1
-
-
34047142478
-
-
This article is a development of the original EURAM paper: Smyth HJ, Morris, PWG and Cooke-Davies T. Understanding the management of projects: philosophical and methodological issues. Oslo: EURAM, May 17-20, 2006.
-
-
-
-
3
-
-
17144382219
-
The validity of knowledge in project management and the challenge of learning and competency development
-
Morris P.W.G., and Pinto J.K. (Eds), John Wiley & Sons, New York
-
Morris P.W.G. The validity of knowledge in project management and the challenge of learning and competency development. In: Morris P.W.G., and Pinto J.K. (Eds). The Wiley guide to managing projects (2004), John Wiley & Sons, New York
-
(2004)
The Wiley guide to managing projects
-
-
Morris, P.W.G.1
-
4
-
-
0042350823
-
Beyond the Gantt chart: project management moving on
-
Maylor H. Beyond the Gantt chart: project management moving on. Eur Manage J 19 (2001) 92-100
-
(2001)
Eur Manage J
, Issue.19
, pp. 92-100
-
-
Maylor, H.1
-
5
-
-
34047150609
-
-
cf. Meredith JR. Developing project management theory for managerial application: the view of a research journal's editor. In: PMI Research Conference, Seattle, July 14-17, 2002. p. 47-53.
-
-
-
-
6
-
-
0003898887
-
-
The narrow sense, project management is the traditional approach, reflected in, Project Management Institute, Newton Square, PA which focuses upon execution
-
The narrow sense, project management is the traditional approach, reflected in. PMI. A guide to the project management body of knowledge (2004), Project Management Institute, Newton Square, PA which focuses upon execution
-
(2004)
A guide to the project management body of knowledge
-
-
PMI1
-
7
-
-
0003725868
-
-
The management of projects, the broad sense, refers to everything needed to define, develop and realise projects successfully - see, Thomas Telford, London
-
The management of projects, the broad sense, refers to everything needed to define, develop and realise projects successfully - see. Morris P.W.G. The management of projects (1994), Thomas Telford, London
-
(1994)
The management of projects
-
-
Morris, P.W.G.1
-
8
-
-
21444437471
-
-
Morris P.W.G., and Pinto J.K. (Eds), John Wiley & Sons, New York
-
In: Morris P.W.G., and Pinto J.K. (Eds). The Wiley guide to managing projects (2004), John Wiley & Sons, New York
-
(2004)
The Wiley guide to managing projects
-
-
-
9
-
-
33745162443
-
-
Project management may be taken either as synonymous with the management of projects, as is the case in the Association for Project Management's BOK - see, Association for Project Management, High Wycombe
-
Project management may be taken either as synonymous with the management of projects, as is the case in the Association for Project Management's BOK - see. APM. Project management body of knowledge (2006), Association for Project Management, High Wycombe
-
(2006)
Project management body of knowledge
-
-
APM1
-
10
-
-
34047181346
-
-
For example Griseri, see [2].
-
-
-
-
11
-
-
34047140884
-
-
Engwall M. The project concept(s): on the unit of analysis in the study of project management. In: Lundin RA, Midler C, editors. Projects as arenas for renewal and learning processes. Boston: Kluwer Academic Publishers.
-
-
-
-
14
-
-
34047162740
-
-
Morris PWG, Crawford L, Hodgson D, Shepherd M, Thomas J. Exploring the role of formal bodies of knowledge in defining a profession - the case of project management. International Journal of Project Management, forthcoming.
-
-
-
-
15
-
-
34047154280
-
-
Morris PWG. Managing the front-end: how project managers shape business strategy and manage project definition. Edinburgh: Project Management Institute EMEA Symposium. Newton Square, PA: Project Management Institute; 2005.
-
-
-
-
16
-
-
33750933500
-
Directions for future research in project management: the main findings of a UK government-funded research network
-
Winter M., Smith C., Morris P.W.G., and Cicmil S. Directions for future research in project management: the main findings of a UK government-funded research network. Int J Project Manage 24 (2006) 638-649
-
(2006)
Int J Project Manage
, vol.24
, pp. 638-649
-
-
Winter, M.1
Smith, C.2
Morris, P.W.G.3
Cicmil, S.4
-
17
-
-
0000090983
-
The project-based organisation: an ideal form for managing complex products and systems?
