메뉴 건너뛰기




Volumn 26, Issue 3, 2015, Pages 249-271

A review of the use of multicriteria and multi-objective models in maintenance and reliability

Author keywords

maintenance policies; multi criteria decision; preventive maintenance

Indexed keywords

PREVENTIVE MAINTENANCE; RELIABILITY;

EID: 84937397393     PISSN: 1471678X     EISSN: 14716798     Source Type: Journal    
DOI: 10.1093/imaman/dpv010     Document Type: Article
Times cited : (96)

References (232)
  • 1
    • 84866542680 scopus 로고    scopus 로고
    • Application of ipso-monte carlo for optimal distributed generation allocation and sizing
    • Abdi, S. & Afshar, K. (2013) Application of IPSO-Monte Carlo for optimal distributed generation allocation and sizing. Int. J. Electr. Power Energy Syst., 44, 786-797
    • (2013) Int. J. Electr. Power Energy Syst , vol.44 , pp. 786-797
    • Abdi, S.1    Afshar, K.2
  • 2
    • 84876843790 scopus 로고    scopus 로고
    • Multiobjective generation expansion planning considering power system adequacy
    • Aghaei, J., Akbari, M. A., Roosta, A. & Baharvandi, A. (2013) Multiobjective generation expansion planning considering power system adequacy. Electr. Power Syst. Res., 102, 8-19
    • (2013) Electr. Power Syst. Res , vol.102 , pp. 8-19
    • Aghaei, J.1    Akbari, M.A.2    Roosta, A.3    Baharvandi, A.4
  • 3
    • 77950298149 scopus 로고    scopus 로고
    • Assigning priorities to actions in a pipeline transporting hydrogen based on a multicriteria decision model
    • Alencar, M. H. & de Almeida, A. T. (2010) Assigning priorities to actions in a pipeline transporting hydrogen based on a multicriteria decision model. Int. J. Hydrog. Energy, 35, 3610-3619
    • (2010) Int. J. Hydrog. Energy , vol.35 , pp. 3610-3619
    • Alencar, M.H.1    De Almeida, A.T.2
  • 4
    • 0037432505 scopus 로고    scopus 로고
    • Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making
    • Al-Najjar, B. & Alsyouf, I. (2003) Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making. Int. J. Prod. Econ., 84, 85-100
    • (2003) Int. J. Prod. Econ , vol.84 , pp. 85-100
    • Al-Najjar, B.1    Alsyouf, I.2
  • 6
    • 0035284045 scopus 로고    scopus 로고
    • Multicriteria decision making on maintenance: Spares and contracts planning
    • de Almeida, A. T. (2001) Multicriteria decision making on maintenance: spares and contracts planning. Eur. J. Oper. Res., 129, 235-241
    • (2001) Eur. J. Oper. Res , vol.129 , pp. 235-241
    • De Almeida, A.T.1
  • 7
    • 0034893391 scopus 로고    scopus 로고
    • Repair contract decision model through additive utility function
    • de Almeida, A. T. (2001) Repair contract decision model through additive utility function. J. Qual. Maint. Eng., 7, 42-48
    • (2001) J. Qual. Maint. Eng , vol.7 , pp. 42-48
    • De Almeida, A.T.1
  • 8
    • 0036073875 scopus 로고    scopus 로고
    • Multicriteria modelling for a repair contract problem based on utility and the electre i method
    • de Almeida, A. T. (2002) Multicriteria modelling for a repair contract problem based on utility and the ELECTRE I method. IMA J. Manag. Math., 13, 29-37
    • (2002) IMA J. Manag. Math , vol.13 , pp. 29-37
    • De Almeida, A.T.1
  • 9
    • 24144481467 scopus 로고    scopus 로고
    • Multicriteria modelling of repair contract based on utility and electre i method with dependability and service quality criteria
    • de Almeida, A. T. (2005) Multicriteria Modelling of Repair Contract Based on Utility and ELECTRE I Method with Dependability and Service Quality Criteria. Ann. Oper. Res., 138, 113-126
    • (2005) Ann. Oper. Res , vol.138 , pp. 113-126
    • De Almeida, A.T.1
  • 10
    • 34247645554 scopus 로고    scopus 로고
    • Multicriteria decision model for outsourcing contracts selection based on utility function and electre method
    • de Almeida, A. T. (2007) Multicriteria decision model for outsourcing contracts selection based on utility function and ELECTRE method. Comput. Oper. Res., 34, 3569-3574
    • (2007) Comput. Oper. Res , vol.34 , pp. 3569-3574
    • De Almeida, A.T.1
  • 11
    • 0004205128 scopus 로고
    • Decision theory in maintenance decision making
    • de Almeida, A. T. & Bohoris, G. A. (1995) Decision theory in maintenance decision making. J. Qual. Maint. Eng., 1, 39-45
    • (1995) J. Qual. Maint. Eng , vol.1 , pp. 39-45
    • De Almeida, A.T.1    Bohoris, G.A.2
  • 12
    • 84866521581 scopus 로고    scopus 로고
    • Multicriteria model for selection of preventive maintenance intervals
    • de Almeida, A. T. (2012) Multicriteria model for selection of preventive maintenance intervals. Qual. Reliab. Eng. Int., 28, 585-593
    • (2012) Qual. Reliab. Eng. Int , vol.28 , pp. 585-593
    • De Almeida, A.T.1
  • 13
    • 84887325954 scopus 로고    scopus 로고
    • Additive-veto models for choice and ranking multicriteria decision problems
    • 1350026/-1-1350026/20
    • de Almeida, A. T. (2013) Additive-veto models for choice and ranking multicriteria decision problems. Asia-Pac. J. Oper. Res., 30, 1350026/-1-1350026/20
    • (2013) Asia-Pac. J. Oper. Res , vol.30
    • De Almeida, A.T.1
  • 14
    • 84856516186 scopus 로고    scopus 로고
    • A note on scale transformations in the promethee v method
    • de Almeida, A. T. & Vetschera, R. (2012). A note on scale transformations in the PROMETHEE V method. Eur. J. Oper. Res., 219, 198-200
    • (2012) Eur. J. Oper. Res , vol.219 , pp. 198-200
    • De Almeida, A.T.1    Vetschera, R.2
  • 15
    • 0030172154 scopus 로고    scopus 로고
    • Decision theory in maintenance strategy of standby system with gamma-distribution repair-Time
    • de Almeida, A. T. & Bohoris, G. A. (1996) Decision theory in maintenance strategy of standby system with Gamma-distribution repair-Time. IEEE Trans. Reliab., 45, 216-219
    • (1996) IEEE Trans. Reliab , vol.45 , pp. 216-219
    • De Almeida, A.T.1    Bohoris, G.A.2
  • 16
    • 0027666923 scopus 로고
    • Decision theory in maintenance strategy for a 2-unit redundant standby system
    • de Almeida, A. T. & deSouza, F. M. C. (1993) Decision theory in maintenance strategy for a 2-unit redundant standby system. IEEE Trans. Reliab., 42, 401-407
    • (1993) IEEE Trans. Reliab , vol.42 , pp. 401-407
    • De Almeida, A.T.1    Desouza, F.M.C.2
  • 17
    • 0024130398 scopus 로고
    • A critique of recent models for human error rate assessment
    • Apostolakis, G. E., Bier, V. M. & Mosleh, A. (1988). A critique of recent models for human error rate assessment. Reliab. Eng. Syst. Saf., 22, 201-217
    • (1988) Reliab. Eng. Syst. Saf , vol.22 , pp. 201-217
    • Apostolakis, G.E.1    Bier, V.M.2    Mosleh, A.3
  • 18
    • 0036378705 scopus 로고    scopus 로고
    • A multi-Attribute preventive replacement model
    • Azaiez, M. N. (2002). A multi-Attribute preventive replacement model. J. Qual. Maint. Eng., 8, 213-225
    • (2002) J. Qual. Maint. Eng , vol.8 , pp. 213-225
    • Azaiez, M.N.1
  • 19
    • 55749096731 scopus 로고    scopus 로고
    • Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm
    • Azaron, A., Perkgoz, C., Katagiri, H., Kato, K. & Sakawa, M. (2009) Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm. Comput. Oper. Res., 36, 1562-1571
    • (2009) Comput. Oper. Res , vol.36 , pp. 1562-1571
    • Azaron, A.1    Perkgoz, C.2    Katagiri, H.3    Kato, K.4    Sakawa, M.5
  • 20
    • 77954033742 scopus 로고    scopus 로고
    • Allocation of network-driven load-management measures using multiattribute decision making
    • Baboli, P. T. & Moghaddam, M. P. (2010) Allocation of network-driven load-management measures using multiattribute decision making. IEEE Trans. Power Deliv., 25, 1839-1845
    • (2010) IEEE Trans. Power Deliv , vol.25 , pp. 1839-1845
    • Baboli, P.T.1    Moghaddam, M.P.2
  • 21
  • 22
    • 1542316248 scopus 로고    scopus 로고
    • Multi-objective reliability-based optimization of prestressed concrete beams
    • Barakat, S., Bani-Hani, K. & Taha, M. Q. (2004) Multi-objective reliability-based optimization of prestressed concrete beams. Struct. Saf., 26, 311-342
    • (2004) Struct. Saf , vol.26 , pp. 311-342
    • Barakat, S.1    Bani-Hani, K.2    Taha, M.Q.3
  • 25
    • 67649873297 scopus 로고    scopus 로고
    • Electric distribution network reconfiguration based on a fuzzy multi-criteria decision making algorithm
    • Bernardon, D. P., Garcia, V. J., Ferreira, A. S. Q. & Canha, L. N. (2009) Electric distribution network reconfiguration based on a fuzzy multi-criteria decision making algorithm. Electr. Power Syst. Res., 79, 1400-1407
    • (2009) Electr. Power Syst. Res , vol.79 , pp. 1400-1407
    • Bernardon, D.P.1    Garcia, V.J.2    Ferreira, A.S.Q.3    Canha, L.N.4
  • 26
    • 78650599022 scopus 로고    scopus 로고
    • Methodology for allocation of remotely controlled switches in distribution networks based on a fuzzy multi-criteria decision making algorithm
    • Bernardon, D. P., Sperandio, M., Garcia, V. J., Russi, J., Canha, L. N., Abaide, A. R. & Daza, E. F. B. (2011) Methodology for allocation of remotely controlled switches in distribution networks based on a fuzzy multi-criteria decision making algorithm. Electr. Power Syst. Res., 81, 414-420
    • (2011) Electr. Power Syst. Res , vol.81 , pp. 414-420
    • Bernardon, D.P.1    Sperandio, M.2    Garcia, V.J.3    Russi, J.4    Canha, L.N.5    Abaide, A.R.6    Daza, E.F.B.7
  • 28
    • 75449112582 scopus 로고    scopus 로고
    • Bi-objective ant colony optimization approach to optimize production and maintenance scheduling
    • Berrichi, A., Yalaoui, F., Amodeo, L. & Mezghiche, M. (2010) Bi-objective ant colony optimization approach to optimize production and maintenance scheduling. Comput. Oper. Res., 37, 1584-1596
    • (2010) Comput. Oper. Res , vol.37 , pp. 1584-1596
    • Berrichi, A.1    Yalaoui, F.2    Amodeo, L.3    Mezghiche, M.4
  • 29
    • 33645230448 scopus 로고    scopus 로고
    • A combined goal programming-Ahp approach to maintenance selection problem
    • Bertolini, M. & Bevilacqua, M. (2006). A combined goal programming-AHP approach to maintenance selection problem. Reliab. Eng. Syst. Saf., 91, 839-848
    • (2006) Reliab. Eng. Syst. Saf , vol.91 , pp. 839-848
    • Bertolini, M.1    Bevilacqua, M.2
  • 30
    • 0034288043 scopus 로고    scopus 로고
    • The analytic hierarchy process applied to maintenance strategy selection
    • Bevilacqua, M. & Braglia, M. (2000) The analytic hierarchy process applied to maintenance strategy selection. Reliab. Eng. Syst. Saf., 70, 71-83
    • (2000) Reliab. Eng. Syst. Saf , vol.70 , pp. 71-83
    • Bevilacqua, M.1    Braglia, M.2
  • 31
    • 0015671939 scopus 로고
    • A review of new methods and attitudes in reliability engineering
    • Blanks, H. (1973). A review of new methods and attitudes in reliability engineering. Microelectr. Reliab., 12, 301-308
    • (1973) Microelectr. Reliab , vol.12 , pp. 301-308
    • Blanks, H.1
  • 32
    • 78751580347 scopus 로고    scopus 로고
    • A probabilistic computational framework for bridge network optimal maintenance scheduling
    • Bocchini, P. & Frangopol, D. M. (2011). A probabilistic computational framework for bridge network optimal maintenance scheduling. Reliab. Eng. Syst. Saf., 96, 332-349
    • (2011) Reliab. Eng. Syst. Saf , vol.96 , pp. 332-349
    • Bocchini, P.1    Frangopol, D.M.2
  • 33
    • 62149140828 scopus 로고    scopus 로고
