The cost of non-conformance during a highway project: A case study
-
Abdul-Rahman, H. (1995). " The cost of non-conformance during a highway project: A case study.." Constr. Manage. Econom., 13 (1), 23-32.
-
(1995)
Constr. Manage. Econom.
, vol.13
, Issue.1
, pp. 23-32
-
-
Abdul-Rahman, H.1
-
3
-
-
0001326664
-
Quality failure costs in civil engineering projects
-
".
-
Barber, P., Graves, A., Hall, M., Sheath, D., and Tomkins, C. (2000). " Quality failure costs in civil engineering projects.." Int. J. Qual. Reliab. Manage., 17 (4/5), 479-492.
-
(2000)
Int. J. Qual. Reliab. Manage.
, vol.17
, Issue.4-5
, pp. 479-492
-
-
Barber, P.1
Graves, A.2
Hall, M.3
Sheath, D.4
Tomkins, C.5
-
4
-
-
0026837054
-
Causes of quality deviations in design and construction
-
".
-
Burati, J. L., Farrington, J. J., and Ledbetter, W. B. (1992). " Causes of quality deviations in design and construction.." J. Constr. Eng. Manage., 118 (1), 34-49.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.1
, pp. 34-49
-
-
Burati, J.L.1
Farrington, J.J.2
Ledbetter, W.B.3
-
5
-
-
84868894256
-
-
Bureau of Economic Analysis (BEA).. "." 〈〉 (Oct., 2006).
-
Bureau of Economic Analysis (BEA). (2006). " Gross domestic product by industry in current dollars.." 〈 http://bea.gov/bea/dn2/gdpbyind- data.htm 〉 (Oct. 20, 2006).
-
(2006)
Gross Domestic Product by Industry in Current Dollars
, vol.20
-
-
-
7
-
-
0003805578
-
-
Construction Industry Institute (CII).. "." RS 10-1 (Jan.), The Univ. of Texas at Austin, Austin, Tex.
-
Construction Industry Institute (CII). (1989). " Costs of quality deviations in design and construction.." RS 10-1 (Jan.), The Univ. of Texas at Austin, Austin, Tex.
-
(1989)
Costs of Quality Deviations in Design and Construction
-
-
-
8
-
-
1642306374
-
-
Construction Industry Institute (CII).. "." RS 153-1 (May), The Univ. of Texas at Austin, Austin, Tex.
-
Construction Industry Institute (CII). (2001). " The field rework index: Early warning for field rework and cost growth.." RS 153-1 (May), The Univ. of Texas at Austin, Austin, Tex.
-
(2001)
The Field Rework Index: Early Warning for Field Rework and Cost Growth
-
-
-
9
-
-
60449120852
-
-
Construction Industry Institute (CII).. "." IR 166-3 (July), The Univ. of Texas at Austin, Austin, Tex.
-
Construction Industry Institute (CII). (2002). " CII best practices guide.." IR 166-3 (July), The Univ. of Texas at Austin, Austin, Tex.
-
(2002)
CII Best Practices Guide
-
-
-
10
-
-
23044454493
-
-
Construction Industry Institute (CII).. "." BMM 2003-4, CII, The Univ. of Texas at Austin, Austin, Tex.
-
Construction Industry Institute (CII). (2003). " Benchmarking and metrics value of best practices report.." BMM 2003-4, CII, The Univ. of Texas at Austin, Austin, Tex.
-
(2003)
Benchmarking and Metrics Value of Best Practices Report
-
-
-
11
-
-
60449114118
-
-
Construction Industry Institute (CII).. "." RS 203-1 (Nov.), The Univ. of Texas at Austin, Austin, Tex.
-
Construction Industry Institute (CII). (2005). " Making zero rework A reality.." RS 203-1 (Nov.), The Univ. of Texas at Austin, Austin, Tex.
-
(2005)
Making Zero Rework A Reality
-
-
-
12
-
-
84930774438
-
Measuring design and construction quality costs
-
".
-
Davis, K., Ledbetter, W. B., and Burati, J. L. (1989). " Measuring design and construction quality costs.." J. Constr. Eng. Manage., 115 (3), 385-400.
-
(1989)
J. Constr. Eng. Manage.
, vol.115
, Issue.3
, pp. 385-400
-
-
Davis, K.1
Ledbetter, W.B.2
Burati, J.L.3
-
13
-
-
4544250875
-
-
" Research Re (May), Construction Owners Association of Alberta (COAA), The University of Alberta, Edmonton, Al., Canada.
