineering Management, Vol. 45 No. 1, pp. 33-48.
    • (1998) IEEE Transactions on Engineering Management , vol.45 , Issue.1 , pp. 33-48
    • Shenhar, A.1
  • 56
    • 0035735411 scopus 로고    scopus 로고
    • Project success: a multidimensional strategic concept
    • (), “” , -
    • Shenhar, A., Dvir, D., Levy, O. and Maltz, A.C. (2001), “Project success: a multidimensional strategic concept”, Long Range Planning, Vol. 34, pp. 699-725.
    • (2001) Long Range Planning , vol.34 , pp. 699-725
    • Shenhar, A.1    Dvir, D.2    Levy, O.3    Maltz, A.C.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.