-
1
-
-
84866542680
-
Application of ipso-monte carlo for optimal distributed generation allocation and sizing
-
Abdi, S. & Afshar, K. (2013) Application of IPSO-Monte Carlo for optimal distributed generation allocation and sizing. Int. J. Electr. Power Energy Syst., 44, 786-797
-
(2013)
Int. J. Electr. Power Energy Syst
, vol.44
, pp. 786-797
-
-
Abdi, S.1
Afshar, K.2
-
2
-
-
84876843790
-
Multiobjective generation expansion planning considering power system adequacy
-
Aghaei, J., Akbari, M. A., Roosta, A. & Baharvandi, A. (2013) Multiobjective generation expansion planning considering power system adequacy. Electr. Power Syst. Res., 102, 8-19
-
(2013)
Electr. Power Syst. Res
, vol.102
, pp. 8-19
-
-
Aghaei, J.1
Akbari, M.A.2
Roosta, A.3
Baharvandi, A.4
-
3
-
-
77950298149
-
Assigning priorities to actions in a pipeline transporting hydrogen based on a multicriteria decision model
-
Alencar, M. H. & de Almeida, A. T. (2010) Assigning priorities to actions in a pipeline transporting hydrogen based on a multicriteria decision model. Int. J. Hydrog. Energy, 35, 3610-3619
-
(2010)
Int. J. Hydrog. Energy
, vol.35
, pp. 3610-3619
-
-
Alencar, M.H.1
De Almeida, A.T.2
-
4
-
-
0037432505
-
Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making
-
Al-Najjar, B. & Alsyouf, I. (2003) Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making. Int. J. Prod. Econ., 84, 85-100
-
(2003)
Int. J. Prod. Econ
, vol.84
, pp. 85-100
-
-
Al-Najjar, B.1
Alsyouf, I.2
-
5
-
-
84937404782
-
Multicriteria and multiobjective models for risk, reliability and maintenance decision analysis
-
New York Springer
-
De Almeida, A. T., Cavalcante, C. A. V., Alencar, M. H., Ferreira, R. J. P., Almeida-Filho, A. T. & Garcez, T. V. (2015) Multicriteria and Multiobjective Models for Risk, Reliability and Maintenance Decision Analysis. International Series in Operations Research and Management Science. New York: Springer
-
(2015)
International Series in Operations Research and Management Science
-
-
De Almeida, A.T.1
Cavalcante, C.A.V.2
Alencar, M.H.3
Ferreira, R.J.P.4
Almeida-Filho, A.T.5
Garcez, T.V.6
-
6
-
-
0035284045
-
Multicriteria decision making on maintenance: Spares and contracts planning
-
de Almeida, A. T. (2001) Multicriteria decision making on maintenance: spares and contracts planning. Eur. J. Oper. Res., 129, 235-241
-
(2001)
Eur. J. Oper. Res
, vol.129
, pp. 235-241
-
-
De Almeida, A.T.1
-
7
-
-
0034893391
-
Repair contract decision model through additive utility function
-
de Almeida, A. T. (2001) Repair contract decision model through additive utility function. J. Qual. Maint. Eng., 7, 42-48
-
(2001)
J. Qual. Maint. Eng
, vol.7
, pp. 42-48
-
-
De Almeida, A.T.1
-
8
-
-
0036073875
-
Multicriteria modelling for a repair contract problem based on utility and the electre i method
-
de Almeida, A. T. (2002) Multicriteria modelling for a repair contract problem based on utility and the ELECTRE I method. IMA J. Manag. Math., 13, 29-37
-
(2002)
IMA J. Manag. Math
, vol.13
, pp. 29-37
-
-
De Almeida, A.T.1
-
9
-
-
24144481467
-
Multicriteria modelling of repair contract based on utility and electre i method with dependability and service quality criteria
-
de Almeida, A. T. (2005) Multicriteria Modelling of Repair Contract Based on Utility and ELECTRE I Method with Dependability and Service Quality Criteria. Ann. Oper. Res., 138, 113-126
-
(2005)
Ann. Oper. Res
, vol.138
, pp. 113-126
-
-
De Almeida, A.T.1
-
10
-
-
34247645554
-
Multicriteria decision model for outsourcing contracts selection based on utility function and electre method
-
de Almeida, A. T. (2007) Multicriteria decision model for outsourcing contracts selection based on utility function and ELECTRE method. Comput. Oper. Res., 34, 3569-3574
-
(2007)
Comput. Oper. Res
, vol.34
, pp. 3569-3574
-
-
De Almeida, A.T.1
-
11
-
-
0004205128
-
Decision theory in maintenance decision making
-
de Almeida, A. T. & Bohoris, G. A. (1995) Decision theory in maintenance decision making. J. Qual. Maint. Eng., 1, 39-45
-
(1995)
J. Qual. Maint. Eng
, vol.1
, pp. 39-45
-
-
De Almeida, A.T.1
Bohoris, G.A.2
-
12
-
-
84866521581
-
Multicriteria model for selection of preventive maintenance intervals
-
de Almeida, A. T. (2012) Multicriteria model for selection of preventive maintenance intervals. Qual. Reliab. Eng. Int., 28, 585-593
-
(2012)
Qual. Reliab. Eng. Int
, vol.28
, pp. 585-593
-
-
De Almeida, A.T.1
-
13
-
-
84887325954
-
Additive-veto models for choice and ranking multicriteria decision problems
-
1350026/-1-1350026/20
-
de Almeida, A. T. (2013) Additive-veto models for choice and ranking multicriteria decision problems. Asia-Pac. J. Oper. Res., 30, 1350026/-1-1350026/20
-
(2013)
Asia-Pac. J. Oper. Res
, vol.30
-
-
De Almeida, A.T.1
-
14
-
-
84856516186
-
A note on scale transformations in the promethee v method
-
de Almeida, A. T. & Vetschera, R. (2012). A note on scale transformations in the PROMETHEE V method. Eur. J. Oper. Res., 219, 198-200
-
(2012)
Eur. J. Oper. Res
, vol.219
, pp. 198-200
-
-
De Almeida, A.T.1
Vetschera, R.2
-
15
-
-
0030172154
-
Decision theory in maintenance strategy of standby system with gamma-distribution repair-Time
-
de Almeida, A. T. & Bohoris, G. A. (1996) Decision theory in maintenance strategy of standby system with Gamma-distribution repair-Time. IEEE Trans. Reliab., 45, 216-219
-
(1996)
IEEE Trans. Reliab
, vol.45
, pp. 216-219
-
-
De Almeida, A.T.1
Bohoris, G.A.2
-
16
-
-
0027666923
-
Decision theory in maintenance strategy for a 2-unit redundant standby system
-
de Almeida, A. T. & deSouza, F. M. C. (1993) Decision theory in maintenance strategy for a 2-unit redundant standby system. IEEE Trans. Reliab., 42, 401-407
-
(1993)
IEEE Trans. Reliab
, vol.42
, pp. 401-407
-
-
De Almeida, A.T.1
Desouza, F.M.C.2
-
17
-
-
0024130398
-
A critique of recent models for human error rate assessment
-
Apostolakis, G. E., Bier, V. M. & Mosleh, A. (1988). A critique of recent models for human error rate assessment. Reliab. Eng. Syst. Saf., 22, 201-217
-
(1988)
Reliab. Eng. Syst. Saf
, vol.22
, pp. 201-217
-
-
Apostolakis, G.E.1
Bier, V.M.2
Mosleh, A.3
-
18
-
-
0036378705
-
A multi-Attribute preventive replacement model
-
Azaiez, M. N. (2002). A multi-Attribute preventive replacement model. J. Qual. Maint. Eng., 8, 213-225
-
(2002)
J. Qual. Maint. Eng
, vol.8
, pp. 213-225
-
-
Azaiez, M.N.1
-
19
-
-
55749096731
-
Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm
-
Azaron, A., Perkgoz, C., Katagiri, H., Kato, K. & Sakawa, M. (2009) Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm. Comput. Oper. Res., 36, 1562-1571
-
(2009)
Comput. Oper. Res
, vol.36
, pp. 1562-1571
-
-
Azaron, A.1
Perkgoz, C.2
Katagiri, H.3
Kato, K.4
Sakawa, M.5
-
20
-
-
77954033742
-
Allocation of network-driven load-management measures using multiattribute decision making
-
Baboli, P. T. & Moghaddam, M. P. (2010) Allocation of network-driven load-management measures using multiattribute decision making. IEEE Trans. Power Deliv., 25, 1839-1845
-
(2010)
IEEE Trans. Power Deliv
, vol.25
, pp. 1839-1845
-
-
Baboli, P.T.1
Moghaddam, M.P.2
-
21
-
-
80755136714
-
A multi-criteria model for auditing a predictive maintenance programme
-
Bana e Costa, C. A., Carmen Carnero, M. & Duarte Oliveira, M.( 2012) A multi-criteria model for auditing a predictive maintenance programme. Eur. J. Oper. Res., 217, 381-393
-
(2012)
Eur. J. Oper. Res
, vol.217
, pp. 381-393
-
-
Bana, E.1
Costa, C.A.2
Carmen Carnero, M.3
Duarte Oliveira, M.4
-
22
-
-
1542316248
-
Multi-objective reliability-based optimization of prestressed concrete beams
-
Barakat, S., Bani-Hani, K. & Taha, M. Q. (2004) Multi-objective reliability-based optimization of prestressed concrete beams. Struct. Saf., 26, 311-342
-
(2004)
Struct. Saf
, vol.26
, pp. 311-342
-
-
Barakat, S.1
Bani-Hani, K.2
Taha, M.Q.3
-
25
-
-
67649873297
-
Electric distribution network reconfiguration based on a fuzzy multi-criteria decision making algorithm
-
Bernardon, D. P., Garcia, V. J., Ferreira, A. S. Q. & Canha, L. N. (2009) Electric distribution network reconfiguration based on a fuzzy multi-criteria decision making algorithm. Electr. Power Syst. Res., 79, 1400-1407
-
(2009)
Electr. Power Syst. Res
, vol.79
, pp. 1400-1407
-
-
Bernardon, D.P.1
Garcia, V.J.2
Ferreira, A.S.Q.3
Canha, L.N.4
-
26
-
-
78650599022
-
Methodology for allocation of remotely controlled switches in distribution networks based on a fuzzy multi-criteria decision making algorithm
-
Bernardon, D. P., Sperandio, M., Garcia, V. J., Russi, J., Canha, L. N., Abaide, A. R. & Daza, E. F. B. (2011) Methodology for allocation of remotely controlled switches in distribution networks based on a fuzzy multi-criteria decision making algorithm. Electr. Power Syst. Res., 81, 414-420
-
(2011)
Electr. Power Syst. Res
, vol.81
, pp. 414-420
-
-
Bernardon, D.P.1
Sperandio, M.2
Garcia, V.J.3
Russi, J.4
Canha, L.N.5
Abaide, A.R.6
Daza, E.F.B.7
-
27
-
-
79952003246
-
Decision making in fuzzy environment and multicriteria power engineering problems
-
Berredo, R. C., Ekel, P. Y., Martini, J. S. C., Palhares, R. M., Parreiras, R. O. & Pereira, JR, J. G. (2011) Decision making in fuzzy environment and multicriteria power engineering problems. Int. J. Electr. Power Energy Syst., 33, 623-632
-
(2011)
Int. J. Electr. Power Energy Syst
, vol.33
, pp. 623-632
-
-
Berredo, R.C.1
Ekel, P.Y.2
Martini, J.S.C.3
Palhares, R.M.4
Parreiras, R.O.5
Pereira, J.G.6
-
28
-
-
75449112582
-
Bi-objective ant colony optimization approach to optimize production and maintenance scheduling
-
Berrichi, A., Yalaoui, F., Amodeo, L. & Mezghiche, M. (2010) Bi-objective ant colony optimization approach to optimize production and maintenance scheduling. Comput. Oper. Res., 37, 1584-1596
-
(2010)
Comput. Oper. Res
, vol.37
, pp. 1584-1596
-
-
Berrichi, A.1
Yalaoui, F.2
Amodeo, L.3
Mezghiche, M.4
-
29
-
-
33645230448
-
A combined goal programming-Ahp approach to maintenance selection problem
-
Bertolini, M. & Bevilacqua, M. (2006). A combined goal programming-AHP approach to maintenance selection problem. Reliab. Eng. Syst. Saf., 91, 839-848
-
(2006)
Reliab. Eng. Syst. Saf
, vol.91
, pp. 839-848
-
-
Bertolini, M.1
Bevilacqua, M.2
-
30
-
-
0034288043
-
The analytic hierarchy process applied to maintenance strategy selection
-
Bevilacqua, M. & Braglia, M. (2000) The analytic hierarchy process applied to maintenance strategy selection. Reliab. Eng. Syst. Saf., 70, 71-83
-
(2000)
Reliab. Eng. Syst. Saf
, vol.70
, pp. 71-83
-
-
