-
2
-
-
0001817717
-
Capturing the cost of nonconformance on construction sites: An application of the quality cost matrix
-
Abdul-Rahman, H., Thompson, P.A. and Whyte, I.L. (1996), "Capturing the cost of nonconformance on construction sites: an application of the quality cost matrix", International Journal of Quality & Reliability Management, Vol. 13 No. 1, pp. 48-60.
-
(1996)
International Journal of Quality & Reliability Management
, vol.13
, Issue.1
, pp. 48-60
-
-
Abdul-Rahman, H.1
Thompson, P.A.2
Whyte, I.L.3
-
3
-
-
0003419001
-
-
National Association of Accountants-KPMG
-
Atkinson, J., Hohner, J., Mundt, B., Troxel, R., Winchell, W. and Montvale, N. (1991), Current Trends in Cost of Quality: Linking the Cost of Quality and Continuous Improvement, National Association of Accountants-KPMG.
-
(1991)
Current Trends In Cost of Quality: Linking the Cost of Quality and Continuous Improvement
-
-
Atkinson, J.1
Hohner, J.2
Mundt, B.3
Troxel, R.4
Winchell, W.5
Montvale, N.6
-
4
-
-
84887264064
-
-
British Standards Institute, Part 1: Process Cost Model (Revised), British Standards Institute, London
-
British Standards Institute (1990), BSI Handbook 22. BS 6143: Guide to the Economics of Quality. Part 1: Process Cost Model (Revised), British Standards Institute, London.
-
(1990)
BSI Handbook 22. BS 6143: Guide to The Economics of Quality
-
-
-
5
-
-
84887292006
-
-
British Standards Institute, Part 2: Prevention, Appraisal and Failure Model (Revised), British Standards Institute, London
-
British Standards Institute (1992), BSI Handbook 22. BS 6143: Guide to the Economics of Quality. Part 2: Prevention, Appraisal and Failure Model (Revised), British Standards Institute, London.
-
(1992)
BSI Handbook 22. BS 6143: Guide to The Economics of Quality
-
-
-
7
-
-
0026837054
-
Causes of quality deviations in design and construction
-
March
-
Burati, J.L. Jr, Farrington, J.J. and Ledbetter, W.B. (1992) "Causes of quality deviations in design and construction", Journal of Construction Engineering and Management, Vol. 118 No. 1, March, pp. 34-49.
-
(1992)
Journal of Construction Engineering and Management
, vol.118
, Issue.1
, pp. 34-49
-
-
Burati Jr., J.L.1
Farrington, J.J.2
Ledbetter, W.B.3
-
8
-
-
84887315420
-
-
Failure Prevention Inc., San Clemente, CA
-
Chui, C. (1989), Root Cause Guidebook, Failure Prevention Inc., San Clemente, CA.
-
(1989)
Root Cause Guidebook
-
-
Chui, C.1
-
9
-
-
0010786483
-
Quality consciousness in Japanese and US electronics manufacturers: An examination of the impact of quality strategy and management control systems on perceptions of the importance of quality to expected management rewards
-
Daniel, S.J., Reitsperger, W.D. and Gregson, T. (1995), "Quality consciousness in Japanese and US electronics manufacturers: an examination of the impact of quality strategy and management control systems on perceptions of the importance of quality to expected management rewards", Management Accounting Research, Vol. 6, pp. 367-82.
-
(1995)
Management Accounting Research
, vol.6
, pp. 367-382
-
-
Daniel, S.J.1
Reitsperger, W.D.2
Gregson, T.3
-
10
-
-
0003869357
-
-
Productivity and Competitive Position, Cambridge University Press, Cambridge
-
Deming, W.E. (1986), Out of Crisis: Quality, Productivity and Competitive Position, Cambridge University Press, Cambridge.
-
(1986)
Out of Crisis: Quality
-
-
Deming, W.E.1
-
11
-
-
0003998119
-
-
Transport and the Regions, HMSO, London
-
Egan, J. (1998), Rethinking Construction: The Report of the Construction Task Force, Department of the Environment, Transport and the Regions, HMSO, London.
-
(1998)
Rethinking Construction: The Report of the Construction Task Force, Department of the Environment
-
-
Egan, J.1
-
12
-
-
14744286845
-
Quality failure costs in building construction
-
International Council for Building Research Studies and Documentation, Sydney
-
Haamarlund, Y., Jacobsson, S. and Josephson, P. (1990a), "Quality failure costs in building construction", Proceedings of the CIB W55/W65 Joint Symposium, International Council for Building Research Studies and Documentation, Sydney, pp. 77-89.