    • Contribution of simulation to the optimization of maintenance strategies for a randomly failing production system
    • Boschian, V., Rezg, N. & Chelbi, A. (2009) Contribution of simulation to the optimization of maintenance strategies for a randomly failing production system. Eur. J. Oper. Res., 197, 1142-1149
    • (2009) Eur. J. Oper. Res , vol.197 , pp. 1142-1149
    • Boschian, V.1    Rezg, N.2    Chelbi, A.3
  • 34
    • 70350136745 scopus 로고    scopus 로고
    • Multiobjective optimization in an unreliable failure-prone manufacturing system
    • Boulet, J. F., Gharbi, A. & Kenn, J. P. (2009) Multiobjective optimization in an unreliable failure-prone manufacturing system. J. Qual. Maint. Eng., 15, 397-411
    • (2009) J. Qual. Maint. Eng , vol.15 , pp. 397-411
    • Boulet, J.F.1    Gharbi, A.2    Kenn, J.P.3
  • 35
    • 2342527340 scopus 로고    scopus 로고
    • Multi-Attribute classification method for spare parts inventory management
    • Braglia, M., Grassi, A. & Montanari, R. (2004) Multi-Attribute classification method for spare parts inventory management. J. Qual. Maint. Eng., 10, 55-65
    • (2004) J. Qual. Maint. Eng , vol.10 , pp. 55-65
    • Braglia, M.1    Grassi, A.2    Montanari, R.3
  • 36
    • 33847607172 scopus 로고    scopus 로고
    • Multiple Criteria Decision Analysis: State of the Art Surveys (J. Figueira, S. Greco & M. Ehrgott eds). New York Springer
    • Brans, J.-P. & Mareschal, B. (2005) Promethee methods. Multiple Criteria Decision Analysis: State of the Art Surveys (J. Figueira, S. Greco & M. Ehrgott eds). New York: Springer
    • (2005) Promethee Methods
    • Brans, J.-P.1    Mareschal, B.2
  • 37
    • 54049102014 scopus 로고    scopus 로고
    • Multi-Attribute risk assessment for risk ranking of natural gas pipelines
    • Brito, A. J. & de Almeida, A. T. (2009) Multi-Attribute risk assessment for risk ranking of natural gas pipelines. Reliab. Eng. Syst. Saf., 94, 187-198
    • (2009) Reliab. Eng. Syst. Saf , vol.94 , pp. 187-198
    • Brito, A.J.1    De Almeida, A.T.2
  • 38
    • 77956577649 scopus 로고    scopus 로고
    • Multi-criteria decision model for selecting repair contracts by applying utility theory and variable interdependent parameters
    • Brito, A. J. M., Almeida-Filho, A. T. & de Almeida, A. T. (2010) Multi-criteria decision model for selecting repair contracts by applying utility theory and variable interdependent parameters. IMA J. Manag. Math., 21, 349-361
    • (2010) IMA J. Manag. Math , vol.21 , pp. 349-361
    • Brito, A.J.M.1    Almeida-Filho, A.T.2    De Almeida, A.T.3
  • 39
    • 69749090825 scopus 로고    scopus 로고
    • A multicriteria model for risk sorting of natural gas pipelines based on electre tri integrating utility theory
    • Brito, A. J. M., de Almeida, A. T. & Mota, C. M. M. (2010) A multicriteria model for risk sorting of natural gas pipelines based on ELECTRE TRI integrating Utility Theory. Eur. J. Oper. Res., 200, 812-821
    • (2010) Eur. J. Oper. Res , vol.200 , pp. 812-821
    • Brito, A.J.M.1    De Almeida, A.T.2    Mota, C.M.M.3
  • 40
    • 73649147328 scopus 로고    scopus 로고
    • Optimal expansion of an existing electrical power transmission network by multi-objective genetic algorithms
    • Cadini, F., Zio, E. & Petrescu, C. A. (2010) Optimal expansion of an existing electrical power transmission network by multi-objective genetic algorithms. Reliab. Eng. Syst. Saf., 95, 173-181
    • (2010) Reliab. Eng. Syst. Saf , vol.95 , pp. 173-181
    • Cadini, F.1    Zio, E.2    Petrescu, C.A.3
  • 41
    • 84870774907 scopus 로고    scopus 로고
    • Efficient exact optimization of multi-objective redundancy allocation problems in series-parallel systems
    • Cao, D., Murat, A. & Chinnam, R. B. (2013) Efficient exact optimization of multi-objective redundancy allocation problems in series-parallel systems. Reliab. Eng. Syst. Saf., 111, 154-163
    • (2013) Reliab. Eng. Syst. Saf , vol.111 , pp. 154-163
    • Cao, D.1    Murat, A.2    Chinnam, R.B.3
  • 42
    • 58749099423 scopus 로고    scopus 로고
    • An integrated structural framework to cost-based fmeca: The priority-cost fmeca
    • Carmignani, G. (2009) An integrated structural framework to cost-based FMECA: the priority-cost FMECA. Reliab. Eng. Syst. Saf., 94, 861-871
    • (2009) Reliab. Eng. Syst. Saf , vol.94 , pp. 861-871
    • Carmignani, G.1
  • 43
    • 53149097394 scopus 로고    scopus 로고
    • Maintenance audit by means of value analysis technique and decision rules: A case study in a bank
    • Carnero, C. & Delgado, S. (2008) Maintenance audit by means of value analysis technique and decision rules: a case study in a bank. J. Qual. Maint. Eng., 14, 329-342
    • (2008) J. Qual. Maint. Eng , vol.14 , pp. 329-342
    • Carnero, C.1    Delgado, S.2
  • 44
    • 33646106578 scopus 로고    scopus 로고
    • An evaluation system of the setting up of predictive maintenance programmes
    • Carnero, M. C. (2006) An evaluation system of the setting up of predictive maintenance programmes. Reliab. Eng. Syst. Saf., 91, 945-963
    • (2006) Reliab. Eng. Syst. Saf , vol.91 , pp. 945-963
    • Carnero, M.C.1
  • 45
    • 33645731779 scopus 로고    scopus 로고
    • Electric distribution network multiobjective design using a problem-specific genetic algorithm
    • Carrano, E. G., Soares, L. A., Takahashi, R. H., Saldanha, R. R. & Neto, O. M. (2006) Electric distribution network multiobjective design using a problem-specific genetic algorithm. IEEE Trans. Power Deliv., 21, 995-1005
    • (2006) IEEE Trans Power Deliv , vol.21 , pp. 995-1005
    • Carrano, E.G.1    Soares, L.A.2    Takahashi, R.H.3    Saldanha, R.R.4    Neto, O.M.5
  • 46
    • 34848871929 scopus 로고    scopus 로고
    • A multi-criteria decision-Aiding model using promethee III for preventive maintenance planning under uncertain conditions
    • Cavalcante, C. A. V. & de Almeida, A. T. (2007). A multi-criteria decision-Aiding model using PROMETHEE III for preventive maintenance planning under uncertain conditions. J. Qual. Maint. Eng., 13, 385-397
    • (2007) J. Qual. Maint. Eng , vol.13 , pp. 385-397
    • Cavalcante, C.A.V.1    De Almeida, A.T.2
  • 47
    • 77956563947 scopus 로고    scopus 로고
    • A preventive maintenance decision model based on multicriteria method promethee II integrated with Bayesian approach
    • Cavalcante, C. A. V., Ferreira, R. J. P. & de Almeida, A. T. (2010). A preventive maintenance decision model based on multicriteria method PROMETHEE II integrated with Bayesian approach. IMA J. Manag. Math., 21, 333-348
    • (2010) IMA J. Manag. Math , vol.21 , pp. 333-348
    • Cavalcante, C.A.V.1    Ferreira, R.J.P.2    De Almeida, A.T.3
  • 48
    • 79953694464 scopus 로고    scopus 로고
    • A study of a two-phase inspection policy for a preparedness system with a defective state and heterogeneous lifetime
    • Cavalcante, C.A.V., Scarf, P. A. & de Almeida, A. T. (2011). A study of a two-phase inspection policy for a preparedness system with a defective state and heterogeneous lifetime. Reliab. Eng. Syst. Saf., 96, 627-635
    • (2011) Reliab. Eng. Syst. Saf , vol.96 , pp. 627-635
    • Cavalcante, C.A.V.1    Scarf, P.A.2    De Almeida, A.T.3
  • 49
    • 79955524773 scopus 로고    scopus 로고
    • Determination of pareto frontier in multi-objective maintenance optimization
    • Certa, A., Galante, G., Lupo, T. & Passannanti, G. (2011) Determination of Pareto frontier in multi-objective maintenance optimization. Reliab. Eng. Syst. Saf., 96, 861-867
    • (2011) Reliab. Eng. Syst. Saf , vol.96 , pp. 861-867
    • Certa, A.1    Galante, G.2    Lupo, T.3    Passannanti, G.4
  • 50
    • 0031099506 scopus 로고    scopus 로고
    • A multicriteria approach to the selection of preventive maintenance intervals
    • Chareonsuk, C., Nagarur, N. & Tabucanon, M. T. (1997). A multicriteria approach to the selection of preventive maintenance intervals. Int. J. Prod. Econ., 49, 55-64
    • (1997) Int. J. Prod. Econ , vol.49 , pp. 55-64
    • Chareonsuk, C.1    Nagarur, N.2    Tabucanon, M.T.3
  • 51
    • 33847047429 scopus 로고    scopus 로고
    • Availability allocation and multi-objective optimization for parallel-series systems
    • Chiang, C.-H. & Chen, L.-H. (2007) Availability allocation and multi-objective optimization for parallel-series systems. Eur. J. Oper. Res., 180, 1231-1244
    • (2007) Eur. J. Oper. Res , vol.180 , pp. 1231-1244
    • Chiang, C.-H.1    Chen, L.-H.2
  • 52
    • 84868200303 scopus 로고    scopus 로고
    • Multi-objective decision-making methodology to create an optimal design chain partner combination
    • Chiang, T.-A. (2012) Multi-objective decision-making methodology to create an optimal design chain partner combination. Comput. Indus. Eng., 63, 875-889
    • (2012) Comput. Indus. Eng , vol.63 , pp. 875-889
    • Chiang, T.-A.1
  • 53
    • 56549091665 scopus 로고    scopus 로고
    • Failure mode and effects analysis using a group-based evidential reasoning approach
    • Chin, K.-S., Wang, Y.-M., Ka Kwai Poon, G. & Yang, J.-B. (2009) Failure mode and effects analysis using a group-based evidential reasoning approach. Comput. Oper. Res., 36, 1768-1779
    • (2009) Comput. Oper. Res , vol.36 , pp. 1768-1779
    • Chin, K.-S.1    Wang, Y.-M.2    Ka Kwai Poon, G.3    Yang, J.-B.4
  • 54
    • 79961000777 scopus 로고    scopus 로고
    • Reliability-based performance simulation for optimized pavement maintenance
    • Chou, J.-S. & Le, T.-S. (2011) Reliability-based performance simulation for optimized pavement maintenance. Reliab. Eng. Syst. Saf., 96, 1402-1410
    • (2011) Reliab. Eng. Syst. Saf , vol.96 , pp. 1402-1410
    • Chou, J.-S.1    Le, T.-S.2
  • 55
    • 4544229131 scopus 로고    scopus 로고
    • System optimization with component reliability estimation uncertainty: A multi-criteria approach
    • Coit, D. W., Jin, T. D. & Wattanapongsakorn, N. (2004) System optimization with component reliability estimation uncertainty: a multi-criteria approach. IEEE Trans. Reliab., 53, 369-380
    • (2004) IEEE Trans Reliab , vol.53 , pp. 369-380
    • Coit, D.W.1    Jin, T.D.2    Wattanapongsakorn, N.3
  • 56
    • 34047271087 scopus 로고    scopus 로고
    • Multiple weighted objectives heuristic for the redundancy allocation problem
    • Coit, D. W. & Konak, A. (2006) Multiple weighted objectives heuristic for the redundancy allocation problem. IEEE Trans. Reliab., 55, 551-558
    • (2006) IEEE Trans Reliab , vol.55 , pp. 551-558
    • Coit, D.W.1    Konak, A.2
  • 57
    • 0037117677 scopus 로고    scopus 로고
    • Assigning priorities for maintenance repair and refurbishment in managing a municipal housing stock
    • Costa, C. & Oliveira, R. C. (2002) Assigning priorities for maintenance, repair and refurbishment in managing a municipal housing stock. Eur. J. Oper. Res., 138, 380-391
    • (2002) Eur. J. Oper. Res , vol.138 , pp. 380-391
    • Costa, C.1    Oliveira, R.C.2
  • 58
    • 0002663119 scopus 로고    scopus 로고
    • The macbeth approach: Basic ideas, software, and an application
    • N. Meskens & M. Roubens eds). Dordrecht Kluwer Academic Publishers
    • Costa, C. A. B. E. & Vansnick, J.-C. (1999) The MACBETH approach: basic ideas, software, and an application. Advances in Decision Analysis (N. Meskens & M. Roubens eds). Dordrecht: Kluwer Academic Publishers
    • (1999) Advances in Decision Analysis
    • Costa, C.A.B.E.1    Vansnick, J.-C.2
  • 59
