Volumn 135, Issue 3, 2009, Pages 187-198

Measuring the impact of rework on construction cost performance

Author keywords

Construction costs; Construction industry; Construction management; Failures; Measurement; Performance characteristics

Indexed keywords

CONSTRUCTION COSTS; CONSTRUCTION MANAGEMENT; FAILURES; MEASUREMENT; PERFORMANCE CHARACTERISTICS;

EID: 60449091309     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2009)135:3(187)     Document Type: Article
Times cited : (266)

References (23)
  • 1
    • 0002444471 scopus 로고
    • The cost of non-conformance during a highway project: A case study
    • Abdul-Rahman, H. (1995). " The cost of non-conformance during a highway project: A case study.." Constr. Manage. Econom., 13 (1), 23-32.
    • (1995) Constr. Manage. Econom. , vol.13 , Issue.1 , pp. 23-32
    • Abdul-Rahman, H.1
  • 4
    • 0026837054 scopus 로고
    • Causes of quality deviations in design and construction
    • ".
    • Burati, J. L., Farrington, J. J., and Ledbetter, W. B. (1992). " Causes of quality deviations in design and construction.." J. Constr. Eng. Manage., 118 (1), 34-49.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.1 , pp. 34-49
    • Burati, J.L.1    Farrington, J.J.2    Ledbetter, W.B.3
  • 5
    • 84868894256 scopus 로고    scopus 로고
    • Bureau of Economic Analysis (BEA).. "." 〈〉 (Oct., 2006).
    • Bureau of Economic Analysis (BEA). (2006). " Gross domestic product by industry in current dollars.." 〈 http://bea.gov/bea/dn2/gdpbyind- data.htm 〉 (Oct. 20, 2006).
    • (2006) Gross Domestic Product by Industry in Current Dollars , vol.20
  • 7
    • 0003805578 scopus 로고
    • Construction Industry Institute (CII).. "." RS 10-1 (Jan.), The Univ. of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (1989). " Costs of quality deviations in design and construction.." RS 10-1 (Jan.), The Univ. of Texas at Austin, Austin, Tex.
    • (1989) Costs of Quality Deviations in Design and Construction
  • 8
    • 1642306374 scopus 로고    scopus 로고
    • Construction Industry Institute (CII).. "." RS 153-1 (May), The Univ. of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (2001). " The field rework index: Early warning for field rework and cost growth.." RS 153-1 (May), The Univ. of Texas at Austin, Austin, Tex.
    • (2001) The Field Rework Index: Early Warning for Field Rework and Cost Growth
  • 9
    • 60449120852 scopus 로고    scopus 로고
    • Construction Industry Institute (CII).. "." IR 166-3 (July), The Univ. of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (2002). " CII best practices guide.." IR 166-3 (July), The Univ. of Texas at Austin, Austin, Tex.
    • (2002) CII Best Practices Guide
  • 10
    • 23044454493 scopus 로고    scopus 로고
    • Construction Industry Institute (CII).. "." BMM 2003-4, CII, The Univ. of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (2003). " Benchmarking and metrics value of best practices report.." BMM 2003-4, CII, The Univ. of Texas at Austin, Austin, Tex.
    • (2003) Benchmarking and Metrics Value of Best Practices Report
  • 11
    • 60449114118 scopus 로고    scopus 로고
    • Construction Industry Institute (CII).. "." RS 203-1 (Nov.), The Univ. of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (2005). " Making zero rework A reality.." RS 203-1 (Nov.), The Univ. of Texas at Austin, Austin, Tex.
    • (2005) Making Zero Rework A Reality
  • 12
    • 84930774438 scopus 로고
    • Measuring design and construction quality costs
    • ".
    • Davis, K., Ledbetter, W. B., and Burati, J. L. (1989). " Measuring design and construction quality costs.." J. Constr. Eng. Manage., 115 (3), 385-400.
    • (1989) J. Constr. Eng. Manage. , vol.115 , Issue.3 , pp. 385-400
    • Davis, K.1    Ledbetter, W.B.2    Burati, J.L.3
  • 14
    • 0032593163 scopus 로고    scopus 로고