Bevilacqua, M.1
Braglia, M.2
-
31
-
-
0015671939
-
A review of new methods and attitudes in reliability engineering
-
Blanks, H. (1973). A review of new methods and attitudes in reliability engineering. Microelectr. Reliab., 12, 301-308
-
(1973)
Microelectr. Reliab
, vol.12
, pp. 301-308
-
-
Blanks, H.1
-
32
-
-
78751580347
-
A probabilistic computational framework for bridge network optimal maintenance scheduling
-
Bocchini, P. & Frangopol, D. M. (2011). A probabilistic computational framework for bridge network optimal maintenance scheduling. Reliab. Eng. Syst. Saf., 96, 332-349
-
(2011)
Reliab. Eng. Syst. Saf
, vol.96
, pp. 332-349
-
-
Bocchini, P.1
Frangopol, D.M.2
-
33
-
-
62149140828
-
Contribution of simulation to the optimization of maintenance strategies for a randomly failing production system
-
Boschian, V., Rezg, N. & Chelbi, A. (2009) Contribution of simulation to the optimization of maintenance strategies for a randomly failing production system. Eur. J. Oper. Res., 197, 1142-1149
-
(2009)
Eur. J. Oper. Res
, vol.197
, pp. 1142-1149
-
-
Boschian, V.1
Rezg, N.2
Chelbi, A.3
-
34
-
-
70350136745
-
Multiobjective optimization in an unreliable failure-prone manufacturing system
-
Boulet, J. F., Gharbi, A. & Kenn, J. P. (2009) Multiobjective optimization in an unreliable failure-prone manufacturing system. J. Qual. Maint. Eng., 15, 397-411
-
(2009)
J. Qual. Maint. Eng
, vol.15
, pp. 397-411
-
-
Boulet, J.F.1
Gharbi, A.2
Kenn, J.P.3
-
35
-
-
2342527340
-
Multi-Attribute classification method for spare parts inventory management
-
Braglia, M., Grassi, A. & Montanari, R. (2004) Multi-Attribute classification method for spare parts inventory management. J. Qual. Maint. Eng., 10, 55-65
-
(2004)
J. Qual. Maint. Eng
, vol.10
, pp. 55-65
-
-
Braglia, M.1
Grassi, A.2
Montanari, R.3
-
36
-
-
33847607172
-
-
Multiple Criteria Decision Analysis: State of the Art Surveys (J. Figueira, S. Greco & M. Ehrgott eds). New York Springer
-
Brans, J.-P. & Mareschal, B. (2005) Promethee methods. Multiple Criteria Decision Analysis: State of the Art Surveys (J. Figueira, S. Greco & M. Ehrgott eds). New York: Springer
-
(2005)
Promethee Methods
-
-
Brans, J.-P.1
Mareschal, B.2
-
37
-
-
54049102014
-
Multi-Attribute risk assessment for risk ranking of natural gas pipelines
-
Brito, A. J. & de Almeida, A. T. (2009) Multi-Attribute risk assessment for risk ranking of natural gas pipelines. Reliab. Eng. Syst. Saf., 94, 187-198
-
(2009)
Reliab. Eng. Syst. Saf
, vol.94
, pp. 187-198
-
-
Brito, A.J.1
De Almeida, A.T.2
-
38
-
-
77956577649
-
Multi-criteria decision model for selecting repair contracts by applying utility theory and variable interdependent parameters
-
Brito, A. J. M., Almeida-Filho, A. T. & de Almeida, A. T. (2010) Multi-criteria decision model for selecting repair contracts by applying utility theory and variable interdependent parameters. IMA J. Manag. Math., 21, 349-361
-
(2010)
IMA J. Manag. Math
, vol.21
, pp. 349-361
-
-
Brito, A.J.M.1
Almeida-Filho, A.T.2
De Almeida, A.T.3
-
39
-
-
69749090825
-
A multicriteria model for risk sorting of natural gas pipelines based on electre tri integrating utility theory
-
Brito, A. J. M., de Almeida, A. T. & Mota, C. M. M. (2010) A multicriteria model for risk sorting of natural gas pipelines based on ELECTRE TRI integrating Utility Theory. Eur. J. Oper. Res., 200, 812-821
-
(2010)
Eur. J. Oper. Res
, vol.200
, pp. 812-821
-
-
Brito, A.J.M.1
De Almeida, A.T.2
Mota, C.M.M.3
-
40
-
-
73649147328
-
Optimal expansion of an existing electrical power transmission network by multi-objective genetic algorithms
-
Cadini, F., Zio, E. & Petrescu, C. A. (2010) Optimal expansion of an existing electrical power transmission network by multi-objective genetic algorithms. Reliab. Eng. Syst. Saf., 95, 173-181
-
(2010)
Reliab. Eng. Syst. Saf
, vol.95
, pp. 173-181
-
-
Cadini, F.1
Zio, E.2
Petrescu, C.A.3
-
41
-
-
84870774907
-
Efficient exact optimization of multi-objective redundancy allocation problems in series-parallel systems
-
Cao, D., Murat, A. & Chinnam, R. B. (2013) Efficient exact optimization of multi-objective redundancy allocation problems in series-parallel systems. Reliab. Eng. Syst. Saf., 111, 154-163
-
(2013)
Reliab. Eng. Syst. Saf
, vol.111
, pp. 154-163
-
-
Cao, D.1
Murat, A.2
Chinnam, R.B.3
-
42
-
-
58749099423
-
An integrated structural framework to cost-based fmeca: The priority-cost fmeca
-
Carmignani, G. (2009) An integrated structural framework to cost-based FMECA: the priority-cost FMECA. Reliab. Eng. Syst. Saf., 94, 861-871
-
(2009)
Reliab. Eng. Syst. Saf
, vol.94
, pp. 861-871
-
-
Carmignani, G.1
-
43
-
-
53149097394
-
Maintenance audit by means of value analysis technique and decision rules: A case study in a bank
-
Carnero, C. & Delgado, S. (2008) Maintenance audit by means of value analysis technique and decision rules: a case study in a bank. J. Qual. Maint. Eng., 14, 329-342
-
(2008)
J. Qual. Maint. Eng
, vol.14
, pp. 329-342
-
-
Carnero, C.1
Delgado, S.2
-
44
-
-
33646106578
-
An evaluation system of the setting up of predictive maintenance programmes
-
Carnero, M. C. (2006) An evaluation system of the setting up of predictive maintenance programmes. Reliab. Eng. Syst. Saf., 91, 945-963
-
(2006)
Reliab. Eng. Syst. Saf
, vol.91
, pp. 945-963
-
-
Carnero, M.C.1
-
45
-
-
33645731779
-
Electric distribution network multiobjective design using a problem-specific genetic algorithm
-
Carrano, E. G., Soares, L. A., Takahashi, R. H., Saldanha, R. R. & Neto, O. M. (2006) Electric distribution network multiobjective design using a problem-specific genetic algorithm. IEEE Trans. Power Deliv., 21, 995-1005
-
(2006)
IEEE Trans Power Deliv
, vol.21
, pp. 995-1005
-
-
Carrano, E.G.1
Soares, L.A.2
Takahashi, R.H.3
Saldanha, R.R.4
Neto, O.M.5
-
46
-
-
34848871929
-
A multi-criteria decision-Aiding model using promethee III for preventive maintenance planning under uncertain conditions
-
Cavalcante, C. A. V. & de Almeida, A. T. (2007). A multi-criteria decision-Aiding model using PROMETHEE III for preventive maintenance planning under uncertain conditions. J. Qual. Maint. Eng., 13, 385-397
-
(2007)
J. Qual. Maint. Eng
, vol.13
, pp. 385-397
-
-
Cavalcante, C.A.V.1
De Almeida, A.T.2
-
47
-
-
77956563947
-
A preventive maintenance decision model based on multicriteria method promethee II integrated with Bayesian approach
-
Cavalcante, C. A. V., Ferreira, R. J. P. & de Almeida, A. T. (2010). A preventive maintenance decision model based on multicriteria method PROMETHEE II integrated with Bayesian approach. IMA J. Manag. Math., 21, 333-348
-
(2010)
IMA J. Manag. Math
, vol.21
, pp. 333-348
-
-
Cavalcante, C.A.V.1
Ferreira, R.J.P.2
De Almeida, A.T.3
-
48
-
-
79953694464
-
A study of a two-phase inspection policy for a preparedness system with a defective state and heterogeneous lifetime
-
Cavalcante, C.A.V., Scarf, P. A. & de Almeida, A. T. (2011). A study of a two-phase inspection policy for a preparedness system with a defective state and heterogeneous lifetime. Reliab. Eng. Syst. Saf., 96, 627-635
-
(2011)
Reliab. Eng. Syst. Saf
, vol.96
, pp. 627-635
-
-
Cavalcante, C.A.V.1
Scarf, P.A.2
De Almeida, A.T.3
-
49
-
-
79955524773
-
Determination of pareto frontier in multi-objective maintenance optimization
-
Certa, A., Galante, G., Lupo, T. & Passannanti, G. (2011) Determination of Pareto frontier in multi-objective maintenance optimization. Reliab. Eng. Syst. Saf., 96, 861-867
-
(2011)
Reliab. Eng. Syst. Saf
, vol.96
, pp. 861-867
-
-
Certa, A.1
Galante, G.2
Lupo, T.3
Passannanti, G.4
-
50
-
-
0031099506
-
A multicriteria approach to the selection of preventive maintenance intervals
-
Chareonsuk, C., Nagarur, N. & Tabucanon, M. T. (1997). A multicriteria approach to the selection of preventive maintenance intervals. Int. J. Prod. Econ., 49, 55-64
-
(1997)
Int. J. Prod. Econ
, vol.49
, pp. 55-64
-
-
Chareonsuk, C.1
Nagarur, N.2
Tabucanon, M.T.3
-
51
-
-
33847047429
-
Availability allocation and multi-objective optimization for parallel-series systems
-
Chiang, C.-H. & Chen, L.-H. (2007) Availability allocation and multi-objective optimization for parallel-series systems. Eur. J. Oper. Res., 180, 1231-1244
-
(2007)
Eur. J. Oper. Res
, vol.180
, pp. 1231-1244
-
-
Chiang, C.-H.1
Chen, L.-H.2
-
52
-
-
84868200303
-
Multi-objective decision-making methodology to create an optimal design chain partner combination
-
Chiang, T.-A. (2012) Multi-objective decision-making methodology to create an optimal design chain partner combination. Comput. Indus. Eng., 63, 875-889
-
(2012)
Comput. Indus. Eng
, vol.63
, pp. 875-889
-
-
Chiang, T.-A.1
-
53
-
-
56549091665
-
Failure mode and effects analysis using a group-based evidential reasoning approach
-
Chin, K.-S., Wang, Y.-M., Ka Kwai Poon, G. & Yang, J.-B. (2009) Failure mode and effects analysis using a group-based evidential reasoning approach. Comput. Oper. Res., 36, 1768-1779
-
(2009)
Comput. Oper. Res
, vol.36
, pp. 1768-1779
-
-
Chin, K.-S.1
Wang, Y.-M.2
Ka Kwai Poon, G.3
Yang, J.-B.4
-
54
-
-
79961000777
-
Reliability-based performance simulation for optimized pavement maintenance
-
Chou, J.-S. & Le, T.-S. (2011) Reliability-based performance simulation for optimized pavement maintenance. Reliab. Eng. Syst. Saf., 96, 1402-1410
-
(2011)
Reliab. Eng. Syst. Saf
, vol.96
, pp. 1402-1410
-
-
Chou, J.-S.1
Le, T.-S.2
-
55
-
-
4544229131
-
System optimization with component reliability estimation uncertainty: A multi-criteria approach
-
Coit, D. W., Jin, T. D. & Wattanapongsakorn, N. (2004) System optimization with component reliability estimation uncertainty: a multi-criteria approach. IEEE Trans. Reliab., 53, 369-380
-
(2004)
IEEE Trans Reliab
, vol.53
, pp. 369-380
-
-
Coit, D.W.1
Jin, T.D.2
Wattanapongsakorn, N.3
-
56
-
-
34047271087
-
Multiple weighted objectives heuristic for the redundancy allocation problem
-
Coit, D. W. & Konak, A. (2006) Multiple weighted objectives heuristic for the redundancy allocation problem. IEEE Trans. Reliab., 55, 551-558
-
(2006)
IEEE Trans Reliab
, vol.55
, pp. 551-558
-
-
Coit, D.W.1
Konak, A.2
-
57
-
-
0037117677
-
Assigning priorities for maintenance repair and refurbishment in managing a municipal housing stock
-
Costa, C. & Oliveira, R. C. (2002) Assigning priorities for maintenance, repair and refurbishment in managing a municipal housing stock. Eur. J. Oper. Res., 138, 380-391
-
(2002)
Eur. J. Oper. Res
, vol.138
, pp. 380-391
-
-
Costa, C.1
Oliveira, R.C.2
-
58
-
-
0002663119
