The cost of non-conformance during a highway project: a case study
-
Abdul-Rahman H. The cost of non-conformance during a highway project: a case study. Constr. Manag. Econ. 1995, 13(1):23-32.
-
(1995)
Constr. Manag. Econ.
, vol.13
, Issue.1
, pp. 23-32
-
-
Abdul-Rahman, H.1
-
2
-
-
84925901561
-
Ordinal-scaled variables and multivariate analysis: comment on Hawkes
-
Allan G.J.B. Ordinal-scaled variables and multivariate analysis: comment on Hawkes. Am. J. Sociol. 1976, 81(6):1498-1500.
-
(1976)
Am. J. Sociol.
, vol.81
, Issue.6
, pp. 1498-1500
-
-
Allan, G.J.B.1
-
3
-
-
34547768074
-
Likert scales and data analyses
-
Allen I.E., Seaman C.A. Likert scales and data analyses. Qual. Prog. 2007, 40(7):64-65.
-
(2007)
Qual. Prog.
, vol.40
, Issue.7
, pp. 64-65
-
-
Allen, I.E.1
Seaman, C.A.2
-
4
-
-
85015378568
-
How design consultants perceive potential causes of variation orders for institutional buildings in Singapore
-
Arain F.M., Low S.P. How design consultants perceive potential causes of variation orders for institutional buildings in Singapore. Archit. Eng. Des. Manag. 2005, 1(3):181-196.
-
(2005)
Archit. Eng. Des. Manag.
, vol.1
, Issue.3
, pp. 181-196
-
-
Arain, F.M.1
Low, S.P.2
-
5
-
-
33645048477
-
Developers' views of potential causes of variation orders for institutional buildings in Singapore
-
Arain F.M., Low S.P. Developers' views of potential causes of variation orders for institutional buildings in Singapore. Archit. Sci. Rev. 2006, 49(1):59-74.
-
(2006)
Archit. Sci. Rev.
, vol.49
, Issue.1
, pp. 59-74
-
-
Arain, F.M.1
Low, S.P.2
-
6
-
-
0001326664
-
Quality failure costs in civil engineering projects
-
Barber P., Graves A., Hall M., Sheath D., Tomkins C. Quality failure costs in civil engineering projects. Int. J. Qual. Manag. Reliab. 2000, 17(4/5):479-492.
-
(2000)
Int. J. Qual. Manag. Reliab.
, vol.17
, Issue.4-5
, pp. 479-492
-
-
Barber, P.1
Graves, A.2
Hall, M.3
Sheath, D.4
Tomkins, C.5
-
14
-
-
33751295266
-
Significant factors causing delay in the UAE construction industry
-
Faridi A.S., El-Sayegh S.M. Significant factors causing delay in the UAE construction industry. Constr. Manag. Econ. 2006, 24(11):1167-1176.
-
(2006)
Constr. Manag. Econ.
, vol.24
, Issue.11
, pp. 1167-1176
-
-
Faridi, A.S.1
El-Sayegh, S.M.2
-
15
-
-
4544250875
-
-
University of Alberta, Edmonton, Canada
-
Fayek A.R., Dissanayake M., Campero O. Measuring and Classifying Construction Field Rework: A Pilot Study 2003, University of Alberta, Edmonton, Canada.
-
(2003)
Measuring and Classifying Construction Field Rework: A Pilot Study
-
-
Fayek, A.R.1
Dissanayake, M.2
Campero, O.3
-
17
-
-
16444383213
-
Statistical-fuzzy approach to quantify cumulative impact of change orders
-
Hanna A.S., Lotfallah W.B., Lee M.-J. Statistical-fuzzy approach to quantify cumulative impact of change orders. J. Comput. Civ. Eng. 2002, 16(4):252-258.
-
(2002)
J. Comput. Civ. Eng.
, vol.16
, Issue.4
, pp. 252-258
-
-
Hanna, A.S.1
Lotfallah, W.B.2
Lee, M.-J.3
-
18
-
-
80053638754
-
Incorporating rework into construction schedule analysis
-
Hegazy T., Said M., Kassab M. Incorporating rework into construction schedule analysis. Autom. Constr. 2011, 20(8):1051-1059.
-
(2011)
Autom. Constr.
, vol.20
, Issue.8
, pp. 1051-1059
-
-
Hegazy, T.1
Said, M.2
Kassab, M.3
-
19
-
-
84865384217
-
Construction project change management in Singapore: status, importance and impact
-
Hwang B.-G., Low L.K. Construction project change management in Singapore: status, importance and impact. Int. J. Proj. Manag. 2012, 30(7):817-826.
-
(2012)
Int. J. Proj. Manag.
