메뉴 건너뛰기




Volumn 94, Issue 8, 2009, Pages 1308-1313

Business-oriented prioritization: A novel graphical technique

Author keywords

Criticality; Maintenance decision making; Multicriteria analysis; Physical asset management; Prioritization; Resource assignment; Subset selection

Indexed keywords

CRITICALITY; MAINTENANCE DECISION-MAKING; MULTICRITERIA ANALYSIS; PHYSICAL ASSET MANAGEMENT; PRIORITIZATION; RESOURCE ASSIGNMENT; SUBSET SELECTION;

EID: 67349228029     PISSN: 09518320     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ress.2009.01.013     Document Type: Article
Times cited : (18)

References (34)
  • 1
    • 24644521050 scopus 로고    scopus 로고
    • A method for the efficient prioritization of infrastructure renewal projects
    • Karydas D.M., and Gifun J.F. A method for the efficient prioritization of infrastructure renewal projects. Reliability Engineering and System Safety 91 (2006) 84-99
    • (2006) Reliability Engineering and System Safety , vol.91 , pp. 84-99
    • Karydas, D.M.1    Gifun, J.F.2
  • 2
  • 4
    • 0034288043 scopus 로고    scopus 로고
    • The analytic hierarchy process applied to maintenance strategy selection
    • Bevilacqua M., and Braglia M. The analytic hierarchy process applied to maintenance strategy selection. Reliability Engineering and System Safety 70 (2000) 71-83
    • (2000) Reliability Engineering and System Safety , vol.70 , pp. 71-83
    • Bevilacqua, M.1    Braglia, M.2
  • 5
    • 0002965657 scopus 로고
    • How outranking helps multiple criteria decision making
    • Cochrane J.L., and Zeleny M. (Eds), University of South Carolina Press
    • Roy B. How outranking helps multiple criteria decision making. In: Cochrane J.L., and Zeleny M. (Eds). Multiple criteria decision-making (1973), University of South Carolina Press
    • (1973) Multiple criteria decision-making
    • Roy, B.1
  • 7
    • 84979045308 scopus 로고    scopus 로고
    • Multi-criteria decision aid in financial decision making: methodologies and literature review
    • Zopounidis C., and Doumpos M. Multi-criteria decision aid in financial decision making: methodologies and literature review. Journal of Multi-Criteria Decision Analysis 11 4-5 (2002) 167-186
    • (2002) Journal of Multi-Criteria Decision Analysis , vol.11 , Issue.4-5 , pp. 167-186
    • Zopounidis, C.1    Doumpos, M.2
  • 8
    • 9444274138 scopus 로고    scopus 로고
    • Selection of diagnostic techniques and instrumentation in a predictive maintenance program: a case study
    • Carnero M.C. Selection of diagnostic techniques and instrumentation in a predictive maintenance program: a case study. Decision Support Systems 38 (2005) 539-555
    • (2005) Decision Support Systems , vol.38 , pp. 539-555
    • Carnero, M.C.1
  • 9
    • 33646106578 scopus 로고    scopus 로고
    • An evaluation system of the setting up of predictive maintenance programmes
    • Carnero M.C. An evaluation system of the setting up of predictive maintenance programmes. Reliability Engineering and System Safety 91 (2006) 945-963
    • (2006) Reliability Engineering and System Safety , vol.91 , pp. 945-963
    • Carnero, M.C.1
  • 10
    • 4344630372 scopus 로고    scopus 로고
    • An empirical study of service differentiation for weapon system service parts
    • Deshpande V., Cohen M.A., and Donohue K. An empirical study of service differentiation for weapon system service parts. Operations Research 51 4 (2003) 518-530
    • (2003) Operations Research , vol.51 , Issue.4 , pp. 518-530
    • Deshpande, V.1    Cohen, M.A.2    Donohue, K.3
  • 11
    • 0032058347 scopus 로고    scopus 로고
    • On the impact of optimisation models in maintenance decision making: the state of the art
    • Dekker R., and Scarf Ph. On the impact of optimisation models in maintenance decision making: the state of the art. Reliability Engineering and System Safety 60 (1998) 111-119
    • (1998) Reliability Engineering and System Safety , vol.60 , pp. 111-119
    • Dekker, R.1    Scarf, Ph.2
  • 12
    • 24644436364 scopus 로고    scopus 로고
    • Overall strategy for risk evaluation and priority setting of risk regulations
    • Hokstad P., and Steiro T. Overall strategy for risk evaluation and priority setting of risk regulations. Reliability Engineering and System Safety 91 (2006) 100-111
    • (2006) Reliability Engineering and System Safety , vol.91 , pp. 100-111
    • Hokstad, P.1    Steiro, T.2
  • 13
    • 0032190827 scopus 로고    scopus 로고
    • An approach to vulnerability analysis of complex industrial systems
    • Einarsson S., and Rausand M. An approach to vulnerability analysis of complex industrial systems. Risk Analysis 18 5 (1998) 535-546
    • (1998) Risk Analysis , vol.18 , Issue.5 , pp. 535-546
    • Einarsson, S.1    Rausand, M.2
  • 16
  • 17
    • 10144261235 scopus 로고    scopus 로고
    • Depot-level maintenance planning for marine corps ground equipment
    • Goodhart C.A. Depot-level maintenance planning for marine corps ground equipment. Military Operations Research 4 3 (1999) 77-89
    • (1999) Military Operations Research , vol.4 , Issue.3 , pp. 77-89
