-
2
-
-
0003764618
-
-
Richard D. Irwin Inc., Homewood, Ill
-
Alreck, P. L., and Settle, R. B. (1985). The survey research handbook, Richard D. Irwin Inc., Homewood, Ill.
-
(1985)
The Survey Research Handbook
-
-
Alreck, P.L.1
Settle, R.B.2
-
3
-
-
0001326664
-
The cost of quality failures in major civil engineering projects
-
" 0265-671X, (),. 10.1108/02656710010298544
-
Barber, P., Sheath, D., Tomkins, C., and Graves, A. (2000). " The cost of quality failures in major civil engineering projects.." Int. J. Qual. Reliab. Manage. 0265-671X, 17 (4/5), 479-492. 10.1108/02656710010298544
-
(2000)
Int. J. Qual. Reliab. Manage.
, vol.17
, Issue.4-5
, pp. 479-492
-
-
Barber, P.1
Sheath, D.2
Tomkins, C.3
Graves, A.4
-
4
-
-
0026837054
-
Causes of quality deviations in design and construction
-
" 0733-9364, (),. 10.1061/(ASCE)0733-9364(1992)118:1(34)
-
Burati, J. L., Farrington, J. J., and Ledbetter, W. B. (1992). " Causes of quality deviations in design and construction.." J. Constr. Eng. Manage. 0733-9364, 118 (1), 34-49. 10.1061/(ASCE)0733-9364(1992)118:1(34)
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.1
, pp. 34-49
-
-
Burati, J.L.1
Farrington, J.J.2
Ledbetter, W.B.3
-
5
-
-
0009198824
-
-
Construction Industry Development Agency (CIDA).., Construction Industry Development Agency and Masters Builders Australia, Sydney, Australia
-
Construction Industry Development Agency (CIDA). (1995). Measuring up or muddling through: Best practice in the Australian non-residential construction industry, Construction Industry Development Agency and Masters Builders Australia, Sydney, Australia.
-
(1995)
Measuring Up or Muddling Through: Best Practice in the Australian Non-residential Construction Industry
-
-
-
6
-
-
33845945922
-
Coefficient alpha and the internal structure of tests
-
0033-3123,. 10.1007/BF02310555
-
Cronbach, L. J. (1951). " Coefficient alpha and the internal structure of tests.." Psychometrika 0033-3123, 16, 297-334. 10.1007/BF02310555
-
(1951)
Psychometrika
, vol.16
, pp. 297-334
-
-
Cronbach, L.J.1
-
7
-
-
0032593163
-
The causes and costs of defects in construction. A study of seven building projects
-
0926-5805, (),. 10.1016/S0926-5805(98)00114-9
-
Josephson, P. -E., and Hammarlund, Y. (1999). " The causes and costs of defects in construction. A study of seven building projects.." Autom. Constr. 0926-5805, 8 (6), 681-687. 10.1016/S0926-5805(98)00114-9
-
(1999)
Autom. Constr.
, vol.8
, Issue.6
, pp. 681-687
-
-
Josephson, P.-E.1
Hammarlund, Y.2
-
8
-
-
0042689966
-
Influence of project type and procurement method on rework costs in building construction projects
-
DOI 10.1061/(ASCE)0733-9364(2002)128:1(18)
-
Love, P. E. D. (2002). " Influence of project type and procurement method on rework costs in building construction projects.." J. Constr. Eng. Manage. 0733-9364, 128 (1), 18-29. 10.1061/(ASCE)0733-9364(2002)128:1(18) (Pubitemid 40264891)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.1
, pp. 18-29
-
-
Love, P.E.D.1
-
9
-
-
27944450797
-
Calculating total rework costs in Australian construction projects
-
DOI 10.1080/10286600500049904
-
Love, P. E. D., and Edwards, D. (2005). " Calculating total rework costs in Australian construction projects.." Civ. Eng. Environ. Syst. 1028-6628, 22 (1), 11-27. 10.1080/10286600500049904 (Pubitemid 41663392)
-
(2005)
Civil Engineering and Environmental Systems
, vol.22
, Issue.1
, pp. 11-27
-
-
Love, P.E.D.1
Edwards, D.J.2
-
10
-
-
68349117209
-
Project pathogens: The anatomy of omission errors in construction and resource engineering projects
-
" 0018-9391, (),. 10.1109/TEM.2008.927774
-
Love, P. E. D., Edwards, D. J., Irani, Z., and Walker, D. H. T. (2009). " Project pathogens: The anatomy of omission errors in construction and resource engineering projects.." IEEE Trans. Eng. Manage. 0018-9391, 56 (3), 425-435. 10.1109/TEM.2008.927774
-
(2009)
IEEE Trans. Eng. Manage.
