Volumn 146, Issue 2, 2013, Pages 704-716

Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming

Author keywords

Goal programming; Manufacturing planning; Monte Carlo simulation; Multi objective optimization; Preventive maintenance scheduling; Simulation optimization

Indexed keywords

COMPUTATIONAL PERFORMANCE; GOAL PROGRAMMING; HYBRID MONTE CARLO SIMULATIONS; MANUFACTURING PLANNING; MIXED INTEGER OPTIMIZATION; MULTI-OBJECTIVE MODELING; PARETO OPTIMAL SOLUTIONS; SIMULATION OPTIMIZATION;

EID: 84886725638     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2013.08.027     Document Type: Article
Times cited : (78)

References (35)
  • 1
    • 10444260511 scopus 로고    scopus 로고
    • Integrating simulation and optimization to schedule a hybrid flowshop with maintenance constraints
    • H. Allaoui, and A. Artiba Integrating simulation and optimization to schedule a hybrid flowshop with maintenance constraints Computers and Industrial Engineering 47 2004 431 450
    • (2004) Computers and Industrial Engineering , vol.47 , pp. 431-450
    • Allaoui, H.1    Artiba, A.2
  • 2
    • 26444492122 scopus 로고    scopus 로고
    • Scheduling two-stage hybrid flow shop with availability constraints
    • H. Allaoui, and A. Artiba Scheduling two-stage hybrid flow shop with availability constraints Computers and Operations Research 33 2006 1399 1419
    • (2006) Computers and Operations Research , vol.33 , pp. 1399-1419
    • Allaoui, H.1    Artiba, A.2
  • 3
    • 38749090130 scopus 로고    scopus 로고
    • Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan
    • H. Allaoui, S. Lamouri, A. Artiba, and E. Aghezzaf Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan International Journal of Production Economics 112 2008 161 167
    • (2008) International Journal of Production Economics , vol.112 , pp. 161-167
    • Allaoui, H.1    Lamouri, S.2    Artiba, A.3    Aghezzaf, E.4
  • 4
    • 0025418901 scopus 로고
    • Equipment utilization based maintenance task scheduling in a job shop
    • A. Banerjee, and J.S. Burton Equipment utilization based maintenance task scheduling in a job shop European Journal of Operational Research 45 1990 191 202
    • (1990) European Journal of Operational Research , vol.45 , pp. 191-202
    • Banerjee, A.1    Burton, J.S.2
  • 7
    • 67749116576 scopus 로고    scopus 로고
    • Bi-objective optimization algorithms for joint production and maintenance scheduling: Application to the parallel machine problem
    • A. Berrichi, L. Amodeo, F. Yalaoui, and E. Châtelet Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem Journal of Intelligent Manufacturing 20 2009 389 400
    • (2009) Journal of Intelligent Manufacturing , vol.20 , pp. 389-400
    • Berrichi, A.1    Amodeo, L.2    Yalaoui, F.3    Châtelet, E.4
  • 8
    • 75449112582 scopus 로고    scopus 로고
    • Bi-objective ant colony optimization approach to optimize production and maintenance scheduling
    • A. Berrichi, F. Yalaoui, L. Amodeo, and M. Mezghiche Bi-objective ant colony optimization approach to optimize production and maintenance scheduling Computers and Operations Research 37 2010 1584 1596
    • (2010) Computers and Operations Research , vol.37 , pp. 1584-1596
    • Berrichi, A.1    Yalaoui, F.2    Amodeo, L.3    Mezghiche, M.4
  • 9
    • 0024901561 scopus 로고
    • A simulation study of sequencing and maintenance decisions in a dynamic job shop
    • J.S. Burton, A. Banerjee, and C. Sylla A simulation study of sequencing and maintenance decisions in a dynamic job shop Computers and Industrial Engineering 17 1989 447 452
    • (1989) Computers and Industrial Engineering , vol.17 , pp. 447-452
    • Burton, J.S.1    Banerjee, A.2    Sylla, C.3
  • 10
    • 0038813446 scopus 로고    scopus 로고
    • Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    • C.R. Cassady, and E. Kutanoglu Minimizing job tardiness using integrated preventive maintenance planning and production scheduling IIE Transactions 35 2003 505 513
    • (2003) IIE Transactions , vol.35 , pp. 505-513
    • Cassady, C.R.1    Kutanoglu, E.2
  • 11
    • 22444439337 scopus 로고    scopus 로고
    • Integrating preventive maintenance planning and production scheduling for a single machine
    • C.R. Cassady, and E. Kutanoglu Integrating preventive maintenance planning and production scheduling for a single machine IEEE Transactions on Reliability 54 2005 304 309
    • (2005) IEEE Transactions on Reliability , vol.54 , pp. 304-309
    • Cassady, C.R.1    Kutanoglu, E.2
  • 14
  • 15
    • 15344350551 scopus 로고    scopus 로고
    • Maintenance scheduling and production control of multiple-machine manufacturing systems
    • A. Gharbi, and J.P. Kenné Maintenance scheduling and production control of multiple-machine manufacturing systems Computers and Industrial Engineering 48 2005 693 707
    • (2005) Computers and Industrial Engineering , vol.48 , pp. 693-707
    • Gharbi, A.1    Kenné, J.P.2
  • 18
    • 34548580996 scopus 로고    scopus 로고
    • Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process
    • Y. Kuo, and Z.-A. Chang Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process Naval Research Logistics 54 2007 602 614
    • (2007) Naval Research Logistics , vol.54 , pp. 602-614
    • Kuo, Y.1    Chang, Z.-A.2
  • 19
    • 34047237637 scopus 로고    scopus 로고
    • A novel approach to integrated preventive maintenance planning and production scheduling for a single machine using the chaotic particle swarm optimization algorithm