-
Fayek, A. R., Dissanayake, M., and Campero, O. (2003). " Measuring and classifying construction field rework: A pilot study.." Research Rep. (May), Construction Owners Association of Alberta (COAA), The University of Alberta, Edmonton, Al., Canada.
-
(2003)
Measuring and Classifying Construction Field Rework: A Pilot Study
-
-
Fayek, A.R.1
Dissanayake, M.2
Campero, O.3
-
14
-
-
0032593163
-
The causes and costs of defects in construction: A study of seven building projects
-
Josephson, P. E., and Hammarlund, Y. (1999). " The causes and costs of defects in construction: A study of seven building projects.." Autom. Constr., 8 (6), 681-687.
-
(1999)
Autom. Constr.
, vol.8
, Issue.6
, pp. 681-687
-
-
Josephson, P.E.1
Hammarlund, Y.2
-
15
-
-
84986104505
-
Auditing the indirect consequences of rework in construction: A case based approach
-
Love, P. E. D. (2002a). " Auditing the indirect consequences of rework in construction: A case based approach.." Manage. Audit. J., 17 (3), 138-46.
-
(2002)
Manage. Audit. J.
, vol.17
, Issue.3
, pp. 138-46
-
-
Love, P.E.D.1
-
16
-
-
0042689966
-
Influence of project type and procurement method on rework costs in building construction projects
-
Love, P. E. D. (2002b). " Influence of project type and procurement method on rework costs in building construction projects.." J. Constr. Eng. Manage., 128 (1), 18-29.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.1
, pp. 18-29
-
-
Love, P.E.D.1
-
17
-
-
27944504058
-
Forensic project management: The underlying causes of rework in construction projects
-
Love, P. E. D., and Edwards, D. (2004). " Forensic project management: The underlying causes of rework in construction projects.." Civ. Eng. Environ. Syst., 12 (3), 207-228.
-
(2004)
Civ. Eng. Environ. Syst.
, vol.12
, Issue.3
, pp. 207-228
-
-
Love, P.E.D.1
Edwards, D.2
-
18
-
-
2542461920
-
Learning to reduce rework in projects: Analysis of firms learning and quality practices
-
".
-
Love, P. E. D., Irani, Z., and Edwards, D. (2003). " Learning to reduce rework in projects: Analysis of firms learning and quality practices.." Proj. Manage. J., 34 (3), 13-25.
-
(2003)
Proj. Manage. J.
, vol.34
, Issue.3
, pp. 13-25
-
-
Love, P.E.D.1
Irani, Z.2
Edwards, D.3
-
19
-
-
0000797825
-
Quantifying the causes and costs of rework in construction
-
Love, P. E. D., and Li, H. (2000). " Quantifying the causes and costs of rework in construction.." Constr. Manage. Econom., 18 (4), 479-490.
-
(2000)
Constr. Manage. Econom.
, vol.18
, Issue.4
, pp. 479-490
-
-
Love, P.E.D.1
Li, H.2
-
20
-
-
0033096295
-
Rework: A symptom of a dysfunctional supply-chain
-
".
-
Love, P. E. D., Li, H., and Mandal, P. (1999a). " Rework: A symptom of a dysfunctional supply-chain.." Eur. J. Purch. Supply Manage., 5 (1), 1-11.
-
(1999)
Eur. J. Purch. Supply Manage.
, vol.5
, Issue.1
, pp. 1-11
-
-
Love, P.E.D.1
Li, H.2
Mandal, P.3
-
21
-
-
0001187120
-
Determining the casual structure of rework influences in construction
-
".
-
Love, P. E. D., Mandal, P., and Li, H. (1999b). " Determining the casual structure of rework influences in construction.." Constr. Manage. Econom., 17 (4), 505-517.
-
(1999)
Constr. Manage. Econom.
, vol.17
, Issue.4
, pp. 505-517
-
-
Love, P.E.D.1
Mandal, P.2
Li, H.3
-
22
-
-
2142718584
-
Modeling the dynamics of design error induced rework in construction
-
".
-
Love, P. E. D., Mandal, P., and Smith, J. (2000). " Modeling the dynamics of design error induced rework in construction.." Constr. Manage. Econom., 18 (5), 567-574.
-
(2000)
Constr. Manage. Econom.
, vol.18
, Issue.5
, pp. 567-574
-
-
Love, P.E.D.1
Mandal, P.2
Smith, J.3
-
23
-
-
0022674213
-
Industrial project constructibility improvement
-
O'Conner, J. T., and Tucker, R. L. (1986). " Industrial project constructibility improvement.." J. Constr. Eng. Manage., 112 (1), 69-82.
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.1
, pp. 69-82
-
-
O'Conner, J.T.1
Tucker, R.L.2
|