1
-
-
30844450691
-
-
unpublished MS Thesis, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia
-
Arain, F. M., 2002. Design-Construction Interface Dissonances unpublished MS Thesis, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia
-
(2002)
Design-Construction Interface Dissonances
-
-
Arain, F.M.1
-
2
-
-
4444266567
-
Causes of discrepancies between design and construction
-
Arain, F. M., Assaf, S. A., and Low, S. P., 2004. Causes of discrepancies between design and construction. Architectural Science Review, 47 (3):237–249.
-
(2004)
Architectural Science Review
, vol.47
, Issue.3
, pp. 237-249
-
-
Arain, F.M.1
Assaf, S.A.2
Low, S.P.3
-
3
-
-
0026642766
-
Design-Construction interface problems in Saudi Arabia
-
Al-Hammad, A. M., and Assaf, S. A., 1992. Design-Construction interface problems in Saudi Arabia. Journal of Building Research and Information, 20 (1):60–63.
-
(1992)
Journal of Building Research and Information
, vol.20
, Issue.1
, pp. 60-63
-
-
Al-Hammad, A.M.1
Assaf, S.A.2
-
4
-
-
84927635730
-
Causes of delays in large building construction projects
-
Assaf, S. A., Al-Khalil, M., and Al-Hazmi, M., 1995. Causes of delays in large building construction projects. Journal of Construction Engineering and Management, ASCE, 11 (2):45–50.
-
(1995)
Journal of Construction Engineering and Management, ASCE
, vol.11
, Issue.2
, pp. 45-50
-
-
Assaf, S.A.1
Al-Khalil, M.2
Al-Hazmi, M.3
-
5
-
-
13844303115
-
-
8th edition, Malden, USA: Blackwell Science Ltd
-
Chappell, D., and Willis, A., 1996. The Architect in Practice., 8th edition Malden, USA:Blackwell Science Ltd.
-
(1996)
The Architect in Practice.
-
-
Chappell, D.1
Willis, A.2
-
8
-
-
63049095916
-
-
TX: Construction Industry Institute, University of Texas at Austin
-
CII. 1990a. Scope Definition and Control, Publication 6–2 TX:Construction Industry Institute, University of Texas at Austin.
-
(1990)
Scope Definition and Control
-
-
-
9
-
-
0008190565
-
-
TX: Construction Industry Institute, University of Texas at Austin
-
CII. 1994. Pre-project Planning:Beginning a Project the Right Way, Publication 39–1 TX:Construction Industry Institute, University of Texas at Austin.
-
(1994)
Pre-project Planning: Beginning a Project the Right Way
-
-
-
10
-
-
0004715737
-
-
TX: Construction Industry Institute, University of Texas at Austin
-
CII. 1994a. Project Change Management, Special Publication 43–1 TX:Construction Industry Institute, University of Texas at Austin.
-
(1994)
Project Change Management
-
-
-
13
-
-
0035479301
-
Developing world class construction companies in Singapore
-
Dulaimi, M. F., and Hwa, T. F., 2001. Developing world class construction companies in Singapore. Construction Management and Economics, 19 (3):591–599.
-
(2001)
Construction Management and Economics
, vol.19
, Issue.3
, pp. 591-599
-
-
Dulaimi, M.F.1
Hwa, T.F.2
-
16
-
-
0040941588
-
-
University of California- Berkeley
-
Hester, W., Kuprenas, J. A., and Chang, T. C., 1991. Construction Changes and Change Orders:Their Magnitude and Impact, CII Source Document 66 University of California- Berkeley.
-
(1991)
Construction Changes and Change Orders: Their Magnitude and Impact
-
-
Hester, W.1
Kuprenas, J.A.2
Chang, T.C.3
-
19
-
-
0004706464
-
Fast tracking's impact on project change
-
Ibbs, C. W., Lee, S. A., and Li, M. I., 1998. Fast tracking's impact on project change. Project Management Journal, 29 (4):35–41.
-
(1998)
Project Management Journal
, vol.29
, Issue.4
, pp. 35-41
-
-
Ibbs, C.W.1
Lee, S.A.2
Li, M.I.3
-
20
-
-
0035399179
-
Project change management system
-
Ibbs, C. W., Wong, C. K., and Kwak, Y. H., 2001. Project change management system. Journal of Management in Engineering, ASCE, 17 (3):159–165.
-
(2001)
Journal of Management in Engineering, ASCE
, vol.17
, Issue.3
, pp. 159-165
-
-
Ibbs, C.W.1
Wong, C.K.2
Kwak, Y.H.3
-
21
-
-
0039997969
-
Factors influencing construction time and cost overruns on high rise projects in Indonesia
-
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., and Harris, F. C., 1997. Factors influencing construction time and cost overruns on high rise projects in Indonesia. Construction Management and Economics, 15 (1):83–94.
-
(1997)
Construction Management and Economics
, vol.15
, Issue.1
, pp. 83-94
-
-
Kaming, P.F.1
Olomolaiye, P.O.2
Holt, G.D.3
Harris, F.C.4
-
22
-
-
2242422127
-
Claims for extensions of time in civil engineering projects
-
Kumaraswamy, M. M., Miller, D. R. A., and Yogeswaran, K., 1998. Claims for extensions of time in civil engineering projects. Construction Management and Economics, 16 (3):283–294.
-
(1998)
Construction Management and Economics
, vol.16
, Issue.3
, pp. 283-294
-
-
Kumaraswamy, M.M.1
Miller, D.R.A.2
Yogeswaran, K.3
-
23
-
-
0031146036
-
The constructability review process: A constructor's perspective
-
Mendelsohn, R., 1997. The constructability review process:a constructor's perspective. Journal of Management in Engineering, ASCE, 13 (3):17–19.
-
(1997)
Journal of Management in Engineering, ASCE
, vol.13
, Issue.3
, pp. 17-19
-
-
Mendelsohn, R.1
-
24
-
-
0345846263
-
Collaborative planning and scheduling of interrelated design changes
-
Mokhtar, A., Bedard, C., and Fazio, P., 2000. Collaborative planning and scheduling of interrelated design changes. Journal of Architectural Engineering, ASCE, 6 (2):66–75.
-
(2000)
Journal of Architectural Engineering, ASCE
, vol.6
, Issue.2
, pp. 66-75
-
-
Mokhtar, A.1
Bedard, C.2
Fazio, P.3
-
27
-
-
0026835330
-
Critical success factors for construction projects
-
Sanvido, V., Parfitt, K., Guvensia, M., and Coyle, M., 1992. Critical success factors for construction projects. Journal of Construction Engineering and Management, ASCE, 118 (1):94–111.
-
(1992)
Journal of Construction Engineering and Management, ASCE
, vol.118
, Issue.1
, pp. 94-111
-
-
Sanvido, V.1
Parfitt, K.2
Guvensia, M.3
Coyle, M.4
-
29
-
-
0034322517
-
Coordination issues in Chinese large building projects
-
Wang, Y., 2000. Coordination issues in Chinese large building projects. Journal of Management in Engineering, ASCE, 16 (6):54–61.
-
(2000)
Journal of Management in Engineering, ASCE
, vol.16
, Issue.6
, pp. 54-61
-
-
Wang, Y.1
|