, vol.56
, Issue.3
, pp. 425-435
-
-
Love, P.E.D.1
Edwards, D.J.2
Irani, Z.3
Walker, D.H.T.4
-
11
-
-
7944219517
-
A rework reduction model for construction projects
-
" 0018-9391, (),. 10.1109/TEM.2004.835092
-
Love, P. E. D., Irani, Z., and Edwards, D. J. (2004). " A rework reduction model for construction projects.." IEEE Trans. Eng. Manage. 0018-9391, 51 (4), 426-440. 10.1109/TEM.2004.835092
-
(2004)
IEEE Trans. Eng. Manage.
, vol.51
, Issue.4
, pp. 426-440
-
-
Love, P.E.D.1
Irani, Z.2
Edwards, D.J.3
-
12
-
-
0000797825
-
Quantifying the causes and costs of rework in construction
-
0144-6193, (),. 10.1080/01446190050024897
-
Love, P. E. D., and Li, H. (2000). " Quantifying the causes and costs of rework in construction.." Constr. Manage. Econom. 0144-6193, 18 (4), 479-490. 10.1080/01446190050024897
-
(2000)
Constr. Manage. Econom.
, vol.18
, Issue.4
, pp. 479-490
-
-
Love, P.E.D.1
Li, H.2
-
13
-
-
0036680986
-
Using systems dynamics to better understand change and rework in construction project management systems
-
DOI 10.1016/S0263-7863(01)00039-4, PII S0263786301000394
-
Love, P. E. D., Shen, L. Y., Li, H., Holt, G. D., and Irani, Z. (2002). " Using system dynamics to understand change and rework within construction project management systems.." Int. J. Proj. Manage. 0263-7863, 20 (6), 425-436. 10.1016/S0263-7863(01)00039-4 (Pubitemid 34490374)
-
(2002)
International Journal of Project Management
, vol.20
, Issue.6
, pp. 425-436
-
-
Love, P.E.D.1
Holt, G.D.2
Shen, L.Y.3
Li, H.4
Irani, Z.5
-
14
-
-
2642539100
-
Benchmarking, benchaction, and benchlearning: Rework mitigation in projects
-
DOI 10.1061/(ASCE)0742-597X(2003)19:4(147)
-
Love, P. E. D., and Smith, J. (2003). " Bench-marking, bench-action and bench-learning: Rework mitigation in projects.." J. Manage. Eng., 19 (4), 147-159. 10.1061/(ASCE)0742-597X(2003)19:4(147) (Pubitemid 40337158)
-
(2003)
Journal of Management in Engineering
, vol.19
, Issue.4
, pp. 147-159
-
-
Love, P.E.D.1
Smith, J.2
-
15
-
-
4244208223
-
-
Licentiate thesis, Div. of Construction Management and Economics, Dept. of Real Estate and Construction Management, Royal Institute of Technology, Stockholm, Sweden
-
Nyĺn, K. -O. (1996). " Cost of failure in a major civil engineering project.." Licentiate thesis, Div. of Construction Management and Economics, Dept. of Real Estate and Construction Management, Royal Institute of Technology, Stockholm, Sweden.
-
(1996)
Cost of Failure in A Major Civil Engineering Project
-
-
Nyĺn, K.-O.1
-
17
-
-
15844361911
-
Developing a standard methodology for measuring and classifying construction field rework
-
DOI 10.1139/L04-068
-
Robinson-Fayek, A., Dissanayake, M., and Campero, O. (2004). " Developing a standard methodology for measuring and classifying construction field rework.." Can. J. Civ. Eng. 0315-1468, 31 (6), 1077-1089. 10.1139/l04-068 (Pubitemid 40426909)
-
(2004)
Canadian Journal of Civil Engineering
, vol.31
, Issue.6
, pp. 1077-1089
-
-
Fayek, A.R.1
Dissanayake, M.2
Campero, O.3
-
18
-
-
0003976359
-
-
3rd Ed., Harper Collins, New York
-
Tabachnick, B., and Fidell, L. S. (1996). Using multivariate statistics, 3rd Ed., Harper Collins, New York.
-
(1996)
Using Multivariate Statistics
-
-
Tabachnick, B.1
Fidell, L.S.2
-
19
-
-
4143124331
-
Early warning signs of project changes
-
Construction Industry Institute, The University of Texas at Austin, Tex
-
Zeitoun, A., and Oberlander, G. (1993). " Early warning signs of project changes.." Source Document 91, Construction Industry Institute, The University of Texas at Austin, Tex.
-
(1993)
Source Document 91
-
-
Zeitoun, A.1
Oberlander, G.2
|