    • 33750293588 scopus 로고    scopus 로고
    • Reliability consideration in the design and analysis of cellular manufacturing systems
    • Das, K., Lashkari, R. S. & Sengupta, S. (2007) Reliability consideration in the design and analysis of cellular manufacturing systems. Int. J. Prod. Econ., 105, 243-262
    • (2007) Int. J. Prod. Econ , vol.105 , pp. 243-262
    • Das, K.1    Lashkari, R.S.2    Sengupta, S.3
  • 61
    • 0036530772 scopus 로고    scopus 로고
    • A fast and elitist multiobjective genetic algorithm: Nsga-II
    • Deb, K., Pratap, A., Agarwal, S. & Meyarivan, T. (2002). A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Trans. Evol. Comput., 6, 182-197
    • (2002) IEEE Trans Evol. Comput , vol.6 , pp. 182-197
    • Deb, K.1    Pratap, A.2    Agarwal, S.3    Meyarivan, T.4
  • 62
    • 0030106093 scopus 로고    scopus 로고
    • Applications of maintenance optimization models: A review and analysis
    • Dekker, R. (1996) Applications of maintenance optimization models: a review and analysis. Reliab. Eng. Syst. Saf., 51, 229-240
    • (1996) Reliab. Eng. Syst. Saf , vol.51 , pp. 229-240
    • Dekker, R.1
  • 63
    • 0021302592 scopus 로고
    • A computer-based application of non-linear multiple objective optimization
    • Dewispelare, A. R. (1984). A computer-based application of non-linear multiple objective optimization. Comput. Indus. Eng., 8, 143-152
    • (1984) Comput. Indus. Eng , vol.8 , pp. 143-152
    • Dewispelare, A.R.1
  • 64
    • 0026997949 scopus 로고
    • Optimal apportionment of reliability and redundancy in series systems under multiple objectives
    • Dhingra, A. K. (1992) Optimal apportionment of reliability and redundancy in series systems under multiple objectives. IEEE Trans. Reliab., 41, 576-582
    • (1992) IEEE Trans Reliab , vol.41 , pp. 576-582
    • Dhingra, A.K.1
  • 65
    • 35548949549 scopus 로고
    • Smarts and smarter: Improved simple methods for multiattribute utility measurement
    • Edwards, W. & Barron, F. H. (1994) SMARTS and SMARTER: improved simple methods for multiattribute utility measurement. Organ. Behav. Hum. Decis. Process., 60, 306-325
    • (1994) Organ. Behav. Hum. Decis. Process , vol.60 , pp. 306-325
    • Edwards, W.1    Barron, F.H.2
  • 67
    • 13844296818 scopus 로고    scopus 로고
    • Optimal preventive control actions using multi-objective fuzzy linear programming technique
    • El-Ela, A. A. A., Bishr, M., Allam, S. & El-Sehiemy, R. (2005) Optimal preventive control actions using multi-objective fuzzy linear programming technique. Electr. Power Syst. Res., 74, 147-155
    • (2005) Electr. Power Syst. Res , vol.74 , pp. 147-155
    • El-Ela, A.A.A.1    Bishr, M.2    Allam, S.3    El-Sehiemy, R.4
  • 68
    • 0141929393 scopus 로고    scopus 로고
    • Availability allocation to repairable systems with genetic algorithms: A multi-objective formulation
    • Elegbede, C. & Adjallah, K. (2003) Availability allocation to repairable systems with genetic algorithms: a multi-objective formulation. Reliab. Eng. Syst. Saf., 82, 319-330
    • (2003) Reliab. Eng. Syst. Saf , vol.82 , pp. 319-330
    • Elegbede, C.1    Adjallah, K.2
  • 69
    • 0037275725 scopus 로고    scopus 로고
    • Decision support in selecting maintenance organization
    • Emblemsvåg, J. & Tonning, L. (2003) Decision support in selecting maintenance organization. J. Qual. Maint. Eng., 9, 11-24
    • (2003) J. Qual. Maint. Eng , vol.9 , pp. 11-24
    • Emblemsvåg, J.1    Tonning, L.2
  • 70
    • 58249129087 scopus 로고    scopus 로고
    • Ant colony optimization-based method for placement of sectionalizing switches in distribution networks using a fuzzy multiobjective approach
    • Falaghi, H., Haghifam, M.-R. & Singh, C. (2009) Ant colony optimization-based method for placement of sectionalizing switches in distribution networks using a fuzzy multiobjective approach. IEEE Trans. Power Deliv., 24, 268-276
    • (2009) IEEE Trans Power Deliv , vol.24 , pp. 268-276
    • Falaghi, H.1    Haghifam, M.-R.2    Singh, C.3
  • 71
    • 60249094324 scopus 로고    scopus 로고
    • A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis
    • Ferreira, R. J. R., de Almeida, A. T. & Cavalcante, C. A. V. (2009). A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis. Reliab. Eng. Syst. Saf., 94, 905-912
    • (2009) Reliab. Eng. Syst. Saf , vol.94 , pp. 905-912
    • Ferreira, R.J.R.1    De Almeida, A.T.2    Cavalcante, C.A.V.3
  • 73
    • 0001518569 scopus 로고
    • Noncompensatory preferences
    • Fishburn, P. C. (1976) Noncompensatory preferences. Synthese, 33, 393-403
    • (1976) Synthese , vol.33 , pp. 393-403
    • Fishburn, P.C.1
  • 74
    • 36248990084 scopus 로고    scopus 로고
    • Bridge network maintenance optimization using stochastic dynamic programming
    • Frangopol, D. M. & Liu, M. (2007) Bridge network maintenance optimization using stochastic dynamic programming. J. Struct. Eng.-ASCE, 133, 1772-1782
    • (2007) J. Struct. Eng.-ASCE , vol.133 , pp. 1772-1782
    • Frangopol, D.M.1    Liu, M.2
  • 75
    • 0026986147 scopus 로고
    • Towards a theory of determining size in multiobjective service systems
    • Friedman, L. & Mehrez, A. (1992) Towards a theory of determining size in multiobjective service systems. Eur. J. Oper. Res., 63, 398-408
    • (1992) Eur. J. Oper. Res , vol.63 , pp. 398-408
    • Friedman, L.1    Mehrez, A.2
  • 76
    • 0025399206 scopus 로고
    • Balancing weight system reliability and redundancy in a multiobjective optimization framework
    • Fu, G. K. & Frangopol, D. M. (1990) Balancing weight, system reliability and redundancy in a multiobjective optimization framework. Struct. Saf., 7, 165-175
    • (1990) Struct. Saf , vol.7 , pp. 165-175
    • Fu, G.K.1    Frangopol, D.M.2
  • 77
    • 84869888279 scopus 로고    scopus 로고
    • Multi-objective planning of electrical distribution systems using dynamic programming
    • Ganguly, S., Sahoo, N. C. & Das, D. (2013) Multi-objective planning of electrical distribution systems using dynamic programming. Int. J. Electr. Power Energy Syst., 46, 65-78
    • (2013) Int. J. Electr. Power Energy Syst , vol.46 , pp. 65-78
    • Ganguly, S.1    Sahoo, N.C.2    Das, D.3
  • 78
    • 84890485588 scopus 로고    scopus 로고
    • A risk measurement tool for an underground electricity distribution system considering the consequences and uncertainties of manhole events
    • Garcez, T. V. & de Almeida, A. T. (2014). A risk measurement tool for an underground electricity distribution system considering the consequences and uncertainties of manhole events. Reliab. Eng. Syst. Saf., 124, 68-80
    • (2014) Reliab. Eng. Syst. Saf , vol.124 , pp. 68-80
    • Garcez, T.V.1    De Almeida, A.T.2
  • 79
    • 33746931196 scopus 로고    scopus 로고
    • Maintenance management: Literature review and directions
    • Garg, A. & Deshmukh, S. G. (2006) Maintenance management: literature review and directions. J. Qual. Maint. Eng., 12, 205-238
    • (2006) J. Qual. Maint. Eng , vol.12 , pp. 205-238
    • Garg, A.1    Deshmukh, S.G.2
  • 80
    • 84869862160 scopus 로고    scopus 로고
    • Multi-objective reliability-redundancy allocation problem using particle swarm optimization
    • Garg, H. & Sharma, S. P. (2013) Multi-objective reliability-redundancy allocation problem using particle swarm optimization. Comput. Indus. Eng., 64, 247-255
    • (2013) Comput. Indus. Eng , vol.64 , pp. 247-255
    • Garg, H.1    Sharma, S.P.2
  • 81
    • 0024896932 scopus 로고
    • Algorithm for solving large-scale 0-1 goal programming and its application to reliability optimization problem
    • Gen, M., Ida, K., Sasaki, M. & Lee, J. U. (1989) Algorithm for solving large-scale 0-1 goal programming and its application to reliability optimization problem. Comput. Indus. Eng., 17, 525-530
    • (1989) Comput. Indus. Eng , vol.17 , pp. 525-530
    • Gen, M.1    Ida, K.2    Sasaki, M.3    Lee, J.U.4
  • 82
    • 0027683123 scopus 로고
    • Large-scale 0-1 fuzzy goal programming and its application to reliability optimization problem
    • Gen, M., Ida, K., Tsujimura, Y. & Kim, C. E. (1993) Large-scale 0-1 fuzzy goal programming and its application to reliability optimization problem. Comput. Indus. Eng., 24, 539-549
    • (1993) Comput. Indus. Eng , vol.24 , pp. 539-549
    • Gen, M.1    Ida, K.2    Tsujimura, Y.3    Kim, C.E.4
  • 83
    • 84870320870 scopus 로고    scopus 로고
    • A new model for optimal generation scheduling of power system considering generation units availability
    • Gjorgiev, B. & Kančev, D. (2013). A new model for optimal generation scheduling of power system considering generation units availability. Int. J. Electr. Power Energy Syst., 47, 129-139
    • (2013) Int. J. Electr. Power Energy Syst , vol.47 , pp. 129-139
    • Gjorgiev, B.1    Kančev, D.2
  • 84
    • 0032167344 scopus 로고    scopus 로고
    • Tentative guidelines to help choosing an appropriate mcda method
    • Guitouni, A. & Martel, J. M. (1998) Tentative guidelines to help choosing an appropriate MCDA method. Eur. J. Oper. Res., 109, 501-521
    • (1998) Eur. J. Oper. Res , vol.109 , pp. 501-521
    • Guitouni, A.1    Martel, J.M.2
  • 85
    • 79952194346 scopus 로고    scopus 로고
    • Grid service reliability modeling and optimal task scheduling considering fault recovery
    • Guo, S., Huang, H.-Z., Wang, Z. & Xie, M. (2011) Grid service reliability modeling and optimal task scheduling considering fault recovery. IEEE Trans. Reliab., 60, 263-274
    • (2011) IEEE Trans Reliab , vol.60 , pp. 263-274
    • Guo, S.1    Huang, H.-Z.2    Wang, Z.3    Xie, M.4
  • 86
    • 2342533288 scopus 로고    scopus 로고
    • Maintenance management-An ahp application for centralization/decentralization
    • Hajshirmohammadi, A. & Wedley, W. C. (2004) Maintenance management-An AHP application for centralization/decentralization. J. Qual. Maint. Eng., 10, 16-25
    • (2004) J. Qual. Maint. Eng , vol.10 , pp. 16-25
    • Hajshirmohammadi, A.1    Wedley, W.C.2
  • 87
    • 0029471492 scopus 로고
    • Application of multiattribute theory in a safety monitor for the planning of maintenance jobs
    • Heins, W. & Roling, M. W. M. (1995) Application of multiattribute theory in a safety monitor for the planning of maintenance jobs. Eur. J. Oper. Res., 86, 270-280
    • (1995) Eur. J. Oper. Res , vol.86 , pp. 270-280
    • Heins, W.1    Roling, M.W.M.2
  • 88
    • 29744438237 scopus 로고    scopus 로고
    • Maintenance strategy based on a multicriterion classification of equipments
    • Hijes, F. & Cartagena, J. J. R. (2006) Maintenance strategy based on a multicriterion classification of equipments. Reliab. Eng. Syst. Saf., 91, 444-451
    • (2006) Reliab. Eng. Syst. Saf , vol.91 , pp. 444-451
    • Hijes, F.1    Cartagena, J.J.R.2
  • 89
    • 36348973029 scopus 로고    scopus 로고
    • Multiobjective optimization applied to maintenance policy for electrical networks
    • Hilber, P., Miranda, V., Matos, M. A. & Bertling, L. (2007) Multiobjective optimization applied to maintenance policy for electrical networks. IEEE Trans. Power Syst., 22, 1675-1682
    • (2007) IEEE Trans Power Syst , vol.22 , pp. 1675-1682
    • Hilber, P.1    Miranda, V.2    Matos, M.A.3    Bertling, L.4
  • 90
    • 0026889708 scopus 로고
    • Fuzzy approach for generator maintenance scheduling