-
The macbeth approach: Basic ideas, software, and an application
-
N. Meskens & M. Roubens eds). Dordrecht Kluwer Academic Publishers
-
Costa, C. A. B. E. & Vansnick, J.-C. (1999) The MACBETH approach: basic ideas, software, and an application. Advances in Decision Analysis (N. Meskens & M. Roubens eds). Dordrecht: Kluwer Academic Publishers
-
(1999)
Advances in Decision Analysis
-
-
Costa, C.A.B.E.1
Vansnick, J.-C.2
-
59
-
-
33750293588
-
Reliability consideration in the design and analysis of cellular manufacturing systems
-
Das, K., Lashkari, R. S. & Sengupta, S. (2007) Reliability consideration in the design and analysis of cellular manufacturing systems. Int. J. Prod. Econ., 105, 243-262
-
(2007)
Int. J. Prod. Econ
, vol.105
, pp. 243-262
-
-
Das, K.1
Lashkari, R.S.2
Sengupta, S.3
-
61
-
-
0036530772
-
A fast and elitist multiobjective genetic algorithm: Nsga-II
-
Deb, K., Pratap, A., Agarwal, S. & Meyarivan, T. (2002). A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Trans. Evol. Comput., 6, 182-197
-
(2002)
IEEE Trans Evol. Comput
, vol.6
, pp. 182-197
-
-
Deb, K.1
Pratap, A.2
Agarwal, S.3
Meyarivan, T.4
-
62
-
-
0030106093
-
Applications of maintenance optimization models: A review and analysis
-
Dekker, R. (1996) Applications of maintenance optimization models: a review and analysis. Reliab. Eng. Syst. Saf., 51, 229-240
-
(1996)
Reliab. Eng. Syst. Saf
, vol.51
, pp. 229-240
-
-
Dekker, R.1
-
63
-
-
0021302592
-
A computer-based application of non-linear multiple objective optimization
-
Dewispelare, A. R. (1984). A computer-based application of non-linear multiple objective optimization. Comput. Indus. Eng., 8, 143-152
-
(1984)
Comput. Indus. Eng
, vol.8
, pp. 143-152
-
-
Dewispelare, A.R.1
-
64
-
-
0026997949
-
Optimal apportionment of reliability and redundancy in series systems under multiple objectives
-
Dhingra, A. K. (1992) Optimal apportionment of reliability and redundancy in series systems under multiple objectives. IEEE Trans. Reliab., 41, 576-582
-
(1992)
IEEE Trans Reliab
, vol.41
, pp. 576-582
-
-
Dhingra, A.K.1
-
65
-
-
35548949549
-
Smarts and smarter: Improved simple methods for multiattribute utility measurement
-
Edwards, W. & Barron, F. H. (1994) SMARTS and SMARTER: improved simple methods for multiattribute utility measurement. Organ. Behav. Hum. Decis. Process., 60, 306-325
-
(1994)
Organ. Behav. Hum. Decis. Process
, vol.60
, pp. 306-325
-
-
Edwards, W.1
Barron, F.H.2
-
67
-
-
13844296818
-
Optimal preventive control actions using multi-objective fuzzy linear programming technique
-
El-Ela, A. A. A., Bishr, M., Allam, S. & El-Sehiemy, R. (2005) Optimal preventive control actions using multi-objective fuzzy linear programming technique. Electr. Power Syst. Res., 74, 147-155
-
(2005)
Electr. Power Syst. Res
, vol.74
, pp. 147-155
-
-
El-Ela, A.A.A.1
Bishr, M.2
Allam, S.3
El-Sehiemy, R.4
-
68
-
-
0141929393
-
Availability allocation to repairable systems with genetic algorithms: A multi-objective formulation
-
Elegbede, C. & Adjallah, K. (2003) Availability allocation to repairable systems with genetic algorithms: a multi-objective formulation. Reliab. Eng. Syst. Saf., 82, 319-330
-
(2003)
Reliab. Eng. Syst. Saf
, vol.82
, pp. 319-330
-
-
Elegbede, C.1
Adjallah, K.2
-
69
-
-
0037275725
-
Decision support in selecting maintenance organization
-
Emblemsvåg, J. & Tonning, L. (2003) Decision support in selecting maintenance organization. J. Qual. Maint. Eng., 9, 11-24
-
(2003)
J. Qual. Maint. Eng
, vol.9
, pp. 11-24
-
-
Emblemsvåg, J.1
Tonning, L.2
-
70
-
-
58249129087
-
Ant colony optimization-based method for placement of sectionalizing switches in distribution networks using a fuzzy multiobjective approach
-
Falaghi, H., Haghifam, M.-R. & Singh, C. (2009) Ant colony optimization-based method for placement of sectionalizing switches in distribution networks using a fuzzy multiobjective approach. IEEE Trans. Power Deliv., 24, 268-276
-
(2009)
IEEE Trans Power Deliv
, vol.24
, pp. 268-276
-
-
Falaghi, H.1
Haghifam, M.-R.2
Singh, C.3
-
71
-
-
60249094324
-
A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis
-
Ferreira, R. J. R., de Almeida, A. T. & Cavalcante, C. A. V. (2009). A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis. Reliab. Eng. Syst. Saf., 94, 905-912
-
(2009)
Reliab. Eng. Syst. Saf
, vol.94
, pp. 905-912
-
-
Ferreira, R.J.R.1
De Almeida, A.T.2
Cavalcante, C.A.V.3
-
73
-
-
0001518569
-
Noncompensatory preferences
-
Fishburn, P. C. (1976) Noncompensatory preferences. Synthese, 33, 393-403
-
(1976)
Synthese
, vol.33
, pp. 393-403
-
-
Fishburn, P.C.1
-
74
-
-
36248990084
-
Bridge network maintenance optimization using stochastic dynamic programming
-
Frangopol, D. M. & Liu, M. (2007) Bridge network maintenance optimization using stochastic dynamic programming. J. Struct. Eng.-ASCE, 133, 1772-1782
-
(2007)
J. Struct. Eng.-ASCE
, vol.133
, pp. 1772-1782
-
-
Frangopol, D.M.1
Liu, M.2
-
75
-
-
0026986147
-
Towards a theory of determining size in multiobjective service systems
-
Friedman, L. & Mehrez, A. (1992) Towards a theory of determining size in multiobjective service systems. Eur. J. Oper. Res., 63, 398-408
-
(1992)
Eur. J. Oper. Res
, vol.63
, pp. 398-408
-
-
Friedman, L.1
Mehrez, A.2
-
76
-
-
0025399206
-
Balancing weight system reliability and redundancy in a multiobjective optimization framework
-
Fu, G. K. & Frangopol, D. M. (1990) Balancing weight, system reliability and redundancy in a multiobjective optimization framework. Struct. Saf., 7, 165-175
-
(1990)
Struct. Saf
, vol.7
, pp. 165-175
-
-
Fu, G.K.1
Frangopol, D.M.2
-
77
-
-
84869888279
-
Multi-objective planning of electrical distribution systems using dynamic programming
-
Ganguly, S., Sahoo, N. C. & Das, D. (2013) Multi-objective planning of electrical distribution systems using dynamic programming. Int. J. Electr. Power Energy Syst., 46, 65-78
-
(2013)
Int. J. Electr. Power Energy Syst
, vol.46
, pp. 65-78
-
-
Ganguly, S.1
Sahoo, N.C.2
Das, D.3
-
78
-
-
84890485588
-
A risk measurement tool for an underground electricity distribution system considering the consequences and uncertainties of manhole events
-
Garcez, T. V. & de Almeida, A. T. (2014). A risk measurement tool for an underground electricity distribution system considering the consequences and uncertainties of manhole events. Reliab. Eng. Syst. Saf., 124, 68-80
-
(2014)
Reliab. Eng. Syst. Saf
, vol.124
, pp. 68-80
-
-
Garcez, T.V.1
De Almeida, A.T.2
-
79
-
-
33746931196
-
Maintenance management: Literature review and directions
-
Garg, A. & Deshmukh, S. G. (2006) Maintenance management: literature review and directions. J. Qual. Maint. Eng., 12, 205-238
-
(2006)
J. Qual. Maint. Eng
, vol.12
, pp. 205-238
-
-
Garg, A.1
Deshmukh, S.G.2
-
80
-
-
84869862160
-
Multi-objective reliability-redundancy allocation problem using particle swarm optimization
-
Garg, H. & Sharma, S. P. (2013) Multi-objective reliability-redundancy allocation problem using particle swarm optimization. Comput. Indus. Eng., 64, 247-255
-
(2013)
Comput. Indus. Eng
, vol.64
, pp. 247-255
-
-
Garg, H.1
Sharma, S.P.2
-
81
-
-
0024896932
-
Algorithm for solving large-scale 0-1 goal programming and its application to reliability optimization problem
-
Gen, M., Ida, K., Sasaki, M. & Lee, J. U. (1989) Algorithm for solving large-scale 0-1 goal programming and its application to reliability optimization problem. Comput. Indus. Eng., 17, 525-530
-
(1989)
Comput. Indus. Eng
, vol.17
, pp. 525-530
-
-
Gen, M.1
Ida, K.2
Sasaki, M.3
Lee, J.U.4
-
82
-
-
0027683123
-
Large-scale 0-1 fuzzy goal programming and its application to reliability optimization problem
-
Gen, M., Ida, K., Tsujimura, Y. & Kim, C. E. (1993) Large-scale 0-1 fuzzy goal programming and its application to reliability optimization problem. Comput. Indus. Eng., 24, 539-549
-
(1993)
Comput. Indus. Eng
, vol.24
, pp. 539-549
-
-
Gen, M.1
Ida, K.2
Tsujimura, Y.3
Kim, C.E.4
-
83
-
-
84870320870
-
A new model for optimal generation scheduling of power system considering generation units availability
-
Gjorgiev, B. & Kančev, D. (2013). A new model for optimal generation scheduling of power system considering generation units availability. Int. J. Electr. Power Energy Syst., 47, 129-139
-
(2013)
Int. J. Electr. Power Energy Syst
, vol.47
, pp. 129-139
-
-
Gjorgiev, B.1
Kančev, D.2
-
84
-
-
0032167344
-
Tentative guidelines to help choosing an appropriate mcda method
-
Guitouni, A. & Martel, J. M. (1998) Tentative guidelines to help choosing an appropriate MCDA method. Eur. J. Oper. Res., 109, 501-521
-
(1998)
Eur. J. Oper. Res
, vol.109
, pp. 501-521
-
-
Guitouni, A.1
Martel, J.M.2
-
85
-
-
79952194346
-
Grid service reliability modeling and optimal task scheduling considering fault recovery
-
Guo, S., Huang, H.-Z., Wang, Z. & Xie, M. (2011) Grid service reliability modeling and optimal task scheduling considering fault recovery. IEEE Trans. Reliab., 60, 263-274
-
(2011)
IEEE Trans Reliab
, vol.60
, pp. 263-274
-
-
Guo, S.1
Huang, H.-Z.2
Wang, Z.3
Xie, M.4
-
86
-
-
2342533288
-
Maintenance management-An ahp application for centralization/decentralization
-
Hajshirmohammadi, A. & Wedley, W. C. (2004) Maintenance management-An AHP application for centralization/decentralization. J. Qual. Maint. Eng., 10, 16-25
-
(2004)
J. Qual. Maint. Eng
, vol.10
, pp. 16-25
-
-
Hajshirmohammadi, A.1
Wedley, W.C.2
-
87
-
-
0029471492
-
Application of multiattribute theory in a safety monitor for the planning of maintenance jobs
-
Heins, W. & Roling, M. W. M. (1995) Application of multiattribute theory in a safety monitor for the planning of maintenance jobs. Eur. J. Oper. Res., 86, 270-280
-
(1995)
Eur. J. Oper. Res
, vol.86
, pp. 270-280
-
-
Heins, W.1
Roling, M.W.M.2
-
88
-
-
29744438237
-
Maintenance strategy based on a multicriterion classification of equipments
-
Hijes, F. & Cartagena, J. J. R. (2006) Maintenance strategy based on a multicriterion classification of equipments. Reliab. Eng. Syst. Saf., 91, 444-451
-
(2006)
Reliab. Eng. Syst. Saf
, vol.91
, pp. 444-451
-
-
Hijes, F.1
Cartagena, J.J.R.2
-
89
-
-
36348973029
-
Multiobjective optimization applied to maintenance policy for electrical networks
-
Hilber, P., Miranda, V., Matos, M. A. & Bertling, L. (2007) Multiobjective optimization applied to maintenance policy for electrical networks. IEEE Trans. Power Syst., 22, 1675-1682
-
(2007)
IEEE Trans Power Syst
, vol.22
, pp. 1675-1682
-
-
Hilber, P.1
Miranda, V.2
Matos, M.A.3
Bertling, L.4
-
90
-
-