, vol.30
, Issue.7
, pp. 817-826
-
-
Hwang, B.-G.1
Low, L.K.2
-
20
-
-
60449091309
-
Measuring the impact of rework on construction cost performance
-
Hwang B.-G., Thomas S.R., Haas C.T., Caldas C.H. Measuring the impact of rework on construction cost performance. J. Constr. Eng. Manag. 2009, 135(3):187-198.
-
(2009)
J. Constr. Eng. Manag.
, vol.135
, Issue.3
, pp. 187-198
-
-
Hwang, B.-G.1
Thomas, S.R.2
Haas, C.T.3
Caldas, C.H.4
-
21
-
-
84874303376
-
Public private partnership projects in Singapore: factors, critical risks and preferred risk allocation from the perspective of contractors
-
Hwang B.G., Zhao X., Gay M.J.S. Public private partnership projects in Singapore: factors, critical risks and preferred risk allocation from the perspective of contractors. Int. J. Proj. Manag. 2013, 31(3):424-433.
-
(2013)
Int. J. Proj. Manag.
, vol.31
, Issue.3
, pp. 424-433
-
-
Hwang, B.G.1
Zhao, X.2
Gay, M.J.S.3
-
23
-
-
0032593163
-
The causes and costs of defects in construction: a study of seven building projects
-
Josephson P.-E., Hammarlund Y. The causes and costs of defects in construction: a study of seven building projects. Autom. Constr. 1999, 8(6):681-687.
-
(1999)
Autom. Constr.
, vol.8
, Issue.6
, pp. 681-687
-
-
Josephson, P.-E.1
Hammarlund, Y.2
-
24
-
-
4143067931
-
Illustrative benchmarking rework and rework costs in Swedish construction industry
-
Josephson P.-E., Larsson B., Li H. Illustrative benchmarking rework and rework costs in Swedish construction industry. J. Manag. Eng. 2002, 18(2):76-83.
-
(2002)
J. Manag. Eng.
, vol.18
, Issue.2
, pp. 76-83
-
-
Josephson, P.-E.1
Larsson, B.2
Li, H.3
-
25
-
-
84925894405
-
Multivariate analysis of ordinal variables
-
Kim J.O. Multivariate analysis of ordinal variables. Am. J. Sociol. 1975, 81(2):261-298.
-
(1975)
Am. J. Sociol.
, vol.81
, Issue.2
, pp. 261-298
-
-
Kim, J.O.1
-
26
-
-
0032207592
-
Comparison of US project delivery systems
-
Konchar M., Sanvido V. Comparison of US project delivery systems. J. Constr. Eng. Manag. 1998, 124(6):435-444.
-
(1998)
J. Constr. Eng. Manag.
, vol.124
, Issue.6
, pp. 435-444
-
-
Konchar, M.1
Sanvido, V.2
-
27
-
-
3042540677
-
Design management in building construction: from theory to practice
-
Koskela L., Huovila P., Leinonen J. Design management in building construction: from theory to practice. J. Constr. Res. 2002, 3(01):1-16.
-
(2002)
J. Constr. Res.
, vol.3
, Issue.1
, pp. 1-16
-
-
Koskela, L.1
Huovila, P.2
Leinonen, J.3
-
28
-
-
0000803861
-
In defense of assigning numbers to ranks
-
Labovitz S. In defense of assigning numbers to ranks. Am. Sociol. Rev. 1971, 36(3):521-522.
-
(1971)
Am. Sociol. Rev.
, vol.36
, Issue.3
, pp. 521-522
-
-
Labovitz, S.1
-
29
-
-
56749097044
-
Key project management practices affecting Singaporean firms' project performance in China
-
Ling F.Y.Y., Low S.P., Wang S.Q., Lim H.H. Key project management practices affecting Singaporean firms' project performance in China. Int. J. Proj. Manag. 2009, 27(1):59-71.
-
(2009)
Int. J. Proj. Manag.
, vol.27
, Issue.1
, pp. 59-71
-
-
Ling, F.Y.Y.1
Low, S.P.2
Wang, S.Q.3
Lim, H.H.4
-
30
-
-
0042689966
-
Influence of project type and procurement method on rework costs in building construction projects
-
Love P.E.D. Influence of project type and procurement method on rework costs in building construction projects. J. Constr. Eng. Manag. 2002, 128(1):18-29.
-
(2002)
J. Constr. Eng. Manag.
, vol.128
, Issue.1
, pp. 18-29
-
-
Love, P.E.D.1
-
31
-
-
4143055741
-
Determinants of rework in building construction projects
-
Love P.E.D., Edwards D.J. Determinants of rework in building construction projects. Eng. Constr. Archit. Manag. 2004, 11(4):259-274.
-
(2004)
Eng. Constr. Archit. Manag.
