메뉴 건너뛰기




Volumn 136, Issue 3, 2010, Pages 275-282

Rework in civil infrastructure projects: Determination of cost predictors

Author keywords

Australia; Civil infrastructure; Construction costs; Cost predictors; Infrastructure; Rework; Stepwise regression

Indexed keywords

AUSTRALIA; CIVIL INFRASTRUCTURE; CIVIL INFRASTRUCTURES; CONTRACT VALUES; COST AND SCHEDULE; PREVENTIVE STRATEGIES; PROJECT COMPLEXITY; PROJECT COST; QUESTIONNAIRE SURVEYS; REGRESSION MODEL; REWORK COSTS; ROOT CAUSE; SIGNIFICANT FACTORS; STEPWISE MULTIPLE REGRESSION; STEPWISE REGRESSION; UNDERLYING FACTORS; WORKING PROCEDURE;

EID: 77149177666     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000136     Document Type: Article
Times cited : (125)

References (19)
  • 3
    • 0001326664 scopus 로고    scopus 로고
    • The cost of quality failures in major civil engineering projects
    • " 0265-671X, (),. 10.1108/02656710010298544
    • Barber, P., Sheath, D., Tomkins, C., and Graves, A. (2000). " The cost of quality failures in major civil engineering projects.." Int. J. Qual. Reliab. Manage. 0265-671X, 17 (4/5), 479-492. 10.1108/02656710010298544
    • (2000) Int. J. Qual. Reliab. Manage. , vol.17 , Issue.4-5 , pp. 479-492
    • Barber, P.1    Sheath, D.2    Tomkins, C.3    Graves, A.4
  • 4
    • 0026837054 scopus 로고
    • Causes of quality deviations in design and construction
    • " 0733-9364, (),. 10.1061/(ASCE)0733-9364(1992)118:1(34)
    • Burati, J. L., Farrington, J. J., and Ledbetter, W. B. (1992). " Causes of quality deviations in design and construction.." J. Constr. Eng. Manage. 0733-9364, 118 (1), 34-49. 10.1061/(ASCE)0733-9364(1992)118:1(34)
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.1 , pp. 34-49
    • Burati, J.L.1    Farrington, J.J.2    Ledbetter, W.B.3
  • 5
  • 6
    • 33845945922 scopus 로고
    • Coefficient alpha and the internal structure of tests
    • 0033-3123,. 10.1007/BF02310555
    • Cronbach, L. J. (1951). " Coefficient alpha and the internal structure of tests.." Psychometrika 0033-3123, 16, 297-334. 10.1007/BF02310555
    • (1951) Psychometrika , vol.16 , pp. 297-334
    • Cronbach, L.J.1
  • 7
    • 0032593163 scopus 로고    scopus 로고
    • The causes and costs of defects in construction. A study of seven building projects
    • 0926-5805, (),. 10.1016/S0926-5805(98)00114-9
    • Josephson, P. -E., and Hammarlund, Y. (1999). " The causes and costs of defects in construction. A study of seven building projects.." Autom. Constr. 0926-5805, 8 (6), 681-687. 10.1016/S0926-5805(98)00114-9
    • (1999) Autom. Constr. , vol.8 , Issue.6 , pp. 681-687
    • Josephson, P.-E.1    Hammarlund, Y.2
  • 8
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • DOI 10.1061/(ASCE)0733-9364(2002)128:1(18)
    • Love, P. E. D. (2002). " Influence of project type and procurement method on rework costs in building construction projects.." J. Constr. Eng. Manage. 0733-9364, 128 (1), 18-29. 10.1061/(ASCE)0733-9364(2002)128:1(18) (Pubitemid 40264891)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.1 , pp. 18-29
    • Love, P.E.D.1
  • 9
    • 27944450797 scopus 로고    scopus 로고
    • Calculating total rework costs in Australian construction projects
    • DOI 10.1080/10286600500049904
    • Love, P. E. D., and Edwards, D. (2005). " Calculating total rework costs in Australian construction projects.." Civ. Eng. Environ. Syst. 1028-6628, 22 (1), 11-27. 10.1080/10286600500049904 (Pubitemid 41663392)
    • (2005) Civil Engineering and Environmental Systems , vol.22 , Issue.1 , pp. 11-27
    • Love, P.E.D.1    Edwards, D.J.2
  • 10
    • 68349117209 scopus 로고    scopus 로고
    • Project pathogens: The anatomy of omission errors in construction and resource engineering projects
    • " 0018-9391, (),. 10.1109/TEM.2008.927774