-
Hobday M. The project-based organisation: an ideal form for managing complex products and systems?. Res Policy 29 (2000) 871-893
-
(2000)
Res Policy
, Issue.29
, pp. 871-893
-
-
Hobday, M.1
-
20
-
-
34047177760
-
-
Meredith, see [2].
-
-
-
-
24
-
-
0032371458
-
Paradox in project-based enterprise: The case of filmmaking
-
DeFillippi R.J., and Arthur M. Paradox in project-based enterprise: The case of filmmaking. Calif Manage Rev 40 (1998) 125-139
-
(1998)
Calif Manage Rev
, Issue.40
, pp. 125-139
-
-
DeFillippi, R.J.1
Arthur, M.2
-
25
-
-
84990324288
-
Project-based organizations, embeddedness and repositories of knowledge
-
Sydow J., Lindkvist L., and DeFillippi R.J. Project-based organizations, embeddedness and repositories of knowledge. Organization Stud 25 (2004) 1475-1489
-
(2004)
Organization Stud
, Issue.25
, pp. 1475-1489
-
-
Sydow, J.1
Lindkvist, L.2
DeFillippi, R.J.3
-
26
-
-
84954639070
-
Studying the client's role in project management
-
cf.
-
cf. Cherns A.B., and Bryant D.T. Studying the client's role in project management. Construct Manage Econ 1 (1983) 177-184
-
(1983)
Construct Manage Econ
, Issue.1
, pp. 177-184
-
-
Cherns, A.B.1
Bryant, D.T.2
-
28
-
-
0003847850
-
-
MIT Press, Boston
-
Miller R., and Lessard D.R. The strategic management of large engineering projects: shaping institutions, risks, and governance (2000), MIT Press, Boston
-
(2000)
The strategic management of large engineering projects: shaping institutions, risks, and governance
-
-
Miller, R.1
Lessard, D.R.2
-
30
-
-
34047144219
-
-
For detailed citation see Winter, see [7].
-
-
-
-
31
-
-
34047187791
-
-
Davies, Hobday, see [8].
-
-
-
-
33
-
-
34047175188
-
-
Engwall, see [4].
-
-
-
-
34
-
-
34047094712
-
-
Winch, see [9].
-
-
-
-
37
-
-
34047139207
-
-
Hodgson, Cicmil, see [6].
-
-
-
-
38
-
-
34047170624
-
New possibilities for project management theory: a critical engagement
-
Hodgson D., and Cicmil S. New possibilities for project management theory: a critical engagement. Project Manage J 37 3 (2006) 111-122
-
(2006)
Project Manage J
, vol.37
, Issue.3
, pp. 111-122
-
-
Hodgson, D.1
Cicmil, S.2
-
39
-
-
27344439225
-
Insights into collaboration at the project level: complexity, social interaction and procurement mechanisms
-
Cicmil S., and Marshall D. Insights into collaboration at the project level: complexity, social interaction and procurement mechanisms. Build Res Inf 33 (2005) 523-535
-
(2005)
Build Res Inf
, Issue.33
, pp. 523-535
-
-
Cicmil, S.1
Marshall, D.2
-
40
-
-
0036013212
-
Narratives of success and failure in systems development
-
Fincham R. Narratives of success and failure in systems development. Br J Manage 13 (2002) 1-14
-
(2002)
Br J Manage
, Issue.13
, pp. 1-14
-
-
Fincham, R.1
-
42
-
-
34047155921
-
-
Pryke, Smyth, see [4].
-
-
-
-
44
-
-
1842864264
-
Describing differences in approaches to organization science: rethinking Burrell and Morgan and their legacy
-
cf.
-
cf. Deetz S. Describing differences in approaches to organization science: rethinking Burrell and Morgan and their legacy. Organization Sci 7 (1996) 191-207
-
(1996)
Organization Sci
, Issue.7
, pp. 191-207
-
-
Deetz, S.1
-
46
-
-
0037210846
-
-
Turner JR, Mûller R, On the nature of the project as a temporary organization. 21, 2003, p. 1-8.
-
-
-
-
47
-
-
34047144218
-
-
Koskela L. An exploration towards a production theory and its application to construction, Report 408. Espoo: VTT; 2000.
