Volumn 28, Issue 1, 2013, Pages 357-367

Multicriteria planning for distributed wind generation under strategic maintenance

Author keywords

Chance constraint; moment method; multicriteria programming; preventive maintenance; renewable energy

Indexed keywords

CENTRAL LIMIT THEOREM; CHANCE CONSTRAINT; DISTRIBUTED GENERATION SYSTEM; ENVIRONMENTAL PENALTIES; GENERATING UNIT; INTERMITTENCY; LOAD UNCERTAINTY; MAINTENANCE COST; MAINTENANCE INTERVALS; MAINTENANCE POLICY; MAINTENANCE SCHEDULES; MULTI-CRITERIA; MULTICRITERIA OPTIMIZATION; MULTICRITERIA PROGRAMMING; PLANNING MODELS; RENEWABLE ENERGIES; SOLUTION SET; STRATEGIC MAINTENANCE; SYSTEM COSTS; WIND GENERATION; WIND SPEED;

EID: 84871715607     PISSN: 08858977     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRD.2012.2222936     Document Type: Article
Times cited : (65)

References (32)
  • 1
    • 0027576693 scopus 로고
    • Investigation into the impact of electric vehicle load on the electric utility distribution system
    • DOI 10.1109/61.216865
    • S. Rahman and G. B. Shrestha, "An investigation into the impact of electric vehicle load on the electric utility distribution system," IEEE Trans. Power Del., vol. 8, no. 2, pp. 591-597, Apr. 1993. (Pubitemid 23680137)
    • (1993) IEEE Transactions on Power Delivery , vol.8 , Issue.2 , pp. 591-597
    • Rahman, S.1    Shrestha, G.B.2
  • 2
    • 0031258484 scopus 로고    scopus 로고
    • A procedure for derating a substation transformer in the presence of widespread electric vehicle battery charging
    • P. T. Staats, W. M. Grady, A. Arapostathis, and R. S. Thallam, "A procedure for derating a substation transformer in the presence of wide spread electric vehicle battery charging," IEEE Trans. Power Del., vol. 12, no. 4, pp. 1562-1568, Oct. 1997. (Pubitemid 127827643)
    • (1997) IEEE Transactions on Power Delivery , vol.12 , Issue.4 , pp. 1562-1568
    • Staats, P.T.1    Grady, W.M.2    Arapostathis, A.3    Thallam, R.S.4
  • 3
    • 77954136145 scopus 로고    scopus 로고
    • Rapid-charge electric-vehicle stations
    • Jul.
    • M. Etezadi-Amoli, K. Choma, and J. Stefani, "Rapid-charge electric-vehicle stations," IEEE Trans. Power Del., vol. 25, no. 3, pp. 1883-1887, Jul. 2010.
    • (2010) IEEE Trans. Power Del , vol.25 , Issue.3 , pp. 1883-1887
    • Etezadi-Amoli, M.1    Choma, K.2    Stefani, J.3
  • 4
    • 0028549988 scopus 로고
    • Optimum location of resources in distributed planning
    • Nov
    • N. S. Rau and Y.-H. Wan, "Optimum location of resources in distributed planning," IEEE Trans. Power Syst., vol. 9, no. 4, pp. 2014-2020, Nov. 1994.
    • (1994) IEEE Trans. Power Syst , vol.9 , Issue.4 , pp. 2014-2020
    • Rau, N.S.1    Wan, Y.-H.2
  • 5
  • 6
    • 33845293461 scopus 로고    scopus 로고
    • Siting and sizing of distributed generation for optimal microgrid architecture
    • DOI 10.1109/NAPS.2005.1560597, 1560597, Proceedings - Thirteenth International Symposium on Temporal Representation and Reasoning, TIME 2006
    • M. R. Vallem and J. Mitra, "Siting and sizing of distributed generation for optimal microgrid architecture," in Proc. 37th Annu. North American Power Symp., 2005, pp. 611-616. (Pubitemid 44872864)
    • (2005) Proceedings of the 37th Annual North American Power Symposium, 2005 , vol.2005 , pp. 611-616
    • Vallem, M.R.1    Mitra, J.2
  • 7
    • 4043160511 scopus 로고    scopus 로고
    • Optimal investment planning for distributed generation in a competitive electricitymarket
    • Aug
    • W. El-Khattam, K. Bhattacharya, Y. Hegazy, and M. Salama, "Optimal investment planning for distributed generation in a competitive electricitymarket," IEEE Trans. Power Syst., vol. 19, no. 3, pp. 1674-1684, Aug. 2004.
    • (2004) IEEE Trans. Power Syst , vol.19 , Issue.3 , pp. 1674-1684
    • El-Khattam, W.1    Bhattacharya, K.2    Hegazy, Y.3    Salama, M.4
  • 8
    • 18944400970 scopus 로고    scopus 로고
    • A multiobjective evolutionary algorithm for the sizing and siting of distributed generation
    • May
    • G. Celli, E. Ghaiani, S. Mocci, and F. Pilo, "A multiobjective evolutionary algorithm for the sizing and siting of distributed generation," IEEE Trans. Power Syst., vol. 20, no. 2, pp. 47-55, May 2005.