    • Huang, C. J., Lin, C. E. & Huang, C. L. (1992) Fuzzy approach for generator maintenance scheduling. Electr. Power Syst. Res., 24, 31-38
    • (1992) Electr. Power Syst. Res , vol.24 , pp. 31-38
    • Huang, C.J.1    Lin, C.E.2    Huang, C.L.3
  • 91
    • 0031104095 scopus 로고    scopus 로고
    • Fuzzy multi-objective optimization decision-making of reliability of series system
    • Huang, H. Z. (1997) Fuzzy multi-objective optimization decision-making of reliability of series system. Microelectron. Reliab., 37, 447-449
    • (1997) Microelectron. Reliab , vol.37 , pp. 447-449
    • Huang, H.Z.1
  • 92
    • 0018771786 scopus 로고
    • Optimal scheduled-maintenance policy based on multiple-criteria decision-making
    • Hwang, C. L., Tillman, F. A., Wei, W. K. & Lie, C. H. (1979) Optimal scheduled-maintenance policy based on multiple-criteria decision-making. IEEE Trans. Reliab., 28, 394-399
    • (1979) IEEE Trans Reliab , vol.28 , pp. 394-399
    • Hwang, C.L.1    Tillman, F.A.2    Wei, W.K.3    Lie, C.H.4
  • 94
    • 0018020677 scopus 로고
    • Interactive optimization of system reliability under multiple objectives
    • Inagaki, T., Inoue, K. & Akashi, H. (1978) Interactive optimization of system reliability under multiple objectives. IEEE Trans. Reliab., 27, 264-267
    • (1978) IEEE Trans Reliab , vol.27 , pp. 264-267
    • Inagaki, T.1    Inoue, K.2    Akashi, H.3
  • 95
    • 70349469254 scopus 로고    scopus 로고
    • Reliability-based robust pareto design of linear state feedback controllers using a multi-objective uniform-diversity genetic algorithm (mug)
    • Jamali, A., Hajiloo, A. & Nariman-Zadeh, N. (2010) Reliability-based robust Pareto design of linear state feedback controllers using a multi-objective uniform-diversity genetic algorithm (MUG). Expert Syst. Appl., 37, 401-413
    • (2010) Expert Syst. Appl , vol.37 , pp. 401-413
    • Jamali, A.1    Hajiloo, A.2    Nariman-Zadeh, N.3
  • 96
    • 0142165034 scopus 로고    scopus 로고
    • Reducing the run-Time complexity of multiobjective eas: The nsga-II and other algorithms
    • Jensen, M. T. (2003) Reducing the run-Time complexity of multiobjective EAs: the NSGA-II and other algorithms. IEEE Trans. Evol. Comput., 7, 503-515
    • (2003) IEEE Trans Evol. Comput , vol.7 , pp. 503-515
    • Jensen, M.T.1
  • 97
    • 0036604021 scopus 로고    scopus 로고
    • Age replacement policy: A multi-Attribute value model
    • Jiang, R. & Ji, P. (2002) Age replacement policy: a multi-Attribute value model. Reliab. Eng. Syst. Saf., 76, 311-318
    • (2002) Reliab. Eng. Syst. Saf , vol.76 , pp. 311-318
    • Jiang, R.1    Ji, P.2
  • 98
    • 84871715607 scopus 로고    scopus 로고
    • Multicriteria planning for distributed wind generation under strategic maintenance
    • Jin, T., Tian, Y., Zhang, C. W. & Coit, D. W. (2013) Multicriteria planning for distributed wind generation under strategic maintenance. IEEE Trans. Power Deliv., 28, 357-367
    • (2013) IEEE Trans Power Deliv , vol.28 , pp. 357-367
    • Jin, T.1    Tian, Y.2    Zhang, C.W.3    Coit, D.W.4
  • 99
    • 39749159847 scopus 로고    scopus 로고
    • Optimization of cost and downtime for replacement model following the expiration of warranty
    • Jung, K. M., Han, S. S. & Park, D. H. (2008) Optimization of cost and downtime for replacement model following the expiration of warranty. Reliab. Eng. Syst. Saf., 93, 995-1003
    • (2008) Reliab. Eng. Syst. Saf , vol.93 , pp. 995-1003
    • Jung, K.M.1    Han, S.S.2    Park, D.H.3
  • 100
    • 0027307116 scopus 로고
    • Determination of design alternatives and performance criteria for safety systems in a nuclear-power-plant via simulated annealing
    • Jung, W. S. & Cho, N. Z. (1993) Determination of design alternatives and performance criteria for safety systems in a nuclear-power-plant via simulated annealing. Reliab. Eng. Syst. Saf., 41, 71-94
    • (1993) Reliab. Eng. Syst. Saf , vol.41 , pp. 71-94
    • Jung, W.S.1    Cho, N.Z.2
  • 101
    • 24644521050 scopus 로고    scopus 로고
    • A method for the efficient prioritization of infrastructure renewal projects
    • Karydas, D. M. & Gifun, J. F. (2006). A method for the efficient prioritization of infrastructure renewal projects. Reliab. Eng. Syst. Saf., 91, 84-99
    • (2006) Reliab. Eng. Syst. Saf , vol.91 , pp. 84-99
    • Karydas, D.M.1    Gifun, J.F.2
  • 103
    • 84870192596 scopus 로고    scopus 로고
    • A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems
    • Khalili-Damghani, K., Abtahi, A.-R.& Tavana, M. (2013). A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems. Reliab. Eng. Syst. Saf., 111, 58-75
    • (2013) Reliab. Eng. Syst. Saf , vol.111 , pp. 58-75
    • Khalili-Damghani, K.1    Abtahi, A.-R.2    Tavana, M.3
  • 104
    • 84859517787 scopus 로고    scopus 로고
    • Solving binary-state multi-objective reliability redundancy allocation series-parallel problem using efficient epsilon-constraint, multi-start partial bound enumeration algorithm, and dea
    • Khalili-Damghani, K. & Amiri, M. (2012) Solving binary-state multi-objective reliability redundancy allocation series-parallel problem using efficient epsilon-constraint, multi-start partial bound enumeration algorithm, and DEA. Reliab. Eng. Syst. Saf., 103, 35-44
    • (2012) Reliab. Eng. Syst. Saf , vol.103 , pp. 35-44
    • Khalili-Damghani, K.1    Amiri, M.2
  • 105
    • 78650350129 scopus 로고    scopus 로고
    • Cost-effective lifetime structural health monitoring based on availability
    • Kim, S. & Frangopol, D. M. (2011) Cost-effective lifetime structural health monitoring based on availability. J. Struct. Eng.-ASCE, 137, 22-33
    • (2011) J. Struct. Eng.-ASCE , vol.137 , pp. 22-33
    • Kim, S.1    Frangopol, D.M.2
  • 106
    • 80755152974 scopus 로고    scopus 로고
    • Multi-objective optimization of linear multi-state multiple sliding window system
    • Konak, A., Kulturel-Konak, S. & Levitin, G. (2012) Multi-objective optimization of linear multi-state multiple sliding window system. Reliab. Eng. Syst. Saf., 98, 24-34
    • (2012) Reliab. Eng. Syst. Saf , vol.98 , pp. 24-34
    • Konak, A.1    Kulturel-Konak, S.2    Levitin, G.3
  • 108
    • 0029343602 scopus 로고
    • A multiobjective optimization approach to thermal generating-units maintenance scheduling
    • Kralj, B. & Petrovic, R. (1995). A multiobjective optimization approach to thermal generating-units maintenance scheduling. Eur. J. Oper. Res., 84, 481-493
    • (1995) Eur. J. Oper. Res , vol.84 , pp. 481-493
    • Kralj, B.1    Petrovic, R.2
  • 109
    • 34548496610 scopus 로고
    • Multiobjective programming in power-system optimization-new approach to generator maintenance scheduling
    • Kralj, B. & Rajakovic, N. (1994) Multiobjective programming in power-system optimization-new approach to generator maintenance scheduling. Int. J. Electr. Power Energy Syst., 16, 211-220
    • (1994) Int. J. Electr. Power Energy Syst , vol.16 , pp. 211-220
    • Kralj, B.1    Rajakovic, N.2
  • 110
    • 67349114259 scopus 로고    scopus 로고
    • Attribute based specification comparison and selection of electroplating system using madm approach
    • Kumar, A. & Agrawal, V. P. (2009) Attribute based specification, comparison and selection of electroplating system using MADM approach. Expert Syst. Appl., 36, 10815-10827
    • (2009) Expert Syst. Appl , vol.36 , pp. 10815-10827
    • Kumar, A.1    Agrawal, V.P.2
  • 111
    • 58749111611 scopus 로고    scopus 로고
    • Multi-objective hierarchical genetic algorithms for multilevel redundancy allocation optimization
    • Kumar, R., Izui, K., Yoshimura, M. & Nishiwaki, S. (2009) Multi-objective hierarchical genetic algorithms for multilevel redundancy allocation optimization. Reliab. Eng. Syst. Saf., 94, 891-904
    • (2009) Reliab. Eng. Syst. Saf , vol.94 , pp. 891-904
    • Kumar, R.1    Izui, K.2    Yoshimura, M.3    Nishiwaki, S.4
  • 112
    • 33646000281 scopus 로고    scopus 로고
    • Service restoration in distribution system using non-dominated sorting genetic algorithm
    • Kumar, Y., Das, B. & Sharma, J. (2006) Service restoration in distribution system using non-dominated sorting genetic algorithm. Electr. Power Syst. Res., 76, 768-777
    • (2006) Electr. Power Syst. Res , vol.76 , pp. 768-777
    • Kumar, Y.1    Das, B.2    Sharma, J.3
  • 113
    • 37749027354 scopus 로고    scopus 로고
    • Multiobjective, multiconstraint service restoration of electric power distribution system with priority customers
    • Kumar, Y., Das, B. & Sharma, J. (2008) Multiobjective, multiconstraint service restoration of electric power distribution system with priority customers. IEEE Trans. Power Deliv., 23, 261-270
    • (2008) IEEE Trans. Power Deliv , vol.23 , pp. 261-270
    • Kumar, Y.1    Das, B.2    Sharma, J.3
  • 114
    • 25844491812 scopus 로고    scopus 로고
    • A model for preventive maintenance planning by genetic algorithms based in cost and reliability
    • Lapa, C. M. F., Pereira, C. & De Barros, M. P. (2006). A model for preventive maintenance planning by genetic algorithms based in cost and reliability. Reliab. Eng. Syst. Saf., 91, 233-240
    • (2006) Reliab. Eng. Syst. Saf , vol.91 , pp. 233-240
    • Lapa, C.M.F.1    Pereira, C.2    De Barros, M.P.3
  • 116
    • 0042545120 scopus 로고    scopus 로고
    • Total quality management of a production-maintenance system: A network approach
    • Levner, E., Zuckerman, D. & Meirovich, G. (1998) Total quality management of a production-maintenance system: a network approach. Int. J. Prod. Econ., 56, 407-421
    • (1998) Int. J. Prod. Econ , vol.56 , pp. 407-421
    • Levner, E.1    Zuckerman, D.2    Meirovich, G.3
  • 117
    • 84871110815 scopus 로고    scopus 로고
    • Non-dominated sorting binary differential evolution for the multi-objective optimization of cascading failures protection in complex networks
    • Li, Y. F., Sansavini, G. & Zio, E. (2013) Non-dominated sorting binary differential evolution for the multi-objective optimization of cascading failures protection in complex networks. Reliab. Eng. Syst. Saf., 111, 195-205
    • (2013) Reliab. Eng. Syst. Saf , vol.111 , pp. 195-205
    • Li, Y.F.1    Sansavini, G.2    Zio, E.3
  • 118
    • 67649449001 scopus 로고    scopus 로고
    • A two-stage approach for multi-objective decision making with applications to system reliability optimization
    • Li, Z., Liao, H. & Coit, D. W. (2009). A two-stage approach for multi-objective decision making with applications to system reliability optimization. Reliab. Eng. Syst. Saf., 94, 1585-1592
    • (2009) Reliab. Eng. Syst. Saf , vol.94 , pp. 1585-1592
    • Li, Z.1    Liao, H.2    Coit, D.W.3
  • 119
    • 0027147682 scopus 로고
    • Evaluating human reliability using fuzzy relation
    • Liang, G. S. & Wang, M. J. J. (1993) Evaluating human reliability using fuzzy relation. Microelectron. Reliab., 33, 63-80
    • (1993) Microelectron. Reliab , vol.33 , pp. 63-80
    • Liang, G.S.1    Wang, M.J.J.2
  • 120
    • 34147112241 scopus 로고    scopus 로고
    • Variable neighbourhood search for redundancy allocation problems
    • Liang, Y. C., Lo, M. H. & Chen, Y. C. (2007) Variable neighbourhood search for redundancy allocation problems. IMA J. Manage. Math., 18, 135-155
    • (2007) IMA J. Manage. Math , vol.18 , pp. 135-155
    • Liang, Y.C.1    Lo, M.H.2    Chen, Y.C.3
  • 121
    • 39749093208 scopus 로고    scopus 로고