-
-
-
-
49
-
-
34047170626
-
-
Morris, see [3]; Morris and Pinto, see [3]; Miller and Lessard, see [13]; cf. Davies and Hobday, see [8].
-
-
-
-
50
-
-
34047183513
-
-
Bredillet C. Beyond the positivist mirror: towards a project management 'gnosis'. Finland: IRNOP IV, Turku; 2004.
-
-
-
-
52
-
-
34047129497
-
-
Thiry M, Deguire M. Recent developments in project-based organizations, Xi'an: IRNOP VII; 2006.
-
-
-
-
54
-
-
34047159759
-
-
Mintzberg, see [11].
-
-
-
-
55
-
-
27344447274
-
Managing projects as complex social settings
-
cf.
-
cf. Bresnan M., Goussevskaia A., and Swan J. Managing projects as complex social settings. Build Res Inf 33 (2005) 487-493
-
(2005)
Build Res Inf
, Issue.33
, pp. 487-493
-
-
Bresnan, M.1
Goussevskaia, A.2
Swan, J.3
-
57
-
-
0001838293
-
Updating the project management bodies of knowledge
-
Morris P.W.G. Updating the project management bodies of knowledge. Project Manage J 32 (2001) 21-30
-
(2001)
Project Manage J
, Issue.32
, pp. 21-30
-
-
Morris, P.W.G.1
-
58
-
-
34047173850
-
-
Williams T. Assessing and building on the underlying theory of project management in the light of badly overrun projects. In: PMI Research Conference, London, 2004.
-
-
-
-
59
-
-
27744465195
-
Assessing and building on project management theory in the light of badly over-run projects
-
Williams T.M. Assessing and building on project management theory in the light of badly over-run projects. IEEE Trans Eng Manage 52 4 (2005) 497-508
-
(2005)
IEEE Trans Eng Manage
, vol.52
, Issue.4
, pp. 497-508
-
-
Williams, T.M.1
-
60
-
-
0242639520
-
Academic concept inbreeding, failure of interbreeding, and its remedy by outbreeding
-
cf.
-
cf. Maruyama M. Academic concept inbreeding, failure of interbreeding, and its remedy by outbreeding. Human Syst Manage 17 (1998) 89-91
-
(1998)
Human Syst Manage
, Issue.17
, pp. 89-91
-
-
Maruyama, M.1
-
61
-
-
34047180356
-
-
Morris et al., see [6].
-
-
-
-
62
-
-
0041839992
-
-
Zurich International Project Management Association
-
Caupin G., Knopfel H., Morris P.W.G., Motzel E., and Pannenbacker O. ICB IPMA competence baseline (1998), Zurich International Project Management Association
-
(1998)
ICB IPMA competence baseline
-
-
Caupin, G.1
Knopfel, H.2
Morris, P.W.G.3
Motzel, E.4
Pannenbacker, O.5
-
63
-
-
84855983657
-
-
Dixon M. (Ed), Association for Project Management, Buckinghamshire
-
APM. In: Dixon M. (Ed). Project management body of knowledge (2000), Association for Project Management, Buckinghamshire
-
(2000)
Project management body of knowledge
-
-
APM1
-
64
-
-
34047116156
-
-
APM, 2006, see [3].
-
-
-
-
65
-
-
34047132042
-
-
Respectively; Caupin et al., see [32]; APM, 2000, see [32]; ENAA, P2M: project and program management for enterprise innovation. www.enaa,or,op.jp: Engineering Advancement Association of Japan; 2001.
-
-
-
-
66
-
-
32644458810
-
Global body of project management knowledge and standards
-
Morris P.W.G., and Pinto J.K. (Eds), John Wiley & Sons, New York
-
Crawford L. Global body of project management knowledge and standards. In: Morris P.W.G., and Pinto J.K. (Eds). The Wiley guide to managing projects (2004), John Wiley & Sons, New York
-
(2004)
The Wiley guide to managing projects
-
-
Crawford, L.1
-
67
-
-
21444437471
-
-
Morris P.W.G., and Pinto J.K. (Eds), John Wiley & Sons, New York
-
In: Morris P.W.G., and Pinto J.K. (Eds). The Wiley guide to managing projects (2004), John Wiley & Sons, New York
-
(2004)
The Wiley guide to managing projects
-
-
-
68
-
-
34047121049
-
-
Morris et al., see [5].