0026889708
-
Fuzzy approach for generator maintenance scheduling
-
Huang, C. J., Lin, C. E. & Huang, C. L. (1992) Fuzzy approach for generator maintenance scheduling. Electr. Power Syst. Res., 24, 31-38
-
(1992)
Electr. Power Syst. Res
, vol.24
, pp. 31-38
-
-
Huang, C.J.1
Lin, C.E.2
Huang, C.L.3
-
91
-
-
0031104095
-
Fuzzy multi-objective optimization decision-making of reliability of series system
-
Huang, H. Z. (1997) Fuzzy multi-objective optimization decision-making of reliability of series system. Microelectron. Reliab., 37, 447-449
-
(1997)
Microelectron. Reliab
, vol.37
, pp. 447-449
-
-
Huang, H.Z.1
-
92
-
-
0018771786
-
Optimal scheduled-maintenance policy based on multiple-criteria decision-making
-
Hwang, C. L., Tillman, F. A., Wei, W. K. & Lie, C. H. (1979) Optimal scheduled-maintenance policy based on multiple-criteria decision-making. IEEE Trans. Reliab., 28, 394-399
-
(1979)
IEEE Trans Reliab
, vol.28
, pp. 394-399
-
-
Hwang, C.L.1
Tillman, F.A.2
Wei, W.K.3
Lie, C.H.4
-
94
-
-
0018020677
-
Interactive optimization of system reliability under multiple objectives
-
Inagaki, T., Inoue, K. & Akashi, H. (1978) Interactive optimization of system reliability under multiple objectives. IEEE Trans. Reliab., 27, 264-267
-
(1978)
IEEE Trans Reliab
, vol.27
, pp. 264-267
-
-
Inagaki, T.1
Inoue, K.2
Akashi, H.3
-
95
-
-
70349469254
-
Reliability-based robust pareto design of linear state feedback controllers using a multi-objective uniform-diversity genetic algorithm (mug)
-
Jamali, A., Hajiloo, A. & Nariman-Zadeh, N. (2010) Reliability-based robust Pareto design of linear state feedback controllers using a multi-objective uniform-diversity genetic algorithm (MUG). Expert Syst. Appl., 37, 401-413
-
(2010)
Expert Syst. Appl
, vol.37
, pp. 401-413
-
-
Jamali, A.1
Hajiloo, A.2
Nariman-Zadeh, N.3
-
96
-
-
0142165034
-
Reducing the run-Time complexity of multiobjective eas: The nsga-II and other algorithms
-
Jensen, M. T. (2003) Reducing the run-Time complexity of multiobjective EAs: the NSGA-II and other algorithms. IEEE Trans. Evol. Comput., 7, 503-515
-
(2003)
IEEE Trans Evol. Comput
, vol.7
, pp. 503-515
-
-
Jensen, M.T.1
-
97
-
-
0036604021
-
Age replacement policy: A multi-Attribute value model
-
Jiang, R. & Ji, P. (2002) Age replacement policy: a multi-Attribute value model. Reliab. Eng. Syst. Saf., 76, 311-318
-
(2002)
Reliab. Eng. Syst. Saf
, vol.76
, pp. 311-318
-
-
Jiang, R.1
Ji, P.2
-
98
-
-
84871715607
-
Multicriteria planning for distributed wind generation under strategic maintenance
-
Jin, T., Tian, Y., Zhang, C. W. & Coit, D. W. (2013) Multicriteria planning for distributed wind generation under strategic maintenance. IEEE Trans. Power Deliv., 28, 357-367
-
(2013)
IEEE Trans Power Deliv
, vol.28
, pp. 357-367
-
-
Jin, T.1
Tian, Y.2
Zhang, C.W.3
Coit, D.W.4
-
99
-
-
39749159847
-
Optimization of cost and downtime for replacement model following the expiration of warranty
-
Jung, K. M., Han, S. S. & Park, D. H. (2008) Optimization of cost and downtime for replacement model following the expiration of warranty. Reliab. Eng. Syst. Saf., 93, 995-1003
-
(2008)
Reliab. Eng. Syst. Saf
, vol.93
, pp. 995-1003
-
-
Jung, K.M.1
Han, S.S.2
Park, D.H.3
-
100
-
-
0027307116
-
Determination of design alternatives and performance criteria for safety systems in a nuclear-power-plant via simulated annealing
-
Jung, W. S. & Cho, N. Z. (1993) Determination of design alternatives and performance criteria for safety systems in a nuclear-power-plant via simulated annealing. Reliab. Eng. Syst. Saf., 41, 71-94
-
(1993)
Reliab. Eng. Syst. Saf
, vol.41
, pp. 71-94
-
-
Jung, W.S.1
Cho, N.Z.2
-
101
-
-
24644521050
-
A method for the efficient prioritization of infrastructure renewal projects
-
Karydas, D. M. & Gifun, J. F. (2006). A method for the efficient prioritization of infrastructure renewal projects. Reliab. Eng. Syst. Saf., 91, 84-99
-
(2006)
Reliab. Eng. Syst. Saf
, vol.91
, pp. 84-99
-
-
Karydas, D.M.1
Gifun, J.F.2
-
103
-
-
84870192596
-
A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems
-
Khalili-Damghani, K., Abtahi, A.-R.& Tavana, M. (2013). A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems. Reliab. Eng. Syst. Saf., 111, 58-75
-
(2013)
Reliab. Eng. Syst. Saf
, vol.111
, pp. 58-75
-
-
Khalili-Damghani, K.1
Abtahi, A.-R.2
Tavana, M.3
-
104
-
-
84859517787
-
Solving binary-state multi-objective reliability redundancy allocation series-parallel problem using efficient epsilon-constraint, multi-start partial bound enumeration algorithm, and dea
-
Khalili-Damghani, K. & Amiri, M. (2012) Solving binary-state multi-objective reliability redundancy allocation series-parallel problem using efficient epsilon-constraint, multi-start partial bound enumeration algorithm, and DEA. Reliab. Eng. Syst. Saf., 103, 35-44
-
(2012)
Reliab. Eng. Syst. Saf
, vol.103
, pp. 35-44
-
-
Khalili-Damghani, K.1
Amiri, M.2
-
105
-
-
78650350129
-
Cost-effective lifetime structural health monitoring based on availability
-
Kim, S. & Frangopol, D. M. (2011) Cost-effective lifetime structural health monitoring based on availability. J. Struct. Eng.-ASCE, 137, 22-33
-
(2011)
J. Struct. Eng.-ASCE
, vol.137
, pp. 22-33
-
-
Kim, S.1
Frangopol, D.M.2
-
106
-
-
80755152974
-
Multi-objective optimization of linear multi-state multiple sliding window system
-
Konak, A., Kulturel-Konak, S. & Levitin, G. (2012) Multi-objective optimization of linear multi-state multiple sliding window system. Reliab. Eng. Syst. Saf., 98, 24-34
-
(2012)
Reliab. Eng. Syst. Saf
, vol.98
, pp. 24-34
-
-
Konak, A.1
Kulturel-Konak, S.2
Levitin, G.3
-
108
-
-
0029343602
-
A multiobjective optimization approach to thermal generating-units maintenance scheduling
-
Kralj, B. & Petrovic, R. (1995). A multiobjective optimization approach to thermal generating-units maintenance scheduling. Eur. J. Oper. Res., 84, 481-493
-
(1995)
Eur. J. Oper. Res
, vol.84
, pp. 481-493
-
-
Kralj, B.1
Petrovic, R.2
-
109
-
-
34548496610
-
Multiobjective programming in power-system optimization-new approach to generator maintenance scheduling
-
Kralj, B. & Rajakovic, N. (1994) Multiobjective programming in power-system optimization-new approach to generator maintenance scheduling. Int. J. Electr. Power Energy Syst., 16, 211-220
-
(1994)
Int. J. Electr. Power Energy Syst
, vol.16
, pp. 211-220
-
-
Kralj, B.1
Rajakovic, N.2
-
110
-
-
67349114259
-
Attribute based specification comparison and selection of electroplating system using madm approach
-
Kumar, A. & Agrawal, V. P. (2009) Attribute based specification, comparison and selection of electroplating system using MADM approach. Expert Syst. Appl., 36, 10815-10827
-
(2009)
Expert Syst. Appl
, vol.36
, pp. 10815-10827
-
-
Kumar, A.1
Agrawal, V.P.2
-
111
-
-
58749111611
-
Multi-objective hierarchical genetic algorithms for multilevel redundancy allocation optimization
-
Kumar, R., Izui, K., Yoshimura, M. & Nishiwaki, S. (2009) Multi-objective hierarchical genetic algorithms for multilevel redundancy allocation optimization. Reliab. Eng. Syst. Saf., 94, 891-904
-
(2009)
Reliab. Eng. Syst. Saf
, vol.94
, pp. 891-904
-
-
Kumar, R.1
Izui, K.2
Yoshimura, M.3
Nishiwaki, S.4
-
112
-
-
33646000281
-
Service restoration in distribution system using non-dominated sorting genetic algorithm
-
Kumar, Y., Das, B. & Sharma, J. (2006) Service restoration in distribution system using non-dominated sorting genetic algorithm. Electr. Power Syst. Res., 76, 768-777
-
(2006)
Electr. Power Syst. Res
, vol.76
, pp. 768-777
-
-
Kumar, Y.1
Das, B.2
Sharma, J.3
-
113
-
-
37749027354
-
Multiobjective, multiconstraint service restoration of electric power distribution system with priority customers
-
Kumar, Y., Das, B. & Sharma, J. (2008) Multiobjective, multiconstraint service restoration of electric power distribution system with priority customers. IEEE Trans. Power Deliv., 23, 261-270
-
(2008)
IEEE Trans. Power Deliv
, vol.23
, pp. 261-270
-
-
Kumar, Y.1
Das, B.2
Sharma, J.3
-
114
-
-
25844491812
-
A model for preventive maintenance planning by genetic algorithms based in cost and reliability
-
Lapa, C. M. F., Pereira, C. & De Barros, M. P. (2006). A model for preventive maintenance planning by genetic algorithms based in cost and reliability. Reliab. Eng. Syst. Saf., 91, 233-240
-
(2006)
Reliab. Eng. Syst. Saf
, vol.91
, pp. 233-240
-
-
Lapa, C.M.F.1
Pereira, C.2
De Barros, M.P.3
-
116
-
-
0042545120
-
Total quality management of a production-maintenance system: A network approach
-
Levner, E., Zuckerman, D. & Meirovich, G. (1998) Total quality management of a production-maintenance system: a network approach. Int. J. Prod. Econ., 56, 407-421
-
(1998)
Int. J. Prod. Econ
, vol.56
, pp. 407-421
-
-
Levner, E.1
Zuckerman, D.2
Meirovich, G.3
-
117
-
-
84871110815
-
Non-dominated sorting binary differential evolution for the multi-objective optimization of cascading failures protection in complex networks
-
Li, Y. F., Sansavini, G. & Zio, E. (2013) Non-dominated sorting binary differential evolution for the multi-objective optimization of cascading failures protection in complex networks. Reliab. Eng. Syst. Saf., 111, 195-205
-
(2013)
Reliab. Eng. Syst. Saf
, vol.111
, pp. 195-205
-
-
Li, Y.F.1
Sansavini, G.2
Zio, E.3
-
118
-
-
67649449001
-
A two-stage approach for multi-objective decision making with applications to system reliability optimization
-
Li, Z., Liao, H. & Coit, D. W. (2009). A two-stage approach for multi-objective decision making with applications to system reliability optimization. Reliab. Eng. Syst. Saf., 94, 1585-1592
-
(2009)
Reliab. Eng. Syst. Saf
, vol.94
, pp. 1585-1592
-
-
Li, Z.1
Liao, H.2
Coit, D.W.3
-
119
-
-
0027147682
-
Evaluating human reliability using fuzzy relation
-
Liang, G. S. & Wang, M. J. J. (1993) Evaluating human reliability using fuzzy relation. Microelectron. Reliab., 33, 63-80
-
(1993)
Microelectron. Reliab
, vol.33
, pp. 63-80
-
-
Liang, G.S.1
Wang, M.J.J.2
-
120
-
-
34147112241
-
Variable neighbourhood search for redundancy allocation problems
-
Liang, Y. C., Lo, M. H. & Chen, Y. C. (2007) Variable neighbourhood search for redundancy allocation problems. IMA J. Manage. Math., 18, 135-155
-
(2007)
IMA J. Manage. Math
, vol.18
, pp. 135-155
-
-
Liang, Y.C.1
Lo, M.H.2
Chen, Y.C.3
-
121
-
-
39749093208
-
Multi-objective optimization of generalized reliability design problems using feature models-A concept for early design stages
-