    • Multi-objective optimization of generalized reliability design problems using feature models-A concept for early design stages
    • Limbourg, P. & Kochs, H.-D. (2008) Multi-objective optimization of generalized reliability design problems using feature models-A concept for early design stages. Reliab. Eng. Syst. Saf., 93, 815-828
    • (2008) Reliab. Eng. Syst. Saf , vol.93 , pp. 815-828
    • Limbourg, P.1    Kochs, H.-D.2
  • 122
    • 84872079570 scopus 로고    scopus 로고
    • Selection of security system design via games of imperfect information and multi-objective genetic algorithm
    • Lins, I. D., Rê, L. C., Moura, M. D. C. & Droguett, E. L. (2013) Selection of security system design via games of imperfect information and multi-objective genetic algorithm. Reliab. Eng. Syst. Saf., 112, 59-66
    • (2013) Reliab. Eng. Syst. Saf , vol.112 , pp. 59-66
    • Lins, I.D.1    Rê, L.C.2    Moura, M.D.C.3    Droguett, E.L.4
  • 123
    • 84865467545 scopus 로고    scopus 로고
    • Multidimensional risk analysis of hydrogen pipelines
    • Lins, P. H. C. & de Almeida, A. T. (2012) Multidimensional risk analysis of hydrogen pipelines. Int. J. Hydrog. Energy, 37, 13545-13554
    • (2012) Int. J. Hydrog. Energy , vol.37 , pp. 13545-13554
    • Lins, P.H.C.1    De Almeida, A.T.2
  • 124
    • 18144398964 scopus 로고    scopus 로고
    • Multiobjective maintenance planning optimization for deteriorating bridges considering condition safety, and life-cycle cost
    • Liu, M. & Frangopol, D. M. (2005) Multiobjective maintenance planning optimization for deteriorating bridges considering condition, safety, and life-cycle cost. J. Struct. Eng.-ASCE, 131, 833-842
    • (2005) J. Struct. Eng.-ASCE , vol.131 , pp. 833-842
    • Liu, M.1    Frangopol, D.M.2
  • 125
    • 33750126957 scopus 로고    scopus 로고
    • Optimizing bridge network maintenance management under uncertainty with conflicting criteria: Life-cycle maintenance failure, and user costs
    • Liu, M. & Frangopol, D. M. (2006) Optimizing bridge network maintenance management under uncertainty with conflicting criteria: life-cycle maintenance, failure, and user costs. J. Struct. Eng.-ASCE, 132, 1835-1845
    • (2006) J. Struct. Eng.-ASCE , vol.132 , pp. 1835-1845
    • Liu, M.1    Frangopol, D.M.2
  • 126
    • 0028383972 scopus 로고
    • On the total productivity management of amaintenance float system through ahp applications
    • Madu, C. N. (1994) On the total productivity management of amaintenance float system through AHP applications. Int. J. Prod. Econ., 34, 201-207
    • (1994) Int. J. Prod. Econ , vol.34 , pp. 201-207
    • Madu, C.N.1
  • 127
    • 0029389915 scopus 로고
    • A decision-support systems-Approach to adjust maintenance float system availability levels
    • Madu, C. N., Kuei, C. H. & Chen, J. H. (1995). A decision-support systems-Approach to adjust maintenance float system availability levels. Comput. Indus. Eng., 28, 773-786
    • (1995) Comput. Indus. Eng , vol.28 , pp. 773-786
    • Madu, C.N.1    Kuei, C.H.2    Chen, J.H.3
  • 128
    • 33745663528 scopus 로고    scopus 로고
    • Basics of genetic algorithms optimization for rams applications
    • Marseguerra, M., Zio, E. & Martorell, S. (2006) Basics of genetic algorithms optimization for RAMS applications. Reliab. Eng. Syst. Saf., 91, 977-991
    • (2006) Reliab. Eng. Syst. Saf , vol.91 , pp. 977-991
    • Marseguerra, M.1    Zio, E.2    Martorell, S.3
  • 129
    • 0036683331 scopus 로고    scopus 로고
    • Condition-based maintenance optimization by means of genetic algorithms and monte carlo simulation
    • Marseguerra, M., Zio, E. & Podofillini, L. (2002) Condition-based maintenance optimization by means of genetic algorithms and Monte Carlo simulation. Reliab. Eng. Syst. Saf., 77, 151-165
    • (2002) Reliab. Eng. Syst. Saf , vol.77 , pp. 151-165
    • Marseguerra, M.1    Zio, E.2    Podofillini, L.3
  • 130
    • 1642586240 scopus 로고    scopus 로고
    • A multiobjective genetic algorithm approach to the optimization of the technical specifications of a nuclear safety system
    • Marseguerra, M., Zio, E. & Podofillini, L. (2004) A multiobjective genetic algorithm approach to the optimization of the technical specifications of a nuclear safety system. Reliab. Eng. Syst. Saf., 84, 87-99
    • (2004) Reliab. Eng. Syst. Saf , vol.84 , pp. 87-99
    • Marseguerra, M.1    Zio, E.2    Podofillini, L.3
  • 131
    • 4544333060 scopus 로고    scopus 로고
    • Optimal reliability/availability of uncertain systems via multi-objective genetic algorithms
    • Marseguerra, M., Zio, E. & Podofillini, L. (2004) Optimal reliability/availability of uncertain systems via multi-objective genetic algorithms. IEEE Trans. Reliab., 53, 424-434
    • (2004) IEEE Trans Reliab , vol.53 , pp. 424-434
    • Marseguerra, M.1    Zio, E.2    Podofillini, L.3
  • 132
    • 9444289306 scopus 로고    scopus 로고
    • Multiobjective spare part allocation by means of genetic algorithms and monte carlo simulation
    • Marseguerra, M., Zio, E. & Podofillini, L. (2005) Multiobjective spare part allocation by means of genetic algorithms and Monte Carlo simulation. Reliab. Eng. Syst. Saf., 87, 325-335
    • (2005) Reliab. Eng. Syst. Saf , vol.87 , pp. 325-335
    • Marseguerra, M.1    Zio, E.2    Podofillini, L.3
  • 133
    • 22444434834 scopus 로고    scopus 로고
    • Optimal design of reliable network systems in presence of uncertainty
    • Marseguerra, M., Zio, E., Podofillini, L., and Coit, D. W. (2005) Optimal design of reliable network systems in presence of uncertainty. IEEE Trans. Reliab., 54, 243-253
    • (2005) IEEE Trans Reliab , vol.54 , pp. 243-253
    • Marseguerra, M.1    Zio, E.2    Podofillini, L.3    Coit, D.W.4
  • 134
    • 34248562590 scopus 로고    scopus 로고
    • Lifetime multiobjective optimization of cost and spacing of corrosion rate sensors embedded in a deteriorating reinforced concrete bridge deck
    • Marsh, P. S. & Frangopol, D. M. (2007) Lifetime multiobjective optimization of cost and spacing of corrosion rate sensors embedded in a deteriorating reinforced concrete bridge deck. J. Struct. Eng.-ASCE, 133, 777-787
    • (2007) J. Struct. Eng.-ASCE , vol.133 , pp. 777-787
    • Marsh, P.S.1    Frangopol, D.M.2
  • 135
    • 33847297055 scopus 로고    scopus 로고
    • Urban stormwater drainage management: The development of a multicriteria decision aid approach for best management practices
    • Martin, C., Ruperd, Y. & Legret, M. (2007) Urban stormwater drainage management: The development of a multicriteria decision aid approach for best management practices. Eur. J. Oper. Res., 181, 338-349
    • (2007) Eur. J. Oper. Res , vol.181 , pp. 338-349
    • Martin, C.1    Ruperd, Y.2    Legret, M.3
  • 136
    • 0020876651 scopus 로고
    • A review of mechanical reliability modelling in relation to failure mechanisms
    • Martin, P., Strutt, J. & Kinkead, N. (1983). A review of mechanical reliability modelling in relation to failure mechanisms. Reliab. Eng., 6, 13-42
    • (1983) Reliab. Eng , vol.6 , pp. 13-42
    • Martin, P.1    Strutt, J.2    Kinkead, N.3
  • 138
    • 33845644940 scopus 로고    scopus 로고
    • A tolerance interval based approach to address uncertainty for rams plus c optimization
    • Martorell, S., Sanchez, A. & Carlos, S. (2007). A tolerance interval based approach to address uncertainty for RAMS plus C optimization. Reliab. Eng. Syst. Saf., 92, 408-422
    • (2007) Reliab. Eng. Syst. Saf , vol.92 , pp. 408-422
    • Martorell, S.1    Sanchez, A.2    Carlos, S.3
  • 139
    • 0036723346 scopus 로고    scopus 로고
    • Comparing effectiveness and efficiency in technical specifications and maintenance optimization
    • Martorell, S., Sanchez, A., Carlos, S. & Serradell, V. (2002) Comparing effectiveness and efficiency in technical specifications and maintenance optimization. Reliab. Eng. Syst. Saf., 77, 281-289
    • (2002) Reliab. Eng. Syst. Saf , vol.77 , pp. 281-289
    • Martorell, S.1    Sanchez, A.2    Carlos, S.3    Serradell, V.4
  • 140
    • 2942571511 scopus 로고    scopus 로고
    • Alternatives and challenges in optimizing industrial safety using genetic algorithms
    • Martorell, S., Sanchez, A., Carlos, S. & Serradell, V. (2004) Alternatives and challenges in optimizing industrial safety using genetic algorithms. Reliab. Eng. Syst. Saf., 86, 25-38
    • (2004) Reliab. Eng. Syst. Saf , vol.86 , pp. 25-38
    • Martorell, S.1    Sanchez, A.2    Carlos, S.3    Serradell, V.4
  • 141
    • 77957122527 scopus 로고    scopus 로고
    • Maintenance modeling and optimization integrating human and material resources
    • Martorell, S., Villamizar, M., Carlos, S. & Sanchez, A. (2010) Maintenance modeling and optimization integrating human and material resources. Reliab. Eng. Syst. Saf., 95, 1293-1299
    • (2010) Reliab. Eng. Syst. Saf , vol.95 , pp. 1293-1299
    • Martorell, S.1    Villamizar, M.2    Carlos, S.3    Sanchez, A.4
  • 142
    • 4544221624 scopus 로고    scopus 로고
    • Rams+c informed decision-making with application to multi-objective optimization of technical specifications and maintenance using genetic algorithms
    • Martorell, S., Villanueva, J. F., Carlos, S., Nebot, Y., Sanchez, A., Pitarch, J. L. & Serradell, V. (2005) RAMS+C informed decision-making with application to multi-objective optimization of technical specifications and maintenance using genetic algorithms. Reliab. Eng. Syst. Saf., 87, 65-75
    • (2005) Reliab. Eng. Syst. Saf , vol.87 , pp. 65-75
    • Martorell, S.1    Villanueva, J.F.2    Carlos, S.3    Nebot, Y.4    Sanchez, A.5    Pitarch, J.L.6    Serradell, V.7
  • 143
    • 0006470312 scopus 로고
    • Operating characteristics of opportunistic replacement and inspection policies
    • McCall, J. J. (1963) Operating characteristics of opportunistic replacement and inspection policies. Manag. Sci., 10, 85-97
    • (1963) Manag. Sci , vol.10 , pp. 85-97
    • McCall, J.J.1
  • 144
    • 84867743350 scopus 로고    scopus 로고
    • Power customer satisfaction and profitability analysis using multi-criteria decision making methods
    • Medjoudj, R., Aissani, D. & Haim, K. D. (2013) Power customer satisfaction and profitability analysis using multi-criteria decision making methods. Int. J. Electr. Power Energy Syst., 45, 331-339
    • (2013) Int. J. Electr. Power Energy Syst , vol.45 , pp. 331-339
    • Medjoudj, R.1    Aissani, D.2    Haim, K.D.3
  • 145
    • 0025841548 scopus 로고
    • An efficient approach for multiple criteria redundancy optimization problems
    • Misra, K. B. & Sharma, U. (1991) An efficient approach for multiple criteria redundancy optimization problems. Microelectron. Reliab., 31, 303-321
    • (1991) Microelectron. Reliab , vol.31 , pp. 303-321
    • Misra, K.B.1    Sharma, U.2
  • 146
    • 84886725638 scopus 로고    scopus 로고
    • Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming
    • Moghaddam, K. S. (2013) Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming. Int. J. Prod. Econ., 146, 704-716
    • (2013) Int. J. Prod. Econ , vol.146 , pp. 704-716
    • Moghaddam, K.S.1
  • 147
    • 28344437411 scopus 로고
    • Optimization techniques for system reliability: A review
    • Mohamed, A. A., Leemis, L. M. & Ravindran, A. (1992) Optimization techniques for system reliability: a review. Reliab. Eng. Syst. Saf., 35, 137-146
    • (1992) Reliab. Eng. Syst. Saf , vol.35 , pp. 137-146