-
-
-
-
69
-
-
34047186802
-
-
Morris, see [2], p. 1142.
-
-
-
-
70
-
-
34047164836
-
-
Weber, 1949, see [36], p. 1141.
-
-
-
-
71
-
-
34047125127
-
-
Morris, see [2].
-
-
-
-
72
-
-
1342285662
-
Three responses to the methodological challenges of studying strategizing
-
cf.
-
cf. Balogun J., Huff A.S., and Johnson P. Three responses to the methodological challenges of studying strategizing. J Manage Stud 40 (2003) 198-224
-
(2003)
J Manage Stud
, Issue.40
, pp. 198-224
-
-
Balogun, J.1
Huff, A.S.2
Johnson, P.3
-
73
-
-
33845394642
-
Mirco strategy and strategizing: towards an activity-based view
-
Johnson G., Melin L., and Whittington R. Mirco strategy and strategizing: towards an activity-based view. J Manage Stud 40 (2003) 3-22
-
(2003)
J Manage Stud
, Issue.40
, pp. 3-22
-
-
Johnson, G.1
Melin, L.2
Whittington, R.3
-
75
-
-
34047149699
-
-
Maruyama, see [31].
-
-
-
-
76
-
-
33845358961
-
Bad management theories are destroying good management practices
-
Ghoshal S. Bad management theories are destroying good management practices. Acad Manage Learning Educ 4 (2005) 75-91
-
(2005)
Acad Manage Learning Educ
, Issue.4
, pp. 75-91
-
-
Ghoshal, S.1
-
80
-
-
17144423012
-
What's so great about facts?
-
Irvine J., Miles I., and Evans J. (Eds), Pluto, London
-
Krige J. What's so great about facts?. In: Irvine J., Miles I., and Evans J. (Eds). Demystifying social statistics (1979), Pluto, London
-
(1979)
Demystifying social statistics
-
-
Krige, J.1
-
81
-
-
34047104289
-
-
Sayer, see [40].
-
-
-
-
82
-
-
85022739470
-
Calculativeness, trust, and economic organization
-
Williamson O.E. Calculativeness, trust, and economic organization. J Law Econ 36 (1993) 453-486
-
(1993)
J Law Econ
, Issue.36
, pp. 453-486
-
-
Williamson, O.E.1
-
84
-
-
34047171811
-
-
See [2,13], cf. Engwall, see [4].
-
-
-
-
86
-
-
34047138220
-
-
Smyth et al., see [1].
-
-
-
-
94
-
-
34047178209
-
-
Sayer, see [39,48].
-
-
-
-
95
-
-
34047191196
-
The organic management of innovation projects
-
Thiry et al., see [28]
-
Keegan A., and Turner R.J. The organic management of innovation projects. Comportamento Organizacional e Gestao 7 (2001) 57-70 Thiry et al., see [28]
-
(2001)
Comportamento Organizacional e Gestao
, Issue.7
, pp. 57-70
-
-
Keegan, A.1
Turner, R.J.2
-
96
-
-
34047184068
-
-
Bhaskar, 1978, see [50].
-
-
-
-
97
-
-
34047171162
-
-
Sayer, see [39,48].
-
-
-
-
98
-
-
0000355582
-
Inquiring into the temporary organization: new directions for project management research
-
Packendorff J. Inquiring into the temporary organization: new directions for project management research. Scand J Manage 11 4 (1995) 319-334
-
(1995)
Scand J Manage
, vol.11
, Issue.4
, pp. 319-334
-
-
Packendorff, J.1
-
99
-
-
1342282528
-
On the development of project management research: schools of thought and critique
-
Söderlund J. On the development of project management research: schools of thought and critique. Int Project Manage J 8 1 (2002) 20-31
-
(2002)
Int Project Manage J
, vol.8
, Issue.1
, pp. 20-31
-
-
Söderlund, J.1
-
100
-
-
34047104991
-
-
Söderlund, see [53].
-
-
-
-
101
-
-
34047119985
-
-
Harré, 1979, see [49].
-
-
-
-
102
-
-
34047132568
-
-
Sayer, see [39,48].
-
-
-
-
103
-
-
21444440543
-
-
The papers below are all located in the International Journal of Project Management, hence for brevity this has been omitted: Alderman N, Ivory C, McLoughlin I, Vaughan R. Sense-making as a process within complex service-led projects. 2005;23(5):380-5.