Limbourg, P. & Kochs, H.-D. (2008) Multi-objective optimization of generalized reliability design problems using feature models-A concept for early design stages. Reliab. Eng. Syst. Saf., 93, 815-828
-
(2008)
Reliab. Eng. Syst. Saf
, vol.93
, pp. 815-828
-
-
Limbourg, P.1
Kochs, H.-D.2
-
122
-
-
84872079570
-
Selection of security system design via games of imperfect information and multi-objective genetic algorithm
-
Lins, I. D., Rê, L. C., Moura, M. D. C. & Droguett, E. L. (2013) Selection of security system design via games of imperfect information and multi-objective genetic algorithm. Reliab. Eng. Syst. Saf., 112, 59-66
-
(2013)
Reliab. Eng. Syst. Saf
, vol.112
, pp. 59-66
-
-
Lins, I.D.1
Rê, L.C.2
Moura, M.D.C.3
Droguett, E.L.4
-
123
-
-
84865467545
-
Multidimensional risk analysis of hydrogen pipelines
-
Lins, P. H. C. & de Almeida, A. T. (2012) Multidimensional risk analysis of hydrogen pipelines. Int. J. Hydrog. Energy, 37, 13545-13554
-
(2012)
Int. J. Hydrog. Energy
, vol.37
, pp. 13545-13554
-
-
Lins, P.H.C.1
De Almeida, A.T.2
-
124
-
-
18144398964
-
Multiobjective maintenance planning optimization for deteriorating bridges considering condition safety, and life-cycle cost
-
Liu, M. & Frangopol, D. M. (2005) Multiobjective maintenance planning optimization for deteriorating bridges considering condition, safety, and life-cycle cost. J. Struct. Eng.-ASCE, 131, 833-842
-
(2005)
J. Struct. Eng.-ASCE
, vol.131
, pp. 833-842
-
-
Liu, M.1
Frangopol, D.M.2
-
125
-
-
33750126957
-
Optimizing bridge network maintenance management under uncertainty with conflicting criteria: Life-cycle maintenance failure, and user costs
-
Liu, M. & Frangopol, D. M. (2006) Optimizing bridge network maintenance management under uncertainty with conflicting criteria: life-cycle maintenance, failure, and user costs. J. Struct. Eng.-ASCE, 132, 1835-1845
-
(2006)
J. Struct. Eng.-ASCE
, vol.132
, pp. 1835-1845
-
-
Liu, M.1
Frangopol, D.M.2
-
126
-
-
0028383972
-
On the total productivity management of amaintenance float system through ahp applications
-
Madu, C. N. (1994) On the total productivity management of amaintenance float system through AHP applications. Int. J. Prod. Econ., 34, 201-207
-
(1994)
Int. J. Prod. Econ
, vol.34
, pp. 201-207
-
-
Madu, C.N.1
-
127
-
-
0029389915
-
A decision-support systems-Approach to adjust maintenance float system availability levels
-
Madu, C. N., Kuei, C. H. & Chen, J. H. (1995). A decision-support systems-Approach to adjust maintenance float system availability levels. Comput. Indus. Eng., 28, 773-786
-
(1995)
Comput. Indus. Eng
, vol.28
, pp. 773-786
-
-
Madu, C.N.1
Kuei, C.H.2
Chen, J.H.3
-
128
-
-
33745663528
-
Basics of genetic algorithms optimization for rams applications
-
Marseguerra, M., Zio, E. & Martorell, S. (2006) Basics of genetic algorithms optimization for RAMS applications. Reliab. Eng. Syst. Saf., 91, 977-991
-
(2006)
Reliab. Eng. Syst. Saf
, vol.91
, pp. 977-991
-
-
Marseguerra, M.1
Zio, E.2
Martorell, S.3
-
129
-
-
0036683331
-
Condition-based maintenance optimization by means of genetic algorithms and monte carlo simulation
-
Marseguerra, M., Zio, E. & Podofillini, L. (2002) Condition-based maintenance optimization by means of genetic algorithms and Monte Carlo simulation. Reliab. Eng. Syst. Saf., 77, 151-165
-
(2002)
Reliab. Eng. Syst. Saf
, vol.77
, pp. 151-165
-
-
Marseguerra, M.1
Zio, E.2
Podofillini, L.3
-
130
-
-
1642586240
-
A multiobjective genetic algorithm approach to the optimization of the technical specifications of a nuclear safety system
-
Marseguerra, M., Zio, E. & Podofillini, L. (2004) A multiobjective genetic algorithm approach to the optimization of the technical specifications of a nuclear safety system. Reliab. Eng. Syst. Saf., 84, 87-99
-
(2004)
Reliab. Eng. Syst. Saf
, vol.84
, pp. 87-99
-
-
Marseguerra, M.1
Zio, E.2
Podofillini, L.3
-
131
-
-
4544333060
-
Optimal reliability/availability of uncertain systems via multi-objective genetic algorithms
-
Marseguerra, M., Zio, E. & Podofillini, L. (2004) Optimal reliability/availability of uncertain systems via multi-objective genetic algorithms. IEEE Trans. Reliab., 53, 424-434
-
(2004)
IEEE Trans Reliab
, vol.53
, pp. 424-434
-
-
Marseguerra, M.1
Zio, E.2
Podofillini, L.3
-
132
-
-
9444289306
-
Multiobjective spare part allocation by means of genetic algorithms and monte carlo simulation
-
Marseguerra, M., Zio, E. & Podofillini, L. (2005) Multiobjective spare part allocation by means of genetic algorithms and Monte Carlo simulation. Reliab. Eng. Syst. Saf., 87, 325-335
-
(2005)
Reliab. Eng. Syst. Saf
, vol.87
, pp. 325-335
-
-
Marseguerra, M.1
Zio, E.2
Podofillini, L.3
-
133
-
-
22444434834
-
Optimal design of reliable network systems in presence of uncertainty
-
Marseguerra, M., Zio, E., Podofillini, L., and Coit, D. W. (2005) Optimal design of reliable network systems in presence of uncertainty. IEEE Trans. Reliab., 54, 243-253
-
(2005)
IEEE Trans Reliab
, vol.54
, pp. 243-253
-
-
Marseguerra, M.1
Zio, E.2
Podofillini, L.3
Coit, D.W.4
-
134
-
-
34248562590
-
Lifetime multiobjective optimization of cost and spacing of corrosion rate sensors embedded in a deteriorating reinforced concrete bridge deck
-
Marsh, P. S. & Frangopol, D. M. (2007) Lifetime multiobjective optimization of cost and spacing of corrosion rate sensors embedded in a deteriorating reinforced concrete bridge deck. J. Struct. Eng.-ASCE, 133, 777-787
-
(2007)
J. Struct. Eng.-ASCE
, vol.133
, pp. 777-787
-
-
Marsh, P.S.1
Frangopol, D.M.2
-
135
-
-
33847297055
-
Urban stormwater drainage management: The development of a multicriteria decision aid approach for best management practices
-
Martin, C., Ruperd, Y. & Legret, M. (2007) Urban stormwater drainage management: The development of a multicriteria decision aid approach for best management practices. Eur. J. Oper. Res., 181, 338-349
-
(2007)
Eur. J. Oper. Res
, vol.181
, pp. 338-349
-
-
Martin, C.1
Ruperd, Y.2
Legret, M.3
-
136
-
-
0020876651
-
A review of mechanical reliability modelling in relation to failure mechanisms
-
Martin, P., Strutt, J. & Kinkead, N. (1983). A review of mechanical reliability modelling in relation to failure mechanisms. Reliab. Eng., 6, 13-42
-
(1983)
Reliab. Eng
, vol.6
, pp. 13-42
-
-
Martin, P.1
Strutt, J.2
Kinkead, N.3
-
137
-
-
33745657654
-
Use of multiple objective evolutionary algorithms in optimizing surveillance requirements
-
Martorell, S., Carlos, S., Villanueva, J. F., Sanchez, A. I., Galvan, B., Salazar, D. & Cepin, M. (2006) Use of multiple objective evolutionary algorithms in optimizing surveillance requirements. Reliab. Eng. Syst. Saf., 91, 1027-1038
-
(2006)
Reliab. Eng. Syst. Saf
, vol.91
, pp. 1027-1038
-
-
Martorell, S.1
Carlos, S.2
Villanueva, J.F.3
Sanchez, A.I.4
Galvan, B.5
Salazar, D.6
Cepin, M.7
-
138
-
-
33845644940
-
A tolerance interval based approach to address uncertainty for rams plus c optimization
-
Martorell, S., Sanchez, A. & Carlos, S. (2007). A tolerance interval based approach to address uncertainty for RAMS plus C optimization. Reliab. Eng. Syst. Saf., 92, 408-422
-
(2007)
Reliab. Eng. Syst. Saf
, vol.92
, pp. 408-422
-
-
Martorell, S.1
Sanchez, A.2
Carlos, S.3
-
139
-
-
0036723346
-
Comparing effectiveness and efficiency in technical specifications and maintenance optimization
-
Martorell, S., Sanchez, A., Carlos, S. & Serradell, V. (2002) Comparing effectiveness and efficiency in technical specifications and maintenance optimization. Reliab. Eng. Syst. Saf., 77, 281-289
-
(2002)
Reliab. Eng. Syst. Saf
, vol.77
, pp. 281-289
-
-
Martorell, S.1
Sanchez, A.2
Carlos, S.3
Serradell, V.4
-
140
-
-
2942571511
-
Alternatives and challenges in optimizing industrial safety using genetic algorithms
-
Martorell, S., Sanchez, A., Carlos, S. & Serradell, V. (2004) Alternatives and challenges in optimizing industrial safety using genetic algorithms. Reliab. Eng. Syst. Saf., 86, 25-38
-
(2004)
Reliab. Eng. Syst. Saf
, vol.86
, pp. 25-38
-
-
Martorell, S.1
Sanchez, A.2
Carlos, S.3
Serradell, V.4
-
141
-
-
77957122527
-
Maintenance modeling and optimization integrating human and material resources
-
Martorell, S., Villamizar, M., Carlos, S. & Sanchez, A. (2010) Maintenance modeling and optimization integrating human and material resources. Reliab. Eng. Syst. Saf., 95, 1293-1299
-
(2010)
Reliab. Eng. Syst. Saf
, vol.95
, pp. 1293-1299
-
-
Martorell, S.1
Villamizar, M.2
Carlos, S.3
Sanchez, A.4
-
142
-
-
4544221624
-
Rams+c informed decision-making with application to multi-objective optimization of technical specifications and maintenance using genetic algorithms
-
Martorell, S., Villanueva, J. F., Carlos, S., Nebot, Y., Sanchez, A., Pitarch, J. L. & Serradell, V. (2005) RAMS+C informed decision-making with application to multi-objective optimization of technical specifications and maintenance using genetic algorithms. Reliab. Eng. Syst. Saf., 87, 65-75
-
(2005)
Reliab. Eng. Syst. Saf
, vol.87
, pp. 65-75
-
-
Martorell, S.1
Villanueva, J.F.2
Carlos, S.3
Nebot, Y.4
Sanchez, A.5
Pitarch, J.L.6
Serradell, V.7
-
143
-
-
0006470312
-
Operating characteristics of opportunistic replacement and inspection policies
-
McCall, J. J. (1963) Operating characteristics of opportunistic replacement and inspection policies. Manag. Sci., 10, 85-97
-
(1963)
Manag. Sci
, vol.10
, pp. 85-97
-
-
McCall, J.J.1
-
144
-
-
84867743350
-
Power customer satisfaction and profitability analysis using multi-criteria decision making methods
-
Medjoudj, R., Aissani, D. & Haim, K. D. (2013) Power customer satisfaction and profitability analysis using multi-criteria decision making methods. Int. J. Electr. Power Energy Syst., 45, 331-339
-
(2013)
Int. J. Electr. Power Energy Syst
, vol.45
, pp. 331-339
-
-
Medjoudj, R.1
Aissani, D.2
Haim, K.D.3
-
145
-
-
0025841548
-
An efficient approach for multiple criteria redundancy optimization problems
-
Misra, K. B. & Sharma, U. (1991) An efficient approach for multiple criteria redundancy optimization problems. Microelectron. Reliab., 31, 303-321
-
(1991)
Microelectron. Reliab
, vol.31
, pp. 303-321
-
-
Misra, K.B.1
Sharma, U.2
-
146
-
-
84886725638
-
Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming
-
Moghaddam, K. S. (2013) Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming. Int. J. Prod. Econ., 146, 704-716
-
(2013)
Int. J. Prod. Econ
, vol.146
, pp. 704-716
-
-
Moghaddam, K.S.1
-
147
-
-
28344437411
-
Optimization techniques for system reliability: A review
-
Mohamed, A. A., Leemis, L. M. & Ravindran, A. (1992) Optimization techniques for system reliability: a review. Reliab. Eng. Syst. Saf., 35, 137-146