    • Love, P. E. D., Edwards, D. J., Irani, Z., and Walker, D. H. T. (2009). " Project pathogens: The anatomy of omission errors in construction and resource engineering projects.." IEEE Trans. Eng. Manage. 0018-9391, 56 (3), 425-435. 10.1109/TEM.2008.927774
    • (2009) IEEE Trans. Eng. Manage. , vol.56 , Issue.3 , pp. 425-435
    • Love, P.E.D.1    Edwards, D.J.2    Irani, Z.3    Walker, D.H.T.4
  • 11
    • 7944219517 scopus 로고    scopus 로고
    • A rework reduction model for construction projects
    • " 0018-9391, (),. 10.1109/TEM.2004.835092
    • Love, P. E. D., Irani, Z., and Edwards, D. J. (2004). " A rework reduction model for construction projects.." IEEE Trans. Eng. Manage. 0018-9391, 51 (4), 426-440. 10.1109/TEM.2004.835092
    • (2004) IEEE Trans. Eng. Manage. , vol.51 , Issue.4 , pp. 426-440
    • Love, P.E.D.1    Irani, Z.2    Edwards, D.J.3
  • 12
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • 0144-6193, (),. 10.1080/01446190050024897
    • Love, P. E. D., and Li, H. (2000). " Quantifying the causes and costs of rework in construction.." Constr. Manage. Econom. 0144-6193, 18 (4), 479-490. 10.1080/01446190050024897
    • (2000) Constr. Manage. Econom. , vol.18 , Issue.4 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 13
    • 0036680986 scopus 로고    scopus 로고
    • Using systems dynamics to better understand change and rework in construction project management systems
    • DOI 10.1016/S0263-7863(01)00039-4, PII S0263786301000394
    • Love, P. E. D., Shen, L. Y., Li, H., Holt, G. D., and Irani, Z. (2002). " Using system dynamics to understand change and rework within construction project management systems.." Int. J. Proj. Manage. 0263-7863, 20 (6), 425-436. 10.1016/S0263-7863(01)00039-4 (Pubitemid 34490374)
    • (2002) International Journal of Project Management , vol.20 , Issue.6 , pp. 425-436
    • Love, P.E.D.1    Holt, G.D.2    Shen, L.Y.3    Li, H.4    Irani, Z.5
  • 14
    • 2642539100 scopus 로고    scopus 로고
    • Benchmarking, benchaction, and benchlearning: Rework mitigation in projects
    • DOI 10.1061/(ASCE)0742-597X(2003)19:4(147)
    • Love, P. E. D., and Smith, J. (2003). " Bench-marking, bench-action and bench-learning: Rework mitigation in projects.." J. Manage. Eng., 19 (4), 147-159. 10.1061/(ASCE)0742-597X(2003)19:4(147) (Pubitemid 40337158)
    • (2003) Journal of Management in Engineering , vol.19 , Issue.4 , pp. 147-159
    • Love, P.E.D.1    Smith, J.2
  • 15
    • 4244208223 scopus 로고    scopus 로고
    • Licentiate thesis, Div. of Construction Management and Economics, Dept. of Real Estate and Construction Management, Royal Institute of Technology, Stockholm, Sweden
    • Nyĺn, K. -O. (1996). " Cost of failure in a major civil engineering project.." Licentiate thesis, Div. of Construction Management and Economics, Dept. of Real Estate and Construction Management, Royal Institute of Technology, Stockholm, Sweden.
    • (1996) Cost of Failure in A Major Civil Engineering Project
    • Nyĺn, K.-O.1
  • 17
    • 15844361911 scopus 로고    scopus 로고
    • Developing a standard methodology for measuring and classifying construction field rework
    • DOI 10.1139/L04-068
    • Robinson-Fayek, A., Dissanayake, M., and Campero, O. (2004). " Developing a standard methodology for measuring and classifying construction field rework.." Can. J. Civ. Eng. 0315-1468, 31 (6), 1077-1089. 10.1139/l04-068 (Pubitemid 40426909)
    • (2004) Canadian Journal of Civil Engineering , vol.31 , Issue.6 , pp. 1077-1089
    • Fayek, A.R.1    Dissanayake, M.2    Campero, O.3
  • 19
    • 4143124331 scopus 로고
    • Early warning signs of project changes
    • Construction Industry Institute, The University of Texas at Austin, Tex
    • Zeitoun, A., and Oberlander, G. (1993). " Early warning signs of project changes.." Source Document 91, Construction Industry Institute, The University of Texas at Austin, Tex.
    • (1993) Source Document 91
    • Zeitoun, A.1    Oberlander, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.