-
-
-
-
104
-
-
18144410511
-
-
Al-Reshaid K, Kartam N. Design-build pre-qualification and tendering approach for public projects. 2005;23(4):309-20.
-
-
-
-
105
-
-
27944455550
-
-
Artto, Wikstom, op. cit. [22]; Barber RB, Understanding internally generated risks in projects. 2005;(8):584-90.
-
-
-
-
106
-
-
27944507647
-
-
Beach R, Webster M, Campbell KM. An evaluation of partnership development in the construction industry. 2005;(8):611-21.
-
-
-
-
107
-
-
12144255380
-
-
Bing L, Akintoye A, Edwards PJ, Hardcastle C. The allocation of risk in PPP/PFI construction projects in the UK. 2005;(1):25-35.
-
-
-
-
108
-
-
21444441370
-
-
Brady T, Davies A, Gann DM. Creating value by delivering integrated solutions. 2005;(5):360-65.
-
-
-
-
109
-
-
27944433729
-
-
Bryde DJ, Robinson L. Client versus contractor perspectives on project success criteria. 2005;(8):622-9.
-
-
-
-
110
-
-
27944479021
-
-
Chan EHW, Yu ATW. Contract strategy for design management in the design and build system. 2005;(8):630-9.
-
-
-
-
111
-
-
12444268409
-
-
Cheah CYJ, Ting SK. Appraisal of value engineering in construction in Southeast Asia. 2005;(2):151-8.
-
-
-
-
112
-
-
24344459097
-
-
Chen HL, Chen WT. Clarifying the behavioral patterns of contractor supply chain payment conditions. 2005;(6):463-73.
-
-
-
-
113
-
-
15844413358
-
-
Cioffi DF. A tool for managing projects: an analytic parameterization of the S-curve. 2005;(3):215-22.
-
-
-
-
114
-
-
21444455815
-
-
Cova B, Salle R. Six key points to merge project marketing into project management. 2005;(5):354-9.
-
-
-
-
115
-
-
11944272395
-
Senior management perceptions of project management competence
-
Crawford L. Senior management perceptions of project management competence. International Journal of Project Management 1 (2005) 7-16
-
(2005)
International Journal of Project Management
, Issue.1
, pp. 7-16
-
-
Crawford, L.1
-
116
-
-
15844426899
-
-
Danilovic M, Sandkull B. The use of dependence structure matrix and domain mapping matrix in managing uncertainty in multiple project situations. 2005;(3):193-203.
-
-
-
-
117
-
-
11944250245
-
-
Deakins E, Dillon S. A helical model for managing innovative product and service initiatives in volatile commercial environments. 2005;(1):65-74.
-
-
-
-
118
-
-
15844375834
-
-
Diallo A, Thuillier D. The success of international development projects, trust and communication: an African perspective. 2005;(3):237-52.
-
-
-
-
119
-
-
21444449988
-
-
Dietrich P, Lehtonen P. Successful management of strategic intentions through multiple projects - Reflections from empirical study. 2005;(5):386-91.
-
-
-
-
120
-
-
34047137521
-
-
Dillibahu R, Krishnaiah K. Cost estimation of a software product using COCOMO II.2000 model - a case study. 2005;(4):297-307.
-
-
-
-
121
-
-
34047151619
-
-
Dvir D. Transferring projects to their final users: The effect of planning and preparations for commissioning on project success. 2005;(4):257-2.
-
-
-
-
122
-
-
24344498317
-
-
Dzeng R-J, Wen K-S. Evaluating project teaming strategies for construction of Taipei 101 using resource-based theory. 2005;(6):483-91.
-
-
-
-
123
-
-
12444315100
-
-
Eden C, Williams T, Ackermann F. Analysing project cost overruns: comparing the "measured mile" analysis and system dynamics modeling. 2005;(2):135-9.
-
-
-
-
124
-
-
27744519003
-
-
Elhag TMS, Boussabaine AH, Ballal TMA. Critical determinants of construction tendering costs: Quantity surveyors' standpoint. 2005;(7):538-45.
-
-
-
-
125
-
-
27744461393
-
-
Eskerod P, Blichfeldt BS. Managing team entrees and withdrawals during the project life cycle. 2005;(7):495-503.