    • The causes and costs of defects in construction: A study of seven building projects
    • Josephson, P. E., and Hammarlund, Y. (1999). " The causes and costs of defects in construction: A study of seven building projects.." Autom. Constr., 8 (6), 681-687.
    • (1999) Autom. Constr. , vol.8 , Issue.6 , pp. 681-687
    • Josephson, P.E.1    Hammarlund, Y.2
  • 15
    • 84986104505 scopus 로고    scopus 로고
    • Auditing the indirect consequences of rework in construction: A case based approach
    • Love, P. E. D. (2002a). " Auditing the indirect consequences of rework in construction: A case based approach.." Manage. Audit. J., 17 (3), 138-46.
    • (2002) Manage. Audit. J. , vol.17 , Issue.3 , pp. 138-46
    • Love, P.E.D.1
  • 16
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • Love, P. E. D. (2002b). " Influence of project type and procurement method on rework costs in building construction projects.." J. Constr. Eng. Manage., 128 (1), 18-29.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.1 , pp. 18-29
    • Love, P.E.D.1
  • 17
    • 27944504058 scopus 로고    scopus 로고
    • Forensic project management: The underlying causes of rework in construction projects
    • Love, P. E. D., and Edwards, D. (2004). " Forensic project management: The underlying causes of rework in construction projects.." Civ. Eng. Environ. Syst., 12 (3), 207-228.
    • (2004) Civ. Eng. Environ. Syst. , vol.12 , Issue.3 , pp. 207-228
    • Love, P.E.D.1    Edwards, D.2
  • 18
    • 2542461920 scopus 로고    scopus 로고
    • Learning to reduce rework in projects: Analysis of firms learning and quality practices
    • ".
    • Love, P. E. D., Irani, Z., and Edwards, D. (2003). " Learning to reduce rework in projects: Analysis of firms learning and quality practices.." Proj. Manage. J., 34 (3), 13-25.
    • (2003) Proj. Manage. J. , vol.34 , Issue.3 , pp. 13-25
    • Love, P.E.D.1    Irani, Z.2    Edwards, D.3
  • 19
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • Love, P. E. D., and Li, H. (2000). " Quantifying the causes and costs of rework in construction.." Constr. Manage. Econom., 18 (4), 479-490.
    • (2000) Constr. Manage. Econom. , vol.18 , Issue.4 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 20
    • 0033096295 scopus 로고    scopus 로고
    • Rework: A symptom of a dysfunctional supply-chain
    • ".
    • Love, P. E. D., Li, H., and Mandal, P. (1999a). " Rework: A symptom of a dysfunctional supply-chain.." Eur. J. Purch. Supply Manage., 5 (1), 1-11.
    • (1999) Eur. J. Purch. Supply Manage. , vol.5 , Issue.1 , pp. 1-11
    • Love, P.E.D.1    Li, H.2    Mandal, P.3
  • 21
    • 0001187120 scopus 로고    scopus 로고
    • Determining the casual structure of rework influences in construction
    • ".
    • Love, P. E. D., Mandal, P., and Li, H. (1999b). " Determining the casual structure of rework influences in construction.." Constr. Manage. Econom., 17 (4), 505-517.
    • (1999) Constr. Manage. Econom. , vol.17 , Issue.4 , pp. 505-517
    • Love, P.E.D.1    Mandal, P.2    Li, H.3
  • 22
    • 2142718584 scopus 로고    scopus 로고
    • Modeling the dynamics of design error induced rework in construction
    • ".
    • Love, P. E. D., Mandal, P., and Smith, J. (2000). " Modeling the dynamics of design error induced rework in construction.." Constr. Manage. Econom., 18 (5), 567-574.
    • (2000) Constr. Manage. Econom. , vol.18 , Issue.5 , pp. 567-574
    • Love, P.E.D.1    Mandal, P.2    Smith, J.3
  • 23
    • 0022674213 scopus 로고
    • Industrial project constructibility improvement
    • O'Conner, J. T., and Tucker, R. L. (1986). " Industrial project constructibility improvement.." J. Constr. Eng. Manage., 112 (1), 69-82.
    • (1986) J. Constr. Eng. Manage. , vol.112 , Issue.1 , pp. 69-82
    • O'Conner, J.T.1    Tucker, R.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.