, vol.11
, Issue.4
, pp. 259-274
-
-
Love, P.E.D.1
Edwards, D.J.2
-
32
-
-
27944504058
-
Forensic project management: the underlying causes of rework in construction projects
-
Love P.E.D., Edwards D.J. Forensic project management: the underlying causes of rework in construction projects. Civ. Eng. Environ. Syst. 2004, 21(3):207-228.
-
(2004)
Civ. Eng. Environ. Syst.
, vol.21
, Issue.3
, pp. 207-228
-
-
Love, P.E.D.1
Edwards, D.J.2
-
33
-
-
27944450797
-
Calculating total rework costs in Australian construction projects
-
Love P.E.D., Edwards D.J. Calculating total rework costs in Australian construction projects. Civ. Eng. Environ. Syst. 2005, 22(1):11-27.
-
(2005)
Civ. Eng. Environ. Syst.
, vol.22
, Issue.1
, pp. 11-27
-
-
Love, P.E.D.1
Edwards, D.J.2
-
34
-
-
0001187120
-
Determining the causal structure of rework influences in construction
-
Love P.E.D., Mandal P., Li H. Determining the causal structure of rework influences in construction. Constr. Manag. Econ. 1999, 17(4):505-517.
-
(1999)
Constr. Manag. Econ.
, vol.17
, Issue.4
, pp. 505-517
-
-
Love, P.E.D.1
Mandal, P.2
Li, H.3
-
35
-
-
2142718584
-
Modelling the dynamics of design error induced rework in construction
-
Love P.E.D., Mandal P., Smith J., Li H. Modelling the dynamics of design error induced rework in construction. Constr. Manag. Econ. 2000, 18(5):567-574.
-
(2000)
Constr. Manag. Econ.
, vol.18
, Issue.5
, pp. 567-574
-
-
Love, P.E.D.1
Mandal, P.2
Smith, J.3
Li, H.4
-
36
-
-
0036680986
-
Using systems dynamics to better understand change and rework in construction project management systems
-
Love P.E.D., Holt G.D., Shen L.Y., Li H., Irani Z. Using systems dynamics to better understand change and rework in construction project management systems. Int. J. Proj. Manag. 2002, 20(6):425-436.
-
(2002)
Int. J. Proj. Manag.
, vol.20
, Issue.6
, pp. 425-436
-
-
Love, P.E.D.1
Holt, G.D.2
Shen, L.Y.3
Li, H.4
Irani, Z.5
-
37
-
-
77149177666
-
Rework in civil infrastructure projects: determination of cost predictors
-
Love P.E., Edwards D.J., Watson H., Davis P. Rework in civil infrastructure projects: determination of cost predictors. J. Constr. Eng. Manag. 2010, 136(3):275-282.
-
(2010)
J. Constr. Eng. Manag.
, vol.136
, Issue.3
, pp. 275-282
-
-
Love, P.E.1
Edwards, D.J.2
Watson, H.3
Davis, P.4
-
38
-
-
84855948079
-
Dynamics of rework in complex offshore hydrocarbon projects
-
Love P.E., Edwards D.J., Irani Z., Goh Y.M. Dynamics of rework in complex offshore hydrocarbon projects. J. Constr. Eng. Manag. 2011, 137(12):1060-1070.
-
(2011)
J. Constr. Eng. Manag.
, vol.137
, Issue.12
, pp. 1060-1070
-
-
Love, P.E.1
Edwards, D.J.2
Irani, Z.3
Goh, Y.M.4
-
40
-
-
0031146036
-
The constructability review process: a constructor's perspective
-
Mendelsohn R. The constructability review process: a constructor's perspective. J. Manag. Eng. 1997, 13(3):17-19.
-
(1997)
J. Manag. Eng.
, vol.13
, Issue.3
, pp. 17-19
-
-
Mendelsohn, R.1
-
42
-
-
84875859554
-
Comparative study of drivers of and barriers to relational transactions faced by public clients, private contractors and consultants in public projects
-
Ning Y., Ling F.Y.Y. Comparative study of drivers of and barriers to relational transactions faced by public clients, private contractors and consultants in public projects. Habitat Int. 2013, 40:91-99.
-
(2013)
Habitat Int.
, vol.40
, pp. 91-99
-
-
Ning, Y.1
Ling, F.Y.Y.2
-
43
-
-
78649906763
-
Likert scales, levels of measurement and the "laws" of statistics
-
Norman G. Likert scales, levels of measurement and the "laws" of statistics. Adv. Heal. Sci. Educ. 2010, 15(5):625-632.
-
(2010)
Adv. Heal. Sci. Educ.