    • Mohamed, A.A.1    Leemis, L.M.2    Ravindran, A.3
  • 148
    • 79951579853 scopus 로고    scopus 로고
    • Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
    • Moradi, E., Ghomi, S. M. T. F. & Zandieh, M. (2011) Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem. Expert Syst. Appl., 38, 7169-7178
    • (2011) Expert Syst. Appl , vol.38 , pp. 7169-7178
    • Moradi, E.1    Ghomi, S.M.T.F.2    Zandieh, M.3
  • 150
    • 79953680151 scopus 로고    scopus 로고
    • Comparison between different uncertainty propagation methods in multivariate analysis: An application in the bivariate case
    • Mullor, R., Sanchez, A., Martorell, S. & Martinez-Alzamora, N. (2011) Comparison between different uncertainty propagation methods in multivariate analysis: an application in the bivariate case. Reliab. Eng. Syst. Saf., 96, 642-650
    • (2011) Reliab. Eng. Syst. Saf , vol.96 , pp. 642-650
    • Mullor, R.1    Sanchez, A.2    Martorell, S.3    Martinez-Alzamora, N.4
  • 151
    • 84860755051 scopus 로고    scopus 로고
    • A scenario driven multiobjective primary-secondary distribution system expansion planning algorithm in the presence of wholesale-retail market
    • Nazar, M. S., Haghifam, M. R. & Nazar, M. (2012). A scenario driven multiobjective primary-secondary distribution system expansion planning algorithm in the presence of wholesale-retail market. Int. J. Electr. Power Energy Syst., 40, 29-45
    • (2012) Int. J. Electr. Power Energy Syst , vol.40 , pp. 29-45
    • Nazar, M.S.1    Haghifam, M.R.2    Nazar, M.3
  • 152
    • 33646724889 scopus 로고    scopus 로고
    • Probabilistic lifetime-oriented multiobjective optimization of bridge maintenance: Single maintenance type
    • Neves, L. A. C., Frangopol, D. M. & Cruz, P. J. S. (2006) Probabilistic lifetime-oriented multiobjective optimization of bridge maintenance: Single maintenance type. J. Struct. Eng.-ASCE, 132, 991-1005
    • (2006) J. Struct. Eng.-ASCE , vol.132 , pp. 991-1005
    • Neves, L.A.C.1    Frangopol, D.M.2    Cruz, P.J.S.3
  • 153
    • 33750130659 scopus 로고    scopus 로고
    • Probabilistic lifetime-oriented multiobjective optimization of bridge maintenance: Combination of maintenance types
    • Neves, L. A. C., Frangopol, D. M. & Petcherdchoo, A. (2006) Probabilistic lifetime-oriented multiobjective optimization of bridge maintenance: combination of maintenance types. J. Struct. Eng.-ASCE, 132, 1821-1834
    • (2006) J. Struct. Eng.-ASCE , vol.132 , pp. 1821-1834
    • Neves, L.A.C.1    Frangopol, D.M.2    Petcherdchoo, A.3
  • 154
    • 0000591756 scopus 로고
    • Strategic-planning in manufacturing systems-Ahp application to an equipment replacement decision
    • Oeltjenbruns, H., Kolarik, E. J. & Schnadtkirschner, R. (1995) Strategic-planning in manufacturing systems-AHP application to an equipment replacement decision. Int. J. Prod. Econ., 38, 189-197
    • (1995) Int. J. Prod. Econ , vol.38 , pp. 189-197
    • Oeltjenbruns, H.1    Kolarik, E.J.2    Schnadtkirschner, R.3
  • 155
    • 84859635634 scopus 로고    scopus 로고
    • Multi-objective optimization of a series-parallel system using gpsia
    • Okafor, E. G. & Sun, Y.-C. (2012) Multi-objective optimization of a series-parallel system using GPSIA. Reliab. Eng. Syst. Saf., 103, 61-71
    • (2012) Reliab. Eng. Syst. Saf , vol.103 , pp. 61-71
    • Okafor, E.G.1    Sun, Y.-C.2
  • 156
    • 70349152590 scopus 로고    scopus 로고
    • Lifetime-oriented multi-objective optimization of structural maintenance considering system reliability redundancy and life-cycle cost using ga
    • Okasha, N. M. & Frangopol, D. M. (2009) Lifetime-oriented multi-objective optimization of structural maintenance considering system reliability, redundancy and life-cycle cost using GA. Struct. Saf., 31, 460-474
    • (2009) Struct. Saf , vol.31 , pp. 460-474
    • Okasha, N.M.1    Frangopol, D.M.2
  • 157
    • 77955186208 scopus 로고    scopus 로고
    • Novel approach for multicriteria optimization of life-cycle preventive and essential maintenance of deteriorating structures
    • Okasha, N. M. & Frangopol, D.M. (2010) Novel approach for multicriteria optimization of life-cycle preventive and essential maintenance of deteriorating structures. J. Struct. Eng.-ASCE, 136, 1009-1022
    • (2010) J. Struct. Eng.-ASCE , vol.136 , pp. 1009-1022
    • Okasha, N.M.1    Frangopol, D.M.2
  • 158
    • 78649335724 scopus 로고    scopus 로고
    • Optimization of bridge maintenance strategies based on structural health monitoring information
    • Orcesi, A. D. & Frangopol, D. M. (2011) Optimization of bridge maintenance strategies based on structural health monitoring information. Struct. Saf., 33, 26-41
    • (2011) Struct. Saf , vol.33 , pp. 26-41
    • Orcesi, A.D.1    Frangopol, D.M.2
  • 160
    • 34547850627 scopus 로고    scopus 로고
    • Development of a multi-criteria hierarchical framework for maintenance performance measurement (mpm)
    • Parida, A. & Chattopadhyay, G. (2007) Development of a multi-criteria hierarchical framework for maintenance performance measurement (MPM). J. Qual. Maint. Eng., 13, 241-258
    • (2007) J. Qual. Maint. Eng , vol.13 , pp. 241-258
    • Parida, A.1    Chattopadhyay, G.2
  • 161
    • 67349228029 scopus 로고    scopus 로고
    • Business-oriented prioritization: A novel graphical technique
    • Pascual, R., Del, Castillo & Knights, P. (2009) Business-oriented prioritization: a novel graphical technique. Reliab. Eng. Syst. Saf., 94, 1308-1313
    • (2009) Reliab. Eng. Syst. Saf , vol.94 , pp. 1308-1313
    • Castillo. Del, P.R.1    Knights, P.2
  • 162
    • 0030575689 scopus 로고    scopus 로고
    • Imperfect maintenance
    • Pham, H. & Wang, H. (1996) Imperfect maintenance. Eur. J. Oper. Res., 94, 425-438
    • (1996) Eur. J. Oper. Res , vol.94 , pp. 425-438
    • Pham, H.1    Wang, H.2
  • 163
    • 24644473583 scopus 로고    scopus 로고
    • Risk-informed optimisation of railway tracks inspection and maintenance procedures
    • Podofillini, L., Zio, E. & Vatn, J. (2006) Risk-informed optimisation of railway tracks inspection and maintenance procedures. Reliab. Eng. Syst. Saf., 91, 20-35
    • (2006) Reliab. Eng. Syst. Saf , vol.91 , pp. 20-35
    • Podofillini, L.1    Zio, E.2    Vatn, J.3
  • 164
    • 33750731956 scopus 로고    scopus 로고
    • Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms
    • Quan, G., Greenwood, G. W., Liu, D. & Hu, S. (2007) Searching for multiobjective preventive maintenance schedules: combining preferences with evolutionary algorithms. Eur. J. Oper. Res., 177, 1969-1984
    • (2007) Eur. J. Oper. Res , vol.177 , pp. 1969-1984
    • Quan, G.1    Greenwood, G.W.2    Liu, D.3    Hu, S.4
  • 165
    • 0035248413 scopus 로고    scopus 로고
    • Reliability and costs optimization for distribution networks expansion using an evolutionary algorithm
    • Ramirez-Rosado, I. J. & Bernal-Agustin, J. L. (2001) Reliability and costs optimization for distribution networks expansion using an evolutionary algorithm. IEEE Trans. Power Syst., 16, 111-118
    • (2001) IEEE Trans Power Syst , vol.16 , pp. 111-118
    • Ramirez-Rosado, I.J.1    Bernal-Agustin, J.L.2
  • 166
    • 0026476842 scopus 로고
    • Reliability and redundancy apportionment using crisp and fuzzy multiobjective optimization approaches
    • Rao, S. S. & Dhingra, A. K. (1992) Reliability and redundancy apportionment using crisp and fuzzy multiobjective optimization approaches. Reliab. Eng. Syst. Saf., 37, 253-261
    • (1992) Reliab. Eng. Syst. Saf , vol.37 , pp. 253-261
    • Rao, S.S.1    Dhingra, A.K.2
  • 167
    • 84885190574 scopus 로고    scopus 로고
    • Optimizing reliability-based robust design model using multi-objective genetic algorithm
    • Rathod, V., Yadav, O. P., Rathore, A. & Jain, R. (2013) Optimizing reliability-based robust design model using multi-objective genetic algorithm. Comput. Indus. Eng., 66, 301-310
    • (2013) Comput. Indus. Eng , vol.66 , pp. 301-310
    • Rathod, V.1    Yadav, O.P.2    Rathore, A.3    Jain, R.4
  • 168
    • 0032157653 scopus 로고    scopus 로고
    • Design of reliable systems using static and dynamic fault trees
    • Ren, Y. S. & Dugan, J. B. (1998) Design of reliable systems using static and dynamic fault trees. IEEE Trans. Reliab., 47, 234-244
    • (1998) IEEE Trans Reliab , vol.47 , pp. 234-244
    • Ren, Y.S.1    Dugan, J.B.2
  • 169
    • 79958012668 scopus 로고    scopus 로고
    • Assessing the vulnerability of a power system through a multiple objective contingency screening approach
    • Rocco, C. M., Ramirez-Marquez, J. E., Salazar, D. E. & Yajure, C. (2011) Assessing the vulnerability of a power system through a multiple objective contingency screening approach. IEEE Trans. Reliab., 60, 394-403
    • (2011) IEEE Trans Reliab , vol.60 , pp. 394-403
    • Rocco, C.M.1    Ramirez-Marquez, J.E.2    Salazar, D.E.3    Yajure, C.4
  • 170
    • 33846919661 scopus 로고    scopus 로고
    • Optimal medical equipment maintenance service proposal decision support system combining activity based costing (ab) and the analytic hierarchy process (ahp)
    • New York: IEEE
    • Rocha, L. S., Sloane, E. B. & Bassani, J.W.M. (2005) Optimal medical equipment maintenance service proposal decision support system combining Activity Based Costing (AB) and the Analytic Hierarchy Process (AHP). Annual International Conference of the IEEE Engineering in Medicine and Biology-Proceedings, New York: IEEE. pp. 7103-7106
    • (2005) Annual International Conference of the IEEE Engineering in Medicine and Biology-Proceedings , pp. 7103-7106
    • Rocha, L.S.1    Sloane, E.B.2    Bassani, J.W.M.3
  • 172
    • 0003065507 scopus 로고    scopus 로고
    • The european school of mcda: Emergence basic features and current works
    • Roy, B. & Vanderpooten, D. (1996) The European school of MCDA: emergence, basic features and current works. J. Multi-Criteria Dec. Anal., 5, 22-38
    • (1996) J. Multi-Criteria Dec. Anal , vol.5 , pp. 22-38
    • Roy, B.1    Vanderpooten, D.2
  • 174
    • 55449130800 scopus 로고    scopus 로고
    • Planning and optimizing the maintenance of paper production systems in a paper plant
    • Sachdeva, A., Kumar, D. & Kumar, P. (2008) Planning and optimizing the maintenance of paper production systems in a paper plant. Comput. Indus. Eng., 55, 817-829
    • (2008) Comput. Indus. Eng , vol.55 , pp. 817-829
    • Sachdeva, A.1    Kumar, D.2    Kumar, P.3
  • 175
    • 84865491862 scopus 로고    scopus 로고
    • Multi-objective reliability optimization of series-parallel systems with a choice of redundancy strategies
    • Safari, J. (2012) Multi-objective reliability optimization of series-parallel systems with a choice of redundancy strategies. Reliab. Eng. Syst. Saf., 108, 10-20
    • (2012) Reliab. Eng. Syst. Saf , vol.108 , pp. 10-20
    • Safari, J.1
  • 176
    • 82755182529 scopus 로고    scopus 로고
    • Genetic algorithm based multi-objective reliability optimization in interval environment
    • Sahoo, L., Bhunia, A. K. & Kapur, P. K. (2012) Genetic algorithm based multi-objective reliability optimization in interval environment. Comput. Indus. Eng., 62, 152-160
    • (2012) Comput. Indus. Eng , vol.62 , pp. 152-160
    • Sahoo, L.1    Bhunia, A.K.2    Kapur, P.K.3
  • 177
    • 0018105721 scopus 로고
    • Multiobjective reliability and redundancy optimization of a series-parallel system by surrogate worth trade-off method
