메뉴 건너뛰기




Volumn 25, Issue 4, 2010, Pages 3017-3023

Multiple criteria assessment of substation conditions by pair-wise comparison of analytic hierarchy process

Author keywords

Aging; analytic hierarchy process; condition assessment; maintenance; pair wise comparison; replacement; substation equipment; transformers

Indexed keywords

AGING; ANALYTIC HIERARCHY; CONDITION ASSESSMENTS; PAIR-WISE COMPARISON; REPLACEMENT; SUBSTATION EQUIPMENT; TRANSFORMERS;

EID: 77956992498     PISSN: 08858977     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRD.2010.2048437     Document Type: Article
Times cited : (53)

References (25)
  • 1
    • 18844407009 scopus 로고    scopus 로고
    • Asset management for transmission and distribution
    • May-Jun.
    • R. E. Brown and B. G. Humphrey, "Asset management for transmission and distribution," IEEE Power Energy Mag., vol.3, no.3, pp. 39-45, May-Jun. 2005.
    • (2005) IEEE Power Energy Mag. , vol.3 , Issue.3 , pp. 39-45
    • Brown, R.E.1    Humphrey, B.G.2
  • 2
    • 84983099878 scopus 로고    scopus 로고
    • Asset management in distribution systems considering new knowledge on component reliability and damage cost
    • presented at the, Liege, Belgium, Aug.
    • U. Zickler et al., "Asset management in distribution systems considering new knowledge on component reliability and damage cost," presented at the 15th Power Systems Computation Conf., Liege, Belgium, Aug. 2005, session 6, paper 6.
    • (2005) 15th Power Systems Computation Conf.. Session 6
    • Zickler, U.1
  • 5
    • 50849100990 scopus 로고    scopus 로고
    • Fuzzy causal maps for asset management: An approach for problem-structuring and multi-criteria evaluation in electrical utilities
    • Lausanne, Switzerland, Jul.
    • J. C. M. Lucio and R. C. G. Teive, "Fuzzy causal maps for asset management: An approach for problem-structuring and multi-criteria evaluation in electrical utilities," in Proc. 2007 IEEE Lausanne Power Tech Conf., Lausanne, Switzerland, Jul. 2007, pp. 2201-2206.
    • (2007) Proc. 2007 IEEE Lausanne Power Tech Conf. , pp. 2201-2206
    • Lucio, J.C.M.1    Teive, R.C.G.2
  • 6
    • 0033080267 scopus 로고    scopus 로고
    • Modeling the impact of substations on distribution reliability
    • Feb.
    • R. E. Brown and T. M. Taylor, "Modeling the impact of substations on distribution reliability," IEEE Trans. Power Syst., vol.14, no.1, pp. 349-354, Feb. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.1 , pp. 349-354
    • Brown, R.E.1    Taylor, T.M.2
  • 7
    • 34147151719 scopus 로고    scopus 로고
    • Estimation of the lifetime of the electrical components in distribution networks
    • Jan.
    • Z. Xiang, E. Gockenbach, V. Wasserberg, and H. Borsi, "Estimation of the lifetime of the electrical components in distribution networks," IEEE Trans. Power Del., vol.22, no.1, pp. 515-522, Jan. 2007.
    • (2007) IEEE Trans. Power Del. , vol.22 , Issue.1 , pp. 515-522
    • Xiang, Z.1    Gockenbach, E.2    Wasserberg, V.3    Borsi, H.4
  • 8
    • 0142103380 scopus 로고    scopus 로고
    • Multiple criteria decision making techniques applied to electricity distribution system planning
    • Sep.
    • P. Espie, G. W. Ault, G. M. Burt, and J. R. McDonald, "Multiple criteria decision making techniques applied to electricity distribution system planning," in IEE Proc. Gener., Trans. Distrib., Sep. 2003, vol.150, pp. 527-535.
    • (2003) IEE Proc. Gener., Trans. Distrib. , vol.150 , pp. 527-535
    • Espie, P.1    Ault, G.W.2    Burt, G.M.3    McDonald, J.R.4
  • 9
    • 0036880503 scopus 로고    scopus 로고
    • Reviewof condition assessment of power transformers in service
    • Nov./Dec.
    • M.Wang, A. J.Vandermaar, and K. D. Srivastava, "Reviewof condition assessment of power transformers in service," IEEE Elect. Insul. Mag., vol.18, no.6, pp. 12-25, Nov./Dec. 2002.
    • (2002) IEEE Elect. Insul. Mag. , vol.18 , Issue.6 , pp. 12-25
    • Wang, M.1    Vandermaar, A.J.2    Srivastava, K.D.3
  • 10
    • 50849100387 scopus 로고    scopus 로고
    • Condition assessment of transmission network infrastructures
    • Switzerland, Jul.
    • J. J. Smit and E. Gulski, "Condition assessment of transmission network infrastructures," in Proc. 2007 IEEE Lausanne Power Tech, Lausanne, Switzerland, Jul. 2007, pp. 2189-2194.
    • (2007) Proc. 2007 IEEE Lausanne Power Tech, Lausanne , pp. 2189-2194
    • Smit, J.J.1    Gulski, E.2
  • 11
    • 68349135421 scopus 로고    scopus 로고
    • A novel condition assessment system for underground distribution applications
    • Aug.
    • M. J. Mousavi and K. L. Butler-Purry, "A novel condition assessment system for underground distribution applications," IEEE Trans. Power Syst., vol.24, no.3, pp. 1115-1125, Aug. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.3 , pp. 1115-1125