-
(1992)
Reliab. Eng. Syst. Saf
, vol.35
, pp. 137-146
-
-
Mohamed, A.A.1
Leemis, L.M.2
Ravindran, A.3
-
148
-
-
79951579853
-
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
-
Moradi, E., Ghomi, S. M. T. F. & Zandieh, M. (2011) Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem. Expert Syst. Appl., 38, 7169-7178
-
(2011)
Expert Syst. Appl
, vol.38
, pp. 7169-7178
-
-
Moradi, E.1
Ghomi, S.M.T.F.2
Zandieh, M.3
-
150
-
-
79953680151
-
Comparison between different uncertainty propagation methods in multivariate analysis: An application in the bivariate case
-
Mullor, R., Sanchez, A., Martorell, S. & Martinez-Alzamora, N. (2011) Comparison between different uncertainty propagation methods in multivariate analysis: an application in the bivariate case. Reliab. Eng. Syst. Saf., 96, 642-650
-
(2011)
Reliab. Eng. Syst. Saf
, vol.96
, pp. 642-650
-
-
Mullor, R.1
Sanchez, A.2
Martorell, S.3
Martinez-Alzamora, N.4
-
151
-
-
84860755051
-
A scenario driven multiobjective primary-secondary distribution system expansion planning algorithm in the presence of wholesale-retail market
-
Nazar, M. S., Haghifam, M. R. & Nazar, M. (2012). A scenario driven multiobjective primary-secondary distribution system expansion planning algorithm in the presence of wholesale-retail market. Int. J. Electr. Power Energy Syst., 40, 29-45
-
(2012)
Int. J. Electr. Power Energy Syst
, vol.40
, pp. 29-45
-
-
Nazar, M.S.1
Haghifam, M.R.2
Nazar, M.3
-
152
-
-
33646724889
-
Probabilistic lifetime-oriented multiobjective optimization of bridge maintenance: Single maintenance type
-
Neves, L. A. C., Frangopol, D. M. & Cruz, P. J. S. (2006) Probabilistic lifetime-oriented multiobjective optimization of bridge maintenance: Single maintenance type. J. Struct. Eng.-ASCE, 132, 991-1005
-
(2006)
J. Struct. Eng.-ASCE
, vol.132
, pp. 991-1005
-
-
Neves, L.A.C.1
Frangopol, D.M.2
Cruz, P.J.S.3
-
153
-
-
33750130659
-
Probabilistic lifetime-oriented multiobjective optimization of bridge maintenance: Combination of maintenance types
-
Neves, L. A. C., Frangopol, D. M. & Petcherdchoo, A. (2006) Probabilistic lifetime-oriented multiobjective optimization of bridge maintenance: combination of maintenance types. J. Struct. Eng.-ASCE, 132, 1821-1834
-
(2006)
J. Struct. Eng.-ASCE
, vol.132
, pp. 1821-1834
-
-
Neves, L.A.C.1
Frangopol, D.M.2
Petcherdchoo, A.3
-
154
-
-
0000591756
-
Strategic-planning in manufacturing systems-Ahp application to an equipment replacement decision
-
Oeltjenbruns, H., Kolarik, E. J. & Schnadtkirschner, R. (1995) Strategic-planning in manufacturing systems-AHP application to an equipment replacement decision. Int. J. Prod. Econ., 38, 189-197
-
(1995)
Int. J. Prod. Econ
, vol.38
, pp. 189-197
-
-
Oeltjenbruns, H.1
Kolarik, E.J.2
Schnadtkirschner, R.3
-
155
-
-
84859635634
-
Multi-objective optimization of a series-parallel system using gpsia
-
Okafor, E. G. & Sun, Y.-C. (2012) Multi-objective optimization of a series-parallel system using GPSIA. Reliab. Eng. Syst. Saf., 103, 61-71
-
(2012)
Reliab. Eng. Syst. Saf
, vol.103
, pp. 61-71
-
-
Okafor, E.G.1
Sun, Y.-C.2
-
156
-
-
70349152590
-
Lifetime-oriented multi-objective optimization of structural maintenance considering system reliability redundancy and life-cycle cost using ga
-
Okasha, N. M. & Frangopol, D. M. (2009) Lifetime-oriented multi-objective optimization of structural maintenance considering system reliability, redundancy and life-cycle cost using GA. Struct. Saf., 31, 460-474
-
(2009)
Struct. Saf
, vol.31
, pp. 460-474
-
-
Okasha, N.M.1
Frangopol, D.M.2
-
157
-
-
77955186208
-
Novel approach for multicriteria optimization of life-cycle preventive and essential maintenance of deteriorating structures
-
Okasha, N. M. & Frangopol, D.M. (2010) Novel approach for multicriteria optimization of life-cycle preventive and essential maintenance of deteriorating structures. J. Struct. Eng.-ASCE, 136, 1009-1022
-
(2010)
J. Struct. Eng.-ASCE
, vol.136
, pp. 1009-1022
-
-
Okasha, N.M.1
Frangopol, D.M.2
-
158
-
-
78649335724
-
Optimization of bridge maintenance strategies based on structural health monitoring information
-
Orcesi, A. D. & Frangopol, D. M. (2011) Optimization of bridge maintenance strategies based on structural health monitoring information. Struct. Saf., 33, 26-41
-
(2011)
Struct. Saf
, vol.33
, pp. 26-41
-
-
Orcesi, A.D.1
Frangopol, D.M.2
-
160
-
-
34547850627
-
Development of a multi-criteria hierarchical framework for maintenance performance measurement (mpm)
-
Parida, A. & Chattopadhyay, G. (2007) Development of a multi-criteria hierarchical framework for maintenance performance measurement (MPM). J. Qual. Maint. Eng., 13, 241-258
-
(2007)
J. Qual. Maint. Eng
, vol.13
, pp. 241-258
-
-
Parida, A.1
Chattopadhyay, G.2
-
161
-
-
67349228029
-
Business-oriented prioritization: A novel graphical technique
-
Pascual, R., Del, Castillo & Knights, P. (2009) Business-oriented prioritization: a novel graphical technique. Reliab. Eng. Syst. Saf., 94, 1308-1313
-
(2009)
Reliab. Eng. Syst. Saf
, vol.94
, pp. 1308-1313
-
-
Castillo. Del, P.R.1
Knights, P.2
-
162
-
-
0030575689
-
Imperfect maintenance
-
Pham, H. & Wang, H. (1996) Imperfect maintenance. Eur. J. Oper. Res., 94, 425-438
-
(1996)
Eur. J. Oper. Res
, vol.94
, pp. 425-438
-
-
Pham, H.1
Wang, H.2
-
163
-
-
24644473583
-
Risk-informed optimisation of railway tracks inspection and maintenance procedures
-
Podofillini, L., Zio, E. & Vatn, J. (2006) Risk-informed optimisation of railway tracks inspection and maintenance procedures. Reliab. Eng. Syst. Saf., 91, 20-35
-
(2006)
Reliab. Eng. Syst. Saf
, vol.91
, pp. 20-35
-
-
Podofillini, L.1
Zio, E.2
Vatn, J.3
-
164
-
-
33750731956
-
Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms
-
Quan, G., Greenwood, G. W., Liu, D. & Hu, S. (2007) Searching for multiobjective preventive maintenance schedules: combining preferences with evolutionary algorithms. Eur. J. Oper. Res., 177, 1969-1984
-
(2007)
Eur. J. Oper. Res
, vol.177
, pp. 1969-1984
-
-
Quan, G.1
Greenwood, G.W.2
Liu, D.3
Hu, S.4
-
165
-
-
0035248413
-
Reliability and costs optimization for distribution networks expansion using an evolutionary algorithm
-
Ramirez-Rosado, I. J. & Bernal-Agustin, J. L. (2001) Reliability and costs optimization for distribution networks expansion using an evolutionary algorithm. IEEE Trans. Power Syst., 16, 111-118
-
(2001)
IEEE Trans Power Syst
, vol.16
, pp. 111-118
-
-
Ramirez-Rosado, I.J.1
Bernal-Agustin, J.L.2
-
166
-
-
0026476842
-
Reliability and redundancy apportionment using crisp and fuzzy multiobjective optimization approaches
-
Rao, S. S. & Dhingra, A. K. (1992) Reliability and redundancy apportionment using crisp and fuzzy multiobjective optimization approaches. Reliab. Eng. Syst. Saf., 37, 253-261
-
(1992)
Reliab. Eng. Syst. Saf
, vol.37
, pp. 253-261
-
-
Rao, S.S.1
Dhingra, A.K.2
-
167
-
-
84885190574
-
Optimizing reliability-based robust design model using multi-objective genetic algorithm
-
Rathod, V., Yadav, O. P., Rathore, A. & Jain, R. (2013) Optimizing reliability-based robust design model using multi-objective genetic algorithm. Comput. Indus. Eng., 66, 301-310
-
(2013)
Comput. Indus. Eng
, vol.66
, pp. 301-310
-
-
Rathod, V.1
Yadav, O.P.2
Rathore, A.3
Jain, R.4
-
168
-
-
0032157653
-
Design of reliable systems using static and dynamic fault trees
-
Ren, Y. S. & Dugan, J. B. (1998) Design of reliable systems using static and dynamic fault trees. IEEE Trans. Reliab., 47, 234-244
-
(1998)
IEEE Trans Reliab
, vol.47
, pp. 234-244
-
-
Ren, Y.S.1
Dugan, J.B.2
-
169
-
-
79958012668
-
Assessing the vulnerability of a power system through a multiple objective contingency screening approach
-
Rocco, C. M., Ramirez-Marquez, J. E., Salazar, D. E. & Yajure, C. (2011) Assessing the vulnerability of a power system through a multiple objective contingency screening approach. IEEE Trans. Reliab., 60, 394-403
-
(2011)
IEEE Trans Reliab
, vol.60
, pp. 394-403
-
-
Rocco, C.M.1
Ramirez-Marquez, J.E.2
Salazar, D.E.3
Yajure, C.4
-
170
-
-
33846919661
-
Optimal medical equipment maintenance service proposal decision support system combining activity based costing (ab) and the analytic hierarchy process (ahp)
-
New York: IEEE
-
Rocha, L. S., Sloane, E. B. & Bassani, J.W.M. (2005) Optimal medical equipment maintenance service proposal decision support system combining Activity Based Costing (AB) and the Analytic Hierarchy Process (AHP). Annual International Conference of the IEEE Engineering in Medicine and Biology-Proceedings, New York: IEEE. pp. 7103-7106
-
(2005)
Annual International Conference of the IEEE Engineering in Medicine and Biology-Proceedings
, pp. 7103-7106
-
-
Rocha, L.S.1
Sloane, E.B.2
Bassani, J.W.M.3
-
172
-
-
0003065507
-
The european school of mcda: Emergence basic features and current works
-
Roy, B. & Vanderpooten, D. (1996) The European school of MCDA: emergence, basic features and current works. J. Multi-Criteria Dec. Anal., 5, 22-38
-
(1996)
J. Multi-Criteria Dec. Anal
, vol.5
, pp. 22-38
-
-
Roy, B.1
Vanderpooten, D.2
-
174
-
-
55449130800
-
Planning and optimizing the maintenance of paper production systems in a paper plant
-
Sachdeva, A., Kumar, D. & Kumar, P. (2008) Planning and optimizing the maintenance of paper production systems in a paper plant. Comput. Indus. Eng., 55, 817-829
-
(2008)
Comput. Indus. Eng
, vol.55
, pp. 817-829
-
-
Sachdeva, A.1
Kumar, D.2
Kumar, P.3
-
175
-
-
84865491862
-
Multi-objective reliability optimization of series-parallel systems with a choice of redundancy strategies
-
Safari, J. (2012) Multi-objective reliability optimization of series-parallel systems with a choice of redundancy strategies. Reliab. Eng. Syst. Saf., 108, 10-20
-
(2012)
Reliab. Eng. Syst. Saf
, vol.108
, pp. 10-20
-
-
Safari, J.1
-
176
-
-
82755182529
-
Genetic algorithm based multi-objective reliability optimization in interval environment
-
Sahoo, L., Bhunia, A. K. & Kapur, P. K. (2012) Genetic algorithm based multi-objective reliability optimization in interval environment. Comput. Indus. Eng., 62, 152-160
-
(2012)
Comput. Indus. Eng
, vol.62
, pp. 152-160
-
-
Sahoo, L.1
Bhunia, A.K.2
Kapur, P.K.3
-
177
-
-
0018105721
-
Multiobjective reliability and redundancy optimization of a series-parallel system by surrogate worth trade-off method
-
Sakawa, M. (1978) Multiobjective reliability and redundancy optimization of a series-parallel system by surrogate worth trade-off method. Microelectron. Reliab., 17, 465-467
