-
1
-
-
51749098243
-
Promoting demand-side management and energy efficiency in portugal 2 years of experience
-
I. Apolinario, C. C. de Barros, H. Coutinho, L. Ferreira, B. Madeira, P. Oliveira, A. Trindade, and P. Verdelho, "Promoting demand-side management and energy efficiency in portugal 2 years of experience, " in Proc. 5th Int. Conf. Eur. Electricity Market, 2008, pp. 1-6.
-
(2008)
Proc. 5th Int. Conf. Eur. Electricity Market
, pp. 1-6
-
-
Apolinario, I.1
De Barros, C.C.2
Coutinho, H.3
Ferreira, L.4
Madeira, B.5
Oliveira, P.6
Trindade, A.7
Verdelho, P.8
-
2
-
-
0034156451
-
A single phase paral-lely connected uninterruptible power supply/demand side management system
-
Mar.
-
M. Ashari, W. L. Keerthipala, and C. V. Nayar, "A single phase paral-lely connected uninterruptible power supply/demand side management system, " IEEE Trans. Energy Convers., vol.15, no.1, pp. 97-102, Mar. 2000.
-
(2000)
IEEE Trans. Energy Convers.
, vol.15
, Issue.1
, pp. 97-102
-
-
Ashari, M.1
Keerthipala, W.L.2
Nayar, C.V.3
-
3
-
-
84923867231
-
Assessment of demand response and advanced metering
-
[Online]
-
"Assessment of demand response and advanced metering, " FERC, Staff Rep., 2006. [Online]. Available: www. FERC. Gov
-
(2006)
FERC, Staff Rep.
-
-
-
4
-
-
77954030744
-
Worldwide survey of network-driven demand-side management projects
-
"Worldwide survey of network-driven demand-side management projects, " Task XV of the IEA-DSM Res. Rep. No.1, 2006.
-
(2006)
Task XV of the IEA-DSM Res. Rep. No. 1
-
-
-
5
-
-
33947312661
-
A framework to implement supply and demand side contingency management in reliability assessment of restructured power systems
-
DOI 10.1109/TPWRS.2006.887962
-
L. Goel, V. P. Aparna, and P. Wang, "A framework to implement supply and demand side contingency management in reliability assessment of restructured power systems, " IEEE Trans. Power Syst., vol.22, no.1, pp. 205-212, Feb. 2007. (Pubitemid 46437729)
-
(2007)
IEEE Transactions on Power Systems
, vol.22
, Issue.1
, pp. 205-212
-
-
Goel, L.1
Aparna, V.P.2
Wang, P.3
-
6
-
-
0036866624
-
Reliability benefits of price-responsive demand
-
Nov.
-
E. Hirst, "Reliability benefits of price-responsive demand, " IEEE Power Eng. Rev., vol.22, no.11, pp. 16-21, Nov. 2002.
-
(2002)
IEEE Power Eng. Rev.
, vol.22
, Issue.11
, pp. 16-21
-
-
Hirst, E.1
-
7
-
-
35348867511
-
Reliability enhancement of a deregulated power system considering demand response
-
Oct.
-
L. Goel, W. Qiuwei, and P. Wang, "Reliability enhancement of a deregulated power system considering demand response, " in Power Eng. Soc. IEEE General Meeting, Oct. 2006, pp. 1-6.
-
(2006)
Power Eng. Soc. IEEE General Meeting
, pp. 1-6
-
-
Goel, L.1
Qiuwei, W.2
Wang, P.3
-
8
-
-
0027646288
-
A system state transition sampling method for composite system reliability evaluation
-
Aug.
-
R. Billinton and W. Li, "A system state transition sampling method for composite system reliability evaluation, " IEEE Trans. Power Syst., vol.8, no.3, pp. 761-770, Aug. 1993.
-
(1993)
IEEE Trans. Power Syst.
, vol.8
, Issue.3
, pp. 761-770
-
-
Billinton, R.1
Li, W.2
-
9
-
-
0023345268
-
Reliability equivalents in composite system reliability evaluation
-
Gen., Transm. Distrib. May
-
R. Billinton, H. J. Koglin, and E. Roos, "Reliability equivalents in composite system reliability evaluation, " Proc. Inst. Elect. Eng., Gen., Transm. Distrib., vol.134, no.3, pp. 224-232, May 1987.
-
(1987)
Proc. Inst. Elect. Eng.