    • China
    • Leng, K.; Ren, P.; Gao, L.; 2006. A novel approach to integrated preventive maintenance planning and production scheduling for a single machine using the chaotic particle swarm optimization algorithm. In: Proceedings of the 6th World Congress on Intelligent Control and Automation Dalian, China, pp. 7816-7820.
    • (2006) Proceedings of the 6th World Congress on Intelligent Control and Automation Dalian , pp. 7816-7820
    • Leng, K.1    Ren, P.2    Gao, L.3
  • 20
    • 0009565705 scopus 로고
    • Heuristic algorithms for solving earliness-tardiness scheduling problem with machine vacations
    • N. Mannur, and J.B. Addagatla Heuristic algorithms for solving earliness-tardiness scheduling problem with machine vacations Computers and Industrial Engineering 25 1993 255 258
    • (1993) Computers and Industrial Engineering , vol.25 , pp. 255-258
    • Mannur, N.1    Addagatla, J.B.2
  • 22
    • 79952466311 scopus 로고    scopus 로고
    • Optimal preventive maintenance and replacement schedules with variable improvement factor
    • K.S. Moghaddam, and J.S. Usher Optimal preventive maintenance and replacement schedules with variable improvement factor Journal of Quality in Maintenance Engineering 16 2010 271 287
    • (2010) Journal of Quality in Maintenance Engineering , vol.16 , pp. 271-287
    • Moghaddam, K.S.1    Usher, J.S.2
  • 23
    • 79958841957 scopus 로고    scopus 로고
    • A new multi-objective optimization model for preventive maintenance and replacement scheduling of multi-component systems
    • K.S. Moghaddam, and J.S. Usher A new multi-objective optimization model for preventive maintenance and replacement scheduling of multi-component systems Engineering Optimization 43 2011 701 719
    • (2011) Engineering Optimization , vol.43 , pp. 701-719
    • Moghaddam, K.S.1    Usher, J.S.2
  • 24
    • 79951579853 scopus 로고    scopus 로고
    • Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
    • E. Moradi, S.M.T. Fatemi Ghomi, and M. Zandieh Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem Expert Systems with Applications 38 2011 7169 7178
    • (2011) Expert Systems with Applications , vol.38 , pp. 7169-7178
    • Moradi, E.1    Fatemi Ghomi, S.M.T.2    Zandieh, M.3
  • 26
    • 78751615953 scopus 로고    scopus 로고
    • Incorporating periodic preventive maintenance into flexible flowshop scheduling problems
    • B. Naderi, M. Zandieh, and M. Aminnayeri Incorporating periodic preventive maintenance into flexible flowshop scheduling problems Applied Soft Computing 11 2011 2094 2101
    • (2011) Applied Soft Computing , vol.11 , pp. 2094-2101
    • Naderi, B.1    Zandieh, M.2    Aminnayeri, M.3
  • 28
    • 77958072496 scopus 로고    scopus 로고
    • Single-machine-based production scheduling model integrated preventive maintenance planning
    • E. Pan, W. Liao, and L. Xi Single-machine-based production scheduling model integrated preventive maintenance planning International Journal of Advanced Manufacturing Technology 50 2010 365 375
    • (2010) International Journal of Advanced Manufacturing Technology , vol.50 , pp. 365-375
    • Pan, E.1    Liao, W.2    Xi, L.3
  • 29
    • 34047122539 scopus 로고    scopus 로고
    • Considering scheduling and preventive maintenance in the flowshop sequencing problem
    • R. Ruiz, J.C. Garcia-Diaz, and C. Maroto Considering scheduling and preventive maintenance in the flowshop sequencing problem Computers and Operations Research 34 2007 3314 3330
    • (2007) Computers and Operations Research , vol.34 , pp. 3314-3330
    • Ruiz, R.1    Garcia-Diaz, J.C.2    Maroto, C.3
  • 30
    • 33947227221 scopus 로고    scopus 로고
    • Genetic algorithms for total weighted expected tardiness integrated preventive maintenance planning and production scheduling for a single machine
    • N. Sortrakul, and C.R. Cassady Genetic algorithms for total weighted expected tardiness integrated preventive maintenance planning and production scheduling for a single machine Journal of Quality in Maintenance Engineering 13 2007 49 61
    • (2007) Journal of Quality in Maintenance Engineering , vol.13 , pp. 49-61
    • Sortrakul, N.1    Cassady, C.R.2
  • 31
    • 13444291361 scopus 로고    scopus 로고
    • Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
    • N. Sortrakul, H.L. Nachtmann, and C.R. Cassady Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine Computers in Industry 56 2005 161 168
    • (2005) Computers in Industry , vol.56 , pp. 161-168
    • Sortrakul, N.1    Nachtmann, H.L.2    Cassady, C.R.3
  • 34
    • 55649106405 scopus 로고    scopus 로고
    • Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine
    • J. Yulan, J. Zuhua, and H. Wenrui Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine International Journal of Advanced Manufacturing Technology 39 2008 954 964
    • (2008) International Journal of Advanced Manufacturing Technology , vol.39 , pp. 954-964
    • Yulan, J.1    Zuhua, J.2    Wenrui, H.3
  • 35
    • 0034199979 scopus 로고    scopus 로고
    • Comparison of multiobjective evolutionary algorithms: Empirical results
    • E. Zitzler, K. Deb, and L. Thiele Comparison of multiobjective evolutionary algorithms: empirical results Evolutionary Computation Journal 8 2000 173 195
    • (2000) Evolutionary Computation Journal , vol.8 , pp. 173-195
    • Zitzler, E.1    Deb, K.2    Thiele, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.