-
(1978)
Microelectron. Reliab
, vol.17
, pp. 465-467
-
-
Sakawa, M.1
-
178
-
-
0019216476
-
Reliability-design of a standby system by a large-scale multiobjective optimization method
-
Sakawa, M. (1980) Reliability-design of a standby system by a large-scale multiobjective optimization method. Microelectron. Reliab., 20, 191-204
-
(1980)
Microelectron. Reliab
, vol.20
, pp. 191-204
-
-
Sakawa, M.1
-
179
-
-
0019583039
-
Optimal reliability-design of a series-parallel system by a large-scale multiobjective optimization method
-
Sakawa, M. (1981) OPtimal reliability-design of a series-parallel system by a large-scale multiobjective optimization method. IEEE Trans. Reliab., 30, 173-174
-
(1981)
IEEE Trans Reliab
, vol.30
, pp. 173-174
-
-
Sakawa, M.1
-
180
-
-
33846458246
-
Solving advanced multi-objective robust designs by means of multiple objective evolutionary algorithms (moe): A reliability application
-
Salazar, A. D. E. & Rocco, S. C. M. (2007) Solving advanced multi-objective robust designs by means of multiple objective evolutionary algorithms (MOE): a reliability application. Reliab. Eng. Syst. Saf., 92, 697-706
-
(2007)
Reliab. Eng. Syst. Saf
, vol.92
, pp. 697-706
-
-
Salazar, A.D.E.1
Rocco, S.C.M.2
-
181
-
-
33745519716
-
Optimization of constrained multiple-objective reliability problems using evolutionary algorithms
-
Salazar, D., Rocco, C. M. & Galvan, B. J. (2006) Optimization of constrained multiple-objective reliability problems using evolutionary algorithms. Reliab. Eng. Syst. Saf., 91, 1057-1070
-
(2006)
Reliab. Eng. Syst. Saf
, vol.91
, pp. 1057-1070
-
-
Salazar, D.1
Rocco, C.M.2
Galvan, B.J.3
-
182
-
-
52149094108
-
Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization
-
Sanchez, A., Carlos, S., Martorell, S. & Villanueva, J. F. (2009) Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization. Reliab. Eng. Syst. Saf., 94, 22-32
-
(2009)
Reliab. Eng. Syst. Saf
, vol.94
, pp. 22-32
-
-
Sanchez, A.1
Carlos, S.2
Martorell, S.3
Villanueva, J.F.4
-
183
-
-
45149101060
-
Condition evaluation of existing reinforced concrete bridges using fuzzy based analytic hierarchy approach
-
Sasmal, S. & Ramanjaneyulu, K. (2008) Condition evaluation of existing reinforced concrete bridges using fuzzy based analytic hierarchy approach. Expert Syst. Appl., 35, 1430-1443
-
(2008)
Expert Syst. Appl
, vol.35
, pp. 1430-1443
-
-
Sasmal, S.1
Ramanjaneyulu, K.2
-
184
-
-
80055043168
-
Modelling quality in replacement and inspection maintenance
-
Scarf, P. A. & Cavalcante, C. A. (2012) Modelling quality in replacement and inspection maintenance. Int. J. Prod. Econ., 135, 372-381
-
(2012)
Int. J. Prod. Econ
, vol.135
, pp. 372-381
-
-
Scarf, P.A.1
Cavalcante, C.A.2
-
185
-
-
0021497404
-
Regional energy supply optimization with multiple objectives
-
Schulz, V. & Stehfest, H. (1984) Regional energy supply optimization with multiple objectives. Eur. J. Oper. Res., 17, 302-312
-
(1984)
Eur. J. Oper. Res
, vol.17
, pp. 302-312
-
-
Schulz, V.1
Stehfest, H.2
-
186
-
-
0036641666
-
A fuzzy knowledge based method for maintenance planning in a power system
-
Sergaki, A. & Kalaitzakis, K. (2002). A fuzzy knowledge based method for maintenance planning in a power system. Reliab. Eng. Syst. Saf., 77, 19-30
-
(2002)
Reliab. Eng. Syst. Saf
, vol.77
, pp. 19-30
-
-
Sergaki, A.1
Kalaitzakis, K.2
-
187
-
-
79953881384
-
A literature review and future perspectives on maintenance optimization
-
Sharma, A., Yadava, G. S. & Deshmukh, S. G. (2011). A literature review and future perspectives on maintenance optimization. J. Qual. Maint. Eng., 17, 5-25
-
(2011)
J. Qual. Maint. Eng
, vol.17
, pp. 5-25
-
-
Sharma, A.1
Yadava, G.S.2
Deshmukh, S.G.3
-
188
-
-
53149094731
-
Multi-criteria decision-making approach to evaluate optimum maintenance strategy in textile industry
-
Shyjith, K., Ilangkumaran, M. & Kumanan, S. (2008) Multi-criteria decision-making approach to evaluate optimum maintenance strategy in textile industry. J. Qual. Maint. Eng., 14, 375-386
-
(2008)
J. Qual. Maint. Eng
, vol.14
, pp. 375-386
-
-
Shyjith, K.1
Ilangkumaran, M.2
Kumanan, S.3
-
189
-
-
67349182896
-
Selection of a cleaning system for engine maintenance based on the analytic hierarchy process
-
Socorro Garcia-Cascales, M. & Teresa Lamata, M. (2009) Selection of a cleaning system for engine maintenance based on the analytic hierarchy process. Comput. Indus. Eng., 56, 1442-1451
-
(2009)
Comput. Indus. Eng
, vol.56
, pp. 1442-1451
-
-
Socorro Garcia-Cascales, M.1
Teresa Lamata, M.2
-
190
-
-
0035368829
-
Fuzzy qfd for supply chain management with reliability consideration
-
Sohn, S. Y. & Choi, I. S. (2001) Fuzzy QFD for supply chain management with reliability consideration. Reliab. Eng. Syst. Saf., 72, 327-334
-
(2001)
Reliab. Eng. Syst. Saf
, vol.72
, pp. 327-334
-
-
Sohn, S.Y.1
Choi, I.S.2
-
191
-
-
0024141283
-
Failure cost design of structural systems
-
Soltani, M. & Corotis, R. B. (1988) failure cost design of structural systems. Struct. Saf., 5, 239-252
-
(1988)
Struct. Saf
, vol.5
, pp. 239-252
-
-
Soltani, M.1
Corotis, R.B.2
-
192
-
-
84870531839
-
Optimum multi-objective ramp-stress accelerated life test with stress upper bound for burr type-xii distribution
-
Srivastava, P. W. & Mittal, N. (2012) Optimum multi-objective ramp-stress accelerated life test with stress upper bound for Burr type-XII distribution. IEEE Trans. Reliab., 61, 1030-1038
-
(2012)
IEEE Trans Reliab
, vol.61
, pp. 1030-1038
-
-
Srivastava, P.W.1
Mittal, N.2
-
193
-
-
33750296960
-
Practical solutions for multi-objective optimization: An application to system reliability design problems
-
Taboada, H. A., Baheranwala, F., Coit, D. W. & Wattanapongsakorn, N. (2007) Practical solutions for multi-objective optimization: an application to system reliability design problems. Reliab. Eng. Syst. Saf., 92, 314-322
-
(2007)
Reliab. Eng. Syst. Saf
, vol.92
, pp. 314-322
-
-
Taboada, H.A.1
Baheranwala, F.2
Coit, D.W.3
Wattanapongsakorn, N.4
-
194
-
-
41449107140
-
Moms-ga: A multi-objective multi-state genetic algorithm for system reliability optimization design problems
-
Taboada, H. A., Espiritu, J. F. & Coit, D. W. (2008) MOMS-GA: a multi-objective multi-state genetic algorithm for system reliability optimization design problems. IEEE Trans. Reliab., 57, 182-191
-
(2008)
IEEE Trans Reliab
, vol.57
, pp. 182-191
-
-
Taboada, H.A.1
Espiritu, J.F.2
Coit, D.W.3
-
195
-
-
77953539900
-
Performance measures and optimal design of linear structural systems under stochastic stationary excitation
-
Taflanidis, A. A. & Scruggs, J. T. (2010) Performance measures and optimal design of linear structural systems under stochastic stationary excitation. Struct. Saf., 32, 305-315
-
(2010)
Struct. Saf
, vol.32
, pp. 305-315
-
-
Taflanidis, A.A.1
Scruggs, J.T.2
-
196
-
-
77956992498
-
Multiple criteria assessment of substation conditions by pair-wise comparison of analytic hierarchy process
-
Tanaka, H., Tsukao, S., Yamashita, D., Niimura, T. & Yokoyama, R. (2010) Multiple criteria assessment of substation conditions by pair-wise comparison of analytic hierarchy process. IEEE Trans. Power Deliv., 25, 3017-3023
-
(2010)
IEEE Trans Power Deliv
, vol.25
, pp. 3017-3023
-
-
Tanaka, H.1
Tsukao, S.2
Yamashita, D.3
Niimura, T.4
Yokoyama, R.5
-
197
-
-
33745657496
-
Redundancy allocation for multi-state systems using physical programming and genetic algorithms
-
Tian, Z. & Zuo, M. J. (2006) Redundancy allocation for multi-state systems using physical programming and genetic algorithms. Reliab. Eng. Syst. Saf., 91, 1049-1056
-
(2006)
Reliab. Eng. Syst. Saf
, vol.91
, pp. 1049-1056
-
-
Tian, Z.1
Zuo, M.J.2
-
198
-
-
45549108293
-
Reliability-redundancy allocation for multi-state series-parallel systems
-
Tian, Z., Zuo, M. J. & Huang, H. (2008) Reliability-redundancy allocation for multi-state series-parallel systems. IEEE Trans. Reliab., 57, 303-310
-
(2008)
IEEE Trans Reliab
, vol.57
, pp. 303-310
-
-
Tian, Z.1
Zuo, M.J.2
Huang, H.3
-
199
-
-
63649139504
-
Multiobjective optimal placement of switches and protective devices in electric power distribution systems using ant colony optimization
-
Tippachon, W. & Rerkpreedapong, D. (2009) Multiobjective optimal placement of switches and protective devices in electric power distribution systems using ant colony optimization. Electr. Power Syst. Res., 79, 1171-1178
-
(2009)
Electr. Power Syst. Res
, vol.79
, pp. 1171-1178
-
-
Tippachon, W.1
Rerkpreedapong, D.2
-
200
-
-
59049098384
-
Modelling and optimization of proof testing policies for safety instrumented systems
-
Torres-Echeverria, A. C., Martorell, S. & Thompson, H. A. (2009) Modelling and optimization of proof testing policies for safety instrumented systems. Reliab. Eng. Syst. Saf., 94, 838-854
-
(2009)
Reliab. Eng. Syst. Saf
, vol.94
, pp. 838-854
-
-
Torres-Echeverria, A.C.1
Martorell, S.2
Thompson, H.A.3
-
201
-
-
84863477117
-
Multi-objective optimization of design and testing of safety instrumented systems with moon voting architectures using a genetic algorithm
-
Torres-Echeverria, A. C., Martorell, S. & Thompson, H. A. (2012) Multi-objective optimization of design and testing of safety instrumented systems with MooN voting architectures using a genetic algorithm. Reliab. Eng. Syst. Saf., 106, 45-60
-
(2012)
Reliab. Eng. Syst. Saf
, vol.106
, pp. 45-60
-
-
Torres-Echeverria, A.C.1
Martorell, S.2
Thompson, H.A.3
-
202
-
-
0030649068
-
Determining the most important criteria in maintenance decision making
-
Triantaphyllou, E., Kovalerchuk, B., Mann Jr, L. & Knapp, G. M. (1997) Determining the most important criteria in maintenance decision making. J. Qual. Maint. Eng., 3, 16-28
-
(1997)
J. Qual. Maint. Eng
, vol.3
, pp. 16-28
-
-
Triantaphyllou, E.1
Kovalerchuk, B.2
Mann, L.3
Knapp, G.M.4
-
203
-
-
84886405756
-
Evolutionary multi-objective day-Ahead thermal generation scheduling in uncertain environment
-
Trivedi, A., Srinivasan, D., Sharma, D. & Singh, C. (2013) Evolutionary multi-objective day-Ahead thermal generation scheduling in uncertain environment. IEEE Trans. Power Syst., 28, 1345-1354
-
(2013)
IEEE Trans Power Syst
, vol.28
, pp. 1345-1354
-
-
Trivedi, A.1
Srinivasan, D.2
Sharma, D.3
Singh, C.4
-
204
-
-
0026835203
-
Design and implementation of a maintenance planning and controlsystem
-
Ulusoy, G., Or, I. & Soydan, N. (1992) Design and implementation of a maintenance planning and controlsystem. Int. J. Prod. Econ., 24, 263-272
-
(1992)