, vol.134
, Issue.3
, pp. 224-232
-
-
Billinton, R.1
Koglin, H.J.2
Roos, E.3
-
10
-
-
0038384950
-
Composite system reliability evaluation incorporating a six-phase transmission line
-
Gen., Transm. Distrib. Jul.
-
R. Billinton, S. O. Faried, and M. Fotuhi-Firuzabad, "Composite system reliability evaluation incorporating a six-phase transmission line, " Proc. Inst. Elect. Eng., Gen., Transm. Distrib., vol.150, no.4, pp. 413-419, Jul. 2003.
-
(2003)
Proc. Inst. Elect. Eng.
, vol.150
, Issue.4
, pp. 413-419
-
-
Billinton, R.1
Faried, S.O.2
Fotuhi-Firuzabad, M.3
-
11
-
-
77954027380
-
Impact of demand side management on composite generation and transmission system reliability
-
M. Zhou, G. Li, and P. Zhang, "Impact of demand side management on composite generation and transmission system reliability, " Proc. IEEE Power Eng. Soc. PSCE, pp. 819-824, 2006.
-
(2006)
Proc. IEEE Power Eng. Soc. PSCE
, pp. 819-824
-
-
Zhou, M.1
Li, G.2
Zhang, P.3
-
12
-
-
0034186804
-
A multiple objective decision support model for the selection of remote load control strategies
-
May
-
H. Jorge, C. H. Antunes, and A. G. Martins, "A multiple objective decision support model for the selection of remote load control strategies, " IEEE Trans. Power Syst., vol.15, no.2, pp. 865-872, May 2000.
-
(2000)
IEEE Trans. Power Syst.
, vol.15
, Issue.2
, pp. 865-872
-
-
Jorge, H.1
Antunes, C.H.2
Martins, A.G.3
-
13
-
-
0342356895
-
Linear programming with multiple objective functions: Step method (STEM)
-
R. Benayoun, I. de Montgolfier, J. Tergny, and O. Laritchev, "Linear programming with multiple objective functions: Step method (STEM), " Math. Programming, vol.1, pp. 366-375, 1971.
-
(1971)
Math. Programming
, vol.1
, pp. 366-375
-
-
Benayoun, R.1
De Montgolfier, I.2
Tergny, J.3
Laritchev, O.4
-
15
-
-
0028482457
-
Generating system operating health analysis considering stand-by units, interruptible load and postponable outages
-
Aug.
-
R. Billinton and M. Fotuhi-Firuzabad, "Generating system operating health analysis considering stand-by units, interruptible load and postponable outages, " IEEE Trans. Power Syst., vol.9, no.3, pp. 1618-1625, Aug. 1994.
-
(1994)
IEEE Trans. Power Syst.
, vol.9
, Issue.3
, pp. 1618-1625
-
-
Billinton, R.1
Fotuhi-Firuzabad, M.2
-
16
-
-
0038677142
-
A new method for composite system annu-alized reliability indices based on genetic algorithms
-
Jul.
-
N. Samaan and C. Singh, "A new method for composite system annu-alized reliability indices based on genetic algorithms, " in Proc. Power Eng. Soc. Summer Meeting, Jul. 2002, vol.2, pp. 850-855.
-
(2002)
Proc. Power Eng. Soc. Summer Meeting
, vol.2
, pp. 850-855
-
-
Samaan, N.1
Singh, C.2
-
17
-
-
0018544097
-
IEEE reliability test system
-
Nov.
-
P.M. Subcommittee, "IEEE reliability test system, " IEEE Trans. Power Syst., vol.PAS-98, no.6, pp. 2047-2054, Nov. 1979.
-
(1979)
IEEE Trans. Power Syst.
, vol.PAS-98
, Issue.6
, pp. 2047-2054
-
-
Subcommittee, P.M.1
-
18
-
-
45449090223
-
Nodal price volatility reduction and reliability enhancement of restructured power systems considering demand-price elasticity
-
Oct.
-
L. Goel, Q. Wu, and P. Wang, "Nodal price volatility reduction and reliability enhancement of restructured power systems considering demand-price elasticity, " Elect. Power Syst. Res., vol.78, no.10, pp. 1655-1663, Oct. 2008.
-
(2008)
Elect. Power Syst. Res.
, vol.78
, Issue.10
, pp. 1655-1663
-
-
Goel, L.1
Wu, Q.2
Wang, P.3
|