-
(1990)
Proceedings of the CIB W55/W65 Joint Symposium
, pp. 77-89
-
-
Haamarlund, Y.1
Jacobsson, S.2
Josephson, P.3
-
13
-
-
14744283565
-
Quality observer-a new role at the construction site?
-
International Council for Building Research Studies and Documentation, Sydney
-
Haamarlund, Y., Jacobsson, S. and Josephson, P. (1990b), "Quality observer-a new role at the construction site?", Proceedings of the CIB W55/W65 Joint Symposium, International Council for Building Research Studies and Documentation, Sydney, pp. 90-102.
-
(1990)
Proceedings of the CIB W55/W65 Joint Symposium
, pp. 90-102
-
-
Haamarlund, Y.1
Jacobsson, S.2
Josephson, P.3
-
14
-
-
41149157090
-
Strategic goals of quality costing in Japanese companies
-
Ito, Y. (1995), "Strategic goals of quality costing in Japanese companies", Management Accounting Research, Vol. 6, pp. 383-97.
-
(1995)
Management Accounting Research
, vol.6
, pp. 383-397
-
-
Ito, Y.1
-
15
-
-
84887304107
-
-
Harvard Business School, Boston, MA
-
Ittner, C. (1988), Texas Instruments (A), Harvard Business School case 189-029, Harvard Business School, Boston, MA.
-
(1988)
Texas Instruments (A), Harvard Business School Case 189-029
-
-
Ittner, C.1
-
16
-
-
84887304107
-
-
Harvard Business School, Boston, MA
-
Ittner, C. (1989), Texas Instruments (B), Harvard Business School case 189-111, Harvard Business School, Boston, MA.
-
(1989)
Texas Instruments (B), Harvard Business School Case 189-111
-
-
Ittner, C.1
-
19
-
-
0033096295
-
Rework: A symptom of a dysfunctional supply-chain
-
Love, P.E.D., Li, H. and Mandal, P. (1999) "Rework: a symptom of a dysfunctional supply-chain", European Journal of Purchasing and Supply Management, Vol. 5, pp. 1-11.
-
(1999)
European Journal of Purchasing and Supply Management
, vol.5
, pp. 1-11
-
-
Love, P.E.D.1
Li, H.2
Mandal, P.3
-
20
-
-
0000421913
-
A construction quality costs qualifying system for the building industry
-
Low, S.P and Yeo, H.K.C. (1998), "A construction quality costs qualifying system for the building industry", International Journal of Quality & Reliability Management, Vol. 15 No. 3, pp. 329-49.
-
(1998)
International Journal of Quality & Reliability Management
, vol.15
, Issue.3
, pp. 329-349
-
-
Low, S.P.1
Yeo, H.K.C.2
-
21
-
-
0026852083
-
Quality costing for total quality management
-
Porter, L.J. and Rayner, P. (1992), "Quality costing for total quality management", International Journal of Production Economics, Vol. 27, pp. 69-81.
-
(1992)
International Journal of Production Economics
, vol.27
, pp. 69-81
-
-
Porter, L.J.1
Rayner, P.2
-
25
-
-
85056066821
-
Over-manning and the effects on labour efficiency
-
E. & F.N. Spon
-
Thomas, R.H. and Arnold, T.M. (1996), "Over-manning and the effects on labour efficiency", Proceedings of CIB W65 Conference-The Organization and Management of Construction: Shaping Theory and Practice, Vol. 2, E. & F.N. Spon, pp. 39-48.
-
(1996)
Proceedings of CIB W65 Conference-The Organization and Management of Construction: Shaping Theory and Practice
, vol.2
, pp. 39-48
-
-
Thomas, R.H.1
Arnold, T.M.2
-
27
-
-
0042188854
-
A quality performance management system for industrial construction engineering projects
-
Willis, T.H. and Willis, W.D. (1996), "A quality performance management system for industrial construction engineering projects", International Journal of Quality & Reliability Management, Vol. 13 No. 9, pp. 38-48.
-
(1996)
International Journal of Quality & Reliability Management
, vol.13
, Issue.9
, pp. 38-48
-
-
Willis, T.H.1
Willis, W.D.2
|