    • Sakawa, M. (1978) Multiobjective reliability and redundancy optimization of a series-parallel system by surrogate worth trade-off method. Microelectron. Reliab., 17, 465-467
    • (1978) Microelectron. Reliab , vol.17 , pp. 465-467
    • Sakawa, M.1
  • 178
    • 0019216476 scopus 로고
    • Reliability-design of a standby system by a large-scale multiobjective optimization method
    • Sakawa, M. (1980) Reliability-design of a standby system by a large-scale multiobjective optimization method. Microelectron. Reliab., 20, 191-204
    • (1980) Microelectron. Reliab , vol.20 , pp. 191-204
    • Sakawa, M.1
  • 179
    • 0019583039 scopus 로고
    • Optimal reliability-design of a series-parallel system by a large-scale multiobjective optimization method
    • Sakawa, M. (1981) OPtimal reliability-design of a series-parallel system by a large-scale multiobjective optimization method. IEEE Trans. Reliab., 30, 173-174
    • (1981) IEEE Trans Reliab , vol.30 , pp. 173-174
    • Sakawa, M.1
  • 180
    • 33846458246 scopus 로고    scopus 로고
    • Solving advanced multi-objective robust designs by means of multiple objective evolutionary algorithms (moe): A reliability application
    • Salazar, A. D. E. & Rocco, S. C. M. (2007) Solving advanced multi-objective robust designs by means of multiple objective evolutionary algorithms (MOE): a reliability application. Reliab. Eng. Syst. Saf., 92, 697-706
    • (2007) Reliab. Eng. Syst. Saf , vol.92 , pp. 697-706
    • Salazar, A.D.E.1    Rocco, S.C.M.2
  • 181
    • 33745519716 scopus 로고    scopus 로고
    • Optimization of constrained multiple-objective reliability problems using evolutionary algorithms
    • Salazar, D., Rocco, C. M. & Galvan, B. J. (2006) Optimization of constrained multiple-objective reliability problems using evolutionary algorithms. Reliab. Eng. Syst. Saf., 91, 1057-1070
    • (2006) Reliab. Eng. Syst. Saf , vol.91 , pp. 1057-1070
    • Salazar, D.1    Rocco, C.M.2    Galvan, B.J.3
  • 182
    • 52149094108 scopus 로고    scopus 로고
    • Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization
    • Sanchez, A., Carlos, S., Martorell, S. & Villanueva, J. F. (2009) Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization. Reliab. Eng. Syst. Saf., 94, 22-32
    • (2009) Reliab. Eng. Syst. Saf , vol.94 , pp. 22-32
    • Sanchez, A.1    Carlos, S.2    Martorell, S.3    Villanueva, J.F.4
  • 183
    • 45149101060 scopus 로고    scopus 로고
    • Condition evaluation of existing reinforced concrete bridges using fuzzy based analytic hierarchy approach
    • Sasmal, S. & Ramanjaneyulu, K. (2008) Condition evaluation of existing reinforced concrete bridges using fuzzy based analytic hierarchy approach. Expert Syst. Appl., 35, 1430-1443
    • (2008) Expert Syst. Appl , vol.35 , pp. 1430-1443
    • Sasmal, S.1    Ramanjaneyulu, K.2
  • 184
    • 80055043168 scopus 로고    scopus 로고
    • Modelling quality in replacement and inspection maintenance
    • Scarf, P. A. & Cavalcante, C. A. (2012) Modelling quality in replacement and inspection maintenance. Int. J. Prod. Econ., 135, 372-381
    • (2012) Int. J. Prod. Econ , vol.135 , pp. 372-381
    • Scarf, P.A.1    Cavalcante, C.A.2
  • 185
    • 0021497404 scopus 로고
    • Regional energy supply optimization with multiple objectives
    • Schulz, V. & Stehfest, H. (1984) Regional energy supply optimization with multiple objectives. Eur. J. Oper. Res., 17, 302-312
    • (1984) Eur. J. Oper. Res , vol.17 , pp. 302-312
    • Schulz, V.1    Stehfest, H.2
  • 186
    • 0036641666 scopus 로고    scopus 로고
    • A fuzzy knowledge based method for maintenance planning in a power system
    • Sergaki, A. & Kalaitzakis, K. (2002). A fuzzy knowledge based method for maintenance planning in a power system. Reliab. Eng. Syst. Saf., 77, 19-30
    • (2002) Reliab. Eng. Syst. Saf , vol.77 , pp. 19-30
    • Sergaki, A.1    Kalaitzakis, K.2
  • 187
    • 79953881384 scopus 로고    scopus 로고
    • A literature review and future perspectives on maintenance optimization
    • Sharma, A., Yadava, G. S. & Deshmukh, S. G. (2011). A literature review and future perspectives on maintenance optimization. J. Qual. Maint. Eng., 17, 5-25
    • (2011) J. Qual. Maint. Eng , vol.17 , pp. 5-25
    • Sharma, A.1    Yadava, G.S.2    Deshmukh, S.G.3
  • 188
    • 53149094731 scopus 로고    scopus 로고
    • Multi-criteria decision-making approach to evaluate optimum maintenance strategy in textile industry
    • Shyjith, K., Ilangkumaran, M. & Kumanan, S. (2008) Multi-criteria decision-making approach to evaluate optimum maintenance strategy in textile industry. J. Qual. Maint. Eng., 14, 375-386
    • (2008) J. Qual. Maint. Eng , vol.14 , pp. 375-386
    • Shyjith, K.1    Ilangkumaran, M.2    Kumanan, S.3
  • 189
    • 67349182896 scopus 로고    scopus 로고
    • Selection of a cleaning system for engine maintenance based on the analytic hierarchy process
    • Socorro Garcia-Cascales, M. & Teresa Lamata, M. (2009) Selection of a cleaning system for engine maintenance based on the analytic hierarchy process. Comput. Indus. Eng., 56, 1442-1451
    • (2009) Comput. Indus. Eng , vol.56 , pp. 1442-1451
    • Socorro Garcia-Cascales, M.1    Teresa Lamata, M.2
  • 190
    • 0035368829 scopus 로고    scopus 로고
    • Fuzzy qfd for supply chain management with reliability consideration
    • Sohn, S. Y. & Choi, I. S. (2001) Fuzzy QFD for supply chain management with reliability consideration. Reliab. Eng. Syst. Saf., 72, 327-334
    • (2001) Reliab. Eng. Syst. Saf , vol.72 , pp. 327-334
    • Sohn, S.Y.1    Choi, I.S.2
  • 191
    • 0024141283 scopus 로고
    • Failure cost design of structural systems
    • Soltani, M. & Corotis, R. B. (1988) failure cost design of structural systems. Struct. Saf., 5, 239-252
    • (1988) Struct. Saf , vol.5 , pp. 239-252
    • Soltani, M.1    Corotis, R.B.2
  • 192
    • 84870531839 scopus 로고    scopus 로고
    • Optimum multi-objective ramp-stress accelerated life test with stress upper bound for burr type-xii distribution
    • Srivastava, P. W. & Mittal, N. (2012) Optimum multi-objective ramp-stress accelerated life test with stress upper bound for Burr type-XII distribution. IEEE Trans. Reliab., 61, 1030-1038
    • (2012) IEEE Trans Reliab , vol.61 , pp. 1030-1038
    • Srivastava, P.W.1    Mittal, N.2
  • 193
    • 33750296960 scopus 로고    scopus 로고
    • Practical solutions for multi-objective optimization: An application to system reliability design problems
    • Taboada, H. A., Baheranwala, F., Coit, D. W. & Wattanapongsakorn, N. (2007) Practical solutions for multi-objective optimization: an application to system reliability design problems. Reliab. Eng. Syst. Saf., 92, 314-322
    • (2007) Reliab. Eng. Syst. Saf , vol.92 , pp. 314-322
    • Taboada, H.A.1    Baheranwala, F.2    Coit, D.W.3    Wattanapongsakorn, N.4
  • 194
    • 41449107140 scopus 로고    scopus 로고
    • Moms-ga: A multi-objective multi-state genetic algorithm for system reliability optimization design problems
    • Taboada, H. A., Espiritu, J. F. & Coit, D. W. (2008) MOMS-GA: a multi-objective multi-state genetic algorithm for system reliability optimization design problems. IEEE Trans. Reliab., 57, 182-191
    • (2008) IEEE Trans Reliab , vol.57 , pp. 182-191
    • Taboada, H.A.1    Espiritu, J.F.2    Coit, D.W.3
  • 195
    • 77953539900 scopus 로고    scopus 로고
    • Performance measures and optimal design of linear structural systems under stochastic stationary excitation
    • Taflanidis, A. A. & Scruggs, J. T. (2010) Performance measures and optimal design of linear structural systems under stochastic stationary excitation. Struct. Saf., 32, 305-315
    • (2010) Struct. Saf , vol.32 , pp. 305-315
    • Taflanidis, A.A.1    Scruggs, J.T.2
  • 196
    • 77956992498 scopus 로고    scopus 로고
    • Multiple criteria assessment of substation conditions by pair-wise comparison of analytic hierarchy process
    • Tanaka, H., Tsukao, S., Yamashita, D., Niimura, T. & Yokoyama, R. (2010) Multiple criteria assessment of substation conditions by pair-wise comparison of analytic hierarchy process. IEEE Trans. Power Deliv., 25, 3017-3023
    • (2010) IEEE Trans Power Deliv , vol.25 , pp. 3017-3023
    • Tanaka, H.1    Tsukao, S.2    Yamashita, D.3    Niimura, T.4    Yokoyama, R.5
  • 197
    • 33745657496 scopus 로고    scopus 로고
    • Redundancy allocation for multi-state systems using physical programming and genetic algorithms
    • Tian, Z. & Zuo, M. J. (2006) Redundancy allocation for multi-state systems using physical programming and genetic algorithms. Reliab. Eng. Syst. Saf., 91, 1049-1056
    • (2006) Reliab. Eng. Syst. Saf , vol.91 , pp. 1049-1056
    • Tian, Z.1    Zuo, M.J.2
  • 198
    • 45549108293 scopus 로고    scopus 로고
    • Reliability-redundancy allocation for multi-state series-parallel systems
    • Tian, Z., Zuo, M. J. & Huang, H. (2008) Reliability-redundancy allocation for multi-state series-parallel systems. IEEE Trans. Reliab., 57, 303-310
    • (2008) IEEE Trans Reliab , vol.57 , pp. 303-310
    • Tian, Z.1    Zuo, M.J.2    Huang, H.3
  • 199
    • 63649139504 scopus 로고    scopus 로고
    • Multiobjective optimal placement of switches and protective devices in electric power distribution systems using ant colony optimization
    • Tippachon, W. & Rerkpreedapong, D. (2009) Multiobjective optimal placement of switches and protective devices in electric power distribution systems using ant colony optimization. Electr. Power Syst. Res., 79, 1171-1178
    • (2009) Electr. Power Syst. Res , vol.79 , pp. 1171-1178
    • Tippachon, W.1    Rerkpreedapong, D.2
  • 200
    • 59049098384 scopus 로고    scopus 로고
    • Modelling and optimization of proof testing policies for safety instrumented systems
    • Torres-Echeverria, A. C., Martorell, S. & Thompson, H. A. (2009) Modelling and optimization of proof testing policies for safety instrumented systems. Reliab. Eng. Syst. Saf., 94, 838-854
    • (2009) Reliab. Eng. Syst. Saf , vol.94 , pp. 838-854
    • Torres-Echeverria, A.C.1    Martorell, S.2    Thompson, H.A.3
  • 201
    • 84863477117 scopus 로고    scopus 로고
    • Multi-objective optimization of design and testing of safety instrumented systems with moon voting architectures using a genetic algorithm
    • Torres-Echeverria, A. C., Martorell, S. & Thompson, H. A. (2012) Multi-objective optimization of design and testing of safety instrumented systems with MooN voting architectures using a genetic algorithm. Reliab. Eng. Syst. Saf., 106, 45-60
    • (2012) Reliab. Eng. Syst. Saf , vol.106 , pp. 45-60
    • Torres-Echeverria, A.C.1    Martorell, S.2    Thompson, H.A.3
  • 202
    • 0030649068 scopus 로고    scopus 로고
    • Determining the most important criteria in maintenance decision making
    • Triantaphyllou, E., Kovalerchuk, B., Mann Jr, L. & Knapp, G. M. (1997) Determining the most important criteria in maintenance decision making. J. Qual. Maint. Eng., 3, 16-28
    • (1997) J. Qual. Maint. Eng , vol.3 , pp. 16-28
    • Triantaphyllou, E.1    Kovalerchuk, B.2    Mann, L.3    Knapp, G.M.4
  • 203
    • 84886405756 scopus 로고    scopus 로고
    • Evolutionary multi-objective day-Ahead thermal generation scheduling in uncertain environment
    • Trivedi, A., Srinivasan, D., Sharma, D. & Singh, C. (2013) Evolutionary multi-objective day-Ahead thermal generation scheduling in uncertain environment. IEEE Trans. Power Syst., 28, 1345-1354