Int. J. Prod. Econ
, vol.24
, pp. 263-272
-
-
Ulusoy, G.1
Or, I.2
Soydan, N.3
-
205
-
-
73649148677
-
Discounted cost model for conditionbased maintenance optimization
-
Van Der Weide, J. A. M. Pandey, M. D. & Van Noortwijk, J. M. (2010) Discounted cost model for conditionbased maintenance optimization. Reliab. Eng. Syst. Saf., 95, 236-246
-
(2010)
Reliab. Eng. Syst. Saf
, vol.95
, pp. 236-246
-
-
Van Der Weide, J.A.M.1
Pandey, M.D.2
Van Noortwijk, J.M.3
-
206
-
-
0031272441
-
Maintenance optimisation from a decision theoretical point of view
-
Vatn, J. (1997) Maintenance optimisation from a decision theoretical point of view. Reliab. Eng. Syst. Saf., 58, 119-126
-
(1997)
Reliab. Eng. Syst. Saf
, vol.58
, pp. 119-126
-
-
Vatn, J.1
-
207
-
-
0030105804
-
An overall model for maintenance optimization
-
Vatn, J., Hokstad, P. & Bodsberg, L. (1996) An overall model for maintenance optimization. Reliab. Eng. Syst. Saf., 51, 241-257
-
(1996)
Reliab. Eng. Syst. Saf
, vol.51
, pp. 241-257
-
-
Vatn, J.1
Hokstad, P.2
Bodsberg, L.3
-
208
-
-
80052259318
-
A promethee-based approach to portfolio selection problems
-
Vetschera, R & de Almeida, A T. (2012). A PROMETHEE-based approach to portfolio selection problems. Comput. Oper. Res., 39, 1010-1020
-
(2012)
Comput. Oper. Res
, vol.39
, pp. 1010-1020
-
-
Vetschera, R.1
De Almeida, A.T.2
-
209
-
-
49949120095
-
Genetic algorithm-based optimization of testing and maintenance under uncertain unavailability and cost estimation: A survey of strategies for harmonizing evolution and accuracy
-
Villanueva, J. F., Sanchez, A. I., Carlos, S. & Martorell, S. (2008) Genetic algorithm-based optimization of testing and maintenance under uncertain unavailability and cost estimation: a survey of strategies for harmonizing evolution and accuracy. Reliab. Eng. Syst. Saf., 93, 1830-1841
-
(2008)
Reliab. Eng. Syst. Saf
, vol.93
, pp. 1830-1841
-
-
Villanueva, J.F.1
Sanchez, A.I.2
Carlos, S.3
Martorell, S.4
-
211
-
-
2342650302
-
A model to determine the cleanliness measurement interval in an automotive paint shop
-
Waeyenbergh, G., Vannieuwenhuyse, B. & Pintelon, L. (2004). A model to determine the cleanliness measurement interval in an automotive paint shop. J. Qual. Maint. Eng., 10, 37-46
-
(2004)
J. Qual. Maint. Eng
, vol.10
, pp. 37-46
-
-
Waeyenbergh, G.1
Vannieuwenhuyse, B.2
Pintelon, L.3
-
212
-
-
61849128422
-
Multiple criteria decision making multiattribute utility theory: Recent accomplishments and what lies ahead
-
Wallenius, J., Dyer, J. S., Fishburn, P. C., Steuer, R. E., Zionts, S. & Deb, K. (2008) Multiple criteria decision making, multiattribute utility theory: recent accomplishments and what lies ahead. Manage. Sci., 54, 1336-1349
-
(2008)
Manage. Sci
, vol.54
, pp. 1336-1349
-
-
Wallenius, J.1
Dyer, J.S.2
Fishburn, P.C.3
Steuer, R.E.4
Zionts, S.5
Deb, K.6
-
213
-
-
84880924584
-
Supply reliability and generation cost analysis due to load forecast uncertainty in unit commitment problems
-
Wang, B., Li, Y. & Watada, J. (2013) Supply reliability and generation cost analysis due to load forecast uncertainty in unit commitment problems. IEEE Trans. Power Syst
-
(2013)
IEEE Trans. Power Syst
-
-
Wang, B.1
Li, Y.2
Watada, J.3
-
214
-
-
0037118559
-
A survey of maintenance policies of deteriorating systems
-
Wang, H. (2002). A survey of maintenance policies of deteriorating systems. Eur. J. Oper. Res., 139, 469-489
-
(2002)
Eur. J. Oper. Res
, vol.139
, pp. 469-489
-
-
Wang, H.1
-
215
-
-
33847071199
-
Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process
-
Wang, L., Chu, J. & Wu, J. (2007) Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process. Int. J. Prod. Econ., 107, 151-163
-
(2007)
Int. J. Prod. Econ
, vol.107
, pp. 151-163
-
-
Wang, L.1
Chu, J.2
Wu, J.3
-
216
-
-
82455212134
-
A multi-objective optimization of imperfect preventive maintenance policy for dependent competing risk systems with hidden failure
-
Wang, Y. & Hoang, P. (2011). A multi-objective optimization of imperfect preventive maintenance policy for dependent competing risk systems with hidden failure. IEEE Trans. Reliab., 60, 770-781
-
(2011)
IEEE Trans. Reliab
, vol.60
, pp. 770-781
-
-
Wang, Y.1
Hoang, P.2
-
217
-
-
77956343124
-
Multi-objective approaches to optimal testing resource allocation in modular software systems
-
Wang, Z., Tang, K. & Yao, X. (2010) Multi-objective approaches to optimal testing resource allocation in modular software systems. IEEE Trans. Reliab., 59, 563-575
-
(2010)
IEEE Trans. Reliab
, vol.59
, pp. 563-575
-
-
Wang, Z.1
Tang, K.2
Yao, X.3
-
218
-
-
33845780486
-
Fault-Tolerant embedded system design and optimization considering reliability estimation uncertainty
-
Wattanapongskorn, N. & Coit, D. W. (2007) Fault-Tolerant embedded system design and optimization considering reliability estimation uncertainty. Reliab. Eng. Syst. Saf., 92, 395-407
-
(2007)
Reliab. Eng. Syst. Saf
, vol.92
, pp. 395-407
-
-
Wattanapongskorn, N.1
Coit, D.W.2
-
219
-
-
84865744522
-
Robust-optimum multi-Attribute age-based replacement policy
-
Wijaya, A. R., Lundberg, J. & Kumar, U. (2012) Robust-optimum multi-Attribute age-based replacement policy. J. Qual. Maint. Eng., 18, 325-343
-
(2012)
J. Qual. Maint. Eng
, vol.18
, pp. 325-343
-
-
Wijaya, A.R.1
Lundberg, J.2
Kumar, U.3
-
220
-
-
33745664031
-
Multi-objective genetic algorithm for solving n-version program design problem
-
Yamachi, H., Tsujimura, Y., Kambayashi, Y. & Yamamoto, H. (2006) Multi-objective genetic algorithm for solving N-version program design problem. Reliab. Eng. Syst. Saf., 91, 1083-1094
-
(2006)
Reliab. Eng. Syst. Saf
, vol.91
, pp. 1083-1094
-
-
Yamachi, H.1
Tsujimura, Y.2
Kambayashi, Y.3
Yamamoto, H.4
-
221
-
-
56549118368
-
Optimal scheduling of emergency roadway repair and subsequent relief distribution
-
Yan, S. & Shih, Y.-L. (2009) Optimal scheduling of emergency roadway repair and subsequent relief distribution. Comput. Oper. Res., 36, 2049-2065
-
(2009)
Comput. Oper. Res
, vol.36
, pp. 2049-2065
-
-
Yan, S.1
Shih, Y.-L.2
-
222
-
-
70350738356
-
Multiobjective evolutionary optimization of maintenance schedules and extents for composite power systems
-
Yang, F. & Chang, C. S. (2009) Multiobjective evolutionary optimization of maintenance schedules and extents for composite power systems. IEEE Trans. Power Syst., 24, 1694-1702
-
(2009)
IEEE Trans Power Syst
, vol.24
, pp. 1694-1702
-
-
Yang, F.1
Chang, C.S.2
-
223
-
-
49249128934
-
Multiobjective evolutionary optimization of substation maintenance using decision-varying markov model
-
Yang, F., Kwan, C. M. & Chang, C. S. (2008) Multiobjective evolutionary optimization of substation maintenance using decision-varying Markov model. IEEE Trans. Power Syst., 23, 1328-1335
-
(2008)
IEEE Trans Power Syst
, vol.23
, pp. 1328-1335
-
-
Yang, F.1
Kwan, C.M.2
Chang, C.S.3
-
224
-
-
0009458206
-
Trade-off approach in power-system planning case-study-Lebanon
-
Yehia, M., Karaki, S., Chedid, R., Elirani, A., Tabors, R. & Shawcross, P. (1995) Trade-off approach in power-system planning case-study-Lebanon. Int. J. Electr. Power Energy Syst., 17, 137-142
-
(1995)
Int. J. Electr. Power Energy Syst
, vol.17
, pp. 137-142
-
-
Yehia, M.1
Karaki, S.2
Chedid, R.3
Elirani, A.4
Tabors, R.5
Shawcross, P.6
-
225
-
-
2142642253
-
Reliability and cost optimization of electronic devices considering the component failure rate uncertainty
-
Zafiropoulos, E. P. & Dialynas, E. N. (2004) Reliability and cost optimization of electronic devices considering the component failure rate uncertainty. Reliab. Eng. Syst. Saf., 84, 271-284
-
(2004)
Reliab. Eng. Syst. Saf
, vol.84
, pp. 271-284
-
-
Zafiropoulos, E.P.1
Dialynas, E.N.2
-
226
-
-
33748290030
-
Reliability optimization using multiobjective ant colony system approaches
-
Zhao, J.-H., Liu, Z. & Dao, M.-T. (2007) Reliability optimization using multiobjective ant colony system approaches. Reliab. Eng. Syst. Saf., 92, 109-120
-
(2007)
Reliab. Eng. Syst. Saf
, vol.92
, pp. 109-120
-
-
Zhao, J.-H.1
Liu, Z.2
Dao, M.-T.3
-
227
-
-
84883168038
-
Long-Term multi-objective distribution network planning by dg allocation and feeders reconfiguration
-
Zidan, A., Shaaban, M. F. & El-Saadany, E. F. (2013) Long-Term multi-objective distribution network planning by DG allocation and feeders reconfiguration. Electr. Power Syst. Res., 105, 95-104
-
(2013)
Electr. Power Syst. Res
, vol.105
, pp. 95-104
-
-
Zidan, A.1
Shaaban, M.F.2
El-Saadany, E.F.3
-
228
-
-
79151486458
-
A clustering procedure for reducing the number of representative solutions in the pareto front of multiobjective optimization problems
-
Zio, E. & Bazzo, R. (2011) A clustering procedure for reducing the number of representative solutions in the Pareto Front of multiobjective optimization problems. Eur. J. Oper. Res., 210, 624-634
-
(2011)
Eur. J. Oper. Res
, vol.210
, pp. 624-634
-
-
Zio, E.1
Bazzo, R.2
-
229
-
-
79951812692
-
Level diagrams analysis of pareto front for multiobjective system redundancy allocation
-
Zio, E. & Bazzo, R. (2011) Level diagrams analysis of Pareto front for multiobjective system redundancy allocation. Reliab. Eng. Syst. Saf., 96, 569-580
-
(2011)
Reliab. Eng. Syst. Saf
, vol.96
, pp. 569-580
-
-
Zio, E.1
Bazzo, R.2
-
230
-
-
84255178698
-
Identifying groups of critical edges in a realistic electrical network by multi-objective genetic algorithms
-
Zio, E., Golea, L. R., Rocco, C. M. S. (2012) Identifying groups of critical edges in a realistic electrical network by multi-objective genetic algorithms. Reliab. Eng. Syst. Saf., 99, 172-177
-
(2012)
Reliab. Eng. Syst. Saf
, vol.99
, pp. 172-177
-
-
Zio, E.1
Golea, L.R.2
Rocco, C.M.S.3
-
231
-
-
34250212577
-
Importance measures and genetic algorithms for designing a risk-informed optimally balanced system
-
Zio, E. & Podofillini, L. (2007) Importance measures and genetic algorithms for designing a risk-informed optimally balanced system. Reliab. Eng. Syst. Saf., 92, 1435-1447
-
(2007)
Reliab. Eng. Syst. Saf
, vol.92
, pp. 1435-1447
-
-
Zio, E.1
Podofillini, L.2
-
232
-
-
80052488470
-
Optimization of the inspection intervals of a safety system in a nuclear power plant by multi-objective differential evolution (mode)
-
Zio, E. & Viadana, G. (2011) Optimization of the inspection intervals of a safety system in a nuclear power plant by Multi-Objective Differential Evolution (MODE). Reliab. Eng. Syst. Saf., 96, 1552-1563
-
(2011)
Reliab. Eng. Syst. Saf
, vol.96
, pp. 1552-1563
-
-
Zio, E.1
Viadana, G.2
|