메뉴 건너뛰기




Volumn 14, Issue 4, 2008, Pages 329-342

Maintenance audit by means of value analysis technique and decision rules: A case study in a bank

Author keywords

Autogressive process; Control charts; Statistical process control; Vibration measurement

Indexed keywords

ADMINISTRATIVE DATA PROCESSING; COMPETITION; DECISION MAKING; DECISION SUPPORT SYSTEMS; EXPERT SYSTEMS; INDUSTRIAL ECONOMICS; MAINTAINABILITY; MAINTENANCE; PROBLEM SOLVING; PRODUCT DESIGN; VALUE ENGINEERING; WATER SUPPLY TUNNELS;

EID: 53149097394     PISSN: 13552511     EISSN: None     Source Type: Journal    
DOI: 10.1108/13552510810909948     Document Type: Article
Times cited : (7)

References (30)
  • 3
    • 0031707966 scopus 로고    scopus 로고
    • Some aspects of measuring maintenance performance in the process industry
    • Arts, R.H.P.M., Knapp, G.M. and Mann, L. (1998), “Some aspects of measuring maintenance performance in the process industry”, Journal of Quality in Maintenance Engineering, Vol. 4 No. 1, pp. 6-11.
    • (1998) Journal of Quality in Maintenance Engineering , vol.4 , Issue.1 , pp. 6-11
    • Arts, R.H.P.M.1    Knapp, G.M.2    Mann, L.3
  • 5
    • 32144446817 scopus 로고    scopus 로고
    • Researching performance measurement system implementation: the dynamics of success and failure
    • Bourne, M. (2005), “Researching performance measurement system implementation: the dynamics of success and failure”, Production Planning & Control, Vol. 16 No. 2, pp. 101-13.
    • (2005) Production Planning & Control , vol.16 , Issue.2 , pp. 101-113
    • Bourne, M.1
  • 6
    • 84992959556 scopus 로고    scopus 로고
    • The SAMA audit process: status in 2004
    • Proceedings Euromaintenance 2004, Barcelona
    • Bradley, E.A. (2004), “The SAMA audit process: status in 2004”, Proceedings Euromaintenance 2004, Barcelona, pp. 89-96.
    • (2004) , pp. 89-96
    • Bradley, E.A.1
  • 7
    • 0346338151 scopus 로고    scopus 로고
    • The control of the setting up of a Predictive Maintenance Programme using a system of indicators
    • Carnero, M.C. (2004), “The control of the setting up of a Predictive Maintenance Programme using a system of indicators”, Omega, Vol. 32, pp. 57-75.
    • (2004) Omega , vol.32 , pp. 57-75
    • Carnero, M.C.1
  • 11
    • 0141964834 scopus 로고
    • Maintenance performance analysis: a practical approach
    • De Groote, P. (1995), “Maintenance performance analysis: a practical approach”, Journal of Quality in Maintenance Engineering, Vol. 1 No. 2, pp. 4-24.
    • (1995) Journal of Quality in Maintenance Engineering , vol.1 , Issue.2 , pp. 4-24
    • De Groote, P.1
  • 12
    • 0032674306 scopus 로고    scopus 로고
    • Searching for real maintenance performance measures
    • Dwight, R. (1999), “Searching for real maintenance performance measures”, Journal of Quality in Maintenance Engineering, Vol. 5 No. 3, pp. 258-75.
    • (1999) Journal of Quality in Maintenance Engineering , vol.5 , Issue.3 , pp. 258-275
    • Dwight, R.1
  • 16
    • 0032396016 scopus 로고    scopus 로고
    • Measurement of overall equipment effectiveness as a basis for TPM activities
    • Ljungberg, Õ. (1998), “Measurement of overall equipment effectiveness as a basis for TPM activities”, International Journal of Operations & Production Management, Vol. 18 No. 5, pp. 495-507.
    • (1998) International Journal of Operations & Production Management , vol.18 , Issue.5 , pp. 495-507
    • Ljungberg, Õ.1
  • 17
    • 0033471112 scopus 로고    scopus 로고
    • Management of industrial maintenance – economic evaluation of maintenance policies
    • Löfsten, H. (1999), “Management of industrial maintenance – economic evaluation of maintenance policies”, International Journal of Operations & Production Management, Vol. 19 No. 7, pp. 716-37.
    • (1999) International Journal of Operations & Production Management , vol.19 , Issue.7 , pp. 716-737
    • Löfsten, H.1
  • 19
    • 84916465658 scopus 로고
    • A methodology for industrial studies of productivity performance
    • Moseng, B. and Bredrup, H. (1993), “A methodology for industrial studies of productivity performance”, Production Planning & Control, Vol. 4 No. 3, pp. 198-206.
    • (1993) Production Planning & Control , vol.4 , Issue.3 , pp. 198-206
    • Moseng, B.1    Bredrup, H.2
  • 24
    • 4043083498 scopus 로고    scopus 로고
    • Measuring maintenance culture and maintenance core task with CULTURE-questionnaire – a case study in the power industry
    • Reiman, T. and Oedewald, P. (2004), “Measuring maintenance culture and maintenance core task with CULTURE-questionnaire – a case study in the power industry”, Safety Science, Vol. 42, pp. 859-89.
    • (2004) Safety Science , vol.42 , pp. 859-889
    • Reiman, T.1    Oedewald, P.2
  • 25
    • 0031679382 scopus 로고    scopus 로고
    • A strategic approach to managing maintenance performance
    • Tsang, A.H.C. (1998), “A strategic approach to managing maintenance performance”, Journal of Quality in Maintenance Engineering, Vol. 4 No. 2, pp. 87-94.
    • (1998) Journal of Quality in Maintenance Engineering , vol.4 , Issue.2 , pp. 87-94
    • Tsang, A.H.C.1
  • 27
    • 32144437108 scopus 로고    scopus 로고
    • Implementation and impact of performance measures in two SMEs in Central Scotland
    • Turner, T.J., Bititci, U.S. and Nudurupati, S.S. (2005), “Implementation and impact of performance measures in two SMEs in Central Scotland”, Production Planning & Control, Vol. 16 No. 2, pp. 135-51.
    • (2005) Production Planning & Control , vol.16 , Issue.2 , pp. 135-151
    • Turner, T.J.1    Bititci, U.S.2    Nudurupati, S.S.3
  • 30
    • 0031276190 scopus 로고    scopus 로고
    • An empirical study of the relationship between production technology and maintenance management
    • Swanson, L. (1997), “An empirical study of the relationship between production technology and maintenance management”, International Journal of Production Economics, Vol. 53, pp. 191-207.
    • (1997) International Journal of Production Economics , vol.53 , pp. 191-207
    • Swanson, L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.