    • (2013) IEEE Trans Power Syst , vol.28 , pp. 1345-1354
    • Trivedi, A.1    Srinivasan, D.2    Sharma, D.3    Singh, C.4
  • 204
    • 0026835203 scopus 로고
    • Design and implementation of a maintenance planning and controlsystem
    • Ulusoy, G., Or, I. & Soydan, N. (1992) Design and implementation of a maintenance planning and controlsystem. Int. J. Prod. Econ., 24, 263-272
    • (1992) Int. J. Prod. Econ , vol.24 , pp. 263-272
    • Ulusoy, G.1    Or, I.2    Soydan, N.3
  • 206
    • 0031272441 scopus 로고    scopus 로고
    • Maintenance optimisation from a decision theoretical point of view
    • Vatn, J. (1997) Maintenance optimisation from a decision theoretical point of view. Reliab. Eng. Syst. Saf., 58, 119-126
    • (1997) Reliab. Eng. Syst. Saf , vol.58 , pp. 119-126
    • Vatn, J.1
  • 207
    • 0030105804 scopus 로고    scopus 로고
    • An overall model for maintenance optimization
    • Vatn, J., Hokstad, P. & Bodsberg, L. (1996) An overall model for maintenance optimization. Reliab. Eng. Syst. Saf., 51, 241-257
    • (1996) Reliab. Eng. Syst. Saf , vol.51 , pp. 241-257
    • Vatn, J.1    Hokstad, P.2    Bodsberg, L.3
  • 208
    • 80052259318 scopus 로고    scopus 로고
    • A promethee-based approach to portfolio selection problems
    • Vetschera, R & de Almeida, A T. (2012). A PROMETHEE-based approach to portfolio selection problems. Comput. Oper. Res., 39, 1010-1020
    • (2012) Comput. Oper. Res , vol.39 , pp. 1010-1020
    • Vetschera, R.1    De Almeida, A.T.2
  • 209
    • 49949120095 scopus 로고    scopus 로고
    • Genetic algorithm-based optimization of testing and maintenance under uncertain unavailability and cost estimation: A survey of strategies for harmonizing evolution and accuracy
    • Villanueva, J. F., Sanchez, A. I., Carlos, S. & Martorell, S. (2008) Genetic algorithm-based optimization of testing and maintenance under uncertain unavailability and cost estimation: a survey of strategies for harmonizing evolution and accuracy. Reliab. Eng. Syst. Saf., 93, 1830-1841
    • (2008) Reliab. Eng. Syst. Saf , vol.93 , pp. 1830-1841
    • Villanueva, J.F.1    Sanchez, A.I.2    Carlos, S.3    Martorell, S.4
  • 211
    • 2342650302 scopus 로고    scopus 로고
    • A model to determine the cleanliness measurement interval in an automotive paint shop
    • Waeyenbergh, G., Vannieuwenhuyse, B. & Pintelon, L. (2004). A model to determine the cleanliness measurement interval in an automotive paint shop. J. Qual. Maint. Eng., 10, 37-46
    • (2004) J. Qual. Maint. Eng , vol.10 , pp. 37-46
    • Waeyenbergh, G.1    Vannieuwenhuyse, B.2    Pintelon, L.3
  • 212
    • 61849128422 scopus 로고    scopus 로고
    • Multiple criteria decision making multiattribute utility theory: Recent accomplishments and what lies ahead
    • Wallenius, J., Dyer, J. S., Fishburn, P. C., Steuer, R. E., Zionts, S. & Deb, K. (2008) Multiple criteria decision making, multiattribute utility theory: recent accomplishments and what lies ahead. Manage. Sci., 54, 1336-1349
    • (2008) Manage. Sci , vol.54 , pp. 1336-1349
    • Wallenius, J.1    Dyer, J.S.2    Fishburn, P.C.3    Steuer, R.E.4    Zionts, S.5    Deb, K.6
  • 213
    • 84880924584 scopus 로고    scopus 로고
    • Supply reliability and generation cost analysis due to load forecast uncertainty in unit commitment problems
    • Wang, B., Li, Y. & Watada, J. (2013) Supply reliability and generation cost analysis due to load forecast uncertainty in unit commitment problems. IEEE Trans. Power Syst
    • (2013) IEEE Trans. Power Syst
    • Wang, B.1    Li, Y.2    Watada, J.3
  • 214
    • 0037118559 scopus 로고    scopus 로고
    • A survey of maintenance policies of deteriorating systems
    • Wang, H. (2002). A survey of maintenance policies of deteriorating systems. Eur. J. Oper. Res., 139, 469-489
    • (2002) Eur. J. Oper. Res , vol.139 , pp. 469-489
    • Wang, H.1
  • 215
    • 33847071199 scopus 로고    scopus 로고
    • Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process
    • Wang, L., Chu, J. & Wu, J. (2007) Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process. Int. J. Prod. Econ., 107, 151-163
    • (2007) Int. J. Prod. Econ , vol.107 , pp. 151-163
    • Wang, L.1    Chu, J.2    Wu, J.3
  • 216
    • 82455212134 scopus 로고    scopus 로고
    • A multi-objective optimization of imperfect preventive maintenance policy for dependent competing risk systems with hidden failure
    • Wang, Y. & Hoang, P. (2011). A multi-objective optimization of imperfect preventive maintenance policy for dependent competing risk systems with hidden failure. IEEE Trans. Reliab., 60, 770-781
    • (2011) IEEE Trans. Reliab , vol.60 , pp. 770-781
    • Wang, Y.1    Hoang, P.2
  • 217
    • 77956343124 scopus 로고    scopus 로고
    • Multi-objective approaches to optimal testing resource allocation in modular software systems
    • Wang, Z., Tang, K. & Yao, X. (2010) Multi-objective approaches to optimal testing resource allocation in modular software systems. IEEE Trans. Reliab., 59, 563-575
    • (2010) IEEE Trans. Reliab , vol.59 , pp. 563-575
    • Wang, Z.1    Tang, K.2    Yao, X.3
  • 218
    • 33845780486 scopus 로고    scopus 로고
    • Fault-Tolerant embedded system design and optimization considering reliability estimation uncertainty
    • Wattanapongskorn, N. & Coit, D. W. (2007) Fault-Tolerant embedded system design and optimization considering reliability estimation uncertainty. Reliab. Eng. Syst. Saf., 92, 395-407
    • (2007) Reliab. Eng. Syst. Saf , vol.92 , pp. 395-407
    • Wattanapongskorn, N.1    Coit, D.W.2
  • 219
    • 84865744522 scopus 로고    scopus 로고
    • Robust-optimum multi-Attribute age-based replacement policy
    • Wijaya, A. R., Lundberg, J. & Kumar, U. (2012) Robust-optimum multi-Attribute age-based replacement policy. J. Qual. Maint. Eng., 18, 325-343
    • (2012) J. Qual. Maint. Eng , vol.18 , pp. 325-343
    • Wijaya, A.R.1    Lundberg, J.2    Kumar, U.3
  • 220
    • 33745664031 scopus 로고    scopus 로고
    • Multi-objective genetic algorithm for solving n-version program design problem
    • Yamachi, H., Tsujimura, Y., Kambayashi, Y. & Yamamoto, H. (2006) Multi-objective genetic algorithm for solving N-version program design problem. Reliab. Eng. Syst. Saf., 91, 1083-1094
    • (2006) Reliab. Eng. Syst. Saf , vol.91 , pp. 1083-1094
    • Yamachi, H.1    Tsujimura, Y.2    Kambayashi, Y.3    Yamamoto, H.4
  • 221
    • 56549118368 scopus 로고    scopus 로고
    • Optimal scheduling of emergency roadway repair and subsequent relief distribution
    • Yan, S. & Shih, Y.-L. (2009) Optimal scheduling of emergency roadway repair and subsequent relief distribution. Comput. Oper. Res., 36, 2049-2065
    • (2009) Comput. Oper. Res , vol.36 , pp. 2049-2065
    • Yan, S.1    Shih, Y.-L.2
  • 222
    • 70350738356 scopus 로고    scopus 로고
    • Multiobjective evolutionary optimization of maintenance schedules and extents for composite power systems
    • Yang, F. & Chang, C. S. (2009) Multiobjective evolutionary optimization of maintenance schedules and extents for composite power systems. IEEE Trans. Power Syst., 24, 1694-1702
    • (2009) IEEE Trans Power Syst , vol.24 , pp. 1694-1702
    • Yang, F.1    Chang, C.S.2
  • 223
    • 49249128934 scopus 로고    scopus 로고
    • Multiobjective evolutionary optimization of substation maintenance using decision-varying markov model
    • Yang, F., Kwan, C. M. & Chang, C. S. (2008) Multiobjective evolutionary optimization of substation maintenance using decision-varying Markov model. IEEE Trans. Power Syst., 23, 1328-1335
    • (2008) IEEE Trans Power Syst , vol.23 , pp. 1328-1335
    • Yang, F.1    Kwan, C.M.2    Chang, C.S.3
  • 225
    • 2142642253 scopus 로고    scopus 로고
    • Reliability and cost optimization of electronic devices considering the component failure rate uncertainty
    • Zafiropoulos, E. P. & Dialynas, E. N. (2004) Reliability and cost optimization of electronic devices considering the component failure rate uncertainty. Reliab. Eng. Syst. Saf., 84, 271-284
    • (2004) Reliab. Eng. Syst. Saf , vol.84 , pp. 271-284
    • Zafiropoulos, E.P.1    Dialynas, E.N.2
  • 226
    • 33748290030 scopus 로고    scopus 로고
    • Reliability optimization using multiobjective ant colony system approaches
    • Zhao, J.-H., Liu, Z. & Dao, M.-T. (2007) Reliability optimization using multiobjective ant colony system approaches. Reliab. Eng. Syst. Saf., 92, 109-120
    • (2007) Reliab. Eng. Syst. Saf , vol.92 , pp. 109-120
    • Zhao, J.-H.1    Liu, Z.2    Dao, M.-T.3
  • 227
    • 84883168038 scopus 로고    scopus 로고
    • Long-Term multi-objective distribution network planning by dg allocation and feeders reconfiguration
    • Zidan, A., Shaaban, M. F. & El-Saadany, E. F. (2013) Long-Term multi-objective distribution network planning by DG allocation and feeders reconfiguration. Electr. Power Syst. Res., 105, 95-104
    • (2013) Electr. Power Syst. Res , vol.105 , pp. 95-104
    • Zidan, A.1    Shaaban, M.F.2    El-Saadany, E.F.3
  • 228
    • 79151486458 scopus 로고    scopus 로고
    • A clustering procedure for reducing the number of representative solutions in the pareto front of multiobjective optimization problems
    • Zio, E. & Bazzo, R. (2011) A clustering procedure for reducing the number of representative solutions in the Pareto Front of multiobjective optimization problems. Eur. J. Oper. Res., 210, 624-634
    • (2011) Eur. J. Oper. Res , vol.210 , pp. 624-634
    • Zio, E.1    Bazzo, R.2
  • 229
    • 79951812692 scopus 로고    scopus 로고
    • Level diagrams analysis of pareto front for multiobjective system redundancy allocation
    • Zio, E. & Bazzo, R. (2011) Level diagrams analysis of Pareto front for multiobjective system redundancy allocation. Reliab. Eng. Syst. Saf., 96, 569-580
    • (2011) Reliab. Eng. Syst. Saf , vol.96 , pp. 569-580
    • Zio, E.1    Bazzo, R.2
  • 230
    • 84255178698 scopus 로고    scopus 로고
    • Identifying groups of critical edges in a realistic electrical network by multi-objective genetic algorithms
    • Zio, E., Golea, L. R., Rocco, C. M. S. (2012) Identifying groups of critical edges in a realistic electrical network by multi-objective genetic algorithms. Reliab. Eng. Syst. Saf., 99, 172-177
    • (2012) Reliab. Eng. Syst. Saf , vol.99 , pp. 172-177
    • Zio, E.1    Golea, L.R.2    Rocco, C.M.S.3
  • 231
    • 34250212577 scopus 로고    scopus 로고
    • Importance measures and genetic algorithms for designing a risk-informed optimally balanced system
    • Zio, E. & Podofillini, L. (2007) Importance measures and genetic algorithms for designing a risk-informed optimally balanced system. Reliab. Eng. Syst. Saf., 92, 1435-1447
    • (2007) Reliab. Eng. Syst. Saf , vol.92 , pp. 1435-1447
    • Zio, E.1    Podofillini, L.2
  • 232
    • 80052488470 scopus 로고    scopus 로고
    • Optimization of the inspection intervals of a safety system in a nuclear power plant by multi-objective differential evolution (mode)
    • Zio, E. & Viadana, G. (2011) Optimization of the inspection intervals of a safety system in a nuclear power plant by Multi-Objective Differential Evolution (MODE). Reliab. Eng. Syst. Saf., 96, 1552-1563
    • (2011) Reliab. Eng. Syst. Saf , vol.96 , pp. 1552-1563
    • Zio, E.1    Viadana, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.