-
-
-
-
126
-
-
24344471342
-
-
Eskerod P, Jepsen AL. Staffing renewal projects by voluntary enrolment. 2005;(6):445-53.
-
-
-
-
127
-
-
27744433005
-
-
Fung IWH, Tam CM, Tung KCF, Man ASK. Safety cultural divergences among management, supervisory and worker groups in Hong Kong construction industry. 2005;(7):504-12.
-
-
-
-
128
-
-
11944274059
-
-
Garcia ACB, Kunz J, Fischer M. Voting on the agenda: the key to social efficient meetings. 2005;(1):17-24.
-
-
-
-
129
-
-
21444458582
-
-
Gemunden HG, Salomo S, Krieger A. The influence of project autonomy on project success. 2005;(5):366-73.
-
-
-
-
130
-
-
27744572798
-
-
Gutierrez O, Friedman DH. Managing project expectations in human services information systems implementations: The case of homeless management information systems. 2005;(7):513-23.
-
-
-
-
131
-
-
21444432274
-
-
Hellstrom M, Wikstrom K. Project business concepts based on modularity - improved manoeuvrability through unstable structures. 2005;(5):392-7.
-
-
-
-
132
-
-
18144374111
-
-
Iyer KC, Jha KN. Factors affecting cost performance: evidence from Indian construction projects. 2005;(4):283-95.
-
-
-
-
133
-
-
21444438281
-
-
Kujala J, Ahola T. The value of customer satisfaction surveys for project-based organizations: symbolic, technical, or none. 2005;(5):404-9.
-
-
-
-
134
-
-
27944460283
-
-
Kutsch E, Hall M. Intervening conditions on the management of project risk: Dealing with uncertainty in information technology projects. 2005;(8):591-9.
-
-
-
-
135
-
-
12444273745
-
-
Labuschagne C, Brent AC. Sustainable Project Life Cycle Management: the need to integrate life cycles in the manufacturing sector. 2005;(2):159-68.
-
-
-
-
136
-
-
21444447834
-
-
Linderoth HCJ, Pellegrino G. Frames and inscriptions: tracing a way to understand IT-dependent change projects. 2005;(5):415-20.
-
-
-
-
137
-
-
27744450360
-
-
Mahdi IM, Alreshaid K. Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP). 2005;(7):564-72.
-
-
-
-
138
-
-
15844383101
-
-
Maheswari JU, Varghese K. Project Scheduling using Dependency Structure Matrix. 2005;(3):223-30.
-
-
-
-
139
-
-
21444446472
-
-
Manning S. Managing project networks as dynamic organizational forms: Learning from the TV movie industry. 2005;(5):410-4.
-
-
-
-
140
-
-
12444280089
-
-
Mavrotas G, Caloghirou Y, Koune J. A model on cash flow forecasting and early warning for multi-project programmes: application to the Operational Programme for the Information Society in Greece. 2005;(2):121-33.
-
-
-
-
141
-
-
15844412260
-
-
Milosevic D, Patanakul P. Standardized project management may increase development projects success. 2005;(3):181-92.
-
-
-
-
142
-
-
21444459526
-
-
Muller R, Turner JR. The impact of principal-agent relationship and contract type on communication between project owner and manager. 2005;(5):398-403.
-
-
-
-
143
-
-
18144403769
-
-
Olander S, Landin A. Evaluation of stakeholder influence in the implementation of construction projects. 2005;(4):321-8.
-
-
-
-
144
-
-
15844421239
-
-
Parker SK, Skitmore M. Project management turnover: causes and effects on project performance. 2005;(3):205-14
-
-
-
-
145
-
-
12444257792
-
-
Partington D, Pellegrinelli S, Young M. Attributes and levels of programme management competence: an interpretive study. 2005;(2):87-95.
-
-
-
-
146
-
-
27744598006
-
-
Reyck B de, Grushka-Cockayne Y, Lockett, M, Calderini SR, Moura M, Sloper A. The impact of project portfolio management on information technology projects. 2005;(7):524-37.
-
-
-
-
147
-
-
21444437041
-
-
Ruuska I, Vartiainen M. Characteristics of knowledge sharing communities in project organizations. 2005;(5):374-9.
-
-
-
-
148
-
-
12444253046
-
-
Shi JJ, Li H, Zhang H. Two resource dispatching rules for modeling human decisions in simulation. 2005;(2):97-107.