    • (2005) IEEE Trans. Power Syst , vol.20 , Issue.2 , pp. 47-55
    • Celli, G.1    Ghaiani, E.2    Mocci, S.3    Pilo, F.4
  • 9
    • 0038492476 scopus 로고    scopus 로고
    • Analytical methods and rules of thumb for modeling DG distribution interaction
    • H. L. Willis, "Analytical methods and rules of thumb for modeling DG distribution interaction," in Proc. IEEE Power Eng. Soc. Summer Meeting, 2000, pp. 1643-1644.
    • (2000) Proc. IEEE Power Eng. Soc. Summer Meeting , pp. 1643-1644
    • Willis, H.L.1
  • 10
    • 9244221125 scopus 로고    scopus 로고
    • Analytical approaches for optimal placement of distributed generation resources in power systems
    • Nov
    • C. Wang and M. H. Nehrir, "Analytical approaches for optimal placement of distributed generation resources in power systems," IEEE Trans. Power Syst., vol. 19, no. 4, pp. 2068-2076, Nov. 2004.
    • (2004) IEEE Trans. Power Syst , vol.19 , Issue.4 , pp. 2068-2076
    • Wang, C.1    Nehrir, M.H.2
  • 12
    • 80054081204 scopus 로고    scopus 로고
    • Optimal siting and sizing of distributed generators in distribution systems considering uncertainties
    • Oct.
    • Z. Liu, F. Wen, and G. Ledwich, "Optimal siting and sizing of distributed generators in distribution systems considering uncertainties," IEEE Trans. Power Del., vol. 26, no. 4, pp. 2541-2551, Oct. 2011.
    • (2011) IEEE Trans. Power Del , vol.26 , Issue.4 , pp. 2541-2551
    • Liu, Z.1    Wen, F.2    Ledwich, G.3
  • 13
    • 79957916026 scopus 로고    scopus 로고
    • Reliability centered planning for distributed generation considering wind power volatility
    • C. Novoa and T. Jin, "Reliability centered planning for distributed generation considering wind power volatility," Elect. Power Syst. Res., vol. 81, no. 8, pp. 1654-1661, 2011.
    • (2011) Elect. Power Syst. Res , vol.81 , Issue.8 , pp. 1654-1661
    • Novoa, C.1    Jin, T.2
  • 14
    • 84864276822 scopus 로고    scopus 로고
    • Possibilistic-scenario model for DG impact assessment on distribution networks in an uncertain environment
    • Aug.
    • A. Soroudi, "Possibilistic-scenario model for DG impact assessment on distribution networks in an uncertain environment," IEEE Trans. Power Syst., vol. 27, no. 3, pp. 1283-1293, Aug. 2012.
    • (2012) IEEE Trans. Power Syst , vol.27 , Issue.3 , pp. 1283-1293
    • Soroudi, A.1
  • 15
    • 78149445841 scopus 로고    scopus 로고
    • Review on planning and automation technologies for distributed generation systems
    • T. Jin and J. A. Jimenez, "Review on planning and automation technologies for distributed generation systems," in Proc. IEEE Conf. Autom. Sci. Eng., 2010, pp. 269-274.
    • (2010) Proc. IEEE Conf. Autom. Sci. Eng , pp. 269-274
    • Jin, T.1    Jimenez, J.A.2
  • 16
    • 84865037466 scopus 로고    scopus 로고
    • Review of distributed generation planning: Objectives, constraints, and algorithms
    • R. P. Payasi, A. K. Singh, and D. Singh, "Review of distributed generation planning: Objectives, constraints, and algorithms," Int. J. Eng. Sci. Technol., vol. 3, no. 3, pp. 133-153, 2011.
    • (2011) Int. J. Eng. Sci. Technol , vol.3 , Issue.3 , pp. 133-153
    • Payasi, R.P.1    Singh, A.K.2    Singh, D.3
  • 17
    • 51849124712 scopus 로고    scopus 로고
    • Wind turbine reliability: Understanding and minimizing wind turbine operation and maintenance costs
    • [Online]
    • C. Walford, "Wind turbine reliability: Understanding and minimizing wind turbine operation and maintenance costs," Sandia National Labs., Albuquerque, NM, Tech. rep. SAND2006-1100, 2006. [Online]. Available: http://prod. sandia. gov/techlib/access-control. cgi/2006/061100. pdf
    • (2006) Sandia National Labs., Albuquerque, NM, Tech. Rep. SAND2006-1100
    • Walford, C.1
  • 18
    • 33947708442 scopus 로고    scopus 로고
    • Maintenance management of wind power systems using condition monitoring systems - Life cycle cost analysis for two case studies
    • DOI 10.1109/TEC.2006.889623, Special Issue on Wind Power
    • J. Nilsson and L. Bertling, "Maintenance management of wind power systems using condition monitoring systems-Life cycle cost analysis for two case studies," IEEE Trans. Energy Convers., vol. 22, no. 1, pp. 223-229, Mar. 2007. (Pubitemid 46487496)