    • Mousavi, M.J.1    Butler-Purry, K.L.2
  • 12
    • 0035505636 scopus 로고    scopus 로고
    • The present status of maintenance strategies and the impact of maintenance on reliability
    • Nov.
    • J. Endrenyi et al., "The present status of maintenance strategies and the impact of maintenance on reliability," IEEE Trans. Power Syst., vol.16, no.4, pp. 638-646, Nov. 2001.
    • (2001) IEEE Trans. Power Syst. , vol.16 , Issue.4 , pp. 638-646
    • Endrenyi, J.1
  • 15
    • 1542299768 scopus 로고    scopus 로고
    • Optimizing asset usage through integrated maintenance software systems
    • presented at the, Toronto, ON, Canada, Jul.
    • T. Werner and C. Vetter, "Optimizing asset usage through integrated maintenance software systems," presented at the IEEE 2003 Power Engineering Society General Meeting, Toronto, ON, Canada, Jul. 2003.
    • (2003) IEEE 2003 Power Engineering Society General Meeting
    • Werner, T.1    Vetter, C.2
  • 16
    • 49249128934 scopus 로고    scopus 로고
    • Multiobjective evolutionary optimization of substation maintenance using decision-varying Markov model
    • Aug.
    • F.Yang, "Multiobjective evolutionary optimization of substation maintenance using decision-varying Markov model," IEEE Trans. Power Syst., vol.23, no.3, pp. 1328-1335, Aug. 2008.
    • (2008) IEEE Trans. Power Syst. , vol.23 , Issue.3 , pp. 1328-1335
    • Yang, F.1
  • 17
    • 77957009528 scopus 로고    scopus 로고
    • Substation asset management
    • L. Willis,R. E. Brown,J. D. McDonald Ed., Boca Raton, FL: RC Press, ch. 19
    • L. Willis and R. E. Brown, , J. D. McDonald, Ed., "Substation Asset Management," in Electric Power Substations Engineering. Boca Raton, FL: CRC Press, 2007, ch. 19.
    • (2007) Electric Power Substations Engineering
  • 18
    • 2242485025 scopus 로고
    • The analytic hierarchy process: What it is and how it is used
    • T. L. Saaty, "The analytic hierarchy process: What it is and how it is used," Mathemat. Modell., vol.9, pp. 161-176, 1987.
    • (1987) Mathemat. Modell. , vol.9 , pp. 161-176
    • Saaty, T.L.1
  • 19
    • 84861493371 scopus 로고    scopus 로고
    • Handling maintenance priorities using multi criteria decision making
    • Bologna, Italy. Jun.
    • D. E. Nordgard, J. Heggset, and E. Ostgulen, "Handling maintenance priorities using multi criteria decision making," in Proc. 2003 IEEE Power Tech Conf., Bologna, Italy, Jun. 2003, vol.3, p. 6.
    • (2003) Proc. 2003 IEEE Power Tech Conf. , vol.3 , pp. 6
    • Nordgard, D.E.1    Heggset, J.2    Ostgulen, E.3
  • 22
    • 0030410268 scopus 로고    scopus 로고
    • Choosing an integrated resource plan for electric utilities: An analytic hierarchy approach
    • Washington, DC, Aug.
    • R. R. Clarke, "Choosing an integrated resource plan for electric utilities: An analytic hierarchy approach," in Proc. 31st Intersociety Energy Conversion Engineering Conf. (IECEC 96), Washington, DC, Aug. 1996, vol.3, pp. 1592-1597.
    • (1996) Proc. 31st Intersociety Energy Conversion Engineering Conf. (IECEC 96) , vol.3 , pp. 1592-1597
    • Clarke, R.R.1
  • 23
    • 77957013364 scopus 로고    scopus 로고
    • CESI, Working Group Report on Electricity Interconnections-Phase II: Methodology for the Assessment of new Infrastructures and Application to the Assessment of the Interconnection Projects Already Identified in the Baltic Area May 2009, European Commission, submitted to, available: [Online]. Available:
    • CESI, Working Group Report on Electricity Interconnections-Phase II: Methodology for the Assessment of new Infrastructures and Application to the Assessment of the Interconnection Projects Already Identified in the Baltic Area May 2009, European Commission, submitted to, available: [Online]. Available: http://ec.europa.eu/energy/infrastructure/ bemip-en.htm
  • 25
    • 70349572550 scopus 로고    scopus 로고
    • Relative measurement and its generalization in decision making: Why pairwise comparisons are central in mathematics for the measurement of intangible factors-the analytic hierarchy/network process
    • Jun., [Online]. Available
    • T. L. Saaty, "Relative Measurement and its Generalization in Decision Making: Why Pairwise Comparisons are Central in Mathematics for the Measurement of Intangible Factors-The Analytic Hierarchy/Network Process," in Review of the Royal Spanish Academy of Sciences ser. A, Jun. 2008, vol. 102, no. 2, pp. 251-318 [Online]. Available: http://www.rac.es/ficheros/doc/00576. PDF.
    • (2008) Review of the Royal Spanish Academy of Sciences Ser. A , vol.102 , Issue.2 , pp. 251-318
    • Saaty, T.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.