-
-
-
-
149
-
-
12144275636
-
-
Shore B, Cross BJ. Exploring the role of national culture in the management of largescale international science projects. 2005;(1):55-64.
-
-
-
-
150
-
-
34047137708
-
-
Sing D, Tiong RLK. Development of life cycle costing framework for highway bridges in Myanmar. 2005;(1):37-44.
-
-
-
-
151
-
-
24344463935
-
-
Taylor H. Congruence between risk management theory and practice in Hong Kong vendor-driven IT projects. 2005;(6):437-44.
-
-
-
-
152
-
-
18144428668
-
-
Teo EAI, Ling FYY, Chong AFW. Framework for project managers to manage construction safety. 2005;(4):329-41.
-
-
-
-
153
-
-
18144410870
-
-
Trietsch D. The effect of systemic errors on optimal project buffers. 2005;(4):267-74.
-
-
-
-
154
-
-
24344451677
-
-
Uher TE, Brand MC. Analysis of adjudication determinations made under security of payment legislation in New South Wales. 2005;(6):474-82
-
-
-
-
155
-
-
11944258506
-
-
van Donk DP, Riezebos J. Exploring the knowledge inventory in project-based organisations: a case study. 2005;(1):75-83.
-
-
-
-
156
-
-
24344458574
-
-
Wadeson N. Projects as search processes. 2005;(6):421-7.
-
-
-
-
157
-
-
27944510967
-
-
Wang W-C. Impact of soft logic on the probabilistic duration of construction projects. 2005;(8):600-10.
-
-
-
-
158
-
-
12444300210
-
-
Wang W-C, Liu JJ. Factor-based path analysis to support subcontractor management. 2005;(2):109-20.
-
-
-
-
159
-
-
15844398265
-
-
Wang E, Chou H-W, Jiang J. The impacts of charismatic leadership style on team cohesiveness and overall performance during ERP implementation. 2005;(3):173-80.
-
-
-
-
160
-
-
27944444402
-
-
Whitty SJ. A memetic paradigm of project management. 2005;(8):575-83.
-
-
-
-
161
-
-
27944496790
-
-
Wierschem D, Johnston C. The role of project management in university computing resource departments. 2005;(8):640-9.
-
-
-
-
162
-
-
15844377451
-
-
Willoughby KA. Process improvement in project expediting: there must be a better way. 2005;(3):231-6.
-
-
-
-
163
-
-
12444290959
-
-
Winch GM, Kelsey J. What do construction project planners do? 2005;(2):141-9.
-
-
-
-
164
-
-
27744473626
-
-
Wu C, Hsieh T, Cheng W. Statistical analysis of causes for design change in highway construction on Taiwan. 2005;(7):554-63.
-
-
-
-
165
-
-
34047102721
-
-
Xu T, Bower DA, Smith NJ. Types of collaboration between foreign contractors and their Chinese partners. 2005;(1):45-53.
-
-
-
-
166
-
-
27744569616
-
-
Yang I-T, Chang C-Y. Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding. 2005;(7):546-53.
-
-
-
-
167
-
-
34047163803
-
-
Yang I-T. Simulation-based estimation for correlated cost elements. 2005;(4):275-82.
-
-
-
-
168
-
-
24344488634
-
-
Yu AGY, Flett PD, Bowers AJ. Developing a value-centred proposal for assessing project success. 2005;(6):428-36.
-
-
-
-
169
-
-
24344494424
-
-
Zwikael O, Shimizu, K, Globerson S. Cultural differences in project management capabilities: A field study. 2005;(6):454-62.
-
-
-
-
170
-
-
34047146778
-
-
Crawford, see [56], p. 11.
-
-
-
-
171
-
-
34047093142
-
-
note
-
Dillibahu, Krishnaiah, see [56], stated they used a 'case study' approach, which in practice meant a small sample.
-
-
-
-
172
-
-
34047180893
-
-
note
-
For example Diallo and Thuillier consider one international project in Africa, Eskerod and Blichfeldt try to generalize from a single case concerning changing project team membership [62], and Sing and Tiong try to generalise on life cycle costing from a single case of a bridge for Myanmar, which in this instance they admit as being "somewhat crude and imprecise" (p. 43), see [56].
-
-
-
|