    • Goodhart, C.A.1
  • 18
    • 46749103252 scopus 로고    scopus 로고
    • Pareto multi-criteria decision making
    • Grierson D.E. Pareto multi-criteria decision making. Advanced Engineering Informatics 22 3 (2008) 371-384
    • (2008) Advanced Engineering Informatics , vol.22 , Issue.3 , pp. 371-384
    • Grierson, D.E.1
  • 19
    • 67349168883 scopus 로고    scopus 로고
    • PAS-55, Asset Management, British Standards Institute; 2004.
    • PAS-55, Asset Management, British Standards Institute; 2004.
  • 20
    • 67349144832 scopus 로고    scopus 로고
    • AFNOR, Recueil des normes française X 06, X 50, X 60, AFNOR; 1994.
    • AFNOR, Recueil des normes française X 06, X 50, X 60, AFNOR; 1994.
  • 21
    • 0026494564 scopus 로고
    • The balanced scorecard-measures that drive performance
    • Kaplan R.S., and Norton D.P. The balanced scorecard-measures that drive performance. Harvard Business Review 70 1 (1992) 71-79
    • (1992) Harvard Business Review , vol.70 , Issue.1 , pp. 71-79
    • Kaplan, R.S.1    Norton, D.P.2
  • 24
    • 49349096733 scopus 로고    scopus 로고
    • A maintenance prioritisation approach to maximise return on investment subject to time and budget constraints
    • Tam A.S.B., and Price J.W.H. A maintenance prioritisation approach to maximise return on investment subject to time and budget constraints. Journal of Quality in Maintenance Engineering 14 3 (2008) 272-289
    • (2008) Journal of Quality in Maintenance Engineering , vol.14 , Issue.3 , pp. 272-289
    • Tam, A.S.B.1    Price, J.W.H.2
  • 26
    • 29744438237 scopus 로고    scopus 로고
    • Maintenance strategy based on a multicriterion classification of equipments
    • Gomez F.C., and Ruiz J.J. Maintenance strategy based on a multicriterion classification of equipments. Reliability Engineering and System Safety 91 (2006) 444-451
    • (2006) Reliability Engineering and System Safety , vol.91 , pp. 444-451
    • Gomez, F.C.1    Ruiz, J.J.2
  • 27
    • 0031121412 scopus 로고    scopus 로고
    • Reliability centered maintenance for transmission systems
    • Beehler M.E. Reliability centered maintenance for transmission systems. IEEE Transactions on Power Delivery 12 2 (1997) 1023-1028
    • (1997) IEEE Transactions on Power Delivery , vol.12 , Issue.2 , pp. 1023-1028
    • Beehler, M.E.1
  • 28
    • 0031651799 scopus 로고    scopus 로고
    • World-class maintenance using a computerised maintenance management system
    • Labib A.W. World-class maintenance using a computerised maintenance management system. Journal of Quality in Maintenance Engineering 4 1 (1998) 66-75
    • (1998) Journal of Quality in Maintenance Engineering , vol.4 , Issue.1 , pp. 66-75
    • Labib, A.W.1
  • 29
    • 35248865345 scopus 로고    scopus 로고
    • An application of decision making grid to improve maintenance strategies in small and medium industries
    • Burhanuddin M.A., Ahmad A.R., and Desa M.I. An application of decision making grid to improve maintenance strategies in small and medium industries. IEEE conference on industrial electronics and applications 23 25 (2007) 455-460
    • (2007) IEEE conference on industrial electronics and applications , vol.23 , Issue.25 , pp. 455-460
    • Burhanuddin, M.A.1    Ahmad, A.R.2    Desa, M.I.3
  • 30
    • 25144478830 scopus 로고    scopus 로고
    • Downtime priorities, Jack-knife diagrams, and the business cycle
    • Melbourne, Australia
    • Knights P.F. Downtime priorities, Jack-knife diagrams, and the business cycle. Maintenance Journal 17 2 (2004) 14-21 Melbourne, Australia
    • (2004) Maintenance Journal , vol.17 , Issue.2 , pp. 14-21
    • Knights, P.F.1
  • 31
    • 30644462330 scopus 로고    scopus 로고
    • Managing subcontractor supply chain for quality in construction engineering
    • Karim K., Marosszeky M., and Davis S. Managing subcontractor supply chain for quality in construction engineering. Construction and Architectural Management 13 1 (2006) 27-42
    • (2006) Construction and Architectural Management , vol.13 , Issue.1 , pp. 27-42
    • Karim, K.1    Marosszeky, M.2    Davis, S.3
  • 32
    • 67349124535 scopus 로고    scopus 로고
    • On the effect of downtime costs and budget constraint on preventive and replacement policies
    • Pascual R., Meruane V., and Rey P.A. On the effect of downtime costs and budget constraint on preventive and replacement policies. Reliability Engineering and System Safety 93 (2008) 144-151
    • (2008) Reliability Engineering and System Safety , vol.93 , pp. 144-151
    • Pascual, R.1    Meruane, V.2    Rey, P.A.3
  • 33
    • 0001428625 scopus 로고
    • Decision analysis: practice and promise
    • Howard R.A. Decision analysis: practice and promise. Management Science 34 6 (1988) 679-695
    • (1988) Management Science , vol.34 , Issue.6 , pp. 679-695
    • Howard, R.A.1
  • 34
    • 67349228623 scopus 로고    scopus 로고
    • 〈http://opam.ing.uchile.cl〉 (accesed on July 2008).
    • 〈http://opam.ing.uchile.cl〉 (accesed on July 2008).


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.