, vol.15
, Issue.5
, pp. 625-632
-
-
Norman, G.1
-
45
-
-
0018666370
-
The use of Pearson's R with ordinal data
-
O'Brien R.M. The use of Pearson's R with ordinal data. Am. Sociol. Rev. 1979, 44(5):851-857.
-
(1979)
Am. Sociol. Rev.
, vol.44
, Issue.5
, pp. 851-857
-
-
O'Brien, R.M.1
-
46
-
-
0022674213
-
Industrial project constructability improvement
-
O'Connor J.T., Tucker R.L. Industrial project constructability improvement. J. Constr. Eng. Manag. 1986, 112(1):69-82.
-
(1986)
J. Constr. Eng. Manag.
, vol.112
, Issue.1
, pp. 69-82
-
-
O'Connor, J.T.1
Tucker, R.L.2
-
47
-
-
0030074893
-
Construction delays in a fast-growing economy: comparing Thailand with other economies
-
Ogunlana S.O., Promkuntong K., Jearkjirm V. Construction delays in a fast-growing economy: comparing Thailand with other economies. Int. J. Proj. Manag. 1996, 14(1):37-45.
-
(1996)
Int. J. Proj. Manag.
, vol.14
, Issue.1
, pp. 37-45
-
-
Ogunlana, S.O.1
Promkuntong, K.2
Jearkjirm, V.3
-
49
-
-
0141682725
-
Managing value and quality in design
-
Thomson D.S., Austin S.A., Devine-Wright H., Mills G.R. Managing value and quality in design. Build. Res. Inf. 2003, 31(5):334-345.
-
(2003)
Build. Res. Inf.
, vol.31
, Issue.5
, pp. 334-345
-
-
Thomson, D.S.1
Austin, S.A.2
Devine-Wright, H.3
Mills, G.R.4
-
50
-
-
77649264819
-
Facilitating client value creation in the conceptual design phase of construction projects: a workshop approach
-
Thyssen M.H., Emmitt S., Bonke S., Kirk-Christoffersen A. Facilitating client value creation in the conceptual design phase of construction projects: a workshop approach. Archit. Eng. Des. Manag. 2010, 6(1):18-30.
-
(2010)
Archit. Eng. Des. Manag.
, vol.6
, Issue.1
, pp. 18-30
-
-
Thyssen, M.H.1
Emmitt, S.2
Bonke, S.3
Kirk-Christoffersen, A.4
-
51
-
-
0042188854
-
A quality performance management system for industrial construction engineering projects
-
Willis T.H., Willis W.D. A quality performance management system for industrial construction engineering projects. Archit. Eng. Des. Manag. 1996, 13(9):38-48.
-
(1996)
Archit. Eng. Des. Manag.
, vol.13
, Issue.9
, pp. 38-48
-
-
Willis, T.H.1
Willis, W.D.2
-
52
-
-
84873662426
-
Determining the appropriate proportion of owner-provided design in Design-Build contracts: a content analysis approach
-
Xia B., Chan A., Molenaar K., Skitmore M. Determining the appropriate proportion of owner-provided design in Design-Build contracts: a content analysis approach. J. Constr. Eng. Manag. 2012, 138(9):1017-1022.
-
(2012)
J. Constr. Eng. Manag.
, vol.138
, Issue.9
, pp. 1017-1022
-
-
Xia, B.1
Chan, A.2
Molenaar, K.3
Skitmore, M.4
-
53
-
-
84882291097
-
Developing a fuzzy enterprise risk management maturity model for construction firms
-
Zhao X., Hwang B.G., Low S.P. Developing a fuzzy enterprise risk management maturity model for construction firms. J. Constr. Eng. Manag. 2013, 139(9):1179-1189.
-
(2013)
J. Constr. Eng. Manag.
, vol.139
, Issue.9
, pp. 1179-1189
-
-
Zhao, X.1
Hwang, B.G.2
Low, S.P.3
-
54
-
-
84875106439
-
Identifying the critical risks in underground rail international construction joint ventures: case study of Singapore
-
Zhao X., Hwang B.G., Yu G.S. Identifying the critical risks in underground rail international construction joint ventures: case study of Singapore. Int. J. Proj. Manag. 2013, 31(4):554-566.
-
(2013)
Int. J. Proj. Manag.
, vol.31
, Issue.4
, pp. 554-566
-
-
Zhao, X.1
Hwang, B.G.2
Yu, G.S.3
-
55
-
-
21344482061
-
Is the selection of statistical methods governed by level of measurement?
-
Zumbo B.D., Zimmerman D.W. Is the selection of statistical methods governed by level of measurement?. Can. Psychol. 1993, 34(4):390-400.
-
(1993)
Can. Psychol.
, vol.34
, Issue.4
, pp. 390-400
-
-
Zumbo, B.D.1
Zimmerman, D.W.2
|