    • (2007) IEEE Transactions on Energy Conversion , vol.22 , Issue.1 , pp. 223-229
    • Nilsson, J.1    Bertling, L.2
  • 19
    • 33744522630 scopus 로고    scopus 로고
    • A simplified wind power generation model for reliability evaluation
    • DOI 10.1109/TEC.2006.874233
    • R. Karki, P. Hu, and R. Billinton, "A simplified wind power generation model for reliability evaluation," IEEE Trans. Energy Convers., vol. 21, no. 2, pp. 533-540, Jun. 2006. (Pubitemid 43811297)
    • (2006) IEEE Transactions on Energy Conversion , vol.21 , Issue.2 , pp. 533-540
    • Karki, R.1    Hu, P.2    Billinton, R.3
  • 20
    • 36348957426 scopus 로고    scopus 로고
    • Impact of the wind geographical correlation level for reliability studies
    • DOI 10.1109/TPWRS.2007.907969
    • F. Vallee, J. Lobry, and O. Deblecker, "Impact of thewind geographical correlation level for reliability studies," IEEE Trans. Power Syst., vol. 22, no. 4, pp. 2232-2239, Oct. 2007. (Pubitemid 350142025)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 2232-2239
    • Vallee, F.1    Lobry, J.2    Deblecker, O.3
  • 21
    • 38349108557 scopus 로고    scopus 로고
    • Analysis of wind power generation and prediction using ANN: A case study
    • M. C. Mabel and E. Fernandez, "Analysis of wind power generation and prediction using ANN: A case study," Renew. Energy, vol. 33, no. 5, pp. 986-992, 2008.
    • (2008) Renew. Energy , vol.33 , Issue.5 , pp. 986-992
    • Mabel, M.C.1    Fernandez, E.2
  • 24
    • 84876346090 scopus 로고
    • The central limit theorem for dependent random variables
    • W. Hoeffding and H. Robbins, "The central limit theorem for dependent random variables," Duke Math. J., vol. 15, no. 3, pp. 773-780, 1948.
    • (1948) Duke Math. J , vol.15 , Issue.3 , pp. 773-780
    • Hoeffding, W.1    Robbins, H.2
  • 25
    • 54449096143 scopus 로고
    • A central limit theorem for partly dependent variables
    • H. J. Godwin and S. K. Zaremba, "A central limit theorem for partly dependent variables," Ann. Math. Stat., vol. 32, no. 3, pp. 677-686, 1961.
    • (1961) Ann. Math. Stat , vol.32 , Issue.3 , pp. 677-686
    • Godwin, H.J.1    Zaremba, S.K.2
  • 26
    • 0035361595 scopus 로고    scopus 로고
    • Optimisation techniques for electrical power systems Part 2 Heuristic optimisation methods
    • Y. H. Song and M. R. Irving, "Optimization techniques for electrical power systems-Part 2 heuristic optimization methods," Power Eng. J., vol. 15, no. 3, pp. 151-160, 2001. (Pubitemid 32636650)
    • (2001) Power Engineering Journal , vol.15 , Issue.3 , pp. 151-160
    • Song, Y.-H.1    Irving, M.R.2
  • 27
    • 4544229131 scopus 로고    scopus 로고
    • System optimization considering component reliability estimation uncertainty: Multi-criteria approach
    • Sep
    • D. Coit, T. Jin, and N. Wattanapongsakorn, "System optimization considering component reliability estimation uncertainty: Multi-criteria approach," IEEE Trans. Rel., vol. 53, no. 3, pp. 369-380, Sep. 2004.
    • (2004) IEEE Trans. Rel , vol.53 , Issue.3 , pp. 369-380
    • Coit, D.1    Jin, T.2    Wattanapongsakorn, N.3
  • 28
    • 58249129087 scopus 로고    scopus 로고
    • Ant colony optimizationbased method for placement of sectionalizing switches in distribution networks using a fuzzy multi-objective approach
    • Jan
    • H. Falaghi, M.-R. Haghifam, and C. Singh, "Ant colony optimizationbased method for placement of sectionalizing switches in distribution networks using a fuzzy multi-objective approach," IEEE Trans. Power Del., vol. 24, no. 1, pp. 268-276, Jan. 2009.
    • (2009) IEEE Trans. Power Del , vol.24 , Issue.1 , pp. 268-276
    • Falaghi, H.1    Haghifam, M.-R.2    Singh, C.3
  • 30
    • 61349152936 scopus 로고    scopus 로고
    • Reliability analysis for wind turbines with incomplete failure data collected from after the date of initial installation
    • H. T. Guo, S. Watson, and P. Tavner, "Reliability analysis for wind turbines with incomplete failure data collected from after the date of initial installation," Reli. Eng. Syst. Safety, vol. 94, no. 6, pp. 1057-1063, 2009.
    • (2009) Reli. Eng. Syst. Safety , vol.94 , Issue.6 , pp. 1057-1063
    • Guo, H.T.1    Watson, S.2    Tavner, P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.